CN111379260A - Foundation pit rapid supporting system with alarming function - Google Patents

Foundation pit rapid supporting system with alarming function Download PDF

Info

Publication number
CN111379260A
CN111379260A CN202010359650.0A CN202010359650A CN111379260A CN 111379260 A CN111379260 A CN 111379260A CN 202010359650 A CN202010359650 A CN 202010359650A CN 111379260 A CN111379260 A CN 111379260A
Authority
CN
China
Prior art keywords
foundation pit
alarm
computer
data acquisition
acquisition terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010359650.0A
Other languages
Chinese (zh)
Inventor
任双喜
李智
郑厚友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan No6 Engineering Co Ltd
Original Assignee
Hunan No6 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan No6 Engineering Co Ltd filed Critical Hunan No6 Engineering Co Ltd
Priority to CN202010359650.0A priority Critical patent/CN111379260A/en
Publication of CN111379260A publication Critical patent/CN111379260A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/18Status alarms
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B5/00Visible signalling systems, e.g. personal calling systems, remote indication of seats occupied
    • G08B5/22Visible signalling systems, e.g. personal calling systems, remote indication of seats occupied using electric transmission; using electromagnetic transmission
    • G08B5/36Visible signalling systems, e.g. personal calling systems, remote indication of seats occupied using electric transmission; using electromagnetic transmission using visible light sources
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/10Miscellaneous comprising sensor means

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Emergency Alarm Devices (AREA)
  • Alarm Systems (AREA)

Abstract

The invention relates to a foundation pit rapid supporting system with an alarm function, which comprises a cross-brace steel pipe, a hydraulic telescopic device, a pressure sensor, a data acquisition terminal, a computer and an alarm device, the two ends of the cross brace steel pipe are respectively connected with the hydraulic telescopic devices which are respectively connected with the steel sheet piles at the two inner sides of the foundation pit, so as to oppositely support the steel sheet piles, the pressure sensors are respectively arranged on the hydraulic telescopic devices, so as to collect the stress data of the two inner sides of the foundation pit, the pressure sensor is electrically connected with a data acquisition terminal, the data acquisition terminal is in data communication with a computer through a communication network, the computer is in communication connection with the alarm device, analyzes the deformation condition of the foundation pit, and gives an alarm through the alarm device when the deformation condition exceeds the warning threshold value. The system is favorable for rapidly supporting the foundation pit, monitoring the deformation of the foundation pit and giving a safety alarm in case of danger.

Description

Foundation pit rapid supporting system with alarming function
Technical Field
The invention relates to the technical field of foundation pit engineering, in particular to a foundation pit rapid supporting system with an alarming function.
Background
As the excavation depth of foundation pit construction is deeper and deeper, monitoring the stress condition of the foundation pit in the construction process becomes an essential important link for engineering construction. The dynamic monitoring of the excavation and underground construction process of the foundation pit is realized through various testing elements pre-embedded in the supporting structure and the foundation, and the dynamic monitoring becomes an important means for realizing safe construction and information-based construction. However, the existing manual observation method or automatic monitoring device has low accuracy, cannot effectively and timely alarm dangerous information through the alarm device, and has limited promotion on the safety construction of the foundation pit.
Disclosure of Invention
The invention aims to provide a foundation pit rapid supporting system with an alarming function, which is favorable for rapidly supporting a foundation pit, monitoring the deformation of the foundation pit and giving a safety alarm in case of danger.
In order to achieve the purpose, the invention adopts the technical scheme that: the utility model provides a quick braced system of foundation ditch that possesses alarming function, includes stull steel pipe, hydraulic telescoping device, pressure sensor, data acquisition terminal, computer and alarm device, stull steel pipe both ends are connected with hydraulic telescoping device respectively, hydraulic telescoping device is connected with the steel sheet pile of two inboards of foundation ditch respectively to prop to the steel sheet pile, install respectively on each hydraulic telescoping device pressure sensor to gather the two inboard stress data of foundation ditch, pressure sensor and data acquisition terminal electric connection, data acquisition terminal carries out data communication through communication network and computer to the foundation ditch stress data of uploading to the computer, computer and alarm device communication connection, the deformation condition of computer analysis foundation ditch, when it surpasss the warning threshold value, report to the police through alarm device.
Further, the pressure sensor is connected between the cross-brace steel pipe and the hydraulic telescopic device through a flange structure, and the hydraulic telescopic device is connected with the steel sheet pile on the foundation pit through a flange.
Further, the data acquisition terminal is in data communication with the computer through a wireless communication network.
Further, the computer is arranged in the project command center, the alarm device comprises an alarm arranged on a safety helmet worn by constructors and a warning lamp connected to the computer, and the computer is in communication connection with the alarm through a wireless communication network.
Furthermore, the foundation pit rapid supporting system comprises a plurality of cross-brace steel pipes and corresponding hydraulic telescopic devices, wherein the cross-brace steel pipes are arranged at intervals along the length direction of the foundation pit, each hydraulic telescopic device is provided with a pressure sensor, each pressure sensor is electrically connected with a data acquisition terminal, and each data acquisition terminal is in data communication with a computer through a wireless communication network.
Furthermore, a plurality of warning thresholds are arranged on the computer, the computer calculates support deformation and foundation pit displacement according to foundation pit stress data uploaded by data acquisition terminals in all areas of the foundation pit, analyzes the change situation of the foundation pit displacement relative to the depth of the foundation pit, judges the danger level of each area of the foundation pit according to the situation that the change situation exceeds different warning thresholds, and sends the danger level of each area of the foundation pit to the alarm on the safety helmet in the corresponding area, and each alarm gives an alarm according to the corresponding danger level through acousto-optic change.
Compared with the prior art, the invention has the following beneficial effects: the utility model provides a possesses alarming function's quick braced system of foundation ditch, this system can monitor the foundation ditch atress when carrying out quick support to the foundation ditch, then monitors the analysis foundation ditch deformation condition through foundation ditch atress data, when its deformation transfinites the time limit, carries out safety alarm. Meanwhile, the alarm is arranged on each constructor to inform each constructor in real time, so that the safety of foundation pit construction is greatly improved, and the method has strong practicability and wide application prospect.
Drawings
Fig. 1 is a schematic view of an installation state in a foundation pit according to an embodiment of the present invention.
FIG. 2 is a general architecture diagram of an embodiment of the present invention.
Detailed Description
The invention is described in further detail below with reference to the figures and the embodiments.
The invention provides a foundation pit rapid supporting system with an alarm function, which comprises a cross-brace steel pipe 1, hydraulic telescoping devices 2, pressure sensors 3, a data acquisition terminal 4, a computer 5 and an alarm device, wherein the hydraulic telescoping devices 2 are respectively connected with two ends of the cross-brace steel pipe 1, the hydraulic telescoping devices 2 are respectively connected with steel sheet piles on two inner sides of a foundation pit so as to oppositely support the steel sheet piles, the pressure sensors 3 are respectively arranged on the hydraulic telescoping devices 2 so as to acquire stress data on the two inner sides of the foundation pit, the pressure sensors 3 are electrically connected with the data acquisition terminal 4, the data acquisition terminal 4 is in data communication with the computer 5 through a communication network so as to upload the stress data of the foundation pit to the computer, the computer 5 is in communication connection with the alarm device, the computer 5 analyzes the deformation condition of the foundation pit, and when the alarm value exceeds the warning threshold value, alarming is carried out through an alarming device.
In this embodiment, the pressure sensor 3 is connected between the wale steel pipe 1 and the hydraulic telescopic device 2 through a flange structure, and the pressure sensor 3 is made of high-strength low-alloy structural steel. The hydraulic telescopic device 2 is also connected with the steel sheet pile on the foundation pit through a flange. The data acquisition terminal 4 is in data communication with the computer 5 through a wireless communication network. The computer 5 is arranged in the project command center, the alarm device comprises an alarm 6 arranged on a safety helmet worn by a constructor and a warning lamp 7 connected to the computer, and the computer 5 is in communication connection with the alarm 6 through a wireless communication network.
In order to perform safety monitoring on the whole foundation pit, the foundation pit rapid supporting system comprises a plurality of cross-brace steel pipes 1 and corresponding hydraulic telescopic devices 2 which are arranged at intervals along the length direction of the foundation pit, wherein each hydraulic telescopic device 2 is respectively provided with a pressure sensor 3, each pressure sensor 3 is respectively and electrically connected with a data acquisition terminal 4, and each data acquisition terminal 4 is in data communication with a computer 5 through a wireless communication network.
In order to ensure the safety of constructors in a foundation pit, a plurality of warning threshold values are arranged on the computer 5, the computer 5 calculates the support deformation and the foundation pit displacement according to foundation pit stress data uploaded by the data acquisition terminals 4 in each region of the foundation pit, analyzes the change situation of the foundation pit displacement relative to the depth of the foundation pit, judges the danger level of each region of the foundation pit according to the situation that the danger level exceeds different warning threshold values, the computer 5 sends the danger level of each region of the foundation pit to the alarm 6 on the safety helmet in the corresponding region, and each alarm 6 gives an alarm according to the corresponding danger level through acousto-optic change, so that the danger region and the danger level are displayed for the constructors, and the constructors can conveniently withdraw.
In this embodiment, the computer 5 is provided with three warning thresholds, and when the warning thresholds do not exceed the first-level warning threshold, the alarm 6 on the safety helmet worn by the constructor and the warning lamp 7 of the project command center are displayed in green; when the first-level warning threshold value is exceeded, an alarm 6 on a safety helmet worn by a constructor and a warning lamp 7 of a project command center are displayed as yellow lamps, so that a warning project manager immediately organizes personnel to find out cracks and changes around the foundation pit; when the secondary warning threshold value is exceeded, an alarm 6 on a safety helmet worn by a constructor and a warning lamp 7 of a project command center are displayed as red lamps, and a project manager is warned to immediately organize personnel to clean the heaped load within 8 meters of the top of the foundation pit; when the alarm exceeds the three-level warning threshold value, the alarm 6 on the safety helmet worn by the constructor is displayed as an orange lamp and gives out a sudden buzzing sound to warn the constructor to rapidly evacuate from the site through the safety channel, and meanwhile, the alarm lamp 7 of the project command center is displayed as an orange lamp and gives out a sudden buzzing sound to warn the project manager to immediately start an emergency plan.
The above are preferred embodiments of the present invention, and all changes made according to the technical scheme of the present invention that produce functional effects do not exceed the scope of the technical scheme of the present invention belong to the protection scope of the present invention.

Claims (6)

1. A foundation pit rapid supporting system with an alarm function is characterized by comprising a cross-brace steel pipe, a hydraulic telescopic device, a pressure sensor, a data acquisition terminal, a computer and an alarm device, the two ends of the cross brace steel pipe are respectively connected with the hydraulic telescopic devices which are respectively connected with the steel sheet piles at the two inner sides of the foundation pit, so as to oppositely support the steel sheet piles, the pressure sensors are respectively arranged on the hydraulic telescopic devices, so as to collect the stress data of the two inner sides of the foundation pit, the pressure sensor is electrically connected with a data acquisition terminal, the data acquisition terminal is in data communication with a computer through a communication network, the computer is in communication connection with the alarm device, analyzes the deformation condition of the foundation pit, and gives an alarm through the alarm device when the deformation condition exceeds the warning threshold value.
2. The foundation pit rapid supporting system with the alarm function as claimed in claim 1, wherein the pressure sensor is connected between the cross-brace steel pipe and the hydraulic telescopic device through a flange structure, and the hydraulic telescopic device is also connected with the steel sheet pile on the foundation pit through a flange.
3. The foundation pit rapid supporting system with the alarm function as claimed in claim 1, wherein the data acquisition terminal is in data communication with the computer through a wireless communication network.
4. The foundation pit rapid supporting system with the alarming function as claimed in claim 1, wherein the computer is arranged in an item command center, the alarming device comprises an alarm arranged on a safety helmet worn by a constructor and a warning lamp connected to the computer, and the computer is in communication connection with the alarm through a wireless communication network.
5. The foundation pit rapid supporting system with the alarm function as claimed in claim 4, wherein the foundation pit rapid supporting system comprises a plurality of cross-brace steel pipes arranged at intervals along the length direction of the foundation pit and corresponding hydraulic telescoping devices, each hydraulic telescoping device is provided with a pressure sensor, each pressure sensor is electrically connected with a data acquisition terminal, and each data acquisition terminal is in data communication with a computer through a wireless communication network.
6. The system for rapidly supporting a foundation pit with an alarm function according to claim 5, wherein a plurality of warning thresholds are arranged on the computer, the computer calculates support deformation and foundation pit displacement according to foundation pit stress data uploaded by data acquisition terminals in each area of the foundation pit, analyzes the change situation of the foundation pit displacement relative to the depth of the foundation pit, and judges the danger level of each area of the foundation pit according to the situation that the danger level exceeds different warning thresholds, the computer sends the danger level of each area of the foundation pit to the alarm devices on the safety helmets in the corresponding area, and each alarm device gives an alarm according to the corresponding danger level through acousto-optic change.
CN202010359650.0A 2020-04-30 2020-04-30 Foundation pit rapid supporting system with alarming function Pending CN111379260A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010359650.0A CN111379260A (en) 2020-04-30 2020-04-30 Foundation pit rapid supporting system with alarming function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010359650.0A CN111379260A (en) 2020-04-30 2020-04-30 Foundation pit rapid supporting system with alarming function

Publications (1)

Publication Number Publication Date
CN111379260A true CN111379260A (en) 2020-07-07

Family

ID=71217640

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010359650.0A Pending CN111379260A (en) 2020-04-30 2020-04-30 Foundation pit rapid supporting system with alarming function

Country Status (1)

Country Link
CN (1) CN111379260A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112482448A (en) * 2020-11-18 2021-03-12 国网山东省电力公司泰安供电公司 Foundation pit hydraulic support monitoring mechanism
CN112681408A (en) * 2020-12-21 2021-04-20 深圳市科振建设工程检测有限公司 Bridge foundation pit deviation detection device
CN115233748A (en) * 2022-07-20 2022-10-25 无锡建设监理咨询有限公司 Supervision detection method and system for foundation pit monitoring

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112482448A (en) * 2020-11-18 2021-03-12 国网山东省电力公司泰安供电公司 Foundation pit hydraulic support monitoring mechanism
CN112681408A (en) * 2020-12-21 2021-04-20 深圳市科振建设工程检测有限公司 Bridge foundation pit deviation detection device
CN115233748A (en) * 2022-07-20 2022-10-25 无锡建设监理咨询有限公司 Supervision detection method and system for foundation pit monitoring

Similar Documents

Publication Publication Date Title
CN111379260A (en) Foundation pit rapid supporting system with alarming function
CN101458069A (en) Tunnel wall rock deformation monitoring method and monitoring system thereof
CN108180885B (en) Automatic monitoring system and method for tunnel deformation
CN109765297A (en) A kind of avalanche early warning method based on the identification of separation failure omen
CN206409275U (en) A kind of safety monitoring system of tunnel operation stage
CN212112675U (en) Quick strutting arrangement of foundation ditch
CN113538840A (en) Intelligent multi-factor coupling active monitoring and early warning system
CN211523299U (en) Foundation pit engineering safety monitoring and supervision device
CN102434208B (en) Method and system for forecasting coal and gas bursting
CN110984255A (en) Foundation pit support structure horizontal displacement monitoring and early warning system
CN212624348U (en) Pipeline security system
CN104216365A (en) Cloud-based remote tunnel surrounding rock displacement monitoring and warning system
CN204286491U (en) A kind of based on pressure sensing shoe puncture supervising device
CN113269950B (en) High slope monitoring device
CN112070999B (en) Underground pipe network protection warning board and vibration signal identification method thereof
CN217478903U (en) Deformation monitoring device for tower crane
CN205151604U (en) Tower machine control appearance of preventing toppling
CN210268562U (en) Digital display roof separation layer displacement alarm
CN202064340U (en) Intelligent early warning system for dynamic compactor
CN114033498A (en) Excavation area 5G + intelligent mine control system and method
CN111402542A (en) Intelligent construction safety monitoring system and safety monitoring method
CN110965596A (en) Excavator alarm system with excavation depth measuring function and method thereof
CN202348345U (en) Automatic alarm system for monitoring tunnel surrounding rocks
CN212052682U (en) Simple automatic alarm device for monitoring water level change and deformation around foundation pit
CN216793068U (en) Comprehensive monitoring and early warning system for underground pipe gallery

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination