CN111424614A - Rapid construction method for lining of small-sized section canal - Google Patents

Rapid construction method for lining of small-sized section canal Download PDF

Info

Publication number
CN111424614A
CN111424614A CN202010222764.0A CN202010222764A CN111424614A CN 111424614 A CN111424614 A CN 111424614A CN 202010222764 A CN202010222764 A CN 202010222764A CN 111424614 A CN111424614 A CN 111424614A
Authority
CN
China
Prior art keywords
lining
concrete
construction
channel
canal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010222764.0A
Other languages
Chinese (zh)
Inventor
王宏伟
朱飞
马龙
闻艳萍
刘子洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 11 Co Ltd
PowerChina 11th Bureau Engineering Co Ltd
Original Assignee
Sinohydro Bureau 11 Co Ltd
PowerChina 11th Bureau Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 11 Co Ltd, PowerChina 11th Bureau Engineering Co Ltd filed Critical Sinohydro Bureau 11 Co Ltd
Priority to CN202010222764.0A priority Critical patent/CN111424614A/en
Publication of CN111424614A publication Critical patent/CN111424614A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B5/00Artificial water canals, e.g. irrigation canals
    • E02B5/02Making or lining canals
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/22Improving land use; Improving water use or availability; Controlling erosion

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention belongs to the technical field of infrastructure engineering, and relates to a small-section canal lining rapid construction method, which comprises the following steps: the method has the advantages that the steps of lofting measurement, channel filling, channel excavation, cushion layer construction, channel lining, face collection maintenance and the like are performed, the construction progress is accelerated, the construction quality is improved, the construction cost is reduced, the construction progress and quality are improved, the construction cost is reduced, a plurality of procedures of template installation, manual leveling, vibration and face collection are completed at one time through the equipment, meanwhile, continuous construction is realized, the use of templates is eliminated from the material use consideration, wood is saved, and the waste of concrete is avoided in the continuous construction; the construction cross section is guaranteed to be consistent in size, and the problems of vibration leakage and the like cannot occur in the continuous concrete vibration.

Description

Rapid construction method for lining of small-sized section canal
Technical Field
The invention belongs to the technical field of infrastructure engineering, and relates to a method for quickly constructing a small-section canal lining.
Background
At present, two methods are mainly used for channel concrete lining construction: and (5) constructing a manual lining and a lining machine. The artificial lining comprises the processes of foundation surface treatment, template installation, concrete construction and form removal, and needs warehouse adjustment construction. The manual lining requires more manpower, consumes a large number of templates, and is wasted during construction in the last cabin of the shift. The construction quality is difficult to guarantee.
Disclosure of Invention
In order to solve the problems in the prior art, the invention provides a rapid construction method for a small-sized section canal lining.
In order to achieve the purpose, the invention adopts the following technical scheme: a lining rapid construction method for a small-sized section canal comprises the following steps:
(1) measuring and lofting:
measuring and lofting the plane position of the drainage ditch provided by a design drawing, defining a central positioning pile and a bottom slope boundary pile by using a total station or a theodolite, driving the central pile at the position of 50m interval, numbering, measuring pile point elevation by using a level gauge, determining the sideline of the drainage ditch according to the central line, and marking by using lime;
(2) channel filling:
the channel filling utilizes the nearby field grids to arrange and excavate earthwork, the earthwork is paved and filled according to a horizontal layer, and the parameters of the layering thickness and the compaction parameters are determined according to a field test; the filling soil is transported by a loader and a backhoe excavator, and is spread by manual cooperation, the compaction of the earthwork is carried out by the backhoe excavator and a hand-held vibrating plate compactor, the compaction direction is parallel to the axis of the ditch, the filling of the ditch bank avoids filling along the slope, and the adjacent working faces are connected by inclined planes;
(3) channel excavation:
the channel excavation is formed by adopting CAT220 back-shovel excavator one-step excavation, and the side slope of the ditch and the channel is trimmed by manual cooperation at the part with poor local soil condition;
(4) cushion layer construction:
a 5cm sand-gravel cushion layer is arranged at the bottom of the channel, sand-gravel is conveyed to a construction position through a tricycle, manually conveyed to the bottom of the channel, paved, leveled and compacted;
(5) canal lining:
the canal lining adopts a lining machine for concrete pouring, a mechanical lining part is not provided, manual lining is adopted, concrete is intensively mixed, and a tricycle is transported to the vicinity of an operation surface; the lining machine selects a self-propelled trapezoidal canal lining machine;
(6) dough collection and maintenance:
after the lining machine passes, carry out artifical press polish to partial channel surface and receive the face, receive the face job requirement and accomplish that the surface is level and smooth, no stone leaks outward, no honeycomb pitted surface, reach closely knit, level and smooth requirement, if the local appearance is few thick liquid, the honeycomb, pitted surface can mix the local thick liquid of wrapping up in high-grade mortar, press polish with the steel trowel.
Curing the concrete 18-24 h after pouring, manufacturing a U-shaped framework by adopting a mulching film covering method for curing, fixing the framework on two sides of the channel, covering plastic films on the framework to form a closed space, and properly sprinkling water on the surface according to the actual air temperature.
When the lining machine works, a backhoe excavator is matched with manpower to continuously load the mixed concrete into the feeding hole, the vibration equipment works simultaneously, and the lining section of the canal is formed at one time.
The lining machine keeps constant-speed continuous work, the walking speed is controlled to be about 1m/min, the adjustment is carried out by combining the actual situation on site, and the vibrating effect is ensured.
The working condition of the lining trolley vibrating device is required to be frequently checked in the lining process, if the phenomena of exposed stones, honeycombs and pitted surfaces appear on the concrete surface after lining is found, the lining trolley needs to be supplemented and vibrated again to prevent leakage vibration, when the materials are congested, manual leveling is required, sufficient concrete mixture is required to be kept in front of a vibrating box of the lining machine, and the material level is 2-3 cm higher than the bottom surface of the vibrating box.
During construction, a plurality of iron sheets are prepared beside the channel, concrete is stacked to ensure the purity of the concrete, and the loss and waste of the concrete can be avoided.
Before lining, if the canal bed is dry and soil rises, water should be sprayed and wetted so as to avoid fine cracks on the surface of the poured concrete slab due to excessive water loss.
Compared with the prior art, the invention has the beneficial effects that: the invention accelerates the construction progress, improves the construction quality, reduces the construction cost, improves the construction progress and quality, reduces the construction cost, completes a plurality of procedures of template installation, manual leveling, vibration and surface folding at one time through the equipment, simultaneously realizes continuous construction, cancels the use of the template from the material use consideration, saves wood, and avoids the waste of concrete in the continuous construction; the construction cross section is guaranteed to be consistent in size, and the problems of vibration leakage and the like cannot occur in the continuous concrete vibration.
Detailed Description
The present invention will be described in further detail with reference to the following examples, which are provided only for illustrating the present invention and are not intended to limit the scope of the present invention.
Example (b): a lining rapid construction method for a small-sized section canal comprises the following steps:
(1) measuring and lofting:
measuring and lofting the plane position of the drainage ditch provided by a design drawing, defining a central positioning pile and a bottom slope boundary pile by using a total station or a theodolite, driving the central pile (the piles are nailed at the bent positions at intervals of 5 m) at intervals of 50m, numbering, measuring the elevation of a pile point by using a leveling instrument, determining the side line of the drainage ditch according to the central line, and marking by using lime;
(2) channel filling
The channel filling utilizes the nearby field grids to arrange and excavate earthwork, the earthwork is paved and filled according to a horizontal layer, and the parameters of the layering thickness and the compaction parameters are determined according to a field test; the filling soil is mainly transported by a loader and a backhoe excavator and spread by manual cooperation. Because the filling section is smaller, the earthwork compaction is mainly carried out by adopting a backhoe excavator and a hand-held vibrating plate compactor, the compacting direction is parallel to the axis of the ditch, the filling of the ditch bank avoids the filling along the slope, and the adjacent working surfaces are connected by adopting an inclined plane;
(3) channel excavation
The channel excavation adopts CAT220 backhoe excavator one-time excavation molding, in order to carry out the excavation of the trapezoid cross section of the ditch and the ditch with high quality, a steel plate which is consistent with the shape of the ditch body is customized and welded with the backhoe excavator bucket to realize the one-time excavation molding, the shape of the cross section of the steel plate is consistent with the shape of the cross section of the ditch, the edge of the steel plate facing the retreating movement direction of the backhoe excavator is provided with a knife edge-shaped structure, and the part with poor local soil condition is manually matched to carry out the trimming of;
(4) bedding construction
A 5cm sand-gravel cushion layer is arranged at the bottom of the channel, sand-gravel is conveyed to a construction position through a tricycle, manually conveyed to the bottom of the channel, paved, leveled and compacted;
(5) canal lining
The canal lining adopts a lining machine for concrete pouring, a mechanical lining part is not provided, manual lining is adopted, concrete is intensively mixed, and a tricycle (a crawler-type transport vehicle or a four-wheel-drive concrete transport vehicle) is transported to the position near the working surface; the lining machine is a self-advancing type trapezoidal channel lining machine which is provided with a walking vehicle, and a feeding device, a trapezoidal die, an extrusion device matched with the trapezoidal die and a joint cutting device are arranged on an equipment frame. When the lining machine works, the lining machine is placed in the ditch. The concrete is fed into the ditch by the feeding device and distributed along the inner wall of the ditch, the trapezoidal pressure head of the extruding device moves to push the concrete into a trapezoidal cavity formed by the trapezoidal die and the inner wall of the ditch for extrusion forming, and the expansion joint is completed by the joint cutting device.
(6) Harvesting and maintaining
After the lining machine passes, carry out artifical press polish to partial channel surface and receive the face, receive the face job requirement and accomplish that the surface is level and smooth, no stone leaks outward, no honeycomb pitted surface, reach closely knit, level and smooth requirement, if the local appearance is few thick liquid, the honeycomb, pitted surface can mix the local thick liquid of wrapping up in high-grade mortar, press polish with the steel trowel.
Curing the concrete 18-24 h after pouring, manufacturing a U-shaped framework by adopting a mulching film covering method for curing, fixing the framework on two sides of the channel, covering plastic films on the framework to form a closed space, and properly sprinkling water on the surface according to the actual air temperature.
When the lining machine works, a backhoe excavator is matched with manpower to continuously load the mixed concrete into the feeding hole, the vibration equipment works simultaneously, and the lining section of the canal is formed at one time.
The lining machine keeps constant-speed continuous work, the walking speed is controlled to be about 1m/min, the adjustment is carried out by combining the actual situation on site, and the vibrating effect is ensured.
The lining machine has the joint cutting function, and joint cutting is directly completed when mixed soil is poured.
The working condition of the lining trolley vibrating device is required to be frequently checked in the lining process, if the phenomena of exposed stones, honeycombs and pitted surfaces appear on the concrete surface after lining is found, the lining trolley needs to be supplemented and vibrated again to prevent leakage vibration, when the materials are congested, manual leveling is required, sufficient concrete mixture is required to be kept in front of a vibrating box of the lining machine, and the material level is 2-3 cm higher than the bottom surface of the vibrating box.
During construction, a plurality of iron sheets are prepared beside the channel, concrete is stacked to ensure the purity of the concrete, and the loss and waste of the concrete can be avoided.
Before lining, if the canal bed is dry and soil rises, water should be sprayed and wetted so as to avoid fine cracks on the surface of the poured concrete slab due to excessive water loss.
The foregoing is directed to preferred embodiments of the present invention, other and further embodiments of the invention may be devised without departing from the basic scope thereof, and the scope thereof is determined by the claims that follow. However, any simple modification, equivalent change and modification of the above embodiments according to the technical essence of the present invention are within the protection scope of the technical solution of the present invention.

Claims (7)

1. A method for quickly constructing a lining of a small-sized section canal is characterized by comprising the following steps:
(1) measuring and lofting:
measuring and lofting the plane position of the drainage ditch provided by a design drawing, defining a central positioning pile and a bottom slope boundary pile by using a total station or a theodolite, driving the central pile at the position of 50m interval, numbering, measuring pile point elevation by using a level gauge, determining the sideline of the drainage ditch according to the central line, and marking by using lime;
(2) channel filling:
the channel filling utilizes the nearby field grids to arrange and excavate earthwork, the earthwork is paved and filled according to a horizontal layer, and the parameters of the layering thickness and the compaction parameters are determined according to a field test; the filling soil is transported by a loader and a backhoe excavator, and is spread by manual cooperation, the compaction of the earthwork is carried out by the backhoe excavator and a hand-held vibrating plate compactor, the compaction direction is parallel to the axis of the ditch, the filling of the ditch bank avoids filling along the slope, and the adjacent working faces are connected by inclined planes;
(3) channel excavation:
the channel excavation is formed by adopting CAT220 back-shovel excavator one-step excavation, and the side slope of the ditch and the channel is trimmed by manual cooperation at the part with poor local soil condition;
(4) cushion layer construction:
a 5cm sand-gravel cushion layer is arranged at the bottom of the channel, sand-gravel is conveyed to a construction position through a tricycle, manually conveyed to the bottom of the channel, paved, leveled and compacted;
(5) canal lining:
the canal lining adopts a lining machine for concrete pouring, a mechanical lining part is not provided, manual lining is adopted, concrete is intensively mixed, and a tricycle is transported to the vicinity of an operation surface; the lining machine selects a self-propelled trapezoidal canal lining machine;
(6) dough collection and maintenance:
after the lining machine passes, carry out artifical press polish to partial channel surface and receive the face, receive the face job requirement and accomplish that the surface is level and smooth, no stone leaks outward, no honeycomb pitted surface, reach closely knit, level and smooth requirement, if the local appearance is few thick liquid, the honeycomb, pitted surface can mix the local thick liquid of wrapping up in high-grade mortar, press polish with the steel trowel.
2. The method for rapid construction of the channel lining of the small-sized section according to claim 1, wherein the concrete is cured 18 to 24 hours after pouring, the curing is performed by a method of mulching, a U-shaped framework is manufactured and fixed on both sides of the channel, plastic films are covered on the framework to form a closed space, and the surface is sprayed with water properly according to the actual air temperature.
3. The method of claim 2, wherein the lining machine is operated by continuously feeding the mixed concrete into the feed port by a backhoe excavator in cooperation with manual work, and the vibrating device is operated simultaneously to form the lining section of the canal in one step.
4. The lining rapid construction method of a small-sized cross-section canal according to claim 1, characterized in that the lining machine keeps constant speed continuous operation, the walking speed is controlled at about 1m/min, and the adjustment is carried out in combination with the actual situation on site to ensure the vibrating effect.
5. The method as claimed in claim 4, wherein the lining trolley is used for checking the operation of the vibrating device of the lining trolley during lining, if the phenomena of exposed stones, honeycombs and pitted surfaces appear on the concrete surface after lining, the concrete is supplemented and vibrated again to prevent leakage, and when the clogging occurs, the concrete is leveled manually, and sufficient concrete mixture is kept in front of the vibrating box of the lining machine, and the material level is 2-3 cm higher than the bottom surface of the vibrating box.
6. The method of claim 4, wherein a plurality of sheets of iron are prepared beside the canal during construction, and concrete is piled to ensure the purity of the concrete and avoid the loss and waste of the concrete.
7. The method for lining a small-sized cross-section canal of claim 4, wherein if the canal bed is dry and earthed before lining, the surface of the cast concrete slab should be wetted by spraying water to avoid fine cracks due to excessive loss of water.
CN202010222764.0A 2020-03-26 2020-03-26 Rapid construction method for lining of small-sized section canal Pending CN111424614A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010222764.0A CN111424614A (en) 2020-03-26 2020-03-26 Rapid construction method for lining of small-sized section canal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010222764.0A CN111424614A (en) 2020-03-26 2020-03-26 Rapid construction method for lining of small-sized section canal

Publications (1)

Publication Number Publication Date
CN111424614A true CN111424614A (en) 2020-07-17

Family

ID=71548876

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010222764.0A Pending CN111424614A (en) 2020-03-26 2020-03-26 Rapid construction method for lining of small-sized section canal

Country Status (1)

Country Link
CN (1) CN111424614A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114293515A (en) * 2021-12-31 2022-04-08 广东中都建筑集团有限公司 One-step forming construction method for cast-in-situ water channel of rolling type forming machine

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869152A (en) * 2017-03-31 2017-06-20 中国水利水电第十工程局有限公司 A kind of phreatic high chiltern canal slope is changed and is filled out from row's drainage system construction method
CN110485377A (en) * 2019-07-16 2019-11-22 中电建十一局工程有限公司 A kind of light section canal lining construction method
CN110485231A (en) * 2019-09-12 2019-11-22 蓝海建设集团有限公司 A kind of rainy season roadbed earthwork engineering construction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869152A (en) * 2017-03-31 2017-06-20 中国水利水电第十工程局有限公司 A kind of phreatic high chiltern canal slope is changed and is filled out from row's drainage system construction method
CN110485377A (en) * 2019-07-16 2019-11-22 中电建十一局工程有限公司 A kind of light section canal lining construction method
CN110485231A (en) * 2019-09-12 2019-11-22 蓝海建设集团有限公司 A kind of rainy season roadbed earthwork engineering construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114293515A (en) * 2021-12-31 2022-04-08 广东中都建筑集团有限公司 One-step forming construction method for cast-in-situ water channel of rolling type forming machine

Similar Documents

Publication Publication Date Title
CN110761316B (en) Prefabricated foundation ring beam prefabricating method and storage tank construction method applying prefabricated foundation ring beam prefabricating method
CN110485377A (en) A kind of light section canal lining construction method
CN106759126B (en) Construction method of side slope support drainage channel
CN112031374A (en) Construction method of basement large-area terrace
CN111778941A (en) High-standard farmland channel construction method and structure
CN107988852A (en) The construction method of III plate-type non-fragment orbit new structures of tunnel location CRTS
CN105951842B (en) Reversed beam styrofoam fetal membrane construction method under raft plate
CN109537582B (en) Construction method for CFG pile front cut pile head and earth mould pouring pile cap
CN111424614A (en) Rapid construction method for lining of small-sized section canal
CN114508011A (en) Pile-supported soft soil roadbed reinforcing structure and method
CN111074852B (en) Channel lining concrete cast-in-place method and nonlinear channel lining construction method
CN107137913B (en) The construction technology in tennis court and tennis court
CN111608248A (en) Cast-in-situ rainwater cover plate channel construction method
CN109881699A (en) The concrete moulding bed fabrication and installation method of the general raft foundation of assembled tongue and groove Miller type
CN114837038A (en) Construction method of barrier pedestrian path permeable base layer by adopting paver
CN114809000A (en) Rapid construction method of prefabricated plate brick moulding bed
CN112900455A (en) Construction method for burying super-thick landscape table ceramsite and polystyrene board
CN114457846A (en) Road station main body structure construction method
CN108532985B (en) Construction method of foundation beam plate
CN113174904A (en) Construction method for ecological landscape open channel for downward seepage and stagnation storage in sponge city
CN109868700A (en) A kind of highway engineering construction soft groundsill reinforcing equipment and reinforcement means
CN111236170A (en) Quick construction method for buried rock concrete gravity dam
CN110387938A (en) Indoor drainage ditch construction technology
CN221142520U (en) Cover plate auxiliary road culvert structure
CN218621627U (en) Netted cavernosum curved surface type inlays solid formula grass planting chamber concrete terrace structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200717

RJ01 Rejection of invention patent application after publication