CN111382392A - Method for calculating total time of fault handling of power distribution network and method for calculating reliability of total time - Google Patents

Method for calculating total time of fault handling of power distribution network and method for calculating reliability of total time Download PDF

Info

Publication number
CN111382392A
CN111382392A CN202010209079.4A CN202010209079A CN111382392A CN 111382392 A CN111382392 A CN 111382392A CN 202010209079 A CN202010209079 A CN 202010209079A CN 111382392 A CN111382392 A CN 111382392A
Authority
CN
China
Prior art keywords
failure
time
power distribution
distribution network
fault
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010209079.4A
Other languages
Chinese (zh)
Other versions
CN111382392B (en
Inventor
刘小春
李映雪
彭怀德
钟士元
汪楚锟
周成
江涛
陈青华
王雅婷
王丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Jiangxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Jiangxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Economic and Technological Research Institute of State Grid Jiangxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN202010209079.4A priority Critical patent/CN111382392B/en
Publication of CN111382392A publication Critical patent/CN111382392A/en
Application granted granted Critical
Publication of CN111382392B publication Critical patent/CN111382392B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/10Complex mathematical operations
    • G06F17/18Complex mathematical operations for evaluating statistical data, e.g. average values, frequency distributions, probability functions, regression analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • Y04S10/52Outage or fault management, e.g. fault detection or location

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Data Mining & Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Mathematical Analysis (AREA)
  • Pure & Applied Mathematics (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Physics (AREA)
  • Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Tourism & Hospitality (AREA)
  • Strategic Management (AREA)
  • Bioinformatics & Cheminformatics (AREA)
  • Bioinformatics & Computational Biology (AREA)
  • Primary Health Care (AREA)
  • Marketing (AREA)
  • Evolutionary Biology (AREA)
  • General Business, Economics & Management (AREA)
  • General Health & Medical Sciences (AREA)
  • Operations Research (AREA)
  • Probability & Statistics with Applications (AREA)
  • Water Supply & Treatment (AREA)
  • Algebra (AREA)
  • Public Health (AREA)
  • Databases & Information Systems (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a method for calculating the total time of fault handling of a power distribution network, which comprises the steps of reading power grid data information of the power distribution network; establishing a power distribution network terminal failure probability model; determining the type of the failure of the power distribution network terminal; establishing a basic calculation model of the total fault processing time of the power distribution network; correcting the basic calculation model of the total fault processing time of the power distribution network to obtain an accurate calculation model of the total fault processing time of the power distribution network; and calculating to obtain the final total fault processing time of the power distribution network. The invention also discloses a reliability calculation method comprising the power distribution network fault processing total time calculation method. According to the method, the total fault processing time of the power distribution network is accurately calculated by establishing an accurate calculation model and an accurate correction model, so that the reliability of the power distribution network is accurately calculated; therefore, the method has the advantages of high reliability, good practicability, higher precision and wide applicability.

Description

Method for calculating total time of fault handling of power distribution network and method for calculating reliability of total time
Technical Field
The invention belongs to the field of electrical automation, and particularly relates to a method for calculating total fault handling time of a power distribution network and a method for calculating reliability of the power distribution network.
Background
With the development of economic technology and the improvement of living standard of people, electric energy becomes essential secondary energy in production and life of people, and brings endless convenience to production and life of people.
Distribution Terminal (DTU) is distribution automation's basic equipment, can monitor distribution lines's operating condition, in time discovers the circuit trouble, diagnoses trouble district section and with trouble district section isolation, resumes the power supply to non-trouble district section, can show the distribution network power supply reliability level that promotes. Currently, research on power distribution terminals can be roughly divided into two types, one type is developed for the problem of optimal configuration of the power distribution terminals, and the other type is developed for the influence of the power distribution terminals on the power supply reliability of a power distribution network. The two types of researches on the power distribution terminal need to establish a reliability model of the power distribution terminal, and meanwhile, the power distribution terminal is the same as other power equipment, so that the condition that the power distribution terminal fails in the operation process is inevitable, and the power supply reliability of the whole system is influenced.
The total fault processing time of the power distribution network refers to the total time consumed from the occurrence of a fault to the completion of processing when the power distribution network fails. The total fault processing time of the power distribution network is one of important parameters of the power distribution network, and directly influences the reliability calculation result of the power distribution network. Therefore, the calculation of the total time for fault handling of the distribution network is very important.
However, in the current calculation of the total fault handling time of the power distribution network, the calculation process is simple and rough, so that the accuracy of the calculation result of the total fault handling time of the power distribution network is poor, and the reliability calculation result of the power distribution network is seriously influenced.
Disclosure of Invention
The invention aims to provide a method for calculating the total time of fault handling of a power distribution network, which has high reliability, good practicability and higher precision.
The invention also aims to provide a reliability calculation method comprising the method for calculating the total fault handling time of the power distribution network.
The invention provides a method for calculating the total time of fault handling of a power distribution network, which comprises the following steps:
s1, reading power grid data information of a power distribution network;
s2, establishing a power distribution network terminal failure probability model according to the power grid data information obtained in the step S1;
s3, determining the type of failure of the power distribution network terminal;
s4, establishing a basic calculation model of the total fault processing time of the power distribution network;
s5, correcting the basic calculation model of the total time of the power distribution network fault treatment established in the step S4, so as to obtain an accurate calculation model of the total time of the power distribution network fault treatment;
and S6, calculating to obtain the final total fault processing time of the power distribution network according to the accurate calculation model of the total fault processing time of the power distribution network obtained in the step S5.
The grid data information of the power distribution network described in step S1 includes, specifically, the length of the power supply main line, the length of the power supply branch line, the average repair time corresponding to the fault rate, the operation time of the disconnecting switch, the load amount of each load point, and the number of power supply users of each load point.
Step S2, the method for establishing a power distribution network terminal failure probability model specifically includes the following steps:
A. the following formula is adopted to establish a telemetering availability model Q1
Q1=QsenQtraQdat
In the formula QsenIs sensor availability; qtraIs the transmission device availability; qdatData processing device availability;
B. the following formula is adopted to establish a remote signaling availability model Q2
Q2=QmasQsubQcom
In the formula QmasIs the master station availability; qsubIs the substation availability; qcomAvailability for a communication network;
C. the following formula is adopted to establish a remote control availability model Q3
Q3=(1-Pref)(1-Pmal)
In the formula PrefIs the remote control rejection rate; pmalThe false rate of remote control;
D. the following rules are adopted to establish a power distribution network terminal failure probability model:
if the failure condition is: the remote measurement, remote signaling and remote control are normal; the consequences of failure at this time are: the automatic positioning is successful, and the automatic isolation is successful; the failure probability model at this time is: p0=Q1Q2Q3
If the failure condition is: telemetry failure; the consequences of failure at this time are: automatic positioning fails, and automatic isolation fails; the failure probability model at this time is: p1=1-Q1
If the failure condition is: remote signallingFailure; the consequences of failure at this time are: the automatic positioning is successful, and the automatic isolation fails; the failure probability model at this time is: p2=1-Q2
If the failure condition is: remote control fails; the consequences of failure at this time are: the automatic positioning is successful, and the automatic isolation fails; the failure probability model at this time is: p3=1-Q3
If the failure condition is: telemetry failure and remote control failure; the consequences of failure at this time are: automatic positioning fails, and automatic isolation fails; the failure probability model at this time is: p4=(1-Q1)(1-Q3);
If the failure condition is: telemetry failure and telemetry failure; the consequences of failure at this time are: automatic positioning fails, and automatic isolation fails; the failure probability model at this time is: p5=(1-Q1)(1-Q2);
If the failure condition is: remote signaling failure and remote control failure; the consequences of failure at this time are: the automatic positioning is successful, and the automatic isolation fails; the failure probability model at this time is: p6=(1-Q2)(1-Q3);
If the failure condition is: telemetry failure, telemetry failure and remote control failure; the consequences of failure at this time are: automatic positioning fails, and automatic isolation fails; the failure probability model at this time is: p7=(1-Q1)(1-Q2)(1-Q3)。
Step S4, establishing a basic calculation model of the total time of the power distribution network fault treatment, specifically, adopting the following formula as the basic calculation model T of the total time of the power distribution network fault treatmentf
Tf=Tloc-r+Tiso-r+Tpat-exp+Trec
In the formula Tloc-rTime is located for the fault; t isiso-rFault isolation time; t ispat-expExpected value of fault line patrol time; t isrecTime to failure recovery.
The expected value of the fault line patrol time is specifically calculated by adopting the following formula:
Figure BDA0002422189810000041
k is the sectional number of the fault feeder line; n is the total number of the sections of the fault feeder line; Δ LkThe length of the k section of the fault feeder line; l is the length of the fault feeder line; t is tpThe feeder line inspection time is unit length; and the failure rate of each feeder line per unit length is specified to be the same.
Step S5, which is to correct the basic calculation model of the total time of power distribution network fault handling established in step S4, so as to obtain an accurate calculation model of the total time of power distribution network fault handling, specifically, the following steps are adopted to correct and obtain the accurate calculation model:
a. the corrected fault positioning time T is calculated by the following formulaloc-exp
Tloc-exp=(1-Ploc-f)×Tloc-f+Ploc-f×Tloc-f
In the formula Tloc-fAutomatically positioning the positioning time after failure; ploc-fRepresenting the probability of failure of the positioning function;
b. the corrected fault isolation time T is calculated by the following formulaiso-exp
Tiso-exp=(1-Piso-f)×Tiso-f+Piso-f×Tiso-f
In the formula Tiso-fThe isolation time after the automatic isolation failure; piso-fIs the probability of failure of the isolation function;
c. the corrected failure recovery time T is calculated byrec-exp
Figure BDA0002422189810000051
In the formula TterIs the recovery time of the power distribution terminal failure, and
Figure BDA0002422189810000052
Treca failure recovery time for the uncorrected failure;
d. the following formula is adopted as an accurate calculation model of the total time of the fault treatment of the power distribution network: t isf-exp=Tloc-exp+Tiso-exp+Tpat-exp+Trec-exp
The invention also provides a reliability calculation method comprising the power distribution network fault processing total time calculation method, which comprises the following steps:
and S7, calculating to obtain a final power distribution network reliability calculation result considering the failure of the power distribution terminal according to the total power distribution network fault processing time calculated in the step S6.
And calculating to obtain a final power distribution network reliability calculation result considering the failure of the power distribution terminal according to the total power distribution network fault processing time calculated in the step S6, specifically, calculating to obtain a final power distribution network reliability calculation result considering the failure of the power distribution terminal by adopting a fault consequence analysis method.
According to the method for calculating the total time of fault handling of the power distribution network and the reliability calculation method thereof, the total time of fault handling of the power distribution network is accurately calculated by establishing an accurate calculation model and a correction model, so that the reliability of the power distribution network is accurately calculated; therefore, the method has the advantages of high reliability, good practicability, higher precision and wide applicability.
Drawings
Fig. 1 is a schematic flow chart of a method for calculating total time for fault handling of a power distribution network according to the present invention.
Fig. 2 is a schematic diagram of a differential model of a feeder line according to the present invention.
FIG. 3 is a schematic diagram of the coupling relationship of telemetry, and telemetry failures of the present invention.
FIG. 4 is a schematic diagram of an example IEEE RBTS BUS2 system of the present invention.
Fig. 5 is a schematic diagram of the variation curve of ASAI in a single functional failure according to the present invention.
FIG. 6 is a graph showing the variation of ENS in the event of a single functional failure in accordance with the present invention.
FIG. 7 is a diagram illustrating the variation curve of ASAI when multiple functions are disabled according to the present invention.
FIG. 8 is a graph illustrating the variation of ENS in the event of multiple functional failures according to the present invention.
FIG. 9 is a bathtub curve illustrating the failure rate of the power distribution terminal of the present invention.
FIG. 10 is a graph showing the ASAI of the present invention as a function of age.
FIG. 11 is a graph showing the variation of ENS with age according to the present invention.
Fig. 12 is a flowchart illustrating a method of the reliability calculation method according to the present invention.
Detailed Description
Fig. 1 is a schematic flow chart of a method for calculating total time for processing a fault of a power distribution network according to the present invention: the invention provides a method for calculating the total time of fault handling of a power distribution network, which comprises the following steps:
s1, reading power grid data information of a power distribution network; the method specifically comprises the steps of measuring the length of a power supply main line, the length of a power supply branch line, average repair time corresponding to a fault rate, the operation time of an isolating switch, the load quantity of each load point, the number of power supply users of each load point and the like;
s2, establishing a power distribution network terminal failure probability model according to the power grid data information obtained in the step S1;
the fault automation processing process of the power distribution system comprises the following steps: when a fault occurs, firstly, the remote measuring function collects and calculates the running real-time parameters, the position and the type of the fault are judged, then the position signal of the corresponding switch is transmitted through the remote signaling function, and finally, the corresponding switch is operated through the remote control function, so that the automatic isolation and the automatic recovery of a fault area are realized;
if recording the remote measurement, remote signaling and remote control failure as an event A, B, C, according to the coupling relation of the three in the fault automation processing process, the event A, B, C satisfies the relation shown in fig. 3;
when a power distribution system breaks down, if a power distribution terminal fails to work due to some reason, the three sub-processes of fault positioning, fault isolation and fault recovery may change except that the fault line patrol process is not changed in the original fault processing process, and the time required by the corresponding process may also change. Therefore, it is critical to evaluate the reliability of the power distribution system to account for power distribution terminal failures how to build a time model for each sub-process.
For this reason, firstly, a probability model of the failure of the power distribution terminal is established, and the model can be established by adopting the following steps:
A. the following formula is adopted to establish a telemetering availability model Q1
Q1=QsenQtraQdat
In the formula QsenIs sensor availability; qtraIs the transmission device availability; qdatData processing device availability;
B. the following formula is adopted to establish a remote signaling availability model Q2
Q2=QmasQsubQcom
In the formula QmasIs the master station availability; qsubIs the substation availability; qcomAvailability for a communication network;
C. the following formula is adopted to establish a remote control availability model Q3
Q3=(1-Pref)(1-Pmal)
In the formula PrefIs the remote control rejection rate; pmalThe false rate of remote control;
D. the following rules are adopted to establish a power distribution network terminal failure probability model:
if the failure condition is: the remote measurement, remote signaling and remote control are normal; the consequences of failure at this time are: the automatic positioning is successful, and the automatic isolation is successful; the failure probability model at this time is: p0=Q1Q2Q3
If the failure condition is: telemetry failure; the consequences of failure at this time are: automatic positioning fails, and automatic isolation fails; the failure probability model at this time is: p1=1-Q1
If the failure condition is: a remote signaling failure; the consequences of failure at this time are: success of automatic positioningAutomatic isolation fails; the failure probability model at this time is: p2=1-Q2
If the failure condition is: remote control fails; the consequences of failure at this time are: the automatic positioning is successful, and the automatic isolation fails; the failure probability model at this time is: p3=1-Q3
If the failure condition is: telemetry failure and remote control failure; the consequences of failure at this time are: automatic positioning fails, and automatic isolation fails; the failure probability model at this time is: p4=(1-Q1)(1-Q3);
If the failure condition is: telemetry failure and telemetry failure; the consequences of failure at this time are: automatic positioning fails, and automatic isolation fails; the failure probability model at this time is: p5=(1-Q1)(1-Q2);
If the failure condition is: remote signaling failure and remote control failure; the consequences of failure at this time are: the automatic positioning is successful, and the automatic isolation fails; the failure probability model at this time is: p6=(1-Q2)(1-Q3);
If the failure condition is: telemetry failure, telemetry failure and remote control failure; the consequences of failure at this time are: automatic positioning fails, and automatic isolation fails; the failure probability model at this time is: p7=(1-Q1)(1-Q2)(1-Q3);
S3, determining the type of failure of the power distribution network terminal;
s4, establishing a basic calculation model of the total fault processing time of the power distribution network; specifically, the following formula is adopted as a basic calculation model T of the total time of fault treatment of the power distribution networkf
Tf=Tloc-r+Tiso-r+Tpat-exp+Trec
In the formula Tloc-rLocating time for faults, specifically, telemetering, determining the fault position (which feeder line in the system can be determined, but the specific position of the fault on the feeder line cannot be determined) and the time required by the fault type of the system by adopting distribution automation software according to real-time parameters; t isiso-rFor fault isolation time, in particular remote control and field device implementationClosing and opening operations are performed, so that the time required by fault isolation is realized; t ispat-expExpected value of fault line patrol time; t isrecThe fault recovery time, specifically the time required from completion of fault isolation to complete restoration of power to the system, is only related to the type of fault, and thus can be expressed by the following equation: t isrec(x); in the formula, x represents the fault type and indicates which element in the system has any fault;
the expected value of the fault line patrol time is calculated by adopting the following formula:
Figure BDA0002422189810000091
k is the sectional number of the fault feeder line; n is the total number of the sections of the fault feeder line; Δ LkThe length of the k section of the fault feeder line; l is the length of the fault feeder line; t is tpThe feeder line inspection time is unit length; and the failure rate of each feeder line per unit length is specified to be the same;
the method for calculating the expected value of the fault line patrol time specifically comprises the following steps:
supposing that after a feeder line of a power distribution system is in fault, a certain feeder line with the fault in the system is determined through a fault positioning process, the length of the feeder line is set to be L, and the line patrol time of the feeder line with unit length is set to be tpAnd the fault rate of each feeder line per unit length is the same. A differential model of the feeder line is established by adopting a differential idea, and the feeder line is divided into N small sections equally, as shown in figure 2
Figure BDA0002422189810000101
Figure BDA0002422189810000102
Figure BDA0002422189810000103
According to the established feeder differential model, the feeder can be knownThe fault line-patrol time t in the section is in direct proportion to the line-patrol distance for finding the fault point from the head end of the fault feeder (or the tail end of the fault feeder without influencing the fault line-patrol time), i.e. the fault line-patrol time t is directly proportional to the line-patrol distance
Figure BDA0002422189810000104
nkThe number of sections from the head end of the fault feeder line to the section k;
so that the line patrol time expectation in the whole fault feeder line section can be expressed as
Figure BDA0002422189810000105
S5, correcting the basic calculation model of the total time of the power distribution network fault treatment established in the step S4, so as to obtain an accurate calculation model of the total time of the power distribution network fault treatment; the method specifically comprises the following steps of correcting and obtaining an accurate calculation model:
a. the corrected fault positioning time T is calculated by the following formulaloc-exp
Tloc-exp=(1-Ploc-f)×Tloc-f+Ploc-f×Tloc-f
In the formula Tloc-fAutomatically positioning the positioning time after failure; ploc-fRepresenting the probability of failure of the positioning function, and in actual calculation, Ploc-f=Pi,i=1,4,5,7;
b. The corrected fault isolation time T is calculated by the following formulaiso-exp
Tiso-exp=(1-Piso-f)×Tiso-f+Piso-f×Tiso-f
In the formula Tiso-fThe isolation time after the automatic isolation failure; piso-fTo isolate the probability of functional failure, and in actual calculations, Piso-f=Pj,j=1,2,3,4,5,6,7;
c. The corrected failure recovery time T is calculated byrec-exp
Figure BDA0002422189810000111
In the formula TterIs the recovery time of the power distribution terminal failure, and
Figure BDA0002422189810000112
Treca failure recovery time for the uncorrected failure;
d. the following formula is adopted as an accurate calculation model of the total time of the fault treatment of the power distribution network: t isf-exp=Tloc-exp+Tiso-exp+Tpat-exp+Trec-exp
And S6, calculating to obtain the final total fault processing time of the power distribution network according to the accurate calculation model of the total fault processing time of the power distribution network obtained in the step S5.
The process of the invention is further illustrated below with reference to one example:
the test example chosen is the IEEE RBTS BUS2 system (shown in FIG. 4) that has "three remote" distribution terminals installed at both the feeder outlet switch and the tie switch, and segmented switches installed at the 14 main line head ends, i.e., feeders {1, 4, 7, 10, 12, 14, 16, 18, 21, 24, 26, 29, 32, 34} and "three remote" terminals installed on the switches. Data such as feeder fault rate, feeder length, number of load points, and number of users (see specifically Allan R N, Billingon R, Sjarief I, et al]IEEE Transactions on Power Delivery,1991,6(02): 813-. And when the power distribution terminal is not installed, the fault processing time is 3 h. In this example, when the power distribution terminal functions normally, the fault location time T is determinedloc-r0.017h is taken, and the fault isolation time T isiso-rTaking 0; telemetering the location time T after failureloc-fTaking 0.1h as the isolation time T after remote control failureiso-fTake 0.5 h. Time to failure recovery TrecTake 0.2 h. Telemetering function recovery time t of power distribution terminal1All take 0.15h, the remote signaling function recovery time t2All take 0.2h, the remote control function recovery time t3All take 0.25 h.
In the calculation example, the failure probability of the power distribution terminal is set to be between [0 and 1], the universality of the method is verified, and the reliability of the power distribution system under different failure rates is analyzed. The calculation results are shown in fig. 5 to 8, when the failure probability of the power distribution terminal changes in [0, 1], the corresponding reliability can be effectively calculated, and from another point of view, the method can be used for drawing the reliability curves of the power distribution terminal under different availability rates, and can be conveniently checked by related personnel in practice.
Fig. 5 and 6 show the influence of a single functional failure of the power distribution terminal on the reliability, and in the present embodiment, as the failure probability increases, the following is shown: 1) ASAI is continuously increased, ENS is continuously decreased; 2) compared with remote signaling and remote control functions, the influence on the reliability index is small when the remote measurement function fails; 3) the 'inflection point' occurs because the repair time of the remote control function failure is longer than that of the remote control and remote signaling; 4) the curves when the remote signaling and remote control functions fail are parallel after the 'inflection point', because when the remote signaling function fails, the remote control cannot obtain the effective information (opening and closing state, position and the like) of the corresponding switch, so that the corresponding switch cannot be actuated, and the direct influence caused by the failure of the remote control function is the same as that caused by the failure of the remote control function.
Fig. 7 and 8 show the effect of simultaneous failure of multiple functions of the power distribution terminal on reliability, and show that: 1) ASAI is continuously increased, ENS is continuously decreased; 2) compared with the conditions that the remote signaling function and the remote control function are simultaneously failed and the remote signaling function and the remote measuring function are simultaneously failed, the influence on the reliability is larger when the remote measuring function and the remote control function are simultaneously failed; 3) the figure contains "inflection points" in combinations where the remote control function fails, also because the repair time of the remote control function is longer than that of telemetry and telemetry; 4) the curve when the remote measurement and remote signaling function fails simultaneously is parallel to the curve when the remote measurement and remote control fail simultaneously after the inflection point, because when the remote measurement and remote signaling function fails simultaneously, the directly caused influence is consistent with that when the remote measurement and remote control function fails simultaneously, namely, the automatic positioning cannot be realized, and the automatic isolation cannot be realized.
Practice has proved that the failure rate of most equipment is a function related to time, a typical failure curve is called a bathtub curve, the service time of the equipment is used as an abscissa, the failure probability is used as an ordinate, the curve is shaped like a bathtub, and the characteristic of the curve is determined by a proportion parameter and a shape parameter. In this example, the fault rate of the power distribution terminal is set according to the bathtub curve, the proportional parameter is 8 (according to the actual situation of power distribution system dynamic construction, the service life of the power distribution terminal is generally 6-8 years, in the example, 8 years), and the shape parameters are 0.5, 1 and 5 respectively, as shown in fig. 9. From the bathtub curve, the bathtub can be roughly divided into three sections: in the early stage (0-2 years) of equipment use, the failure rate is large, and the failure rate rapidly decreases along with the passage of time; in the middle stage of use (2-5 years), the failure rate is low and stable; in the later period of use (6-8 years), the failure rate increases rapidly. By adopting the invention, the reliability of the IEEE RBTS BUS2 sample system is calculated when the failure rate of the power distribution terminal (taking remote signaling failure as an example, and other conditions are similar) changes according to the bathtub curve, and ENS curves and ASAI curves are shown in fig. 10 and fig. 11. The graph shows that over time, the ASAI curve appears in a reverse tub shape, and the ENS curve still appears in a tub shape. Therefore, in practice, special attention should be paid to the maintenance and repair of the distribution terminals in the early and late stages of use, where the influence on the reliability of the distribution network is relatively large.
In addition, it is defined that no power distribution terminal is installed in any original power distribution system, at this time, one power distribution terminal is installed at any position, and the degree of improvement of the system ASAI before and after installation is called as the ASAI sensitivity. In this example, distribution terminals were installed one by one at the head ends of the feeders {1, 4, 7, 10, 12, 14, 16, 18, 21, 24, 26, 29, 32, 34} of the IEEE RBTS BUS2, and the corresponding ASAI was calculated by the present invention, the ASAI before installation of the distribution terminal was 0.9995876042, and the sensitivity of the ASAI before and after installation was as shown in table 1.
TABLE 1 ASAI sensitivity before and after installation of the respective sites
Position of ASAI sensitivity/× 10-6 Position of ASAI sensitivity × 10-6
1 3.37312256 18 3.292810118
4 1.694592524 21 0.017592249
7 0.088343687 24 0.082224643
10 0.086049045 26 1.68656128
12 0.002294641 29 3.288985716
14 0.002868302 32 0.008222464
16 1.726717501 34 0.09675737
As can be seen from the table, when the distribution terminal is installed at the head of the feed line {1, 18, 29}, the ASAI sensitivity is the greatest, which means that if the distribution terminal on the three sections fails, the reliability of the whole system is greatly influenced; when the power distribution terminal is installed at the first section of the feed line {4, 26}, the ASAI sensitivity is inferior, which means that if the power distribution terminals on the two sections fail, the reliability of the system is greatly influenced; when the distribution terminal is arranged in the head section of the feed line {7, 10, 12, 14, 16, 21, 24, 32, 34}, the ASAI sensitivity is low, which shows that the distribution terminal on the sections has small influence on the reliability of the system if the distribution terminal fails. When the distribution terminal configuration is carried out on the distribution system, firstly, the feeders with the highest ASAI sensitivity and secondly the feeders with the second sensitivity are considered, and the maintenance and overhaul sequence of the distribution terminal is consistent with the installation sequence of the distribution terminal.
The analysis shows that the method has good universality and flexibility, can be used for reliability calculation when the power distribution terminal is normal, can also be used for reliability calculation when the power distribution system is not provided with the terminal, and can also be used for reliability calculation under the condition that the power distribution terminal is invalid. The invention can be used for guiding the configuration and the overhaul of the power distribution terminal: 1) along with the increase of remote signaling, remote measuring and remote control failure rate, the power supply reliability of the power distribution network is reduced to some extent, but the reduction range is different, and the influence degree of different functions on the reliability is reflected to be different. When the power distribution terminal is checked and maintained, the correctness of the remote control function is preferably ensured; 2) in practice, the maintenance and the overhaul of the power distribution terminal are particularly concerned about the early stage and the later stage of use, and the two stages are particularly easy to break down, so that the reliability of the power distribution network is greatly influenced; 3) when the distribution terminal configuration is carried out on the distribution system, firstly, the feeders with the highest ASAI sensitivity and secondly the feeders with the second sensitivity are considered, and the maintenance and overhaul sequence of the distribution terminal is consistent with the installation sequence of the distribution terminal.
Fig. 12 is a schematic flow chart of the reliability calculation method of the present invention: the invention also provides a reliability calculation method comprising the power distribution network fault processing total time calculation method, which comprises the following steps:
s1, reading power grid data information of a power distribution network; the method specifically comprises the steps of measuring the length of a power supply main line, the length of a power supply branch line, average repair time corresponding to a fault rate, the operation time of an isolating switch, the load quantity of each load point, the number of power supply users of each load point and the like;
s2, establishing a power distribution network terminal failure probability model according to the power grid data information obtained in the step S1;
the fault automation processing process of the power distribution system comprises the following steps: when a fault occurs, firstly, the remote measuring function collects and calculates the running real-time parameters, the position and the type of the fault are judged, then the position signal of the corresponding switch is transmitted through the remote signaling function, and finally, the corresponding switch is operated through the remote control function, so that the automatic isolation and the automatic recovery of a fault area are realized;
if recording the remote measurement, remote signaling and remote control failure as an event A, B, C, according to the coupling relation of the three in the fault automation processing process, the event A, B, C satisfies the relation shown in fig. 3;
when a power distribution system breaks down, if a power distribution terminal fails to work due to some reason, the three sub-processes of fault positioning, fault isolation and fault recovery may change except that the fault line patrol process is not changed in the original fault processing process, and the time required by the corresponding process may also change. Therefore, it is critical to evaluate the reliability of the power distribution system to account for power distribution terminal failures how to build a time model for each sub-process.
For this reason, firstly, a probability model of the failure of the power distribution terminal is established, and the model can be established by adopting the following steps:
A. the following formula is adopted to establish a telemetering availability model Q1
Q1=QsenQtraQdat
In the formula QsenIs sensor availability; qtraIs the transmission device availability; qdatData processing device availability;
B. the following formula is adopted to establish a remote signaling availability model Q2
Q2=QmasQsubQcom
In the formula QmasIs the master station availability; qsubIs the substation availability; qcomAvailability for a communication network;
C. the following formula is adopted to establish a remote control availability model Q3
Q3=(1-Pref)(1-Pmal)
In the formula PrefIs the remote control rejection rate; pmalThe false rate of remote control;
D. the following rules are adopted to establish a power distribution network terminal failure probability model:
if the failure condition is: the remote measurement, remote signaling and remote control are normal; the consequences of failure at this time are: the automatic positioning is successful, and the automatic isolation is successful; the failure probability model at this time is: p0=Q1Q2Q3
If the failure condition is: telemetry failure; the consequences of failure at this time are: automatic positioning fails, and automatic isolation fails; the failure probability model at this time is: p1=1-Q1
If the failure condition is: a remote signaling failure; the consequences of failure at this time are: the automatic positioning is successful, and the automatic isolation fails; the failure probability model at this time is: p2=1-Q2
If the failure condition is: remote control fails; the consequences of failure at this time are: the automatic positioning is successful, and the automatic isolation fails; the failure probability model at this time is: p3=1-Q3
If the failure condition is: telemetry failure and remote control failure; the consequences of failure at this time are: automatic positioning fails, and automatic isolation fails; the failure probability model at this time is: p4=(1-Q1)(1-Q3);
If the failure condition is: telemetry failure and telemetry failure; the consequences of failure at this time are: automatic positioning fails, and automatic isolation fails; the failure probability model at this time is: p5=(1-Q1)(1-Q2);
If the failure condition is: remote signaling failure and remote control failure; the consequences of failure at this time are: the automatic positioning is successful, and the automatic isolation fails; the failure probability model at this time is: p6=(1-Q2)(1-Q3) (ii) a If the failure condition is: telemetry failure, telemetry failure and remote control failure; the consequences of failure at this time are: automatic positioning fails, and automatic isolation fails; the failure probability model at this time is: p7=(1-Q1)(1-Q2)(1-Q3);
S3, determining the type of failure of the power distribution network terminal;
s4, establishing a basic calculation model of the total fault processing time of the power distribution network; specifically, the following formula is adopted as a basic calculation model T of the total time of fault treatment of the power distribution networkf
Tf=Tloc-r+Tiso-r+Tpat-exp+Trec
In the formula Tloc-rLocating time for faults, specifically, telemetering, determining the fault position (which feeder line in the system can be determined, but the specific position of the fault on the feeder line cannot be determined) and the time required by the fault type of the system by adopting distribution automation software according to real-time parameters; t isiso-rThe time required for fault isolation is the time required for realizing the on-off operation of a switch by remote control and field equipment to realize fault isolation; t ispat-expExpected value of fault line patrol time; t isrecThe fault recovery time, specifically the time required from completion of fault isolation to complete restoration of power to the system, is only related to the type of fault, and thus can be expressed by the following equation: t isrec(x); in the formula, x represents the fault type and indicates which element in the system has any fault;
the expected value of the fault line patrol time is calculated by adopting the following formula:
Figure BDA0002422189810000171
k is the sectional number of the fault feeder line; n is the total number of the sections of the fault feeder line; Δ LkThe length of the k section of the fault feeder line; l is the length of the fault feeder line; t is tpThe feeder line inspection time is unit length; and the failure rate of each feeder line per unit length is specified to be the same;
the method for calculating the expected value of the fault line patrol time specifically comprises the following steps:
supposing that after a feeder line of a power distribution system is in fault, a certain feeder line with the fault in the system is determined through a fault positioning process, the length of the feeder line is set to be L, and the line patrol time of the feeder line with unit length is set to be tpAnd the fault rate of each feeder line per unit length is the same. A differential model of the feeder line is established by adopting a differential idea, and the feeder line is divided into N small sections equally, as shown in figure 2
Figure BDA0002422189810000181
Figure BDA0002422189810000182
Figure BDA0002422189810000183
According to the established feeder differential model, the fault line patrol time t in the feeder section is in direct proportion to the line patrol distance for finding the fault point from the head end of the fault feeder (or the tail end of the fault feeder without influencing the fault line patrol time), namely the fault line patrol time t is directly proportional to the line patrol distance
Figure BDA0002422189810000184
nkThe number of sections from the head end of the fault feeder line to the section k;
so that the line patrol time expectation in the whole fault feeder line section can be expressed as
Figure BDA0002422189810000185
S5, correcting the basic calculation model of the total time of the power distribution network fault treatment established in the step S4, so as to obtain an accurate calculation model of the total time of the power distribution network fault treatment; the method specifically comprises the following steps of correcting and obtaining an accurate calculation model:
a. the corrected fault positioning time T is calculated by the following formulaloc-exp
Tloc-exp=(1-Ploc-f)×Tloc-f+Ploc-f×Tloc-f
In the formula Tloc-fAutomatically positioning the positioning time after failure; ploc-fRepresenting the probability of failure of the positioning function, and in actual calculation, Ploc-f=Pi,i=1,4,5,7;
b. The corrected fault isolation time T is calculated by the following formulaiso-exp
Tiso-exp=(1-Piso-f)×Tiso-f+Piso-f×Tiso-f
In the formula Tiso-fThe isolation time after the automatic isolation failure; piso-fTo isolate the probability of functional failure, and in actual calculations, Piso-f=Pj,j=1,2,3,4,5,6,7;
c. The corrected failure recovery time T is calculated byrec-exp
Figure BDA0002422189810000191
In the formula TterIs the recovery time of the power distribution terminal failure, and
Figure BDA0002422189810000192
Treca failure recovery time for the uncorrected failure;
d. the following formula is adopted as an accurate calculation model of the total time of the fault treatment of the power distribution network: t isf-exp=Tloc-exp+Tiso-exp+Tpat-exp+Trec-exp
S6, calculating to obtain the final total fault processing time of the power distribution network according to the accurate calculation model of the total fault processing time of the power distribution network obtained in the step S5;
s7, calculating to obtain a final power distribution network reliability calculation result considering the failure of the power distribution terminal according to the total power distribution network fault processing time calculated in the step S6; specifically, a final power distribution network reliability calculation result considering failure of a power distribution terminal is calculated by adopting a fault consequence analysis method.

