CN111305899A - 用于地铁车站拱盖法施工临时支撑拆除长度确定的方法 - Google Patents
用于地铁车站拱盖法施工临时支撑拆除长度确定的方法 Download PDFInfo
- Publication number
- CN111305899A CN111305899A CN202010117569.1A CN202010117569A CN111305899A CN 111305899 A CN111305899 A CN 111305899A CN 202010117569 A CN202010117569 A CN 202010117569A CN 111305899 A CN111305899 A CN 111305899A
- Authority
- CN
- China
- Prior art keywords
- random forest
- temporary support
- algorithm
- value
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 74
- 238000010276 construction Methods 0.000 title claims abstract description 58
- 238000007637 random forest analysis Methods 0.000 claims abstract description 120
- 238000012549 training Methods 0.000 claims abstract description 87
- 239000011435 rock Substances 0.000 claims abstract description 82
- 238000004422 calculation algorithm Methods 0.000 claims description 95
- 241000544061 Cuculus canorus Species 0.000 claims description 49
- 238000012544 monitoring process Methods 0.000 claims description 43
- 230000008569 process Effects 0.000 claims description 34
- 235000005770 birds nest Nutrition 0.000 claims description 33
- 235000005765 wild carrot Nutrition 0.000 claims description 33
- 230000008859 change Effects 0.000 claims description 25
- 238000004088 simulation Methods 0.000 claims description 24
- 230000008878 coupling Effects 0.000 claims description 17
- 238000010168 coupling process Methods 0.000 claims description 17
- 238000005859 coupling reaction Methods 0.000 claims description 17
- 238000003066 decision tree Methods 0.000 claims description 17
- 238000004364 calculation method Methods 0.000 claims description 14
- 238000012360 testing method Methods 0.000 claims description 10
- 238000013461 design Methods 0.000 claims description 9
- 229910000831 Steel Inorganic materials 0.000 claims description 7
- 239000010959 steel Substances 0.000 claims description 7
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims description 6
- 238000005457 optimization Methods 0.000 claims description 5
- 239000002689 soil Substances 0.000 claims description 3
- 230000001737 promoting effect Effects 0.000 abstract description 3
- 230000006870 function Effects 0.000 description 13
- 238000010586 diagram Methods 0.000 description 6
- 238000010801 machine learning Methods 0.000 description 6
- 102100036568 Cell cycle and apoptosis regulator protein 2 Human genes 0.000 description 3
- 101000715194 Homo sapiens Cell cycle and apoptosis regulator protein 2 Proteins 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 238000013507 mapping Methods 0.000 description 2
- 238000005192 partition Methods 0.000 description 2
- 238000012935 Averaging Methods 0.000 description 1
- 201000004569 Blindness Diseases 0.000 description 1
- 238000012952 Resampling Methods 0.000 description 1
- 230000003044 adaptive effect Effects 0.000 description 1
- 125000004122 cyclic group Chemical group 0.000 description 1
- 238000007405 data analysis Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000013138 pruning Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000005070 sampling Methods 0.000 description 1
- 230000011218 segmentation Effects 0.000 description 1
- 229910000702 sendust Inorganic materials 0.000 description 1
- 239000013598 vector Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
- E21F17/18—Special adaptations of signalling or alarm devices
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N20/00—Machine learning
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
- G06T17/20—Finite element generation, e.g. wire-frame surface description, tesselation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T2210/00—Indexing scheme for image generation or computer graphics
- G06T2210/04—Architectural design, interior design
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Geochemistry & Mineralogy (AREA)
- Software Systems (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Physics & Mathematics (AREA)
- Geometry (AREA)
- Computer Graphics (AREA)
- Structural Engineering (AREA)
- Artificial Intelligence (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Data Mining & Analysis (AREA)
- Evolutionary Computation (AREA)
- Medical Informatics (AREA)
- Computing Systems (AREA)
- General Engineering & Computer Science (AREA)
- Mathematical Physics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010117569.1A CN111305899B (zh) | 2020-02-25 | 2020-02-25 | 用于地铁车站拱盖法施工临时支撑拆除长度确定的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010117569.1A CN111305899B (zh) | 2020-02-25 | 2020-02-25 | 用于地铁车站拱盖法施工临时支撑拆除长度确定的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111305899A true CN111305899A (zh) | 2020-06-19 |
CN111305899B CN111305899B (zh) | 2021-09-14 |
Family
ID=71149323
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010117569.1A Active CN111305899B (zh) | 2020-02-25 | 2020-02-25 | 用于地铁车站拱盖法施工临时支撑拆除长度确定的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111305899B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112699166A (zh) * | 2020-12-28 | 2021-04-23 | 中铁一局集团第二工程有限公司 | 一种拱盖法多元信息监测装置及预测方法 |
CN112906102A (zh) * | 2021-01-18 | 2021-06-04 | 大连海事大学 | 一种地铁车站拱盖法施工中高边墙钢管桩参数优化方法 |
CN113931167A (zh) * | 2021-10-12 | 2022-01-14 | 上海城建市政工程(集团)有限公司 | 一种槽壁内切的地下连续墙槽壁加固的方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104965969A (zh) * | 2015-04-20 | 2015-10-07 | 广西大学 | 一种大型洞室群围岩力学参数反演方法 |
CN107253195A (zh) * | 2017-07-31 | 2017-10-17 | 中南大学 | 一种运载机器人手臂操控自适应混合学习映射智能控制方法及*** |
CN109597401A (zh) * | 2018-12-06 | 2019-04-09 | 华中科技大学 | 一种基于数据驱动的设备故障诊断方法 |
CN109657945A (zh) * | 2018-12-06 | 2019-04-19 | 华中科技大学 | 一种基于数据驱动的工业生产过程故障诊断方法 |
CN109886465A (zh) * | 2019-01-20 | 2019-06-14 | 东北电力大学 | 一种基于智能电表用户聚类分析的配电网负荷预测方法 |
-
2020
- 2020-02-25 CN CN202010117569.1A patent/CN111305899B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104965969A (zh) * | 2015-04-20 | 2015-10-07 | 广西大学 | 一种大型洞室群围岩力学参数反演方法 |
CN107253195A (zh) * | 2017-07-31 | 2017-10-17 | 中南大学 | 一种运载机器人手臂操控自适应混合学习映射智能控制方法及*** |
CN109597401A (zh) * | 2018-12-06 | 2019-04-09 | 华中科技大学 | 一种基于数据驱动的设备故障诊断方法 |
CN109657945A (zh) * | 2018-12-06 | 2019-04-19 | 华中科技大学 | 一种基于数据驱动的工业生产过程故障诊断方法 |
CN109886465A (zh) * | 2019-01-20 | 2019-06-14 | 东北电力大学 | 一种基于智能电表用户聚类分析的配电网负荷预测方法 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112699166A (zh) * | 2020-12-28 | 2021-04-23 | 中铁一局集团第二工程有限公司 | 一种拱盖法多元信息监测装置及预测方法 |
CN112699166B (zh) * | 2020-12-28 | 2022-07-15 | 中铁一局集团第二工程有限公司 | 一种拱盖法多元信息监测装置 |
CN112906102A (zh) * | 2021-01-18 | 2021-06-04 | 大连海事大学 | 一种地铁车站拱盖法施工中高边墙钢管桩参数优化方法 |
CN112906102B (zh) * | 2021-01-18 | 2022-09-20 | 大连海事大学 | 一种地铁车站拱盖法施工中高边墙钢管桩参数优化方法 |
CN113931167A (zh) * | 2021-10-12 | 2022-01-14 | 上海城建市政工程(集团)有限公司 | 一种槽壁内切的地下连续墙槽壁加固的方法 |
Also Published As
Publication number | Publication date |
---|---|
CN111305899B (zh) | 2021-09-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111305899B (zh) | 用于地铁车站拱盖法施工临时支撑拆除长度确定的方法 | |
CN110852018B (zh) | 基于神经网络的pso钻井参数优化方法 | |
US10900328B2 (en) | Computer implemented method for generating a field development plan (FDP) for the exploitation of oil and gas reservoirs | |
CN110442666B (zh) | 一种基于神经网络模型的矿产资源预测方法及*** | |
Vardakos et al. | Parameter identification in numerical modeling of tunneling using the Differential Evolution Genetic Algorithm (DEGA) | |
CN108287808A (zh) | 一种面向结构可靠性分析的通用动态追踪序列采样方法 | |
CN110688689A (zh) | 一种基于多源监测数据融合的隧道变形预测方法 | |
CN110705178A (zh) | 一种基于机器学习的隧道/地铁施工全过程围岩变形动态预测方法 | |
CN106327023A (zh) | 输电工程工时定额测定方法及装置 | |
CN114720272A (zh) | 基于多元地质信息融合的隧道支护体系设计方法及*** | |
Rajabi et al. | Studying the deformation and stability of rock mass surrounding the power station caverns using NA and GEP models | |
CN109711063A (zh) | 一种适用于上软下硬地层的车站暗挖进尺调整方法与装置 | |
CN116911216B (zh) | 一种储层油井产能因素评估与预测方法 | |
CN117743978A (zh) | 基于梯度提升决策树和随钻参数的岩体完整性识别方法 | |
Lee et al. | Quick prediction of tunnel displacements using Artificial Neural Network and field measurement results | |
CN110288726B (zh) | 一种基于bp神经网络甘蔗转运车危险预测方法 | |
CN111815769A (zh) | 逆冲推覆构造带构造的建模方法、计算设备及存储介质 | |
CN117574781B (zh) | 抽水蓄能电站地下厂房围岩安全风险智能预测方法及*** | |
CN117474170B (zh) | 基于神经网络的盾构沉降形变模型构建方法 | |
CN117669393B (zh) | 一种***块度不确定性预测方法及*** | |
CN115659772A (zh) | 一种富水区拱盖法车站流固耦合参数的实时反演方法 | |
CN117972852A (zh) | 一种基于多源异构数据和机器学习的岩爆动态预测方法 | |
CN115758527A (zh) | 支护参数预测模型的训练方法、确定方法、装置及设备 | |
ADAK et al. | ENHANCING LARGE UNDERGROUND EXCAVATION RISK ASSESSMENT: OPTIMIZATION THROUGH INFORMATION SYSTEMS | |
CN117952196A (zh) | 基于数据-知识双驱动的tbm掘进参数智慧辅助决策***及方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Jiang Annan Inventor after: Rong Zhuo Inventor after: Xie Tianxiang Inventor after: Gao Junfeng Inventor after: Wang Honglong Inventor after: Wang Yan Inventor after: Guo Xinping Inventor after: Yu Hai Inventor after: Zhang Zilong Inventor after: Xu Chengquan Inventor after: Li Shian Inventor after: Du Hualin Inventor after: Chen Qiang Inventor after: Guo Wangen Inventor before: Jiang Annan Inventor before: Xie Tianxiang Inventor before: Gao Junfeng Inventor before: Yu Hai Inventor before: Wang Honglong Inventor before: Wang Yan Inventor before: Guo Xinping Inventor before: Zhang Zilong Inventor before: Xu Chengquan Inventor before: Li Shian Inventor before: Du Hualin Inventor before: Chen Qiang Inventor before: Guo Wangen Inventor before: Rong Zhuo |