CN111401729A - Newly-increased black start unit distribution point determining method and system - Google Patents

Newly-increased black start unit distribution point determining method and system Download PDF

Info

Publication number
CN111401729A
CN111401729A CN202010172111.6A CN202010172111A CN111401729A CN 111401729 A CN111401729 A CN 111401729A CN 202010172111 A CN202010172111 A CN 202010172111A CN 111401729 A CN111401729 A CN 111401729A
Authority
CN
China
Prior art keywords
black
start unit
unit
scheme
black start
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010172111.6A
Other languages
Chinese (zh)
Inventor
朱海南
张同军
王中刚
王涛
李***
王琰
张锴
孙华忠
王娟娟
薛云霞
李宗璇
宋静
刘明
刘堃
陈兵兵
金峰
刘传良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Weifang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Weifang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Weifang Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN202010172111.6A priority Critical patent/CN111401729A/en
Publication of CN111401729A publication Critical patent/CN111401729A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention provides a method and a system for determining the distribution points of a newly-added black start unit, which comprise the following steps: acquiring topological information of the networking of the existing black starter as an initial topology; acquiring the capacity and the average reactance of a black start unit of an initial topology, and calculating the initial stiffness of the initial topology according to the capacity and the average reactance of the black start unit; calculating the target stiffness of the networking topology of the target black starter of the scheme added by the black starter set to be selected; respectively calculating the strength difference value of the target strength and the initial strength of each black start unit increasing scheme to be selected; and respectively calculating the ratio of the strength difference value of each black-start unit increasing scheme to be selected to the corresponding investment cost, and selecting the black-start unit increasing scheme to be selected with the largest ratio as an execution scheme. The method for determining the layout of the newly blackened starting unit, which is provided by the invention, provides a quantitative calculation means for determining the layout of the blackened starting unit, so that the layout selection is more scientific and reasonable.

Description

Newly-increased black start unit distribution point determining method and system
Technical Field
The invention relates to the technical field of black start, in particular to a method and a system for determining the distribution points of a newly added black start unit.
Background
With the rapid development of the economic society, the installed capacity and the load of the power system are continuously new and high; and the ultra-high voltage alternating current and direct current transmission is rapidly developed, large-scale wind power generation, photovoltaic power generation and micro-grid are connected to a power grid in a large quantity, the dynamic characteristics of the whole power system are greatly changed, and the operating point of the power system is closer to the stable limit point of the power system. In such cases, the risk of a major power outage in the system due to a power failure or improper operation is increasing.
After a power system has a major power failure accident, economic and social influences brought by the power system have great relevance to power failure time, and the longer the power failure time is, the greater the system recovery difficulty is, and the greater the loss is. The recovery process after the power failure accident of the system comprises three stages of black start, net rack recovery and load recovery, wherein the black start stage is the basis of the whole recovery process, and the importance of the black start stage is self-evident. In the black start phase, the number and distribution of black start units are very important influencing factors. The proper black start unit distribution can greatly accelerate the recovery process in the black start stage, thereby shortening the system recovery time.
In order to improve the recovery speed of the system after a power failure accident, a black start unit is required to be additionally arranged in the system, the research on new black start distribution is still in a starting stage, the distribution of the new black start unit is mostly determined by depending on the operation experience, and a quantitative analysis means and a quantitative analysis method are lacked. Therefore, research needs to be carried out on the distribution point for determining the newly added black start unit, and a quantitative analysis method is provided.
Disclosure of Invention
Aiming at the defects in the prior art, the invention provides a method and a system for determining the distribution points of a newly-added black start unit, so as to solve the technical problems.
In a first aspect, the present invention provides a method for determining a point distribution of a newly added black start unit, including:
acquiring topological information of the networking of the existing black starter as an initial topology;
acquiring the capacity and the average reactance of a black start unit of an initial topology, and calculating the initial stiffness of the initial topology according to the capacity and the average reactance of the black start unit;
calculating the target stiffness of the networking topology of the target black starter of the scheme added by the black starter set to be selected;
respectively calculating the strength difference value of the target strength and the initial strength of each black start unit increasing scheme to be selected;
and respectively calculating the ratio of the strength difference value of each black-start unit increasing scheme to be selected to the corresponding investment cost, and selecting the black-start unit increasing scheme to be selected with the largest ratio as an execution scheme.
Further, the acquiring topology information of the existing black starter networking as an initial topology includes:
acquiring sites of available black start units in a power grid system, the number of the black start units, the capacity of the black start units and the start sequence of the black start units contained in the sites;
acquiring a connection topological relation of an available black start unit of a power grid system and reactance of a connection circuit;
and generating a connection matrix of the available black start unit of the power grid system according to the connection line and the reactance of the connection line of the available black start unit.
Further, the acquiring black-start unit capacity and average reactance of the initial topology, and calculating initial stiffness of the initial topology according to the black-start unit capacity and the average reactance include:
calculating the weighted capacity sum of the black start unit of the power grid according to the capacity and the start sequence of the black start unit;
taking the quotient of the weighted capacity sum of the black start unit and a preset reference capacity as the weighted capacity sum per unit value of the black start unit;
calculating an average reactance per unit value according to the total length of the connection circuit of the power grid available black start unit and the total reactance per unit value of the bus circuit;
and taking the quotient of the weighted capacity and the per-unit value of the black-start unit and the per-unit value of the average reactance as the initial stiffness.
Further, the calculating the target stiffness of the target black-start engine networking topology of the black-start unit addition scheme to be selected includes:
setting a plurality of black start unit adding schemes to be selected, wherein the black start unit adding schemes to be selected comprise positions of newly added stations;
and constructing a target black-start unit networking topology on the basis of the initial topology according to the positions of the newly added stations of the black-start unit adding scheme to be selected.
Further, the method further includes the steps of calculating the ratio of the strength difference value of each black-start unit increase scheme to be selected to the corresponding investment cost, and selecting the black-start unit increase scheme to be selected with the largest ratio as an execution scheme, wherein the method further includes the following steps:
and acquiring the investment cost of the newly added station of the increase scheme of the black start unit to be selected to obtain the investment cost of the increase scheme of the black start unit to be selected.
In a second aspect, the present invention provides a new black start unit distribution determining system, including:
the topology acquisition unit is configured to acquire topology information of the existing black starter networking as an initial topology;
the initial calculation unit is configured for acquiring the capacity and the average reactance of a black start unit of an initial topology, and calculating the initial stiffness of the initial topology according to the capacity and the average reactance of the black start unit;
the target calculation unit is configured for calculating the target stiffness of the networking topology of the target black starter of the black starter unit addition scheme to be selected;
the difference value calculating unit is configured to calculate the strength difference value between the target strength and the initial strength of each black start unit increasing scheme to be selected respectively;
and the target determining unit is configured to calculate the ratio of the strength difference value of each black-start unit increasing scheme to be selected to the corresponding investment cost respectively, and select the black-start unit increasing scheme to be selected with the largest ratio as an execution scheme.
Further, the topology acquisition unit includes:
the system comprises an information acquisition module, a data acquisition module and a data processing module, wherein the information acquisition module is configured to acquire sites of an available black start unit in a power grid system, the number of the black start units contained in the sites, the capacity of the black start units and the start sequence of the black start units;
the reactance obtaining module is configured to obtain a connection topological relation of the black start unit of the power grid system and reactance of a connection circuit;
and the matrix establishing module is configured for generating a connection matrix of the available black start unit of the power grid system according to the connection line and the reactance of the connection line of the available black start unit.
Further, the initial calculation unit includes:
the capacity summation module is configured for calculating the weighted capacity sum of the black start units of the power grid according to the capacity of the black start units and the start sequence;
the summation conversion module is configured to take the quotient of the weighted capacity sum of the black start unit and a preset reference capacity as the weighted capacity sum per unit value of the black start unit;
the reactance averaging module is configured for calculating an average reactance per unit value according to the total length of the connecting lines of the power grid available black start unit and the per unit value of the total line reactance;
and the quotient value calculation module is configured to take the quotient of the weighted capacity and the per-unit value of the black-start unit and the per-unit value of the average reactance as the initial stiffness.
Further, the target calculation unit includes:
the system comprises a scheme setting module, a selection module and a selection module, wherein the scheme setting module is configured to set a plurality of black-start unit increasing schemes to be selected, and the black-start unit increasing schemes to be selected comprise positions of newly added stations;
and the target construction module is configured and used for constructing a target black-start unit networking topology on the basis of the initial topology according to the positions of the newly added stations of the black-start unit adding scheme to be selected.
Further, the system further comprises:
and the investment acquisition module is configured for acquiring the investment cost of the newly added station of the increase scheme of the black start unit to be selected, so as to obtain the investment cost of the increase scheme of the black start unit to be selected.
In a third aspect, a terminal is provided, including:
a processor, a memory, wherein,
the memory is used for storing a computer program which,
the processor is used for calling and running the computer program from the memory so as to make the terminal execute the method of the terminal.
In a fourth aspect, a computer storage medium is provided having stored therein instructions that, when executed on a computer, cause the computer to perform the method of the above aspects.
The beneficial effect of the invention is that,
the invention provides a method and a system for determining the distribution points of newly added black start units, which provides a strength index of a network containing the black start units, then calculates the change of the strength index of the network after the newly added black start units are arranged at different sites and the investment caused by the newly added black start units at different sites respectively, and establishes a method for determining the distribution points of the black start units. The method for determining the layout of the newly blackened starting unit, which is provided by the invention, provides a quantitative calculation means for determining the layout of the blackened starting unit, so that the layout selection is more scientific and reasonable. According to the method, the influence of the black start unit and the grid structure on the capability of recovering to the original state after the power grid is greatly disturbed is evaluated through the index of the hardness strength of the power grid, and a means is provided for quantitatively analyzing the benefit of the new black start unit. Meanwhile, the factor that the investment required by newly adding black start units at different sites is different is considered, so that the calculation result is more reasonable.
In addition, the invention has reliable design principle, simple structure and very wide application prospect.
Drawings
In order to more clearly illustrate the embodiments or technical solutions in the prior art of the present invention, the drawings used in the description of the embodiments or prior art will be briefly described below, and it is obvious for those skilled in the art that other drawings can be obtained based on these drawings without creative efforts.
FIG. 1 is a schematic flow diagram of a method of one embodiment of the invention.
Fig. 2 is a modified IEEE30 node system architecture diagram of the method of one embodiment of the present invention.
FIG. 3 is a schematic block diagram of a system of one embodiment of the present invention.
Detailed Description
In order to make those skilled in the art better understand the technical solution of the present invention, the technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the drawings in the embodiment of the present invention, and it is obvious that the described embodiment is only a part of the embodiment of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
FIG. 1 is a schematic flow diagram of a method of one embodiment of the invention. The execution subject in fig. 1 may be a distribution point determination system for a new blacking start unit.
As shown in fig. 1, the method 100 includes:
step 110, acquiring topology information of the networking of the existing black starter as an initial topology;
step 120, collecting the capacity and the average reactance of a black start unit of an initial topology, and calculating the initial stiffness of the initial topology according to the capacity and the average reactance of the black start unit;
step 130, calculating the target stiffness of the networking topology of the target black starter of the black starter unit adding scheme to be selected;
step 140, respectively calculating a hardness difference value between the target hardness and the initial hardness of each black start unit increasing scheme to be selected;
and 150, respectively calculating the ratio of the strength difference value of each black-start unit increasing scheme to be selected to the corresponding investment cost, and selecting the black-start unit increasing scheme to be selected with the largest ratio as an execution scheme.
In order to facilitate understanding of the present invention, the method for determining the distribution point of the newly added black start unit provided by the present invention is further described below by using the principle of the method for determining the distribution point of the newly added black start unit of the present invention and combining the process of determining the distribution point of the newly added black start unit in the embodiment.
Specifically, the method for determining the distribution point of the newly added black start unit comprises the following steps:
simulation calculation is performed by taking a modified IEEE30 node system as an example, and a calculation flow considering the power grid resilience of the black start process is described. A modified IEEE30 node system architecture is shown in fig. 2. Wherein the power plant located at node 1 comprises 3 black start units, and the power plant located at node 25 comprises 2 black start units, and the unit capacities and corresponding unit start sequences are shown in table 1.
TABLE 1 Black Start Unit Capacity and Start sequence
Figure BDA0002409543120000071
The modified IEEE30 node system contains 41 lines in total, and the line reactance is shown in table 2.
TABLE 2 IEEE30 System line parameters
Figure BDA0002409543120000081
According to the proposed calculation method for the power grid restoring force considering the black start process, the specific steps of calculating the power grid restoring force after the major power failure accident of the IEEE30 node system are as follows:
s1: analyzing the network structure of the power grid, acquiring data used for calculation, and establishing a weighted network connection matrix M corresponding to the system;
calculating the used data including the power plant with the available black start unit in the system, the number and the capacity of the available black start units contained in the power plant and the starting sequence of each black start unit; the topological relation of the available transmission lines in the system and the corresponding line parameters. The weighted network connection matrix M corresponding to the system is a square matrix, and the number of rows and columns is equal to the number of available station nodes in the system. When nodes i and i in the systemThere are available crossovers l between nodes jijAnd line lijPer unit value of line reactance of xijThen connect the elements M in the matrix Mij=Mji=xij(ii) a On the contrary, if there is no available tie line between node i and node j in the system, Mij=Mji0. For a system with n sites, the corresponding connection matrix M is of the form as follows.
Figure BDA0002409543120000091
In the formula, for an arbitrary element MijAnd MjiIn the presence of Mij=Mji
Calculating line lijPer unit value x of line reactance ofijTime, reference value SBTaken as 100MVA, UBAnd taking the standard voltage of each voltage class.
In the modified IEEE30 node system, the power plant containing units on node 1 and node 25 are black start units, and the corresponding unit capacities and start priorities are shown in table 1. The units in the power plants on the nodes 2,13,22,23 and 27 have no self-starting capability and are the units to be recovered. The voltage class of the IEEE30 node system is 220 kV.
In this step, the IEEE30 node system is analyzed, and various data required in the calculation process can be acquired, as shown in tables 1 and 2. And establishing a connection matrix M corresponding to the IEEE30 node system according to the topological structure of the IEEE30 node system and the per unit value of each line reactance.
S2: calculating the strength Str of the network before the newly-added black start unit1
The robustness of a network is defined as the ability of the network to quickly recover from an initial operational state after an attack. In the case of a power system, the strength means that the power system can be quickly restored to the initial state after a large-scale power failure accident. After a large-scale power failure occurs to the power system, the process of recovering the power system to the initial state comprises three stages: black start, net rack reconstruction and load recovery. The black start stage is to provide starting power for other units and recover part of important loads after the unit with the black start capability is quickly started. The capacity of the black-start unit represents the capability of the system in the initial recovery stage, and the larger the capacity of the black-start unit is, the stronger the recovery capability is represented, and the higher the robustness of the system is. The system recovery process is essentially a process of timely re-transmitting electric power from the black-start unit to the rest stations in the system, and the tighter the structure of the whole system is, the smaller the difficulty of power supply re-recovery is, and the higher the robustness of the system is.
Weighted sum of black start units in the power plant on node 1
Figure BDA0002409543120000101
Weighted sum of black start units in a power plant on node 25
Figure BDA0002409543120000102
Thus, the weighted capacity sum P of all available black start units in each power plant in the systemblackAs follows
Pblack=153.33
PblackCorresponding per unit value of
Figure BDA0002409543120000103
Since there are 41 lines in the IEEE30 node system, the number of elements other than 0 in the network weight matrix M is 82, that is, the sum of all elements other than 0 in L ═ 82. M is shown in the following formula
sum(M)=16.438
Figure BDA0002409543120000111
Therefore, the power grid strength index before the new blackout start distribution can be defined as
Figure BDA0002409543120000112
S3: in this example, because the normal load station cannot add the black start unit distribution point due to the technical condition limitation, the IEEE30 node system may add the station Set _ G of the black start unit distribution point as {2,13,22,23,27 }. The capacity and corresponding investment of the newly added black start unit at different nodes are shown in the following table.
Figure BDA0002409543120000113
After the new blacking of different stations in Set _ G starts the distribution of the units, the grid robustness is shown in the following table
Figure BDA0002409543120000114
S5, calculating the change of the power grid strength after the new blacking start unit distribution at different stations in Set _ G, wherein the ratio Pr i of the change △ Str of the power grid strength and the corresponding investment C is shown in the following table as shown in the table
Figure BDA0002409543120000121
As can be seen from the above table, the Pr i value corresponding to the newly blackened starting unit at the node 22 is the maximum, which is the optimal distribution point of the newly blackened starting unit.
As shown in fig. 3, the system 300 includes:
the topology acquisition unit 310 is configured to acquire topology information of the existing black starter networking as an initial topology;
the initial calculation unit 320 is configured to collect black start unit capacity and average reactance of an initial topology, and calculate initial stiffness of the initial topology according to the black start unit capacity and the average reactance;
the target calculation unit 330 is configured to calculate the target stiffness of the target black-start engine networking topology of the black-start unit increase scheme to be selected;
the difference value calculating unit 340 is configured to calculate a strength difference value between the target strength and the initial strength of each black start unit to be selected to increase the scheme;
and the target determining unit 350 is configured to calculate a ratio of the strength difference of each black-start unit increase scheme to be selected to the corresponding investment cost, and select the black-start unit increase scheme to be selected with the largest ratio as the execution scheme.
Optionally, as an embodiment of the present invention, the topology acquiring unit includes:
the system comprises an information acquisition module, a data acquisition module and a data processing module, wherein the information acquisition module is configured to acquire sites of an available black start unit in a power grid system, the number of the black start units contained in the sites, the capacity of the black start units and the start sequence of the black start units;
the reactance obtaining module is configured to obtain a connection topological relation of the black start unit of the power grid system and reactance of a connection circuit;
and the matrix establishing module is configured for generating a connection matrix of the available black start unit of the power grid system according to the connection line and the reactance of the connection line of the available black start unit.
Optionally, as an embodiment of the present invention, the initial calculating unit includes:
the capacity summation module is configured for calculating the weighted capacity sum of the black start units of the power grid according to the capacity of the black start units and the start sequence;
the summation conversion module is configured to take the quotient of the weighted capacity sum of the black start unit and a preset reference capacity as the weighted capacity sum per unit value of the black start unit;
the reactance averaging module is configured for calculating an average reactance per unit value according to the total length of the connecting lines of the power grid available black start unit and the per unit value of the total line reactance;
and the quotient value calculation module is configured to take the quotient of the weighted capacity and the per-unit value of the black-start unit and the per-unit value of the average reactance as the initial stiffness.
Optionally, as an embodiment of the present invention, the target computing unit includes:
the system comprises a scheme setting module, a selection module and a selection module, wherein the scheme setting module is configured to set a plurality of black-start unit increasing schemes to be selected, and the black-start unit increasing schemes to be selected comprise positions of newly added stations;
and the target construction module is configured and used for constructing a target black-start unit networking topology on the basis of the initial topology according to the positions of the newly added stations of the black-start unit adding scheme to be selected.
Optionally, as an embodiment of the present invention, the system further includes:
and the investment acquisition module is configured for acquiring the investment cost of the newly added station of the increase scheme of the black start unit to be selected, so as to obtain the investment cost of the increase scheme of the black start unit to be selected.
Fig. 3 is a schematic structural diagram of a terminal system 300 according to an embodiment of the present invention, where the terminal system 300 may be used to execute the method for determining the distribution point of the new blacking start unit according to the embodiment of the present invention.
The terminal system 300 may include: a processor 310, a memory 320, and a communication unit 330. The components communicate via one or more buses, and those skilled in the art will appreciate that the architecture of the servers shown in the figures is not intended to be limiting, and may be a bus architecture, a star architecture, a combination of more or less components than those shown, or a different arrangement of components.
The memory 320 may be used for storing instructions executed by the processor 310, and the memory 320 may be implemented by any type of volatile or non-volatile storage terminal or combination thereof, such as Static Random Access Memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic memory, flash memory, magnetic disk or optical disk. The executable instructions in memory 320, when executed by processor 310, enable terminal 300 to perform some or all of the steps in the method embodiments described below.
The processor 310 is a control center of the storage terminal, connects various parts of the entire electronic terminal using various interfaces and lines, and performs various functions of the electronic terminal and/or processes data by operating or executing software programs and/or modules stored in the memory 320 and calling data stored in the memory. The processor may be composed of an Integrated Circuit (IC), for example, a single packaged IC, or a plurality of packaged ICs connected with the same or different functions. For example, the processor 310 may include only a Central Processing Unit (CPU). In the embodiment of the present invention, the CPU may be a single operation core, or may include multiple operation cores.
A communication unit 330, configured to establish a communication channel so that the storage terminal can communicate with other terminals. And receiving user data sent by other terminals or sending the user data to other terminals.
The present invention also provides a computer storage medium, wherein the computer storage medium may store a program, and the program may include some or all of the steps in the embodiments provided by the present invention when executed. The storage medium may be a magnetic disk, an optical disk, a read-only memory (ROM) or a Random Access Memory (RAM).
Therefore, the invention provides a network strength index containing the black start unit, and then the change of the network strength index after the black start unit is newly added at different sites is calculated respectively, and the investment caused by the new black start unit added at different sites is different, so as to establish a method for determining the distribution points of the black start unit. The method for determining the layout of the newly blackened starting unit, which is provided by the invention, provides a quantitative calculation means for determining the layout of the blackened starting unit, so that the layout selection is more scientific and reasonable. According to the method, the influence of the black start unit and the grid structure on the capability of recovering to the original state after the power grid is greatly disturbed is evaluated through the index of the hardness strength of the power grid, and a means is provided for quantitatively analyzing the benefit of the new black start unit. Meanwhile, the calculation result is more reasonable by considering the factor that the investment required by newly adding black start units at different sites is different, and the technical effect achieved by the embodiment can be referred to the description above, and is not described again here.
Those skilled in the art will readily appreciate that the techniques of the embodiments of the present invention may be implemented as software plus a required general purpose hardware platform. Based on such understanding, the technical solutions in the embodiments of the present invention may be embodied in the form of a software product, where the computer software product is stored in a storage medium, such as a usb disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk or an optical disk, and the like, and the storage medium can store program codes, and includes instructions for enabling a computer terminal (which may be a personal computer, a server, or a second terminal, a network terminal, and the like) to perform all or part of the steps of the method in the embodiments of the present invention.
The same and similar parts in the various embodiments in this specification may be referred to each other. Especially, for the terminal embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant points can be referred to the description in the method embodiment.
In the embodiments provided in the present invention, it should be understood that the disclosed system and method can be implemented in other ways. For example, the above-described system embodiments are merely illustrative, and for example, the division of the units is only one logical functional division, and other divisions may be realized in practice, for example, a plurality of units or components may be combined or integrated into another system, or some features may be omitted, or not executed. In addition, the shown or discussed mutual coupling or direct coupling or communication connection may be an indirect coupling or communication connection through some interfaces, systems or units, and may be in an electrical, mechanical or other form.
The units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the units can be selected according to actual needs to achieve the purpose of the solution of the embodiment.
In addition, functional units in the embodiments of the present invention may be integrated into one processing unit, or each unit may exist alone physically, or two or more units are integrated into one unit.
Although the present invention has been described in detail by referring to the drawings in connection with the preferred embodiments, the present invention is not limited thereto. Various equivalent modifications or substitutions can be made on the embodiments of the present invention by those skilled in the art without departing from the spirit and scope of the present invention, and these modifications or substitutions are within the scope of the present invention/any person skilled in the art can easily conceive of the changes or substitutions within the technical scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (10)

1. A newly increased black start unit distribution point determining method is characterized by comprising the following steps:
acquiring topological information of the networking of the existing black starter as an initial topology;
acquiring the capacity and the average reactance of a black start unit of an initial topology, and calculating the initial stiffness of the initial topology according to the capacity and the average reactance of the black start unit;
calculating the target stiffness of the networking topology of the target black starter of the scheme added by the black starter set to be selected;
respectively calculating the strength difference value of the target strength and the initial strength of each black start unit increasing scheme to be selected;
and respectively calculating the ratio of the strength difference value of each black-start unit increasing scheme to be selected to the corresponding investment cost, and selecting the black-start unit increasing scheme to be selected with the largest ratio as an execution scheme.
2. The method of claim 1, wherein the obtaining topology information of an existing black starter networking as an initial topology comprises:
acquiring sites of available black start units in a power grid system, the number of the black start units, the capacity of the black start units and the start sequence of the black start units contained in the sites;
acquiring a connection topological relation of an available black start unit of a power grid system and reactance of a connection circuit;
and generating a connection matrix of the available black start unit of the power grid system according to the connection line and the reactance of the connection line of the available black start unit.
3. The method of claim 1, wherein collecting black-start unit capacity and average reactance of an initial topology and calculating an initial stiffness of the initial topology based on the black-start unit capacity and average reactance comprises:
calculating the weighted capacity sum of the black start unit of the power grid according to the capacity and the start sequence of the black start unit;
taking the quotient of the weighted capacity sum of the black start unit and a preset reference capacity as the weighted capacity sum per unit value of the black start unit;
calculating an average reactance per unit value according to the total length of the connection circuit of the power grid available black start unit and the total reactance per unit value of the bus circuit;
and taking the quotient of the weighted capacity and the per-unit value of the black-start unit and the per-unit value of the average reactance as the initial stiffness.
4. The method according to claim 1, wherein the calculating the target stiffness of the target black starter networking topology of the to-be-selected black starter group addition scheme comprises:
setting a plurality of black start unit adding schemes to be selected, wherein the black start unit adding schemes to be selected comprise positions of newly added stations;
and constructing a target black-start unit networking topology on the basis of the initial topology according to the positions of the newly added stations of the black-start unit adding scheme to be selected.
5. The method according to claim 1, wherein the ratio of the strength difference of each black-start unit increase scheme to be selected to the corresponding investment cost is calculated separately, and the black-start unit increase scheme to be selected with the largest ratio is selected as the execution scheme, and the method further comprises:
and acquiring the investment cost of the newly added station of the increase scheme of the black start unit to be selected to obtain the investment cost of the increase scheme of the black start unit to be selected.
6. The utility model provides a newly-increased black start unit stationing confirmation system which characterized in that includes:
the topology acquisition unit is configured to acquire topology information of the existing black starter networking as an initial topology;
the initial calculation unit is configured for acquiring the capacity and the average reactance of a black start unit of an initial topology, and calculating the initial stiffness of the initial topology according to the capacity and the average reactance of the black start unit;
the target calculation unit is configured for calculating the target stiffness of the networking topology of the target black starter of the black starter unit addition scheme to be selected;
the difference value calculating unit is configured to calculate the strength difference value between the target strength and the initial strength of each black start unit increasing scheme to be selected respectively;
and the target determining unit is configured to calculate the ratio of the strength difference value of each black-start unit increasing scheme to be selected to the corresponding investment cost respectively, and select the black-start unit increasing scheme to be selected with the largest ratio as an execution scheme.
7. The system of claim 6, wherein the topology acquisition unit comprises:
the system comprises an information acquisition module, a data acquisition module and a data processing module, wherein the information acquisition module is configured to acquire sites of an available black start unit in a power grid system, the number of the black start units contained in the sites, the capacity of the black start units and the start sequence of the black start units;
the reactance obtaining module is configured to obtain a connection topological relation of the black start unit of the power grid system and reactance of a connection circuit;
and the matrix establishing module is configured for generating a connection matrix of the available black start unit of the power grid system according to the connection line and the reactance of the connection line of the available black start unit.
8. The system of claim 6, wherein the initial computing unit comprises:
the capacity summation module is configured for calculating the weighted capacity sum of the black start units of the power grid according to the capacity of the black start units and the start sequence;
the summation conversion module is configured to take the quotient of the weighted capacity sum of the black start unit and a preset reference capacity as the weighted capacity sum per unit value of the black start unit;
the reactance averaging module is configured for calculating an average reactance per unit value according to the total length of the connecting lines of the power grid available black start unit and the per unit value of the total line reactance;
and the quotient value calculation module is configured to take the quotient of the weighted capacity and the per-unit value of the black-start unit and the per-unit value of the average reactance as the initial stiffness.
9. The system of claim 6, wherein the target computing unit comprises:
the system comprises a scheme setting module, a selection module and a selection module, wherein the scheme setting module is configured to set a plurality of black-start unit increasing schemes to be selected, and the black-start unit increasing schemes to be selected comprise positions of newly added stations;
and the target construction module is configured and used for constructing a target black-start unit networking topology on the basis of the initial topology according to the positions of the newly added stations of the black-start unit adding scheme to be selected.
10. The system of claim 6, further comprising:
and the investment acquisition module is configured for acquiring the investment cost of the newly added station of the increase scheme of the black start unit to be selected, so as to obtain the investment cost of the increase scheme of the black start unit to be selected.
CN202010172111.6A 2020-03-12 2020-03-12 Newly-increased black start unit distribution point determining method and system Pending CN111401729A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010172111.6A CN111401729A (en) 2020-03-12 2020-03-12 Newly-increased black start unit distribution point determining method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010172111.6A CN111401729A (en) 2020-03-12 2020-03-12 Newly-increased black start unit distribution point determining method and system

Publications (1)

Publication Number Publication Date
CN111401729A true CN111401729A (en) 2020-07-10

Family

ID=71413416

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010172111.6A Pending CN111401729A (en) 2020-03-12 2020-03-12 Newly-increased black start unit distribution point determining method and system

Country Status (1)

Country Link
CN (1) CN111401729A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112288237A (en) * 2020-10-12 2021-01-29 国网江苏省电力有限公司镇江供电分公司 Black starter subregion partitioning method based on synergy optimization

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107368930A (en) * 2017-08-07 2017-11-21 国网天津节能服务有限公司 A kind of black starting-up site selection of coal fired power plant method suitable for power system partition recovery pattern
CN110148972A (en) * 2019-06-20 2019-08-20 华北电力大学(保定) Extension black-start scheme determines method, apparatus and electronic equipment
WO2019184286A1 (en) * 2018-03-29 2019-10-03 山东大学 Online dynamic decision-making method and system for unit restoration
CN110676869A (en) * 2018-07-02 2020-01-10 国网山东省电力公司潍坊供电公司 Method for determining distribution points of newly-increased black start unit

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107368930A (en) * 2017-08-07 2017-11-21 国网天津节能服务有限公司 A kind of black starting-up site selection of coal fired power plant method suitable for power system partition recovery pattern
WO2019184286A1 (en) * 2018-03-29 2019-10-03 山东大学 Online dynamic decision-making method and system for unit restoration
CN110676869A (en) * 2018-07-02 2020-01-10 国网山东省电力公司潍坊供电公司 Method for determining distribution points of newly-increased black start unit
CN110148972A (en) * 2019-06-20 2019-08-20 华北电力大学(保定) Extension black-start scheme determines method, apparatus and electronic equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112288237A (en) * 2020-10-12 2021-01-29 国网江苏省电力有限公司镇江供电分公司 Black starter subregion partitioning method based on synergy optimization

Similar Documents

Publication Publication Date Title
CN107947164B (en) Electric power system day-ahead robust scheduling method considering multiple uncertainties and correlations
CN105656040B (en) A kind of power system restoration power computational methods for considering black starting-up process
CN107977744B (en) Day-ahead robust scheduling method of power system based on traditional Benders decomposition method
CN109102146B (en) Electric power system risk assessment acceleration method based on multi-parameter linear programming
Molina et al. Transmission network cost allocation based on circuit theory and the Aumann-Shapley method
CN108336741B (en) Fault screening method and system for overall process voltage stability analysis
Hua et al. Eliminating redundant line flow constraints in composite system reliability evaluation
CN106022590B (en) Voltage quality evaluation method and device for active power distribution network
CN111401729A (en) Newly-increased black start unit distribution point determining method and system
CN110912199A (en) Point distribution and constant volume method and device for multi-direct-current feed-in receiving-end power grid synchronous phase modifier
Zhang et al. Intentional islanding method based on community detection for distribution networks
Wu et al. Optimal black start strategy for microgrids considering the uncertainty using a data‐driven chance constrained approach
CN110707729B (en) Method and device for analyzing multi-region primary frequency modulation condition and storage medium
Chen et al. A robust approach for active distribution network restoration based on scenario techniques considering load and DG uncertainties
CN115411735A (en) Method, system and equipment for calculating expected non-supplied electric quantity of power distribution network
Xu et al. Fault recovery of distribution network containing distributed generation based on heuristic search algorithm and multi-population genetic algorithm
CN114819596A (en) Regional transformer substation planning method, system, terminal and storage medium
CN109861214B (en) Method and system for judging weak line with stable transient power angle of regional power grid
CN104035981B (en) The method and system that electric system simulation data are optimized based on XML
CN111884254A (en) Distributed photovoltaic absorption access method and device based on double random simulation
Müller et al. Optimal substation PMU placement method for the two-level state estimator
CN110676869A (en) Method for determining distribution points of newly-increased black start unit
CN116976060B (en) Flexible networking method for dynamic reconfiguration of distributed new energy cluster-load-network
CN112165093B (en) Core bottom-protecting net rack construction method and system based on large power grid
CN117117967A (en) Real-time recovery method, device and equipment for grid rack containing wind power

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200710