CN111287532A - Assembled hangar portal system - Google Patents
Assembled hangar portal system Download PDFInfo
- Publication number
- CN111287532A CN111287532A CN202010097036.1A CN202010097036A CN111287532A CN 111287532 A CN111287532 A CN 111287532A CN 202010097036 A CN202010097036 A CN 202010097036A CN 111287532 A CN111287532 A CN 111287532A
- Authority
- CN
- China
- Prior art keywords
- rod
- connecting piece
- pipe
- flat
- stay cable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H6/00—Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages
- E04H6/44—Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages for storing aircraft
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H15/00—Tents or canopies, in general
- E04H15/32—Parts, components, construction details, accessories, interior equipment, specially adapted for tents, e.g. guy-line equipment, skirts, thresholds
- E04H15/34—Supporting means, e.g. frames
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Tents Or Canopies (AREA)
Abstract
The invention discloses an assembled hangar portal system which comprises at least two vertical portals which are arranged in parallel and tarpaulin covering the outer sides of the portals, wherein each portal comprises a first rod seat connecting piece, a second rod seat connecting piece, a first upright rod, a second upright rod, a first flat rod, a second flat rod, a third flat rod, a fourth flat rod, a first stay cable, a second stay cable, a first upright post, a second upright post, a first oblique post, a second oblique post, a horizontal stay cable, a rod connecting piece and an ejector rod. The invention has the beneficial effects that: the disassembly and assembly are convenient and quick.
Description
Technical Field
The invention relates to an assembled hangar portal system.
Background
The assembled hangar has the advantages of flexible and convenient assembly, and the technical problem to be solved urgently by technical personnel in the field is solved by how to design the assembled hangar which is convenient and quick to disassemble and assemble.
Disclosure of Invention
The invention aims to provide an assembled hangar portal system which is convenient and quick to assemble and disassemble.
In order to achieve the purpose, the invention adopts the technical scheme that
An assembled hangar portal system comprises at least two vertical portals which are arranged in parallel and tarpaulin which covers the outer sides of the portals,
the portal frame comprises a first pole base connecting piece, a second pole base connecting piece, a first vertical pole, a second vertical pole, a first flat pole, a second flat pole, a third flat pole, a fourth flat pole, a first stay cable, a second stay cable, a first upright post, a second upright post, a first oblique post, a second oblique post, a horizontal stay cable, a pole connecting piece and a top pole; the rod-rod connectors comprise a first rod-rod connector, a second rod-rod connector, a third rod-rod connector, a fourth rod-rod connector, a fifth rod-rod connector and a sixth rod-rod connector;
the first rod seat connecting piece is connected with the bottom end of the first vertical rod, the top end of the first vertical rod is connected with the first end of the first flat rod through the first rod connecting piece, the second end of the first flat rod is connected with the first end of the second flat rod through the second rod connecting piece, the second end of the second flat rod is connected with the first end of the ejector rod through the third rod connecting piece, the second end of the ejector rod is connected with the first end of the third flat rod through the fourth rod connecting piece, the second end of the third flat rod is connected with the first end of the fourth flat rod through the fifth rod connecting piece, the second end of the fourth flat rod is connected with the top end of the second vertical column through the sixth rod connecting piece, and the bottom end of the second vertical column is connected with the second rod seat connecting piece;
the first rod connecting piece and the third rod connecting piece are connected through a first stay cable, the fourth rod connecting piece and the sixth rod connecting piece are connected through a second stay cable, the second rod connecting piece and the fourth rod connecting piece are connected through a horizontal stay cable, the third rod connecting piece is connected with the horizontal stay cable through a first upright post, the fourth rod connecting piece is connected with the horizontal stay cable through a second upright post, the third rod connecting piece is connected with the horizontal stay cable through a first inclined post, the fourth rod connecting piece is connected with the horizontal stay cable through a second inclined post, and the intersection point of the first inclined post and the horizontal stay cable is the same as the intersection point of the second inclined post and the horizontal stay cable;
the door frames are connected through a longitudinal support rod;
first pole connecting piece includes the steel connecting pipe, the lateral wall of steel connecting pipe is equipped with the screw, be furnished with the bolt with steel connecting pipe and the part locking that inserts wherein on the screw, the outer wall of steel connecting pipe extends its length direction and still is equipped with the spread groove that is used for installing the hangar tarpaulin, the outer wall of steel connecting pipe still is equipped with the mounting groove that is used for installing the mounting, behind the spread groove is filled in behind the tarpaulin parcel plastic rod, insert the mounting in the mounting groove, the mounting drives the deformation of mounting groove, and then the extrusion spread groove, make the spread groove tightly fix the tarpaulin, first pole connecting piece is still including transverse connection ear and the vertical engaging ear that is used for connecting.
Preferably, the first rod seat connecting piece comprises a bearing, a connecting sleeve, a connecting plate, a connecting pipe, a sealing plate, a rib plate, a stop block and a steel pipe, the connecting sleeve is horizontally arranged, the bearing is located on the inner side of the connecting sleeve, the connecting sleeve is connected with the horizontally arranged sealing plate through the vertically arranged connecting plate, the connecting pipe used for connecting the first vertical rod is connected onto the sealing plate, the steel pipe which is horizontally arranged and used for locking the first vertical rod and the connecting pipe is arranged on the connecting pipe, the rib plate is further arranged between the connecting sleeve and the sealing plate, and the stop block is arranged at the end.
Preferably, the first rod seat connecting piece is rotatably connected with the ground through a support, two vertically arranged support plates are arranged on the support, flat pin holes are formed in the support plates, support pins are inserted in the pin holes, the support plates are also provided with set screws used for locking the support pins and the support plates, the support pins are inserted in bearings of the first rod seat connecting piece, balancing weights are arranged on the support, and the support is fixed with a hard ground anchor bolt through a secondary expansion sleeve.
Preferably, the longitudinal support rod comprises an aluminum alloy rod, an adjustable double lug arranged at the end part of the aluminum alloy rod and a stop screw used for locking the position of the adjustable double lug.
Preferably, still be equipped with the assembly subassembly that tarpaulin and ground are connected, the assembly subassembly includes square pipe, with the fixed inflation sleeve pipe in square pipe and ground, set up the waterproof rubber strip between square pipe and ground, with the flitch that tarpaulin and square pipe lateral wall are pressed close to, with the self-tapping screw of flitch and the locking of square pipe.
Preferably, the longitudinal support rod is fastened between the door frames through two first pull cables which are perpendicular to each other, and each first pull cable comprises a first connecting rod, a second connecting rod and an adjusting solenoid which connects the first connecting rod and the second connecting rod in a threaded mode.
Preferably, the horizontal inhaul cable comprises a first rod part, a second rod part, a third rod part, a fourth rod part and a threaded pipe, wherein the second rod part is rotatably connected with the first rod part, the fourth rod part is rotatably connected with the third rod part, the threaded pipe is used for adjusting the position between the second rod part and the third rod part, and the threaded pipe is respectively in threaded connection with the second rod part and the third rod part.
The working principle of the invention is as follows: through the assembly of each part, an assembled hangar can be conveniently and quickly built.
The invention has the beneficial effects that: the disassembly and assembly are convenient and quick.
Drawings
FIG. 1 is a schematic view of a portal of the present invention;
FIG. 2 is a schematic view of a first stick base connection according to the invention;
FIG. 3 is a schematic view of a first rod link of the present invention;
FIG. 4 is a cross-sectional view taken at A-A in FIG. 3;
FIG. 5 is a schematic view of a horizontal cable of the present invention;
FIG. 6 is a schematic view of a mount of the present invention;
FIG. 7 is a schematic view of an angle of the assembly of the tarpaulin of the present invention connected with the ground;
FIG. 8 is a schematic view of another angle of the assembly of the tarpaulin of the present invention connected with the ground;
FIG. 9 is a schematic view of a longitudinal support bar of the present invention;
fig. 10 is a schematic view of a first cable of the present invention.
Detailed Description
The following description of the embodiments of the present invention will be made with reference to the accompanying drawings. The following examples are only for illustrating the technical solutions of the present invention more clearly, and the protection scope of the present invention is not limited thereby.
The technical scheme of the specific implementation of the invention is as follows:
an assembled hangar portal system comprises at least two vertical portals which are arranged in parallel and a tarpaulin 133 which covers the outer sides of the portals,
the portal frame comprises a first pole base connecting piece 1, a second pole base connecting piece, a first vertical pole 2, a second vertical pole, a first flat pole 5, a second flat pole, a third flat pole, a fourth flat pole, a first stay cable 6, a second stay cable, a first upright post 8, a second upright post, a first oblique post 9, a second oblique post, a horizontal stay cable 10, a pole connecting piece and a top pole 11; the rod-rod connectors comprise a first rod-rod connector 3, a second rod-rod connector 5, a third rod-rod connector 7, a fourth rod-rod connector, a fifth rod-rod connector and a sixth rod-rod connector;
the first rod seat connecting piece 1 is connected with the bottom end of a first vertical rod 2, the top end of the first vertical rod 2 is connected with the first end of a first flat rod 5 through a first rod connecting piece 3, the second end of the first flat rod 5 is connected with the first end of a second flat rod through a second rod connecting piece 5, the second end of the second flat rod is connected with the first end of a top rod 11 through a third rod connecting piece 7, the second end of the top rod 11 is connected with the first end of a third flat rod through a fourth rod connecting piece, the second end of the third flat rod is connected with the first end of a fourth flat rod through a fifth rod connecting piece, the second end of the fourth flat rod is connected with the top end of a second upright post through a sixth rod connecting piece, and the bottom end of the second upright post is connected with the second rod seat connecting piece;
the first rod connecting piece 3 is connected with the third rod connecting piece 7 through a first stay cable 6, the fourth rod connecting piece is connected with the sixth rod connecting piece through a second stay cable, the second rod connecting piece 5 is connected with the fourth rod connecting piece through a horizontal stay cable 10, the third rod connecting piece 7 is connected with the horizontal stay cable 10 through a first upright post 8, the fourth rod connecting piece is connected with the horizontal stay cable 10 through a second upright post, the third rod connecting piece 7 is connected with the horizontal stay cable 10 through a first batter post 9, the fourth rod connecting piece is connected with the horizontal stay cable 10 through a second batter post, and the intersection point of the first batter post 9 and the horizontal stay cable 10 is the same as the intersection point of the second batter post and the horizontal stay cable 10;
the door frames are connected through a longitudinal support rod;
first pole connecting piece 3 includes steel connecting pipe 31, the lateral wall of steel connecting pipe 31 is equipped with the screw, be furnished with on the screw with steel connecting pipe 31 and insert the bolt 32 of part locking wherein, steel connecting pipe 31's outer wall still is equipped with the spread groove 33 that is used for installing hangar tarpaulin 133 along its length direction, steel connecting pipe 31's outer wall still is equipped with the mounting groove 34 that is used for installing the mounting, behind tarpaulin 133 parcel plastic rod stopper income spread groove 33, insert the mounting in mounting groove 34, the mounting drives the deformation of mounting groove 34, and then extrude spread groove 33, make spread groove 33 tightly fix tarpaulin 133, first pole connecting piece 3 still includes transverse connection ear and the vertical engaging ear that is used for connecting.
The tarpaulin 133 comprises a connecting cloth strip, the connecting cloth strip wraps the plastic rod, the plastic rod and the connecting cloth strip are tightly sewn by using a needle thread, and the plastic rod is plugged into the connecting groove 33, so that the connecting groove 33 tightly fixes the plastic rod;
the first rod seat connecting piece 1 comprises a bearing 118, a connecting sleeve 111, a connecting plate 112, a connecting pipe 113, a sealing plate 114, a rib plate 115, a stop block 116 and a steel pipe 117, the connecting pipe 113 is horizontally arranged, the bearing 118 is located on the inner side of the connecting sleeve 111, the connecting sleeve 111 is connected with the horizontally arranged sealing plate 114 through the vertically arranged connecting plate 112, the sealing plate 114 is connected with the connecting pipe 113 used for connecting the first vertical rod 2, the connecting pipe 113 is provided with the horizontally arranged steel pipe 117 used for locking the first vertical rod 2 and the connecting pipe 113, the rib plate 115 is further arranged between the connecting sleeve 111 and the sealing plate 114, and the stop block 116 is arranged at the end part of.
The first rod seat connecting piece 1 is rotatably connected with the ground through a support 122, two vertical support plates are arranged on the support 122, flat pin holes are formed in the support plates, support 122 pins are inserted in the pin holes, set screws 123 used for locking the support pins 121 and the support plates are further arranged on the support plates, the support pins 121 are inserted in bearings 118 of the first rod seat connecting piece 1, balancing weights are arranged on the support 122, and the support 122 is fixed with a hard ground anchor bolt through a relay expansion sleeve 132.
The longitudinal support bar comprises an aluminum alloy bar 142, an adjustable double lug 141 arranged at the end of the aluminum alloy bar 142 and a stop screw 143 for locking the position of the adjustable double lug 141.
The waterproof structure is also provided with an assembly component for connecting the tarpaulin 133 with the ground, wherein the assembly component comprises a square pipe 131, an expansion sleeve 132 for fixing the square pipe 131 with the ground, a waterproof rubber strip 135 arranged between the square pipe 131 and the ground, a flitch 134 for enabling the tarpaulin 133 to be close to the side wall of the square pipe 131, and a self-tapping screw 136 for locking the flitch 134 and the square pipe 131.
The longitudinal supporting rods are fastened between the door frames through two first pull cables which are perpendicular to each other, wherein each first pull cable comprises a first connecting rod 151, a second connecting rod 153 and an adjusting solenoid 152 which connects the first connecting rod 151 and the second connecting rod 153 in a threaded mode.
The horizontal inhaul cable 10 comprises a first rod part 101, a second rod part and a third rod part which are rotatably connected with the first rod part 101, a fourth rod part 103 which is rotatably connected with the third rod part, and a threaded pipe 102 which is used for adjusting the distance between the second rod part and the third rod part, wherein the threaded pipe 102 is respectively in threaded connection with the second rod part and the third rod part.
The working principle of the invention is as follows: through the assembly of each part, an assembled hangar can be conveniently and quickly built.
The invention has the beneficial effects that: the disassembly and assembly are convenient and quick.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, various modifications and decorations can be made without departing from the technical principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.
Claims (7)
1. An assembled hangar portal system is characterized by comprising at least two vertical portals which are arranged in parallel and tarpaulin which covers the outer sides of the portals,
the portal frame comprises a first pole base connecting piece, a second pole base connecting piece, a first vertical pole, a second vertical pole, a first flat pole, a second flat pole, a third flat pole, a fourth flat pole, a first stay cable, a second stay cable, a first upright post, a second upright post, a first oblique post, a second oblique post, a horizontal stay cable, a pole connecting piece and a top pole; the rod-rod connectors comprise a first rod-rod connector, a second rod-rod connector, a third rod-rod connector, a fourth rod-rod connector, a fifth rod-rod connector and a sixth rod-rod connector;
the first rod seat connecting piece is connected with the bottom end of the first vertical rod, the top end of the first vertical rod is connected with the first end of the first flat rod through the first rod connecting piece, the second end of the first flat rod is connected with the first end of the second flat rod through the second rod connecting piece, the second end of the second flat rod is connected with the first end of the ejector rod through the third rod connecting piece, the second end of the ejector rod is connected with the first end of the third flat rod through the fourth rod connecting piece, the second end of the third flat rod is connected with the first end of the fourth flat rod through the fifth rod connecting piece, the second end of the fourth flat rod is connected with the top end of the second vertical column through the sixth rod connecting piece, and the bottom end of the second vertical column is connected with the second rod seat connecting piece;
the first rod connecting piece and the third rod connecting piece are connected through a first stay cable, the fourth rod connecting piece and the sixth rod connecting piece are connected through a second stay cable, the second rod connecting piece and the fourth rod connecting piece are connected through a horizontal stay cable, the third rod connecting piece is connected with the horizontal stay cable through a first upright post, the fourth rod connecting piece is connected with the horizontal stay cable through a second upright post, the third rod connecting piece is connected with the horizontal stay cable through a first inclined post, the fourth rod connecting piece is connected with the horizontal stay cable through a second inclined post, and the intersection point of the first inclined post and the horizontal stay cable is the same as the intersection point of the second inclined post and the horizontal stay cable;
the door frames are connected through a longitudinal support rod;
first pole connecting piece includes the steel connecting pipe, the lateral wall of steel connecting pipe is equipped with the screw, be furnished with the bolt with steel connecting pipe and the part locking that inserts wherein on the screw, the outer wall of steel connecting pipe extends its length direction and still is equipped with the spread groove that is used for installing the hangar tarpaulin, the outer wall of steel connecting pipe still is equipped with the mounting groove that is used for installing the mounting, behind the spread groove is filled in behind the tarpaulin parcel plastic rod, insert the mounting in the mounting groove, the mounting drives the deformation of mounting groove, and then the extrusion spread groove, make the spread groove tightly fix the tarpaulin, first pole connecting piece is still including transverse connection ear and the vertical engaging ear that is used for connecting.
2. The sectional hangar gantry system of claim 1,
the first rod seat connecting piece comprises a bearing, a connecting sleeve, a connecting plate, a connecting pipe, a sealing plate, a rib plate, a stop block and a steel pipe, wherein the connecting pipe is horizontally arranged in the connecting sleeve, the bearing is positioned on the inner side of the connecting sleeve, the connecting sleeve is connected with the horizontally arranged sealing plate through the vertically arranged connecting plate, the sealing plate is connected with the connecting pipe used for connecting a first vertical rod, the connecting pipe is provided with the horizontally arranged steel pipe used for locking the first vertical rod and the connecting pipe, the rib plate is further arranged between the connecting sleeve and the sealing plate, and the end part of the.
3. The assembled hangar gantry system of claim 2, wherein the first bar seat connecting part is rotatably connected with the ground through a support, two vertically arranged support plates are arranged on the support, flat pin holes are arranged on the support plates, support pins are inserted in the pin holes, the support plates are also provided with set screws for locking the support pins and the support plates, the support pins are inserted in bearings of the first bar seat connecting part, balancing weights are arranged on the support, and the support is fixed with a hard ground anchor bolt through a secondary expansion sleeve.
4. The sectional hangar gantry system of claim 3,
the longitudinal support rod comprises an aluminum alloy rod, adjustable double lugs arranged at the end part of the aluminum alloy rod and a stop screw used for locking the positions of the adjustable double lugs.
5. The sectional hangar gantry system of claim 4,
still be equipped with the assembly subassembly that tarpaulin and ground are connected, the assembly subassembly includes square pipe, with the fixed expansion sleeve pipe in square pipe and ground, set up the waterproof rubber strip between square pipe and ground, with the flitch that tarpaulin and square pipe lateral wall are pressed close to, with the self-tapping screw of flitch and the locking of square pipe.
6. The assembled hangar gantry system of claim 5, wherein the longitudinal support rods are fastened between the gantries through two first vertical cables, and each first cable comprises a first connecting rod, a second connecting rod and an adjusting solenoid for connecting the first connecting rod and the second connecting rod in a threaded manner.
7. The assembled hangar gantry system of claim 6, wherein the horizontal cable comprises a first rod part, a second rod part rotationally connected with the first rod part, a third rod part, a fourth rod part rotationally connected with the third rod part, and a threaded pipe used for adjusting the distance between the second rod part and the third rod part, wherein the threaded pipe is in threaded connection with the second rod part and the third rod part respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010097036.1A CN111287532A (en) | 2020-02-17 | 2020-02-17 | Assembled hangar portal system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010097036.1A CN111287532A (en) | 2020-02-17 | 2020-02-17 | Assembled hangar portal system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111287532A true CN111287532A (en) | 2020-06-16 |
Family
ID=71026477
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010097036.1A Pending CN111287532A (en) | 2020-02-17 | 2020-02-17 | Assembled hangar portal system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111287532A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114135133A (en) * | 2022-01-05 | 2022-03-04 | 中国电建集团中南勘测设计研究院有限公司 | Transversely expand quick folding portable folding hangar fast |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2456191A1 (en) * | 1979-05-10 | 1980-12-05 | Barizzi Carlo | Rapidly erected hut for temporary accommodation - has semi-octagon frame with insulated wall and roof boards |
CN2269387Y (en) * | 1995-12-08 | 1997-12-03 | 芜湖矿山机械厂 | Sun shade shed for gantry crane |
CN106812455A (en) * | 2015-12-02 | 2017-06-09 | 湖北华舟重工应急装备股份有限公司 | A kind of reassembling type unmanned plane hangar freshwater mussel shape hangar door |
CN207726611U (en) * | 2017-12-26 | 2018-08-14 | 宿迁百事达教学设备有限公司 | A kind of Novel portal frame |
CN209083061U (en) * | 2018-09-28 | 2019-07-09 | 中国建筑土木建设有限公司 | Temperature control for precast beam constructed in winter conserves canopy |
CN209499281U (en) * | 2018-08-23 | 2019-10-18 | 深圳市卡司通展览股份有限公司 | A kind of top slant-pull structure |
-
2020
- 2020-02-17 CN CN202010097036.1A patent/CN111287532A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2456191A1 (en) * | 1979-05-10 | 1980-12-05 | Barizzi Carlo | Rapidly erected hut for temporary accommodation - has semi-octagon frame with insulated wall and roof boards |
CN2269387Y (en) * | 1995-12-08 | 1997-12-03 | 芜湖矿山机械厂 | Sun shade shed for gantry crane |
CN106812455A (en) * | 2015-12-02 | 2017-06-09 | 湖北华舟重工应急装备股份有限公司 | A kind of reassembling type unmanned plane hangar freshwater mussel shape hangar door |
CN207726611U (en) * | 2017-12-26 | 2018-08-14 | 宿迁百事达教学设备有限公司 | A kind of Novel portal frame |
CN209499281U (en) * | 2018-08-23 | 2019-10-18 | 深圳市卡司通展览股份有限公司 | A kind of top slant-pull structure |
CN209083061U (en) * | 2018-09-28 | 2019-07-09 | 中国建筑土木建设有限公司 | Temperature control for precast beam constructed in winter conserves canopy |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114135133A (en) * | 2022-01-05 | 2022-03-04 | 中国电建集团中南勘测设计研究院有限公司 | Transversely expand quick folding portable folding hangar fast |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104533135B (en) | Rail device capable of being rapidly installed and detached | |
CN2861391Y (en) | Tent house | |
CN111287532A (en) | Assembled hangar portal system | |
CN209855818U (en) | Adjustable underground works supports bow member longitudinal connection device | |
CN108678527B (en) | Auxiliary supporting device | |
CN210739554U (en) | Stable form piping lane support convenient to installation | |
CN217054559U (en) | Membrane structure parking shed of formula of stretching | |
CN206917500U (en) | Integral type subway shield door insulating support | |
CN207063689U (en) | A kind of sunshade | |
CN220798153U (en) | Photovoltaic support | |
CN212715715U (en) | Stair guardrail convenient to installation | |
CN220014553U (en) | Window construction is built with protection safety fence in room | |
CN214786122U (en) | Material platform structure of climbing frame | |
CN211239277U (en) | Lightning conductor fixing device | |
CN219298465U (en) | Connection structure of curtain and canopy | |
CN213297286U (en) | Quickly assembled stand column and cross beam combined frame | |
CN218952560U (en) | Locate inside modularization spatial structure of building | |
CN214144981U (en) | Double-layer tent structure | |
CN216382830U (en) | Pipeline connecting component with strong rust prevention and permeability prevention | |
CN219690379U (en) | Combined type protective guardrail convenient to install | |
CN211189070U (en) | Outdoor fitness equipment rain insensitive device | |
CN220673076U (en) | Mounting frame structure for box-type substation | |
CN217420149U (en) | Horizontal hidden rod structure of unidirectional cable curtain wall | |
CN212428469U (en) | Aluminum alloy window convenient to assemble | |
CN220629258U (en) | Light Fu Banjia convenient to photovoltaic board installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200616 |
|
RJ01 | Rejection of invention patent application after publication |