CN111331305A - Pipeline installation equipment for construction - Google Patents

Pipeline installation equipment for construction Download PDF

Info

Publication number
CN111331305A
CN111331305A CN202010182406.1A CN202010182406A CN111331305A CN 111331305 A CN111331305 A CN 111331305A CN 202010182406 A CN202010182406 A CN 202010182406A CN 111331305 A CN111331305 A CN 111331305A
Authority
CN
China
Prior art keywords
fixed
fixedly connected
pipeline
dead lever
fixed pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202010182406.1A
Other languages
Chinese (zh)
Inventor
李习勇
王安
冯可云
国海芝
刘浩
李卫军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jingmen Yishengyuan Environmental Protection Technology Co ltd
Original Assignee
Jingmen Yishengyuan Environmental Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jingmen Yishengyuan Environmental Protection Technology Co ltd filed Critical Jingmen Yishengyuan Environmental Protection Technology Co ltd
Priority to CN202010182406.1A priority Critical patent/CN111331305A/en
Publication of CN111331305A publication Critical patent/CN111331305A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • B23K37/053Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work aligning cylindrical work; Clamping devices therefor

Landscapes

  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

The invention provides a pipeline installation device for building construction, which comprises a fixed plate, wherein two sides of the top of the fixed plate are fixedly connected with adjusting mechanisms, and pipelines are arranged at the tops of the adjusting mechanisms. The pipeline installation equipment for building construction solves the problems that pipelines at two ends are inconvenient to adjust and weld due to overlarge pipelines and inconvenient to move, so that the pipelines are welded and have flaws, and the pipelines are inconvenient to fix.

Description

Pipeline installation equipment for construction
Technical Field
The invention belongs to the technical field of building pipeline installation, and particularly relates to pipeline installation equipment for building construction.
Background
The building construction is the production activity in the construction implementation stage of engineering construction, is the construction process of various buildings, also can be said to be the process of changing various lines on the design drawing into real objects in the appointed place, and it includes foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction, etc., and the pipeline is a device for conveying gas, liquid or fluid with solid particles which is connected by pipes, pipe connectors and valves, etc.
Need install the pipeline among the building construction process, the problem that prior art exists is: pipeline for construction is at the in-process of installation, because the pipeline is too big, inconvenient shift position, consequently inconvenient adjusts the welding to both ends pipeline to cause the pipeline welding to have the flaw, the inconvenient fixed phenomenon of pipeline, inconvenient user's use has reduced the practicality of pipeline for construction.
Disclosure of Invention
Aiming at the problems in the prior art, the invention provides a pipeline installation device for building construction, which has the advantage of conveniently supporting, fixing and adjusting a pipeline and solves the problems that pipelines at two ends are inconvenient to adjust and weld due to overlarge pipelines and inconvenient position movement in the installation process of the existing pipeline for building construction, so that the pipeline welding has flaws and the pipeline is inconvenient to fix.
The pipeline installation equipment for building construction comprises a fixed plate, wherein two sides of the top of the fixed plate are fixedly connected with adjusting mechanisms, pipelines are arranged at the tops of the adjusting mechanisms, the top of the surface of each adjusting mechanism is fixedly connected with a rotating mechanism, the front and the back of each adjusting mechanism are fixedly connected with supporting mechanisms, and the bottoms of the supporting mechanisms are fixedly connected with the tops of the fixed plate.
Preferably, the adjusting mechanism includes a fixed tube, the bottom of the fixed tube is fixedly connected to the top of the fixed plate, the front and back of the fixed tube are fixedly connected to the surface of the supporting mechanism, a screw is connected to the inner thread of the fixed tube, the top of the screw penetrates through the fixed tube and extends to the top of the fixed tube, the top of the surface of the screw is fixedly connected to the inner part of the rotating mechanism, the top of the surface of the screw is fixedly connected to a bearing, and the top of the bearing is fixedly connected to a supporting plate.
Preferably, the rotating mechanism comprises a fixing ring, the inner part of the fixing ring is fixedly connected with the top of the surface of the screw rod, the front surface and the back surface of the fixing ring are fixedly connected with first fixing rods, and the surface of each first fixing rod is sleeved with a rubber ring.
Preferably, the supporting mechanism includes a fixing block, one side of the fixing block close to the fixing tube is fixedly connected to the surface of the fixing tube, one side of the fixing block far from the fixing tube is fixedly connected to a second fixing rod, the bottom of the second fixing rod is fixedly connected to the top of the fixing plate, one side of the second fixing rod close to the fixing tube is fixedly connected to a third fixing rod, and one side of the third fixing rod far from the second fixing rod is fixedly connected to the surface of the fixing tube.
Preferably, a fourth fixing rod is arranged at the top of the fixing plate, and both sides of the fourth fixing rod are fixedly connected with the top of the surface of the fixing tube.
Preferably, the surface of the screw is in threaded connection with a threaded sleeve, and the surface of the threaded sleeve is fixedly connected with the inside of the fixed pipe.
Preferably, the bottom of the screw is fixedly connected with a limiting ring, and the surface of the limiting ring is matched with the inner wall of the fixed pipe for use.
Preferably, the top of the support plate is fixedly connected with a rubber pad, and the top of the rubber pad is matched with the surface of the pipeline for use.
Compared with the prior art, the invention has the following beneficial effects:
1. the pipeline installation equipment for building construction solves the problems that pipelines at two ends are inconvenient to adjust and weld due to overlarge pipelines and inconvenient to move, so that the pipelines are welded and have flaws, and the pipelines are inconvenient to fix.
2. By arranging the adjusting mechanism, the pipeline can be conveniently supported and adjusted, the butt joint between the pipelines is convenient, the pipeline is prevented from cracking due to the butt joint problem, the practicability of the device is improved, and the use of a user is facilitated.
3. According to the invention, the rotating mechanism is arranged, so that the screw rod can be conveniently rotated, and the supporting plate can be conveniently adjusted up and down, so that the pipeline can be conveniently supported and fixed, the practicability of the device is improved, and the butt joint of the pipeline is convenient.
4. The supporting mechanism is arranged, so that the fixing pipe can be supported, the fixing pipe is prevented from shaking, the structure is convenient to fix, the structure is prevented from loosening, the use stability of the device is improved, and the use of a user is facilitated.
5. According to the invention, the fourth fixing rod is arranged, so that the two adjusting mechanisms can be conveniently fixed, the left and right shaking of the adjusting mechanisms is avoided, the parallelism of the adjusting mechanisms is improved, and the service life of the device is prolonged.
6. According to the invention, the screw sleeve is arranged, so that the screw rod can conveniently move up and down, the shaking of the screw rod is avoided, the use and the operation of a user are facilitated, and the flexibility of up-and-down adjustment of the device is improved.
7. The limiting ring is arranged, so that the phenomenon that the screw rod is separated from the threaded sleeve can be avoided, the threaded sleeve is prevented from loosening, the use stability of the device is improved, and the use and the operation of a user are facilitated.
8. According to the invention, the rubber pad is arranged, so that the abrasion between the supporting plate and the pipeline can be reduced, the service life of the supporting plate is prolonged, the use by a user is facilitated, and the structure is prevented from loosening.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, illustrate embodiments of the invention and, together with the description, serve to explain the invention and not to limit the invention. In the drawings:
FIG. 1 is a schematic diagram of a structure provided by an embodiment of the present invention;
FIG. 2 is a perspective view of an adjustment mechanism and support mechanism provided by an embodiment of the present invention;
FIG. 3 is an enlarged view of a portion of FIG. A in accordance with an embodiment of the present invention;
FIG. 4 is an enlarged view of a portion of FIG. B in accordance with an embodiment of the present invention;
FIG. 5 is a front view of a spacing collar provided in accordance with an embodiment of the present invention;
fig. 6 is a partial enlarged view of fig. C provided in accordance with an embodiment of the present invention.
Wherein the figures include the following reference numerals:
1. a fixing plate; 2. an adjustment mechanism; 201. a fixed tube; 202. a screw; 203. a bearing; 204. a support plate; 3. a pipeline; 4. a rotating mechanism; 401. a stationary ring; 402. a first fixing lever; 403. a rubber ring; 5. a support mechanism; 501. a fixed block; 502. a second fixing bar; 503. a third fixing bar; 6. a fourth fixing bar; 7. a threaded sleeve; 8. a limiting ring; 9. and (7) a rubber pad.
Detailed Description
It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict. The present invention will be described in detail below with reference to the embodiments with reference to the attached drawings.
It should be noted that the following detailed description is exemplary and is intended to provide further explanation of the disclosure. Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs.
Spatially relative terms, such as "above … …," "above … …," "above … …," "above," and the like, may be used herein for ease of description to describe one device or feature's spatial relationship to another device or feature as illustrated in the figures. It will be understood that the spatially relative terms are intended to encompass different orientations of the device in use or operation in addition to the orientation depicted in the figures. For example, if a device in the figures is turned over, devices described as "above" or "on" other devices or configurations would then be oriented "below" or "under" the other devices or configurations. Thus, the exemplary term "above … …" can include both an orientation of "above … …" and "below … …". The device may be otherwise variously oriented (rotated 90 degrees or at other orientations) and the spatially relative descriptors used herein interpreted accordingly.
Exemplary embodiments according to the present application will now be described in more detail with reference to the accompanying drawings. These exemplary embodiments may, however, be embodied in many different forms and should not be construed as limited to only the embodiments set forth herein. It is to be understood that these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the concept of the exemplary embodiments to those skilled in the art, in the drawings, the thicknesses of layers and regions are exaggerated for clarity, and the same devices are denoted by the same reference numerals, and thus the description thereof will be omitted.
As shown in fig. 1 to 6, a pipeline installation device for building construction according to an embodiment of the present invention includes a fixing plate 1, adjusting mechanisms 2 are fixedly connected to both sides of the top of the fixing plate 1, a pipeline 3 is disposed on the top of the adjusting mechanism 2, a rotating mechanism 4 is fixedly connected to the top of the surface of the adjusting mechanism 2, supporting mechanisms 5 are fixedly connected to both the front and back of the adjusting mechanism 2, and the bottoms of the supporting mechanisms 5 are fixedly connected to the top of the fixing plate 1.
Referring to fig. 2, the adjusting mechanism 2 includes a fixing tube 201, the bottom of the fixing tube 201 is fixedly connected to the top of the fixing plate 1, the front and back of the fixing tube 201 are fixedly connected to the surface of the supporting mechanism 5, a screw 202 is connected to the inner thread of the fixing tube 201, the top of the screw 202 penetrates through the fixing tube 201 and extends to the top of the fixing tube 201, the top of the surface of the screw 202 is fixedly connected to the inner surface of the rotating mechanism 4, a bearing 203 is fixedly connected to the top of the surface of the screw 202, and a supporting plate 204 is fixedly connected to the top of the bearing 203.
Adopt above-mentioned scheme: through setting up adjustment mechanism 2, can conveniently support the regulation to pipeline 3, make things convenient for the butt joint between the pipeline 3, avoid pipeline 3 because the butt joint problem leads to pipeline 3's fracture, improved the practicality of device, person's of facilitating the use's use.
Referring to fig. 3 and 4, the rotating mechanism 4 includes a fixing ring 401, the inside of the fixing ring 401 is fixedly connected to the top of the surface of the screw 202, a first fixing rod 402 is fixedly connected to both the front and back of the fixing ring 401, and a rubber ring 403 is sleeved on the surface of the first fixing rod 402.
Adopt above-mentioned scheme: through setting up slewing mechanism 4, can conveniently rotate screw rod 202, make things convenient for the upper and lower regulation of backup pad 204 to make things convenient for pipeline 3's support and fixed, improved the practicality of device, make things convenient for pipeline 3's butt joint.
Referring to fig. 2, the supporting mechanism 5 includes a fixing block 501, one side of the fixing block 501 close to the fixing tube 201 is fixedly connected to the surface of the fixing tube 201, one side of the fixing block 501 far from the fixing tube 201 is fixedly connected to a second fixing rod 502, the bottom of the second fixing rod 502 is fixedly connected to the top of the fixing plate 1, one side of the second fixing rod 502 close to the fixing tube 201 is fixedly connected to a third fixing rod 503, and one side of the third fixing rod 503 far from the second fixing rod 502 is fixedly connected to the surface of the fixing tube 201.
Adopt above-mentioned scheme: through setting up supporting mechanism 5, can play the supporting role to fixed pipe 201, avoid rocking of fixed pipe 201, make things convenient for the fixed of structure, avoid not hard up of structure, improve the stability that the device used, the person's of facilitating the use.
Referring to fig. 1 and 2, a fourth fixing rod 6 is disposed on the top of the fixing plate 1, and both sides of the fourth fixing rod 6 are fixedly connected to the top of the surface of the fixing tube 201.
Adopt above-mentioned scheme: through setting up fourth dead lever 6, can make things convenient for two adjustment mechanism 2 fixed, avoid adjustment mechanism 2 to control and rock, improved adjustment mechanism 2's depth of parallelism simultaneously, increase the life of device.
Referring to fig. 5, a threaded sleeve 7 is threadedly coupled to a surface of the screw 202, and a surface of the threaded sleeve 7 is fixedly coupled to an inside of the fixed pipe 201.
Adopt above-mentioned scheme: through setting up swivel nut 7, can make things convenient for reciprocating of screw rod 202, avoid rocking of screw rod 202, the flexibility of adjusting about having improved the device is used and the operation of person of facilitating the use.
Referring to fig. 5, the bottom of the screw 202 is fixedly connected with a spacing ring 8, and the surface of the spacing ring 8 is matched with the inner wall of the fixed pipe 201.
Adopt above-mentioned scheme: through setting up spacing collar 8, can avoid screw rod 202 the phenomenon that breaks away from swivel nut 7 to appear, avoid the not hard up of swivel nut 7, improve the stability that the device used, person of facilitating the use's use and operation.
Referring to fig. 2, a rubber pad 9 is fixedly connected to the top of the supporting plate 204, and the top of the rubber pad 9 is used in cooperation with the surface of the pipeline 3.
Adopt above-mentioned scheme: through setting up rubber pad 9, can reduce the wearing and tearing between backup pad 204 and the pipeline 3, increase backup pad 204's life, the not hard up of structure is avoided in the person's of facilitating the use's use.
The working principle of the invention is as follows:
when the device is used, when a user needs to support and adjust the pipeline 3, the device is placed at the bottom of the pipeline 3, the fixing plate 1 is in contact with the ground, the first fixing rod 402 is rotated, the first fixing rod 402 drives the fixing ring 401 to rotate, the fixing ring 401 drives the screw 202 to rotate, the screw 202 is matched with the threaded sleeve 7 to enable the screw 202 to move up and down, when the screw 202 moves up, the screw 202 drives the bearing 203 to move up, the bearing 203 drives the supporting plate 204 to move up, meanwhile, the user can rotate the supporting plate 204 to enable the pipeline 3 to be clamped on the upper surface of the supporting plate 204, the pipelines 3 at two ends are aligned and welded by adjusting and rotating the adjusting mechanisms 2 at two sides, when the welding is completed, the first fixing rod 402 is rotated to enable the first fixing rod 402 to drive the screw 202 to move down through the fixing ring 401, and the screw 202 drives the bearing 203 and, the disassembly of the device is completed, the fixing block 501, the second fixing rod 502 and the third fixing rod 503 continuously support the adjusting mechanism 2, the stability of the device is improved, the fourth fixing rod 6 enables the adjusting mechanism 2 to be more stable, and the practicability of the device is improved.
In summary, the following steps: this pipeline installation equipment for construction, through setting up fixed plate 1, adjustment mechanism 2, fixed pipe 201, screw rod 202, bearing 203, backup pad 204, pipeline 3, slewing mechanism 4, retainer plate 401, first dead lever 402, rubber ring 403, supporting mechanism 5, fixed block 501, second dead lever 502, third dead lever 503, fourth dead lever 6, swivel nut 7, the cooperation of spacing collar 8 and rubber pad 9 is used, the in-process of current pipeline for construction at the installation has been solved, because the pipeline is too big, inconvenient shift position, consequently, the welding is adjusted to both ends pipeline to it is inconvenient, thereby cause pipeline welding to have the flaw, the inconvenient fixed problem of pipeline.
It is noted that the terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of example embodiments according to the present application. As used herein, the singular forms "a", "an" and "the" are intended to include the plural forms as well, and it should be understood that when the terms "comprises" and/or "comprising" are used in this specification, they specify the presence of stated features, steps, operations, devices, components, and/or combinations thereof, unless the context clearly indicates otherwise.
It should be noted that the terms "first," "second," and the like in the description and claims of this application and in the drawings described above are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order. It is to be understood that the data so used is interchangeable under appropriate circumstances such that the embodiments of the application described herein are, for example, capable of operation in sequences other than those illustrated or otherwise described herein. Furthermore, the terms "comprises," "comprising," and "having," and any variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, system, article, or apparatus that comprises a list of steps or elements is not necessarily limited to those steps or elements expressly listed, but may include other steps or elements not expressly listed or inherent to such process, method, article, or apparatus.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. The utility model provides a pipeline erection equipment for construction, includes fixed plate (1), its characterized in that: the utility model discloses a pipeline fixing device, including fixed plate (1), the equal fixedly connected with adjustment mechanism (2) in both sides at fixed plate (1) top, the top of adjustment mechanism (2) is provided with pipeline (3), the top fixedly connected with slewing mechanism (4) on adjustment mechanism (2) surface, the equal fixedly connected with supporting mechanism (5) in front and the back of adjustment mechanism (2), the bottom of supporting mechanism (5) and the top fixed connection of fixed plate (1).
2. The piping installation equipment for construction work of claim 1, wherein: adjustment mechanism (2) are including fixed pipe (201), the bottom of fixed pipe (201) and the top fixed connection of fixed plate (1), the front and the back of fixed pipe (201) all are connected with the fixed surface of supporting mechanism (5), the inside threaded connection of fixed pipe (201) has screw rod (202), the top of screw rod (202) runs through fixed pipe (201) and extends to the top of fixed pipe (201), the inside fixed connection of the top on screw rod (202) surface and slewing mechanism (4), the top fixedly connected with bearing (203) on screw rod (202) surface, the top fixedly connected with backup pad (204) of bearing (203).
3. The piping installation equipment for construction work as set forth in claim 2, wherein: slewing mechanism (4) include retainer plate (401), the inside and the top fixed connection on screw rod (202) surface of retainer plate (401), the first dead lever (402) of the equal fixedly connected with in front and the back of retainer plate (401), the surface cover of first dead lever (402) is equipped with rubber circle (403).
4. The piping installation equipment for construction work as set forth in claim 2, wherein: supporting mechanism (5) are including fixed block (501), fixed block (501) are close to one side of fixed pipe (201) and the fixed surface fixed connection of fixed pipe (201), one side fixedly connected with second dead lever (502) of fixed pipe (201) are kept away from to fixed block (501), the bottom of second dead lever (502) and the top fixed connection of fixed plate (1), one side fixedly connected with third dead lever (503) that second dead lever (502) are close to fixed pipe (201), one side and the fixed surface fixed connection of fixed pipe (201) of second dead lever (502) are kept away from in third dead lever (503).
5. The piping installation equipment for construction work as set forth in claim 2, wherein: the top of fixed plate (1) is provided with fourth dead lever (6), the both sides of fourth dead lever (6) all with the top fixed connection on fixed pipe (201) surface.
6. The piping installation equipment for construction work as set forth in claim 2, wherein: the surface of the screw rod (202) is in threaded connection with a threaded sleeve (7), and the surface of the threaded sleeve (7) is fixedly connected with the inside of the fixed pipe (201).
7. The piping installation equipment for construction work as set forth in claim 2, wherein: the bottom fixedly connected with spacing collar (8) of screw rod (202), the surface of spacing collar (8) is used with the inner wall cooperation of fixed pipe (201).
8. The piping installation equipment for construction work as set forth in claim 2, wherein: the top of the supporting plate (204) is fixedly connected with a rubber pad (9), and the top of the rubber pad (9) is matched with the surface of the pipeline (3) for use.
CN202010182406.1A 2020-03-16 2020-03-16 Pipeline installation equipment for construction Withdrawn CN111331305A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010182406.1A CN111331305A (en) 2020-03-16 2020-03-16 Pipeline installation equipment for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010182406.1A CN111331305A (en) 2020-03-16 2020-03-16 Pipeline installation equipment for construction

Publications (1)

Publication Number Publication Date
CN111331305A true CN111331305A (en) 2020-06-26

Family

ID=71176453

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010182406.1A Withdrawn CN111331305A (en) 2020-03-16 2020-03-16 Pipeline installation equipment for construction

Country Status (1)

Country Link
CN (1) CN111331305A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112177336A (en) * 2020-09-24 2021-01-05 梁桂清 Construction concrete bracket cast-in-place construction method

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080106018A1 (en) * 2006-11-08 2008-05-08 Bob Bellavance Pivoting head for welding stand
CN101870056A (en) * 2010-06-10 2010-10-27 无锡华联科技集团有限公司 Handheld lifting wheel holding mechanism
CN202106162U (en) * 2011-04-22 2012-01-11 中国石油天然气集团公司 Butting joint alignment device for butt welding of tubes
CN203045250U (en) * 2013-01-17 2013-07-10 无锡肯克重工设备有限公司 Manual lifting supporting device
CN203092059U (en) * 2013-02-07 2013-07-31 河南机电高等专科学校 Power pipeline processing assembly supporting frame
CN103433679A (en) * 2013-07-25 2013-12-11 湖州天和机械有限公司 Roller tube support device of automatic electric welding machine
CN203992971U (en) * 2014-06-19 2014-12-10 中国海洋石油总公司 The line holder of liftable, rotation
CN105798442A (en) * 2016-03-31 2016-07-27 广东省焊接技术研究所(广东省中乌研究院) Rotary type plasma removing system for flash butt welding seam burrs outside pipes
CN106002067A (en) * 2016-06-13 2016-10-12 济南大学 Auxiliary supporting fixture for circular tube cutting
CN206246825U (en) * 2016-12-19 2017-06-13 郑州铁路职业技术学院 A kind of communication cable ditch inner cable support
US20170182604A1 (en) * 2015-12-29 2017-06-29 Sumner Manufacturing Co., Inc. Jack stand apparatus adaptable to various diameters of pipe
CN107906255A (en) * 2017-12-19 2018-04-13 成都大漠石油技术有限公司 Supporting mechanism for petroleum pipeline hanging part
CN207494848U (en) * 2017-09-19 2018-06-15 自贡华西能源工业有限公司 A kind of regulating device welded for header with tube panel
CN207982675U (en) * 2018-01-23 2018-10-19 海洋石油工程股份有限公司 Rotary lifting-type pipeline assembling device
CN208670276U (en) * 2018-06-29 2019-03-29 王善亮 A kind of adjustable natural gas extraction pipeline support frame
CN208687105U (en) * 2018-12-27 2019-04-02 四川中喻环境治理有限公司 A kind of water supply pipe mounting rack with detection function

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080106018A1 (en) * 2006-11-08 2008-05-08 Bob Bellavance Pivoting head for welding stand
CN101870056A (en) * 2010-06-10 2010-10-27 无锡华联科技集团有限公司 Handheld lifting wheel holding mechanism
CN202106162U (en) * 2011-04-22 2012-01-11 中国石油天然气集团公司 Butting joint alignment device for butt welding of tubes
CN203045250U (en) * 2013-01-17 2013-07-10 无锡肯克重工设备有限公司 Manual lifting supporting device
CN203092059U (en) * 2013-02-07 2013-07-31 河南机电高等专科学校 Power pipeline processing assembly supporting frame
CN103433679A (en) * 2013-07-25 2013-12-11 湖州天和机械有限公司 Roller tube support device of automatic electric welding machine
CN203992971U (en) * 2014-06-19 2014-12-10 中国海洋石油总公司 The line holder of liftable, rotation
US20170182604A1 (en) * 2015-12-29 2017-06-29 Sumner Manufacturing Co., Inc. Jack stand apparatus adaptable to various diameters of pipe
CN105798442A (en) * 2016-03-31 2016-07-27 广东省焊接技术研究所(广东省中乌研究院) Rotary type plasma removing system for flash butt welding seam burrs outside pipes
CN106002067A (en) * 2016-06-13 2016-10-12 济南大学 Auxiliary supporting fixture for circular tube cutting
CN206246825U (en) * 2016-12-19 2017-06-13 郑州铁路职业技术学院 A kind of communication cable ditch inner cable support
CN207494848U (en) * 2017-09-19 2018-06-15 自贡华西能源工业有限公司 A kind of regulating device welded for header with tube panel
CN107906255A (en) * 2017-12-19 2018-04-13 成都大漠石油技术有限公司 Supporting mechanism for petroleum pipeline hanging part
CN207982675U (en) * 2018-01-23 2018-10-19 海洋石油工程股份有限公司 Rotary lifting-type pipeline assembling device
CN208670276U (en) * 2018-06-29 2019-03-29 王善亮 A kind of adjustable natural gas extraction pipeline support frame
CN208687105U (en) * 2018-12-27 2019-04-02 四川中喻环境治理有限公司 A kind of water supply pipe mounting rack with detection function

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112177336A (en) * 2020-09-24 2021-01-05 梁桂清 Construction concrete bracket cast-in-place construction method
CN112177336B (en) * 2020-09-24 2022-04-01 东莞市鹏泰建设工程有限公司 Construction concrete bracket cast-in-place construction method

Similar Documents

Publication Publication Date Title
CN111331305A (en) Pipeline installation equipment for construction
CN203418255U (en) Adjustable pipe fitting fitting-up bracket
CN207526094U (en) H profile steel crossbeam hangs flap seat
CN207509331U (en) Plastic pipe cutting device
CN206889921U (en) High-pressure rubber pipe Quick Connect Kit
CN211219447U (en) Welding auxiliary device for pipeline welding
CN211315348U (en) Pipeline spring support and hanger
CN208614311U (en) A kind of building pipe clamping device
CN210218906U (en) Pipe laying and paying-off device for hydraulic engineering
CN208396116U (en) A kind of antidetonation suspension and support
CN217683563U (en) Connecting device of municipal water supply pipeline
CN206582400U (en) A kind of rotary glass steel cable holder device
CN109434369A (en) A kind of pipe rotary welding platform
CN212004603U (en) Quick connector for stainless steel pipe fitting
CN108274169A (en) Novel suspention is stretched bonding machine
CN218799992U (en) Fixing structure for building engineering pipeline
CN210687250U (en) Natural gas line junction supports protection device
CN210118531U (en) Urban gas engineering pipeline supporting device
CN208795272U (en) A kind of changeable type test fixture
CN208565815U (en) A kind of device for fixed bottom boundary high-pressure hose
CN211940656U (en) Supporting and moving device for quickly installing pipeline
CN206952471U (en) A kind of fire hydrant ring flange positioning device for welding
CN206722787U (en) A kind of polished rod sealer deviation correcting device and polished rod seal component
CN206723684U (en) A kind of Novel elbow pipe structure
CN204163414U (en) A kind of case beam wets the synovial membrane bracket of seam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20200626