Claims (8)

1. A method for calculating the total fault handling time of a power distribution network comprises the following steps:
s1, reading power grid data information of a power distribution network;
s2, establishing a power distribution network terminal failure probability model according to the power grid data information obtained in the step S1;
s3, determining the type of failure of the power distribution network terminal;
s4, establishing a basic calculation model of the total fault processing time of the power distribution network;
s5, correcting the basic calculation model of the total time of the power distribution network fault treatment established in the step S4, so as to obtain an accurate calculation model of the total time of the power distribution network fault treatment;
and S6, calculating to obtain the final total fault processing time of the power distribution network according to the accurate calculation model of the total fault processing time of the power distribution network obtained in the step S5.
2. The method according to claim 1, wherein the grid data information of the power distribution network in step S1 includes length of a main power supply line, length of a branch power supply line, average repair time corresponding to a fault rate, operation time of a disconnector, load capacity of each load point, and number of users of power supply at each load point.
3. The method for calculating the total time for processing the faults of the power distribution network according to claim 1 or 2, wherein the step S2 is used for establishing a probability model of the terminal failure of the power distribution network, and specifically comprises the following steps:
A. the following formula is adopted to establish a telemetering availability model Q1
Q1=QsenQtraQdat
In the formula QsenIs sensor availability; qtraIs the transmission device availability; qdatData processing device availability;
B. the following formula is adopted to establish a remote signaling availability model Q2
Q2=QmasQsubQcom
In the formula QmasIs the master station availability; qsubIs the substation availability; qcomAvailability for a communication network;
C. the following formula is adopted to establish a remote control availability model Q3
Q3=(1-Pref)(1-Pmal)
In the formula PrefIs the remote control rejection rate; pmalThe false rate of remote control;
D. the following rules are adopted to establish a power distribution network terminal failure probability model:
if the failure condition is: the remote measurement, remote signaling and remote control are normal; the consequences of failure at this time are: the automatic positioning is successful, and the automatic isolation is successful; the failure probability model at this time is: p0=Q1Q2Q3
If the failure condition is: telemetry failure; the consequences of failure at this time are: automatic positioning fails, and automatic isolation fails; the failure probability model at this time is: p1=1-Q1
If the failure condition is: a remote signaling failure; the consequences of failure at this time are: the automatic positioning is successful, and the automatic isolation fails; the failure probability model at this time is: p2=1-Q2
If the failure condition is: remote control fails; the consequences of failure at this time are: the automatic positioning is successful, and the automatic isolation fails; the failure probability model at this time is: p3=1-Q3
If the failure condition is: telemetry failure and remote control failure; the consequences of failure at this time are: automatic positioning fails, and automatic isolation fails; the failure probability model at this time is: p4=(1-Q1)(1-Q3);
If the failure condition is: telemetry failure and telemetry failure; the consequences of failure at this time are: automatic positioning fails, and automatic isolation fails; the failure probability model at this time is: p5=(1-Q1)(1-Q2);
If the failure condition is: remote signaling failure and remote control failure; the consequences of failure at this time are: the automatic positioning is successful, and the automatic isolation fails; the failure probability model at this time is: p6=(1-Q2)(1-Q3);
If the failure condition is: telemetry failure, telemetry failure and remote control failure; the consequences of failure at this time are: automatic positioning fails, and automatic isolation fails; the failure probability model at this time is: p7=(1-Q1)(1-Q2)(1-Q3)。
4. The method according to claim 3, wherein the step S4 is implemented by establishing a basic calculation model of the total time of fault handling of the power distribution network, specifically by using the following formula as the basic calculation model T of the total time of fault handling of the power distribution networkf
Tf=Tloc-r+Tiso-r+Tpat-exp+Trec
In the formula Tloc-rTime is located for the fault; t isiso-rFault isolation time; t ispat-expExpected value of fault line patrol time; t isrecTime to failure recovery.
5. The method according to claim 4, wherein the expected value of the fault line patrol time is calculated by using the following formula:
Figure FDA0002422189800000031
k is the sectional number of the fault feeder line; n is the total number of the sections of the fault feeder line; Δ LkThe length of the k section of the fault feeder line; l is the length of the fault feeder line; t is tpThe feeder line inspection time is unit length; and the failure rate of each feeder line per unit length is specified to be the same.
6. The method for calculating the total time for processing the faults of the power distribution network according to claim 5, wherein the basic calculation model of the total time for processing the faults of the power distribution network, which is established in the step S4, is modified in the step S5, so as to obtain the accurate calculation model of the total time for processing the faults of the power distribution network, specifically, the following steps are adopted for modification, and the accurate calculation model is obtained:
a. the corrected fault positioning time T is calculated by the following formulaloc-exp
Tloc-exp=(1-Ploc-f)×Tloc-f+Ploc-f×Tloc-f
In the formula Tloc-fAutomatically positioning the positioning time after failure; ploc-fRepresenting the probability of failure of the positioning function;
b. the corrected fault isolation time T is calculated by the following formulaiso-exp
Tiso-exp=(1-Piso-f)×Tiso-f+Piso-f×Tiso-f
In the formula Tiso-fThe isolation time after the automatic isolation failure; piso-fIs the probability of failure of the isolation function;
c. the corrected failure recovery time T is calculated byrec-exp
Figure FDA0002422189800000032
In the formula TterIs the recovery time of the power distribution terminal failure, and
Figure FDA0002422189800000041
Treca failure recovery time for the uncorrected failure;
d. the following formula is adopted as an accurate calculation model of the total time of the fault treatment of the power distribution network: t isf-exp=Tloc-exp+Tiso-exp+Tpat-exp+Trec-exp
7. A reliability calculation method comprising the method for calculating the total fault handling time of the power distribution network according to any one of claims 1 to 6, the method comprising the steps of:
and S7, calculating to obtain a final power distribution network reliability calculation result considering the failure of the power distribution terminal according to the total power distribution network fault processing time calculated in the step S6.
8. The reliability calculation method according to claim 7, wherein the final calculation result of the reliability of the power distribution network considering the failure of the power distribution terminal is calculated according to the total time of the fault handling of the power distribution network calculated in step S6, specifically, the final calculation result of the reliability of the power distribution network considering the failure of the power distribution terminal is calculated by using a fault consequence analysis method.
CN202010209079.4A 2020-03-23 2020-03-23 Method for calculating total time of fault handling of power distribution network and method for calculating reliability of total time Active CN111382392B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010209079.4A CN111382392B (en) 2020-03-23 2020-03-23 Method for calculating total time of fault handling of power distribution network and method for calculating reliability of total time

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010209079.4A CN111382392B (en) 2020-03-23 2020-03-23 Method for calculating total time of fault handling of power distribution network and method for calculating reliability of total time

Publications (2)

Publication Number Publication Date
CN111382392A true CN111382392A (en) 2020-07-07
CN111382392B CN111382392B (en) 2023-04-18

Family

ID=71221687

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010209079.4A Active CN111382392B (en) 2020-03-23 2020-03-23 Method for calculating total time of fault handling of power distribution network and method for calculating reliability of total time

Country Status (1)

Country Link
CN (1) CN111382392B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112001474A (en) * 2020-08-24 2020-11-27 国网江西省电力有限公司经济技术研究院 Power distribution terminal equipment optimal configuration method for power distribution network

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060099610A1 (en) * 2004-10-15 2006-05-11 Oy Jurilab Ltd. Method and kit for detecting a risk of acute myocardial infarction
CN106887839A (en) * 2017-03-09 2017-06-23 天津大学 The distribution terminal of the consideration information wrong influence of link data transfer is layouted optimization method
CN109146149A (en) * 2018-10-09 2019-01-04 苏州智睿新能信息科技有限公司 A kind of electric network fault method for early warning based on the random short-term failure model of equipment
CN109146124A (en) * 2018-06-27 2019-01-04 国家电网有限公司 A kind of distribution terminal transformation decision-making technique based on time-varying crash rate

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060099610A1 (en) * 2004-10-15 2006-05-11 Oy Jurilab Ltd. Method and kit for detecting a risk of acute myocardial infarction
CN106887839A (en) * 2017-03-09 2017-06-23 天津大学 The distribution terminal of the consideration information wrong influence of link data transfer is layouted optimization method
CN109146124A (en) * 2018-06-27 2019-01-04 国家电网有限公司 A kind of distribution terminal transformation decision-making technique based on time-varying crash rate
CN109146149A (en) * 2018-10-09 2019-01-04 苏州智睿新能信息科技有限公司 A kind of electric network fault method for early warning based on the random short-term failure model of equipment

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
R.N.ALLAN等: "《A_reliability_test_system_for_educational_purposes-basic_distribution_system_data_and_results》", 《IEEE》 *
张曦等: "基于故障树分析法的配电终端失效研究", 《电子器件》 *
徐向磊: "《配电网用户供电可靠性计算与改进措施的研究》", 《动力与电气工程》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112001474A (en) * 2020-08-24 2020-11-27 国网江西省电力有限公司经济技术研究院 Power distribution terminal equipment optimal configuration method for power distribution network

Also Published As

Publication number Publication date
CN111382392B (en) 2023-04-18

Similar Documents

Publication Publication Date Title
JP5952127B2 (en) Distribution system disconnection accident detection method and distribution facility management system
CN108919044B (en) Active identification method for unit distribution power grid faults based on mutual verification mechanism
CN106887839B (en) Distribution terminal distribution optimization method considering data transmission error influence of information link
CN111143958A (en) Reliability analysis method for power distribution network information physical system under power distribution automation condition
CN111695231B (en) Practical reliability analysis method for complex power distribution network information physical system
CN111382392B (en) Method for calculating total time of fault handling of power distribution network and method for calculating reliability of total time
CN104834305B (en) Distribution automation terminal remote measurement exception analysis system and method based on DMS systems
CN110456779B (en) DCS system abnormity monitoring device
CN110443481B (en) Power distribution automation terminal state evaluation system and method based on hybrid K-nearest neighbor algorithm
CN115660631A (en) Power distribution terminal state evaluation method based on correction weight fault tree model
CN105404269A (en) Three-remote signal acceptance system of intelligent transformer station
CN112036712A (en) Power distribution terminal state evaluation index weight distribution method
CN115347570B (en) Main-distribution cooperation-based regional power failure range analysis method
CN103997126A (en) Fault diagnosis grading method and system based on on-off state
CN107482767A (en) A kind of distributed measure line loss and the apparatus and method for for monitoring power network
CN114156865B (en) Low-voltage distribution network topology generation and fault prediction method considering state perception
CN110361688A (en) A kind of high voltage customer three-phase intelligent electric-energy meter condition monitoring system and method
CN114256970A (en) Intelligent substation clock synchronization online monitoring method
US11061056B2 (en) Voltage rating validator for advanced metering
CN114123511B (en) Method and system for monitoring and analyzing abnormal position of cable power distribution terminal
CN107622078A (en) A kind of method of the power information collecting device health status of monitoring in real time
CN114117795B (en) Distribution network reliability evaluation method based on load-power supply connectivity analysis
CN112684299B (en) High fault-tolerant identification method and device for power feeder line fault section by using voltage loss information
CN117347778A (en) Wind power plant transmission line fault positioning method and device
CN114298861A (en) Power failure range analysis method and system based on power failure correlation clustering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant