CN111207244A - Steam boiler pipeline installation construction method - Google Patents

Steam boiler pipeline installation construction method Download PDF

Info

Publication number
CN111207244A
CN111207244A CN202010113198.XA CN202010113198A CN111207244A CN 111207244 A CN111207244 A CN 111207244A CN 202010113198 A CN202010113198 A CN 202010113198A CN 111207244 A CN111207244 A CN 111207244A
Authority
CN
China
Prior art keywords
plate
pipeline
steam boiler
spring
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010113198.XA
Other languages
Chinese (zh)
Other versions
CN111207244B (en
Inventor
潘雪军
程业春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Sanyuan installation Co.,Ltd.
Original Assignee
潘雪军
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 潘雪军 filed Critical 潘雪军
Priority to CN202010113198.XA priority Critical patent/CN111207244B/en
Publication of CN111207244A publication Critical patent/CN111207244A/en
Application granted granted Critical
Publication of CN111207244B publication Critical patent/CN111207244B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/0243Laying or reclaiming pipes on land, e.g. above the ground above ground
    • F16L1/0246Laying or reclaiming pipes on land, e.g. above the ground above ground at a certain height off the ground
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K31/00Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
    • B23K31/02Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • B23K37/053Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work aligning cylindrical work; Clamping devices therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/06Accessories therefor, e.g. anchors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/06Accessories therefor, e.g. anchors
    • F16L1/09Accessories therefor, e.g. anchors for bringing two tubular members closer to each other
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K2101/00Articles made by soldering, welding or cutting
    • B23K2101/04Tubular or hollow articles
    • B23K2101/06Tubes

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The invention relates to a steam boiler pipeline installation construction method, which comprises a bottom plate, a lifting device, a clamping device, a buffer device and a bearing device, wherein the lifting device is arranged at the upper end of the bottom plate, the lower end of the lifting device is connected with the bottom plate, the clamping device is arranged in the middle of the lifting device, the clamping device is connected with the lifting device through thread fit, and the buffer device is arranged below the clamping device. The invention can solve the problems that the existing equipment can not clamp and fix the pipeline during pipeline installation when the pipeline of the steam boiler is installed, can not keep the pipeline horizontal, and is easy to generate the phenomenon of pipeline deviation during pipeline installation, thereby increasing the difficulty of pipeline installation, reducing the success rate of installation, simultaneously, realizing the function of continuous feeding, and needing manual work to sequentially convey the pipeline to the installation position, thereby increasing manpower and material resources, increasing working steps, reducing the efficiency of pipeline installation and the like.

Description

Steam boiler pipeline installation construction method
Technical Field
The invention relates to the technical field of pipeline installation, in particular to a steam boiler pipeline installation construction method.
Background
The steam boiler refers to boiler equipment for producing steam, belongs to special equipment, and is designed, produced, delivered and installed by being inspected by national technical supervision departments, a user can operate the boiler only by obtaining a boiler use certificate, the steam boiler can be divided into an electric steam boiler, an oil steam boiler, a gas steam boiler and the like according to fuels, and the steam boiler is mainly divided into two structures of a vertical double-return stroke structure and a horizontal three-return stroke structure.
At present, when the existing steam boiler pipe is installed, the following defects generally exist: 1. the existing equipment can not clamp and fix the pipeline during pipeline installation, can not keep the pipeline horizontal, and easily causes the pipeline offset phenomenon during pipeline installation, thereby increasing the pipeline installation difficulty and reducing the installation success rate; 2. the function of continuous feeding can not be realized when the existing equipment is used for installing the pipeline, and the pipeline needs to be manually transported to an installation position in sequence, so that manpower and material resources are increased, working steps are increased, and the efficiency of pipeline installation is reduced.
Disclosure of Invention
Technical problem to be solved
The invention can solve the problems that the existing equipment can not clamp and fix the pipeline during pipeline installation when the pipeline of the steam boiler is installed, can not keep the pipeline horizontal, and is easy to generate the phenomenon of pipeline deviation during pipeline installation, thereby increasing the difficulty of pipeline installation, reducing the success rate of installation, simultaneously, realizing the function of continuous feeding, and needing manual work to sequentially convey the pipeline to the installation position, thereby increasing manpower and material resources, increasing working steps, reducing the efficiency of pipeline installation and the like.
(II) technical scheme
In order to achieve the purpose, the invention adopts the following technical scheme that a steam boiler pipeline installation construction method uses a steam boiler pipeline installation device, the steam boiler pipeline installation device comprises a bottom plate, a lifting device, a clamping device, a buffering device and a bearing device, and the specific method for installing the steam boiler pipeline by adopting the steam boiler pipeline installation device is as follows:
s1, selecting a pipeline: selecting corresponding pipelines according to the type of the steam boiler in a manual mode, cleaning the surfaces of the pipelines and removing stains on the surfaces of the pipelines;
s2, placing a pipeline: manually placing the pipelines cleaned in the step S1 in a bearing device, and orderly arranging the pipelines by the bearing device;
s3, feeding treatment: the pipeline in the bearing device falls into the clamping device, the clamping device clamps and fixes the pipeline, and the pipeline is conveyed to a pipeline installation position through the lifting device;
s4, mounting a pipeline: manually welding and installing the pipeline at the pipeline installation position in the step S3;
s5, processing the connection part: and manually cleaning welding slag and residues at the welding position, and detecting whether welding repair is complete or not to avoid the phenomenon of welding missing.
The lifting device is installed at the upper end of the bottom plate, the lower end of the lifting device is connected with the bottom plate, the clamping device is arranged in the middle of the lifting device and connected with the lifting device through matching of threads, the buffer device is arranged below the clamping device and installed on the bottom plate, and the bearing device is arranged on the right side of the buffer device and installed on the bottom plate.
The clamping device comprises an upper lifting plate, a connecting plate, a lower arc plate, an upper arc plate, a limiting branched chain, a clamping mechanism, a limiting seat, an electric push rod and a jacking rod, wherein the upper lifting plate is connected with the lifting device in a sliding fit manner, the right end of the upper lifting plate is provided with the connecting plate, the lower end of the connecting plate is provided with a reinforcing rib, the upper end of the connecting plate is symmetrically provided with the lower arc plate through a base, the lower arc plate is connected with the upper arc plate through a pin shaft, the two upper arc plates are connected through a connecting rod, the upper arc plate is provided with a buckle, the lower arc plate is internally and slidably connected with the clamping mechanism, the left side of the lower arc plate is provided with the limiting seat, the limiting seat is arranged on the upper lifting plate, a circular groove is arranged in the upper lifting plate, the bottom end in the circular groove is provided with the electric push rod, the jacking rod is arranged at the, the connecting plate extrudees the device of putting to holding, thereby the realization falls into the function of arc inboard down with the pipeline, later, manual start electric putter, electric putter passes through the jacking pole with last arc board and arc board joint down, thereby the realization is to the pipeline function of fixing, and adopt two arc boards down can make the pipeline keep the level when the installation, avoid appearing the phenomenon of slope, and finally, after the piping erection finishes, elevating gear drives the connecting plate downstream, thereby realize automatic feeding's function.
The bearing and placing device comprises a support rod, a bearing and placing frame, a blanking plate, a lower pressing plate, a telescopic rod, a telescopic spring, a transition wheel, a baffle plate and a reset spring, wherein the support rod is uniformly arranged at the upper end of the bottom plate, the bearing and placing frame is arranged at the upper end of the support rod, an arc-shaped through hole with a rectangular cross section is arranged in the bearing and placing frame, the blanking plate is arranged at the left end of the arc-shaped through hole and is in sliding connection with the bearing and placing frame, the lower end of the blanking plate is connected with the lower pressing plate through a connecting rod, the telescopic rod is arranged at the right side of the blanking plate and is arranged on the lower pressing plate, the telescopic rod is arranged on the lower pressing plate, the telescopic spring is arranged on the outer surface of the telescopic rod and is arranged on the lower pressing plate, the transition wheel is arranged above the telescopic spring, the transition wheel is arranged in, reset spring installs in holding puts the frame, concrete during operation, at first, place the pipeline in holding puts the frame through artificial mode, later, the connecting plate pushes down and moves blanking plate downstream through holding down the board, thereby open the arc through-hole, realize the function of blanking, and, when blanking plate descends, it rises to separate the baffle through the drive of wire rope, block other pipelines, thereby avoid appearing the too much phenomenon of blanking, and at last, the connecting plate rises the back, reset spring resets blanking plate and separate the baffle, thereby be convenient for next time material loading.
Preferably, the lifting device comprises a lifting column, a threaded rod, a first helical gear, a linkage rod, a driving motor and a second helical gear, the lifting column is symmetrically installed at the upper end of the bottom plate, a rectangular groove is formed in the lifting column, a rectangular through hole is formed in the side wall of the inner end of the rectangular groove, the threaded rod is connected to the interior of the rectangular groove through a bearing, the first helical gear is installed at the lower end of the threaded rod and is located in the bottom plate, the linkage rod is connected to the inner side insection of the first helical gear, the driving motor is arranged between the two linkage rods and is installed on the bottom plate through a motor base, the second helical gear is installed on an output shaft of the driving motor and is connected with the insection of the linkage rod, and during specific work, firstly, the driving motor is manually started, the driving motor drives the threaded rod to rotate through the linkage, and finally, after the pipeline is installed, the driving motor drives the clamping device to descend through the threaded rod, so that the continuous feeding function is realized.
Preferably, buffer include down the traveller, go up traveller and buffer spring, the downslide post install on the bottom plate, the inside sliding connection of downslide post has the traveller, upward the traveller lower extreme is provided with buffer spring, buffer spring installs on the bottom plate, during specific work, when clamping device descends, go up the traveller and play the effect of buffering to clamping device through buffer spring.
Preferably, spacing branch include gag lever post, limiting plate and spacing spring, last arc board on the symmetry be provided with the gag lever post, the limiting plate is installed with last arc board sliding connection gag lever post inner to the gag lever post, the gag lever post surface is provided with spacing spring, spacing spring mounting is on the limiting plate, during concrete work, when carrying out the centre gripping to the pipeline, the limiting plate is fixed the pipeline through spacing spring, avoids the pipeline to appear sliding when the installation.
Preferably, chucking mechanism include chucking pole and chucking spring, lower arc board outer end sliding connection have the chucking pole, chucking pole and buckle joint, chucking pole surface is provided with the chucking spring, the chucking spring is installed under on the arc board, concrete during operation, when last arc board with down the arc board joint, the buckle extrudees the chucking pole, afterwards, the chucking spring resets the chucking pole to realize the function of chucking, after the piping erection, the manual work is pulled out the chucking pole, arc board and last arc board part under will manually.
Preferably, the rolling wheels are symmetrically arranged at the lower end of the bottom plate, and when the pipeline installation device works, the rolling wheels can achieve the function of moving to the next installation position after the pipeline installation is completed.
Preferably, the two ends of the linkage rod are symmetrically provided with the bevel gears, and when the linkage rod works specifically, the two bevel gears are respectively matched with the first bevel gear and the second bevel gear to realize a transmission function.
(III) advantageous effects
1. According to the steam boiler pipeline installation construction method provided by the invention, the adopted clamping device can provide a supporting force during pipeline installation, and can clamp and fix the pipeline, so that the phenomena of sliding and rotating during pipeline installation are avoided, and meanwhile, the clamping device can keep the pipeline horizontal during installation, so that the phenomenon that the installation difficulty is increased due to the fact that the joints of the pipeline are not uniform during installation is avoided, the success rate of pipeline installation is improved, and the waste of materials is avoided;
2. according to the steam boiler pipeline installation construction method provided by the invention, the adopted bearing device can realize the function of sequential feeding, the phenomenon of excessive feeding or clamping at one time is avoided, the bearing device and the clamping device are matched to realize the function of automatic feeding, the working steps are reduced, and the working efficiency is improved;
3. the steam boiler pipeline installation construction method provided by the invention can drive other pipelines to move to the next installation position after the pipeline installation is finished, and reduces the manual work for sequentially transporting the pipelines to the installation positions, thereby reducing the manpower and material resources and improving the pipeline installation efficiency.
Drawings
The invention is further illustrated with reference to the following figures and examples.
FIG. 1 is a process flow diagram of the present invention;
FIG. 2 is a front view of the present invention;
FIG. 3 is a left side view of the present invention;
FIG. 4 is a cross-sectional view A-A of FIG. 2 in accordance with the present invention;
FIG. 5 is a cross-sectional view of B-B of FIG. 3 in accordance with the present invention;
FIG. 6 is a cross-sectional view of C-C of FIG. 3 in accordance with the present invention;
FIG. 7 is an enlarged view of the invention taken in the direction of N in FIG. 5;
FIG. 8 is an enlarged view taken in the direction X of FIG. 5 in accordance with the present invention;
fig. 9 is an enlarged view of the invention taken along direction D in fig. 6.
Detailed Description
The embodiments of the invention will be described in detail below with reference to the drawings, but the invention can be implemented in many different ways as defined and covered by the claims.
As shown in fig. 1 to 9, a steam boiler pipe installation method using a steam boiler pipe installation apparatus including a bottom plate 1, a lifting device 2, a clamping device 3, a buffer device 4 and a receiving device 5, the steam boiler pipe installation apparatus is specifically installed on a steam boiler pipe by the following method:
s1, selecting a pipeline: selecting corresponding pipelines according to the type of the steam boiler in a manual mode, cleaning the surfaces of the pipelines and removing stains on the surfaces of the pipelines;
s2, placing a pipeline: manually placing the pipelines cleaned in the step S1 in a bearing device 5, and orderly arranging the pipelines by the bearing device 5;
s3, feeding treatment: the pipeline in the bearing device 5 falls into the clamping device 3, the clamping device 3 clamps and fixes the pipeline, and the pipeline is conveyed to a pipeline installation position through the lifting device 2;
s4, mounting a pipeline: manually welding and installing the pipeline at the pipeline installation position in the step S3;
s5, processing the connection part: and manually cleaning welding slag and residues at the welding position, and detecting whether welding repair is complete or not to avoid the phenomenon of welding missing.
Lifting device 2 is installed to bottom plate 1 upper end, and 2 lower extremes of lifting device are connected with bottom plate 1, and 2 middle parts of lifting device are provided with clamping device 3, and clamping device 3 is connected with lifting device 2 through the cooperation of screw thread, and clamping device 3 below is provided with buffer 4, and buffer 4 installs on bottom plate 1, and buffer 4 right side is provided with holds puts device 5, holds and puts device 5 and install on bottom plate 1.
The rolling wheels are symmetrically arranged at the lower end of the bottom plate 1, and when the pipeline installation device works, the rolling wheels can achieve the function of moving to the next installation position after the pipeline installation is completed.
The lifting device 2 comprises a lifting column 21, a threaded rod 22, a first helical gear 23, a linkage rod 24, a driving motor 25 and a second helical gear 26, the lifting column 21 is symmetrically installed at the upper end of the bottom plate 1, a rectangular groove is formed in the lifting column 21, a rectangular through hole is formed in the side wall of the inner end of the rectangular groove, the threaded rod 22 is connected in the rectangular groove through a bearing, the first helical gear 23 is installed at the lower end of the threaded rod 22, the first helical gear 23 is located in the bottom plate 1, the linkage rod 24 is connected with the inner side insection of the first helical gear 23, the driving motor 25 is arranged between the two linkage rods 24, the driving motor 25 is installed on the bottom plate 1 through a motor base, the second helical gear 26 is installed on the output shaft of the driving motor 25, the second helical gear 26 is connected with the insection of the linkage rods 24, during specific work, firstly, the driving motor 25 is manually, thereby drive clamping device 3 and carry out the downstream, later, after clamping device 3 material loading, driving motor 25 drives clamping device 3 through threaded rod 22 and rises, and finally, after the piping erection, driving motor 25 drives clamping device 3 through threaded rod 22 and descends to realize the function of continuous material loading.
The two ends of the linkage rod 24 are symmetrically provided with the bevel gears, and when the linkage rod works specifically, the two bevel gears are respectively matched with the first bevel gear 23 and the second bevel gear 26 to realize a transmission function.
The clamping device 3 comprises an ascending plate 31, a connecting plate 32, a lower arc plate 33, an upper arc plate 34, a limiting branched chain 35, a clamping mechanism 36, a limiting seat 37, an electric push rod 38 and a jacking rod 39, wherein the ascending plate 31 is connected with the lifting device 2 in a sliding fit mode, the connecting plate 32 is installed at the right end of the ascending plate 31, reinforcing ribs are arranged at the lower end of the connecting plate 32, the lower arc plate 33 is symmetrically installed at the upper end of the connecting plate 32 through a base, the lower arc plate 33 is connected with the upper arc plate 34 through a pin shaft, the two upper arc plates 34 are connected through a connecting rod, a buckle is arranged on the upper arc plate 34, the clamping mechanism 36 is slidably connected inside the lower arc plate 33, the limiting seat 37 is arranged at the left side of the lower arc plate 33, the limiting seat 37 is installed on the ascending plate 31, a circular groove is arranged inside the ascending plate 31, the electric push rod 38 is installed, the gyro wheel is installed to jacking pole 39 upper end, concrete during operation, at first, elevating gear 2 drives connecting plate 32 downstream through upwelling board 31, connecting plate 32 extrudes holding device 5, thereby realize falling into the function in arc board 33 down with the pipeline, afterwards, manual start electric putter 38, electric putter 38 will go up arc board 34 and arc board 33 joint down through jacking pole 39, thereby realize carrying out the function fixed to the pipeline, and adopt two arc boards 33 down to make the pipeline when the installation keep the level, avoid appearing the phenomenon of slope, finally, after pipeline installation finishes, elevating gear 2 drives connecting plate 32 downstream, thereby realize automatic feeding's function.
Spacing branched chain 35 include gag lever post 351, limiting plate 352 and spacing spring 353, last arc 34 on the symmetry be provided with gag lever post 351, limiting plate 352 is installed with last arc 34 sliding connection gag lever post 351 the inner, gag lever post 351 surface is provided with spacing spring 353, spacing spring 353 installs on limiting plate 352, during concrete work, when carrying out the centre gripping to the pipeline, limiting plate 352 fixes the pipeline through spacing spring 353, avoids the pipeline to appear sliding when the installation.
Chucking mechanism 36 include chucking pole 361 and chucking spring 362, lower arc board 33 outer end sliding connection have chucking pole 361, chucking pole 361 and buckle joint, chucking pole 361 surface is provided with chucking spring 362, chucking spring 362 installs under on arc board 33, concrete during operation, when last arc board 34 and lower arc board 33 joint, the buckle extrudees chucking pole 361, afterwards, chucking spring 362 resets chucking pole 361, thereby realize the function of chucking, after the piping erection, the manual work is pulled out chucking pole 361, arc board 33 and last arc board 34 part down will be manual.
Buffer 4 include traveller 41, last traveller 42 and buffer spring 43 down, traveller 41 install on bottom plate 1, traveller 41 internal sliding connection has last traveller 42, goes up traveller 42 lower extreme and is provided with buffer spring 43, buffer spring 43 installs on bottom plate 1, during concrete work, when clamping device 3 descends, go up traveller 42 and play the effect of buffering to clamping device 3 through buffer spring 43.
The bearing device 5 comprises a support rod 51, a bearing frame 52, a blanking plate 53, a lower press plate 54, an expansion link 55, a telescopic spring 56, a transition wheel 57, a baffle plate 58 and a return spring 59, wherein the support rod 51 is uniformly arranged at the upper end of the bottom plate 1, the bearing frame 52 is arranged at the upper end of the support rod 51, an arc-shaped through hole with a rectangular section is arranged in the bearing frame 52, the blanking plate 53 is arranged at the left end of the arc-shaped through hole, the blanking plate 53 is in sliding connection with the bearing frame 52, the lower end of the blanking plate 53 is connected with the lower press plate 54 through a connecting rod, the expansion link 55 is arranged at the right side of the blanking plate 53, the expansion link 55 is arranged on the lower press plate 54, the outer surface of the expansion link 55 is provided with the telescopic spring 56, the telescopic spring 56 is arranged on the lower press plate 54, the transition wheel 57 is arranged above the telescopic spring 56, the steel wire rope is connected with a separation baffle plate 58 through a transition wheel 57, the separation baffle plate 58 is in sliding connection with the bearing frame 52, a reset spring 59 is arranged at the lower end of the separation baffle plate 58, the reset spring 59 is installed in the bearing frame 52, during specific work, firstly, a pipeline is placed in the bearing frame 52 in a manual mode, then, the connecting plate 32 is pressed downwards to drive the blanking plate 53 to move downwards through the lower pressing plate 54, the arc-shaped through hole is opened, the blanking function is achieved, in addition, the blanking plate 53 is driven to ascend through the steel wire rope, other pipelines are blocked, the phenomenon that blanking is too much is avoided, finally, after the connecting plate 32 ascends, the blanking plate 53 and the separation baffle plate 58 are reset through the reset spring 59, and therefore next feeding is facilitated.
During installation: the first step is as follows: manually placing the pipeline in the arc-shaped through hole in the bearing frame 52;
the second step is that: firstly, manually starting a driving motor 25, driving the connecting plate 32 to move downwards by the driving motor 25 through a threaded rod 22, driving a blanking plate 53 to descend by the connecting plate 32 through a lower pressing plate 54 so as to carry out loading, then manually starting an electric push rod 38, clamping an upper arc plate 34 and a lower arc plate 33 by the electric push rod 38 through a jacking rod 39, and finally, driving the connecting plate 32 to ascend by the driving motor 25 so as to manually install a pipeline;
the third step: after the second step is finished, pushing the equipment to the next installation position, and repeating the second step;
the fourth step: after the pipeline is completely installed, the driving motor 25 is manually turned off, and the pipeline installation is finished.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. A steam boiler pipeline installation construction method uses a steam boiler pipeline installation device which comprises a bottom plate (1), a lifting device (2), a clamping device (3), a buffering device (4) and a bearing device (5), and is characterized in that: the specific method for installing the steam boiler pipeline by adopting the steam boiler pipeline installation device is as follows:
s1, selecting a pipeline: selecting corresponding pipelines according to the type of the steam boiler in a manual mode, cleaning the surfaces of the pipelines and removing stains on the surfaces of the pipelines;
s2, placing a pipeline: manually placing the pipelines cleaned in the step S1 in a bearing device (5), and orderly arranging the steel pipes by the bearing device (5);
s3, feeding treatment: the pipeline in the bearing device (5) falls into the clamping device (3), the clamping device (3) clamps and fixes the pipeline, and the pipeline is conveyed to a pipeline installation position through the lifting device (2);
s4, mounting a pipeline: manually welding and installing the pipeline at the pipeline installation position in the step S3;
s5, processing the connection part: manually cleaning welding slag and residues at the welding position, and detecting whether welding repair is complete or not so as to avoid welding missing;
the lifting device (2) is installed at the upper end of the bottom plate (1), the lower end of the lifting device (2) is connected with the bottom plate (1), the clamping device (3) is arranged in the middle of the lifting device (2), the clamping device (3) is connected with the lifting device (2) through matching of threads, the buffer device (4) is arranged below the clamping device (3), the buffer device (4) is installed on the bottom plate (1), the bearing and placing device (5) is arranged on the right side of the buffer device (4), and the bearing and placing device (5) is installed on the bottom plate (1);
the clamping device (3) comprises an ascending plate (31), a connecting plate (32), a lower arc plate (33), an upper arc plate (34), a limiting branched chain (35), a clamping mechanism (36), a limiting seat (37), an electric push rod (38) and a jacking rod (39), wherein the ascending plate (31) is connected with the lifting device (2) in a sliding fit mode, the connecting plate (32) is installed at the right end of the ascending plate (31), a reinforcing rib is arranged at the lower end of the connecting plate (32), the lower arc plate (33) is symmetrically installed at the upper end of the connecting plate (32) through a base, the lower arc plate (33) is connected with the upper arc plate (34) through a pin shaft, the two upper arc plates (34) are connected through a connecting rod, a buckle is arranged on the upper arc plate (34), the clamping mechanism (36) is slidably connected inside the lower arc plate (33), the limiting seat (37) is arranged on the left side of the lower arc plate (33), and the limiting seat (37), a circular groove is formed in the inner part of the lifting plate (31), an electric push rod (38) is installed at the bottom end of the inner part of the circular groove, a lifting rod (39) is installed at the top end of the electric push rod (38), and a roller is installed at the upper end of the lifting rod (39);
the bearing and placing device (5) comprises a supporting rod (51), a bearing frame (52), a blanking plate (53), a lower pressing plate (54), an expansion link (55), an expansion spring (56), a transition wheel (57), a baffle plate (58) and a reset spring (59), wherein the supporting rod (51) is uniformly arranged at the upper end of the bottom plate (1), the bearing frame (52) is arranged at the upper end of the supporting rod (51), an arc-shaped through hole with a rectangular cross section is arranged in the bearing frame (52), the blanking plate (53) is arranged at the left end of the arc-shaped through hole, the blanking plate (53) is in sliding connection with the bearing frame (52), the lower end of the blanking plate (53) is connected with the lower pressing plate (54) through a connecting rod, the expansion link (55) is arranged at the right side of the blanking plate (53), the expansion link (55) is arranged on the lower pressing plate (54), the expansion spring (56) is arranged on the outer surface of the expansion link (, a transition wheel (57) is arranged above the telescopic spring (56), the transition wheel (57) is installed in the bearing frame (52), the lower end of the blanking plate (53) is connected with a steel wire rope, the steel wire rope is connected with a baffle plate (58) through the transition wheel (57), the baffle plate (58) is in sliding connection with the bearing frame (52), a return spring (59) is arranged at the lower end of the baffle plate (58), and the return spring (59) is installed in the bearing frame (52).
2. A steam boiler tube installation and construction method according to claim 1, wherein: the lifting device (2) comprises a lifting column (21), a threaded rod (22), a first helical gear (23), a linkage rod (24), a driving motor (25) and a second helical gear (26), the lifting column (21) is symmetrically installed at the upper end of the base plate (1), a rectangular groove is formed in the lifting column (21), a rectangular through hole is formed in the side wall of the inner end of the rectangular groove, a threaded rod (22) is connected to the inside of the rectangular groove through a bearing, a first helical gear (23) is installed at the lower end of the threaded rod (22), the first helical gear (23) is located inside the base plate (1), a linkage rod (24) is connected to the inner side tooth pattern of the first helical gear (23), a driving motor (25) is arranged between the two linkage rods (24), the driving motor (25) is installed on the base plate (1) through a motor base, a second helical gear (26) is installed on the output shaft of the driving motor (25), and the second helical gear (26) is connected with.
3. A steam boiler tube installation and construction method according to claim 1, wherein: buffer (4) including traveller (41), last traveller (42) and buffer spring (43) down, traveller (41) install on bottom plate (1), traveller (41) inside sliding connection has last traveller (42) down, goes up traveller (42) lower extreme and is provided with buffer spring (43), buffer spring (43) are installed on bottom plate (1).
4. A steam boiler tube installation and construction method according to claim 1, wherein: spacing branched chain (35) include gag lever post (351), limiting plate (352) and spacing spring (353), last arc board (34) on the symmetry be provided with gag lever post (351), gag lever post (352) are installed to gag lever post (351) and last arc board (34) sliding connection gag lever post (351) the inner, gag lever post (351) surface is provided with spacing spring (353), spacing spring (353) are installed on limiting plate (352).
5. A steam boiler tube installation and construction method according to claim 1, wherein: chucking mechanism (36) including chucking pole (361) and chucking spring (362), lower arc board (33) outer end sliding connection have chucking pole (361), chucking pole (361) and buckle joint, chucking pole (361) surface is provided with chucking spring (362), chucking spring (362) are installed under on arc board (33).
6. A steam boiler tube installation and construction method according to claim 1, wherein: the lower end of the bottom plate (1) is symmetrically provided with rolling wheels.
7. A steam boiler tube installation and construction method according to claim 2, wherein: and helical gears are symmetrically arranged at two ends of the linkage rod (24).
CN202010113198.XA 2020-02-24 2020-02-24 Steam boiler pipeline installation construction method Active CN111207244B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010113198.XA CN111207244B (en) 2020-02-24 2020-02-24 Steam boiler pipeline installation construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010113198.XA CN111207244B (en) 2020-02-24 2020-02-24 Steam boiler pipeline installation construction method

Publications (2)

Publication Number Publication Date
CN111207244A true CN111207244A (en) 2020-05-29
CN111207244B CN111207244B (en) 2021-06-29

Family

ID=70789020

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010113198.XA Active CN111207244B (en) 2020-02-24 2020-02-24 Steam boiler pipeline installation construction method

Country Status (1)

Country Link
CN (1) CN111207244B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112059551A (en) * 2020-09-05 2020-12-11 谷建兴 Method for manufacturing and processing coal economizer of thermal power generation boiler
CN113231785A (en) * 2021-05-31 2021-08-10 龙泉市恒丰汽车空调配件有限公司 Automatic processing equipment for liquid storage drying bottle
CN115255750A (en) * 2022-09-28 2022-11-01 济南盛世阳光机械零部件有限公司 Welding equipment and welding method for embedded part of balancing weight
CN117823716A (en) * 2024-03-06 2024-04-05 福建三元安装有限公司 Steam boiler pipeline installation construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2304394A (en) * 1995-08-19 1997-03-19 Subsea Offshore Ltd Method of and apparatus for repairing a pipeline
DE202009004500U1 (en) * 2009-04-03 2010-08-19 Sbb Stahl Stahl- Und Anlagenbau Gmbh Auxiliary device for a workplace
CN103986108A (en) * 2014-04-03 2014-08-13 杭州吉宝传动设备有限公司 Ocean engineering thermal insulation movable fully-enclosed cable bridge and erection method thereof
US20140346702A1 (en) * 2012-06-01 2014-11-27 Altex Technologies Corporation Method and apparatus for material densification
CN208587600U (en) * 2018-08-01 2019-03-08 天津国化集团有限公司 A kind of fixation device for natural gas line
CN109604890A (en) * 2019-01-29 2019-04-12 李承续 A kind of mobile positioning apparatus of adjustable pipe erecting and welding assembly
CN109973717A (en) * 2019-05-20 2019-07-05 李联辉 A kind of tap water conveyance conduit laying apparatus
US20200018424A1 (en) * 2018-07-10 2020-01-16 Comalander Fabrication and Services, LLC Pipe Support System, And Method Of Use

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2304394A (en) * 1995-08-19 1997-03-19 Subsea Offshore Ltd Method of and apparatus for repairing a pipeline
DE202009004500U1 (en) * 2009-04-03 2010-08-19 Sbb Stahl Stahl- Und Anlagenbau Gmbh Auxiliary device for a workplace
US20140346702A1 (en) * 2012-06-01 2014-11-27 Altex Technologies Corporation Method and apparatus for material densification
CN103986108A (en) * 2014-04-03 2014-08-13 杭州吉宝传动设备有限公司 Ocean engineering thermal insulation movable fully-enclosed cable bridge and erection method thereof
US20200018424A1 (en) * 2018-07-10 2020-01-16 Comalander Fabrication and Services, LLC Pipe Support System, And Method Of Use
CN208587600U (en) * 2018-08-01 2019-03-08 天津国化集团有限公司 A kind of fixation device for natural gas line
CN109604890A (en) * 2019-01-29 2019-04-12 李承续 A kind of mobile positioning apparatus of adjustable pipe erecting and welding assembly
CN109973717A (en) * 2019-05-20 2019-07-05 李联辉 A kind of tap water conveyance conduit laying apparatus

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112059551A (en) * 2020-09-05 2020-12-11 谷建兴 Method for manufacturing and processing coal economizer of thermal power generation boiler
CN112059551B (en) * 2020-09-05 2021-03-09 北方国际合作股份有限公司 Method for manufacturing and processing coal economizer of thermal power generation boiler
CN113231785A (en) * 2021-05-31 2021-08-10 龙泉市恒丰汽车空调配件有限公司 Automatic processing equipment for liquid storage drying bottle
CN113231785B (en) * 2021-05-31 2023-02-10 龙泉市恒丰汽车空调配件有限公司 Automatic processing equipment for liquid storage drying bottle
CN115255750A (en) * 2022-09-28 2022-11-01 济南盛世阳光机械零部件有限公司 Welding equipment and welding method for embedded part of balancing weight
CN115255750B (en) * 2022-09-28 2022-12-13 济南盛世阳光机械零部件有限公司 Welding equipment and welding method for embedded part of balancing weight
CN117823716A (en) * 2024-03-06 2024-04-05 福建三元安装有限公司 Steam boiler pipeline installation construction method
CN117823716B (en) * 2024-03-06 2024-05-14 福建三元安装有限公司 Steam boiler pipeline installation construction method

Also Published As

Publication number Publication date
CN111207244B (en) 2021-06-29

Similar Documents

Publication Publication Date Title
CN111207244B (en) Steam boiler pipeline installation construction method
CN110344490B (en) Municipal road sewer pipeline construction equipment and method
CN110919225B (en) Welding manufacturing and processing technology for hot-dip galvanized steel
CN110849748A (en) PVC pipe quality detection equipment
CN111532971A (en) Environment-friendly glass fiber reinforced plastic septic tank installation and construction system and installation and construction process
CN114991139A (en) Positioning auxiliary support of basement anti-floating anchor rod
CN111604636B (en) Chemical plant pipeline laying connecting device and connecting method thereof
CN207903835U (en) Pipeline apparatus for automatically lifting
CN117451734A (en) Concrete bridge bottom surface crack detection device and application method thereof
CN217108486U (en) Concrete rainwater pipeline installation device capable of being rapidly disassembled
CN110116359B (en) Pre-buried exposing reinforcing bar rust cleaning device of building engineering of adaptable different diameters
CN111495787A (en) Composite carbon fiber rod detection device and detection method thereof
CN206653879U (en) Tyre bead breaker
CN112717649A (en) Anticorrosive durable glass steel desulfurizing tower
CN216479277U (en) Support frame is used in concrete drain pipe installation
CN212608977U (en) Combined lifting appliance for mounting solar panel
CN219324687U (en) Reducing screen pipe shaping processingequipment
CN216447260U (en) Self-locking vertical net joint
CN219566467U (en) Inclined rail type steel pipe conveying device
CN214360158U (en) Device is laid with well lid of being convenient for remove to road facilities construction
CN218426690U (en) Material pipe loading attachment
CN218285429U (en) Civil engineering pipe fitting rack
CN216511358U (en) Steel pipe tower flange group is to machine and is had suspension mobile device of anti-drop structure
CN221113994U (en) Electric pushing vehicle for constructional engineering
CN216336230U (en) Antiseep drain pipe hoist and mount frock

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210602

Address after: 297-2908, block B, Wanda office building, Fengze District, Quanzhou City, Fujian Province, 362000

Applicant after: Fujian Sanyuan installation Co.,Ltd.

Address before: 314001 Jiaxing Shuangli pipe fittings Co., Ltd., Guangyi Road, Nanhu District, Jiaxing City, Zhejiang Province

Applicant before: Pan Xuejun

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant