CN111173166A - Basement outer wall waterproof protection structure and construction method - Google Patents

Basement outer wall waterproof protection structure and construction method Download PDF

Info

Publication number
CN111173166A
CN111173166A CN202010117240.5A CN202010117240A CN111173166A CN 111173166 A CN111173166 A CN 111173166A CN 202010117240 A CN202010117240 A CN 202010117240A CN 111173166 A CN111173166 A CN 111173166A
Authority
CN
China
Prior art keywords
basement
waterproof
waterproofing membrane
groove
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010117240.5A
Other languages
Chinese (zh)
Inventor
魏东
魏庆贵
蓝涵恋
黄军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huachuan Construction Group Co ltd
Original Assignee
Huachuan Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huachuan Construction Group Co ltd filed Critical Huachuan Construction Group Co ltd
Priority to CN202010117240.5A priority Critical patent/CN111173166A/en
Publication of CN111173166A publication Critical patent/CN111173166A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0007Base structures; Cellars
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6806Waterstops
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Building Environments (AREA)

Abstract

The invention relates to a basement outer wall waterproof protection structure and a construction method, wherein the basement outer wall waterproof protection structure comprises a basement main body, a plurality of waterproof rolls are arranged on the upstream surface of the basement main body and are sequentially spliced, the waterproof rolls and the basement main body are fixedly bonded, a connecting groove is formed in the basement main body and is located at the splicing position of the adjacent waterproof rolls, the edge of each waterproof roll is located in the connecting groove, a pressing piece is arranged on each connecting groove, the pressing piece is fixedly connected with each connecting groove, and the pressing piece is abutted against the edge of each waterproof roll. The pressing piece compacts the splicing seams of the waterproof coiled material in the connecting grooves, so that the situation that the waterproof coiled material is easily turned up and degummed at the splicing seams can be effectively avoided.

Description

Basement outer wall waterproof protection structure and construction method
Technical Field
The invention relates to the technical field of basement waterproof construction, in particular to a basement outer wall waterproof protection structure and a construction method.
Background
With the development of cities, the development and utilization of urban underground spaces have become a worldwide trend. Because the basement is underground, it is easily influenced by geographical environment, easily absorbs ambient moisture and humidity, leads to the basement humidity to go mouldy, influences basement's use.
At present, a common method is to paste a waterproof coiled material on the outer wall of a basement, and a plurality of waterproof coiled materials are sequentially spliced, adhered and fixed on the outer wall of the basement. The adjacent waterproof coiled materials have splicing seams, and the waterproof coiled materials are easy to turn up and degum at the splicing seams, so that the waterproof effect at the splicing seams is poor.
Disclosure of Invention
Aiming at the defects in the prior art, the invention aims to provide a basement outer wall waterproof protection structure which can avoid the situation that a waterproof coiled material is easy to turn up and degum at a splicing seam.
The invention also provides a construction method suitable for the basement exterior wall waterproof protection structure.
The above object of the present invention is achieved by the following technical solutions:
basement outer wall water protection architecture, including basement main part, the upstream face of basement main part is equipped with a plurality of waterproofing membrane, and is a plurality of waterproofing membrane splices in proper order, and waterproofing membrane and basement main part bond fixedly, be equipped with the spread groove in the basement main part, the spread groove is located adjacent waterproofing membrane's concatenation position, and waterproofing membrane's edge is located the spread groove, is equipped with on the spread groove and compresses tightly the piece, compress tightly piece and spread groove fixed connection, compress tightly the edge butt of piece and waterproofing membrane.
Through adopting above-mentioned technical scheme, waterproofing membrane's edge bonding is fixed in the spread groove for waterproofing membrane's concatenation seam is located the spread groove, fixes in the spread groove through compressing tightly the piece, compresses tightly the piece with waterproofing membrane's edge compaction in the spread groove, compresses tightly the piece extrusion and locates at waterproofing membrane's concatenation seam, can effectively avoid waterproofing membrane to turn up easily, the condition of coming unstuck in concatenation seam position, and then improves waterproofing membrane and put the waterproof performance in concatenation seam position.
The present invention in a preferred example may be further configured to: the spread groove includes holding tank and draw-in groove, holding tank and draw-in groove intercommunication, it includes connecting portion and clamping part to compress tightly the piece, clamping part and draw-in groove joint, clamping part and waterproofing membrane butt, connecting portion are located the holding tank.
Through adopting above-mentioned technical scheme, waterproofing membrane's edge bonds in holding tank and draw-in groove, chucking part and draw-in groove joint for compress tightly piece and spread groove connection, chucking part is in the draw-in groove with waterproofing membrane's edge compaction, can avoid waterproofing membrane to turn up easily, the condition of coming unstuck in the concatenation seam position.
The present invention in a preferred example may be further configured to: and sealant is arranged in the accommodating groove and is abutted to the connecting part.
Through adopting above-mentioned technical scheme, through sealed setting of gluing, can improve the leakproofness that compresses tightly between piece and the spread groove, also improve the sealed effect of waterproofing membrane concatenation seam department, improve waterproof performance.
The present invention in a preferred example may be further configured to: the connecting portion is provided with an anti-slip groove, and the sealant is located on one side of the connecting portion where the anti-slip groove is formed.
Through adopting above-mentioned technical scheme, set up through the antiskid groove, increased the roughness of this side of connecting portion, the joint sealant bonds with compressing tightly more firmly.
The present invention in a preferred example may be further configured to: the corner of basement main part is equipped with additional coil stock layer, additional coil stock layer is located between basement main part and the waterproofing membrane.
Through adopting above-mentioned technical scheme, the backfill in-process, the soil of backfilling has pressure to waterproofing membrane, and the corner of basement main part is more sharp-pointed, and waterproofing membrane produces the damage easily in the corner of basement main part, sets up through additional coil stock layer, has increased the thickness of the corner waterproof layer of basement main part, reduces waterproofing membrane upstream face and appears the damaged condition.
The present invention in a preferred example may be further configured to: the upstream face of basement main part is equipped with the protection wall, the protection wall top is equipped with polyphenyl board waterproof layer, polyphenyl board waterproof layer is located waterproofing membrane and keeps away from one side of basement main part.
Through adopting above-mentioned technical scheme, through protection wall and polyphenyl board water proof coating setting, can protect waterproofing membrane, during the backfill, can avoid the backfill in-process to produce the damage to waterproofing membrane, polyphenyl board water proof coating can improve the thermal insulation performance of basement main part outer wall simultaneously.
The present invention in a preferred example may be further configured to: be equipped with the space between protection wall and the basement main part, the intussuseption in the space is filled with the water swelling rubber layer, water swelling rubber layer and waterproofing membrane butt.
Through adopting above-mentioned technical scheme, the inflation that absorbs water on the inflation rubber layer absorbs water, and the waterproofing membrane of inflation rubber layer that absorbs water can extrude basement main part bottom increases the leakproofness, improves the waterproof performance of basement main part bottom.
The invention also discloses a construction method of the basement exterior wall waterproof protection structure, which comprises the following steps:
step S1: preparing a waterproof coiled material, and marking off an elastic line on a wall surface according to the specification of the waterproof coiled material;
step S2: excavating a connecting groove at the position of the elastic line, and cleaning a base layer of the outer wall of the basement main body after the connecting groove is finished;
step S3: coating a base adhesive on the outer wall of the basement main body, and then sequentially laying waterproof coiled materials, wherein splicing seams of the waterproof coiled materials are positioned in the connecting grooves;
step S4: after the waterproof coiled material is laid, pressing the pressing piece into the connecting groove, clamping and fixing the pressing piece and the connecting groove, pressing a clamping part of the pressing piece at a splicing seam of the waterproof coiled material, then coating sealant on the connecting groove, and covering the pressing piece with the sealant;
step S5: maintenance, waterproofing membrane maintenance back of finishing, brick the protection wall all around in the basement main part, leave the space between protection wall and the basement main part, the intussuseption in space intussuseption expands the rubber layer, and the waterproofing membrane contact of water expansion rubber layer and basement main part bottom installs polyphenyl board water proof coating at the top of protection wall, and polyphenyl board water proof coating is located waterproofing membrane and keeps away from one side of basement main part, carries out backfill at last.
Through adopting above-mentioned technical scheme, at basement main part excavation spread groove, the tight piece is with waterproofing membrane's edge compaction in the spread groove, can effectively avoid waterproofing membrane to turn up easily, the condition of coming unstuck in the splice joint position, and protection wall and polyphenyl board water proof layer protect waterproofing membrane, and during the backfill soil, can avoid the backfill soil in-process to produce the damage to waterproofing membrane.
In summary, the invention includes at least one of the following beneficial technical effects:
1. the edge compaction of pressing member with waterproofing membrane is in the spread groove, and the extrusion of pressing member is in waterproofing membrane's splice joint department, can effectively avoid waterproofing membrane to turn up easily, the condition of coming unstuck in splice joint position, and then improves waterproofing membrane and put up splice joint position waterproof performance.
2. Through additional coil layer setting, increased the thickness of basement main part's corner waterproof layer, improved the waterproof performance of basement main part's corner, also improved the antifriction performance of basement main part's corner.
3. The waterproof roll is protected by the protection wall and the polystyrene board waterproof protection layer, and when soil is backfilled, the waterproof roll can be prevented from being damaged in the backfilling process.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged schematic view of portion A of FIG. 1;
fig. 3 is a partially enlarged schematic view of a portion B in fig. 1.
In the figure, 1, basement main body; 2. connecting grooves; 21. accommodating grooves; 22. a card slot; 23. a protrusion; 3. waterproof coiled materials; 31. splicing seams; 32. an additional web layer; 4. a compression member; 41. a connecting portion; 42. a clamping part; 43. an anti-slip groove; 5. sealing glue; 6. a protection wall; 61. a water-swellable rubber layer; 7. polystyrene board waterproof layer.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1 and 2, the invention discloses a basement exterior wall waterproof protection structure, which comprises a basement main body 1, wherein a connecting groove 2 is formed in the upstream surface of the basement main body 1, a bulge 23 is arranged on the inner wall of the connecting groove 2, the bulge 23 divides the connecting groove 2 into a containing groove 21 and a clamping groove 22, and the containing groove 21 is communicated with the clamping groove 22. The upstream face of basement main part 1 bonds and is fixed with a plurality of waterproofing membrane 3, and a plurality of waterproofing membrane 3 splice in proper order, and the edge of waterproofing membrane 3 is located spread groove 2 for splice seam 31 between the adjacent waterproofing membrane 3 is located draw-in groove 22.
The joint has the piece 4 that compresses tightly in spread groove 2, and the piece 4 that compresses tightly includes connecting portion 41 and clamping part 42, and clamping part 42 and draw-in groove 22 cooperation joint, 3 butts of waterproofing membrane in clamping part 42 and the draw-in groove 22, and the cross-section of clamping part 42 is trapezoidal. The connecting part 41 is located in the accommodating groove 21, and the thickness of the connecting part 41 is smaller than the distance from the bottom of the connecting groove 2 to the upstream surface of the waterproof roll 3. The side of the connecting portion 41 away from the engaging groove 22 is provided with anti-slip grooves 43 at intervals, and the anti-slip grooves 43 are arranged along the length direction of the pressing member 4. Be provided with sealed glue 5 in the holding tank 21, sealed glue 5 is located connecting portion 41 and has antiskid groove 43 one side, and sealed glue 5 keeps away from the side of draw-in groove 22 and flushes with waterproofing membrane 3's upstream face. The sealant 5 is adhered and fixed to the connection portion 41, and the sealant 5 covers the connection portion 41.
Referring to fig. 1 and 3, an additional roll layer 32 is disposed at a corner of the basement main body 1, the additional roll layer 32 is fixedly bonded to the basement main body 1, the additional roll layer 32 has a width smaller than that of the waterproofing membrane 3, and the additional roll layer 32 is disposed between the basement main body 1 and the waterproofing membrane 3.
The upstream face of basement main part 1 has been bricked to have protection wall 6, and protection wall 6 encloses around basement main part 1. A gap is reserved between the protection wall 6 and the basement main body 1, the water-absorbing expansion rubber layer 61 is filled in the gap, and the water-absorbing expansion rubber layer 61 is in contact with the waterproof coiled material 3. A polystyrene board waterproof protective layer 7 is arranged above the protective wall 6, the thickness of the polystyrene board waterproof protective layer 7 is 30mm, the polystyrene board waterproof protective layer 7 is located on one side, away from the basement main body 1, of the waterproof coiled material 3, and the polystyrene board waterproof protective layer 7 is fixedly bonded with the waterproof coiled material 3 through double-faced adhesive.
The invention also discloses a construction method of the basement exterior wall waterproof protection structure, which comprises the following steps:
step S1: and preparing a waterproof coiled material 3, and marking the elastic line on the wall surface into an area according to the specification of the waterproof coiled material 3.
Step S2: digging a connecting groove 2 at the position of the elastic line, and cleaning the base layer of the outer wall of the basement main body 1 after the connecting groove 2 is finished.
Step S3: the adhesive for the base layer is coated on the outer wall of the basement body 1, and the coating is carried out in one direction, so that the thickness is uniform, and the adhesive does not leak or accumulate. And then the waterproof coiled materials 3 are laid in sequence, and the splicing seams 31 of the waterproof coiled materials 3 are positioned in the connecting grooves 2. After each coiled material is paved, the surface of the coiled material is rolled by the pressing roller, and the coiled material is compacted and exhausted, so that the paving of the coiled material is smooth.
And (3) carrying out small fillet treatment on the corner of the outer wall of the basement main body 1 by cement paste, firstly laying the additional coil layer 32, and then laying the waterproof coil 3.
Step S4: after having laid waterproofing membrane 3, will compress tightly 4 and impress in spread groove 2, compress tightly 4 and fixed with the 2 joints of spread groove, make the chucking part 42 that compresses tightly 4 compress tightly 31 departments at waterproofing membrane 3's splice joint, then scribble sealed glue 5 on spread groove 2, sealed glue 5 covers and compresses tightly 4, and sealed glue 5 flushes with waterproofing membrane 3's upstream face.
Step S5: and (5) maintaining for 24 hours to avoid sunshine exposure. After the maintenance of the waterproof coiled material 3 is finished, the protection wall 6 is bricked around the basement main body 1, a gap is reserved between the protection wall 6 and the basement main body 1, the water absorption expansion rubber layer 61 is filled in the gap, and the water absorption expansion rubber layer 61 is in contact with the waterproof coiled material 3 at the bottom of the basement main body 1. A polystyrene board waterproof protective layer 7 is installed on the top of the protective wall 6, the polystyrene board waterproof protective layer 7 is located on one side, away from the basement main body 1, of the waterproof coiled material 3, and the polystyrene board waterproof protective layer 7 is fixedly bonded with the waterproof coiled material 3 through double faced adhesive.
And finally, backfilling, wherein the waterproof protective layer cannot be damaged when the soil is backfilled, the backfilled soil must meet the backfilling requirement, and the backfilling cannot be carried out by using construction waste.
The implementation principle of the invention is as follows: waterproofing membrane 3's edge bonding is fixed in spread groove 2 for waterproofing membrane 3's concatenation seam 31 is located spread groove 2, fix in spread groove 2 through compressing tightly 4, compress tightly 4 with waterproofing membrane 3's edge compaction in spread groove 2, compress tightly 4 extrusion in waterproofing membrane 3's concatenation seam 31 department, can effectively avoid waterproofing membrane 3 to turn up easily in concatenation seam 31 position, the condition of coming unstuck, and then improve waterproofing membrane 3 and put water resistance in concatenation seam 31. Through protection wall 6 and polyphenyl board waterproof layer 7 setting, can protect waterproofing membrane 3, polyphenyl board waterproof layer 7 can improve the thermal insulation performance of basement main part 1 outer wall simultaneously.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.

Claims (8)

1. Basement outer wall water proof structure, including basement main part (1), the upstream face of basement main part (1) is equipped with a plurality of waterproofing membrane (3), and is a plurality of waterproofing membrane (3) splice in proper order, and waterproofing membrane (3) and basement main part (1) bond fixedly, its characterized in that: be equipped with spread groove (2) on basement main part (1), spread groove (2) are located the concatenation position of adjacent waterproofing membrane (3), and the edge of waterproofing membrane (3) is located spread groove (2), is equipped with on spread groove (2) and compresses tightly piece (4), compress tightly piece (4) and spread groove (2) fixed connection, compress tightly the edge butt of piece (4) and waterproofing membrane (3).
2. The basement exterior wall waterproof protection structure of claim 1, characterized in that: connecting groove (2) are including holding tank (21) and draw-in groove (22), holding tank (21) and draw-in groove (22) intercommunication, it includes connecting portion (41) and clamping part (42) to compress tightly piece (4), clamping part (42) and draw-in groove (22) joint, clamping part (42) and waterproofing membrane (3) butt, connecting portion (41) are located holding tank (21).
3. The basement exterior wall waterproof protective structure of claim 2, characterized in that: be equipped with sealed glue (5) in holding tank (21), sealed glue (5) and connecting portion (41) butt.
4. The basement exterior wall waterproof protective structure of claim 3, characterized in that: the anti-skidding sealing glue is characterized in that an anti-skidding groove (43) is formed in the connecting portion (41), and the sealing glue (5) is located on one side, provided with the anti-skidding groove (43), of the connecting portion (41).
5. The basement exterior wall waterproof protection structure of claim 1, characterized in that: the basement is characterized in that an additional coil layer (32) is arranged at the corner of the basement main body (1), and the additional coil layer (32) is located between the basement main body (1) and the waterproof coiled material (3).
6. The basement exterior wall waterproof protection structure of claim 1, characterized in that: the upstream face of basement main part (1) is equipped with protection wall (6), protection wall (6) top is equipped with polyphenyl board waterproof layer (7), polyphenyl board waterproof layer (7) are located waterproofing membrane (3) and keep away from one side of basement main part (1).
7. The basement exterior wall waterproof protective structure of claim 6, characterized in that: be equipped with the space between protection wall (6) and basement main part (1), the space intussuseption is filled with water-absorbing expansion rubber layer (61), water-absorbing expansion rubber layer (61) and waterproofing membrane (3) butt.
8. The construction method of the basement exterior wall waterproof protective structure according to any one of claims 1 to 7, comprising the following steps;
step S1: preparing a waterproof coiled material (3), and marking off an area by snapping lines on the wall surface according to the specification of the waterproof coiled material (3);
step S2: excavating a connecting groove (2) at the position of the elastic line, and cleaning a base layer of the outer wall of the basement main body (1) after the connecting groove (2) is finished;
step S3: coating a base adhesive on the outer wall of the basement main body (1), then sequentially laying the waterproof coiled material (3), wherein the splicing seam (31) of the waterproof coiled material (3) is positioned in the connecting groove (2);
step S4: after the waterproof coiled material (3) is laid, pressing the pressing piece (4) into the connecting groove (2), clamping and fixing the pressing piece (4) and the connecting groove (2) to enable the clamping part (42) of the pressing piece (4) to be pressed at the splicing seam (31) of the waterproof coiled material (3), then coating the sealing glue (5) on the connecting groove (2), and covering the pressing piece (4) with the sealing glue (5);
step S5: maintenance, after waterproofing membrane (3) maintenance is finished, protective wall (6) have been bricked around basement main part (1), leave the space between protective wall (6) and basement main part (1), the intussuseption in the space is filled with water swelling rubber layer (61), water swelling rubber layer (61) and waterproofing membrane (3) contact of basement main part (1) bottom absorb water, install polyphenyl board waterproof layer (7) at the top of protective wall (6), polyphenyl board waterproof layer (7) are located waterproofing membrane (3) and keep away from one side of basement main part (1), carry out the backfill soil finally.
CN202010117240.5A 2020-02-25 2020-02-25 Basement outer wall waterproof protection structure and construction method Pending CN111173166A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010117240.5A CN111173166A (en) 2020-02-25 2020-02-25 Basement outer wall waterproof protection structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010117240.5A CN111173166A (en) 2020-02-25 2020-02-25 Basement outer wall waterproof protection structure and construction method

Publications (1)

Publication Number Publication Date
CN111173166A true CN111173166A (en) 2020-05-19

Family

ID=70621039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010117240.5A Pending CN111173166A (en) 2020-02-25 2020-02-25 Basement outer wall waterproof protection structure and construction method

Country Status (1)

Country Link
CN (1) CN111173166A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112282116A (en) * 2020-11-30 2021-01-29 北京元洋鑫胜建筑工程有限公司 Wall waterproof construction method
CN112878514A (en) * 2021-01-19 2021-06-01 中国建筑第八工程局有限公司 Assembled waterproof protective layer
CN113374187A (en) * 2021-06-10 2021-09-10 浙江鹏盛建设集团有限公司 Roof heat-insulating waterproof structure and construction method thereof
CN113585355A (en) * 2021-08-25 2021-11-02 江苏南通三建集团股份有限公司 Construction process for preventing basement exterior wall waterproof layer protection board from being stuck and toppled
CN113605461A (en) * 2021-07-28 2021-11-05 中国十七冶集团有限公司 Basement exterior wall waterproof structure and construction method
CN114876092A (en) * 2022-05-24 2022-08-09 江苏启安建设集团有限公司 Assembled outer wall structure with water seepage prevention function for basement and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090274518A1 (en) * 2005-02-25 2009-11-05 Brian Iske Method for Post-Installation In-Situ Barrier Creation
CN107190783A (en) * 2017-06-06 2017-09-22 中国建筑第二工程局有限公司 Basement waterproof structure and construction method of basement outer wall waterproof structure
CN208899541U (en) * 2018-07-25 2019-05-24 江苏铭城建筑设计院有限公司 A kind of pile crown water proof structure
CN210031922U (en) * 2019-03-22 2020-02-07 浙江东南建筑设计有限公司 Basement waterproof structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090274518A1 (en) * 2005-02-25 2009-11-05 Brian Iske Method for Post-Installation In-Situ Barrier Creation
CN107190783A (en) * 2017-06-06 2017-09-22 中国建筑第二工程局有限公司 Basement waterproof structure and construction method of basement outer wall waterproof structure
CN208899541U (en) * 2018-07-25 2019-05-24 江苏铭城建筑设计院有限公司 A kind of pile crown water proof structure
CN210031922U (en) * 2019-03-22 2020-02-07 浙江东南建筑设计有限公司 Basement waterproof structure

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112282116A (en) * 2020-11-30 2021-01-29 北京元洋鑫胜建筑工程有限公司 Wall waterproof construction method
CN112878514A (en) * 2021-01-19 2021-06-01 中国建筑第八工程局有限公司 Assembled waterproof protective layer
CN113374187A (en) * 2021-06-10 2021-09-10 浙江鹏盛建设集团有限公司 Roof heat-insulating waterproof structure and construction method thereof
CN113374187B (en) * 2021-06-10 2022-10-28 浙江鹏盛建设集团有限公司 Roof heat-insulating waterproof structure and construction method thereof
CN113605461A (en) * 2021-07-28 2021-11-05 中国十七冶集团有限公司 Basement exterior wall waterproof structure and construction method
CN113585355A (en) * 2021-08-25 2021-11-02 江苏南通三建集团股份有限公司 Construction process for preventing basement exterior wall waterproof layer protection board from being stuck and toppled
CN114876092A (en) * 2022-05-24 2022-08-09 江苏启安建设集团有限公司 Assembled outer wall structure with water seepage prevention function for basement and construction method thereof

Similar Documents

Publication Publication Date Title
CN111173166A (en) Basement outer wall waterproof protection structure and construction method
CN211547827U (en) Waterproof structure at joint of concrete bottom plates of new and old buildings
CN105544617A (en) Integration construction method for basement soleplate and waterproof roll as well as waterproof structure
CN211312492U (en) Prestressed pipe pile head waterproof structure and pipe pile head
KR100875893B1 (en) The waterproof construct method with waterproof-sheet
KR101431380B1 (en) Triple composite waterproofing method applied loose laying joint type
CN110593420A (en) Waterproof layer splicing seam structure and waterproof roll construction method
CN213086875U (en) Basement bottom plate and wall body handing-over department waterproof layer processing structure
KR100875897B1 (en) The waterproof construction using waterproof with lmf nonwoven both sides of synthetic resin sheet
KR102072401B1 (en) Waterproofing system using metal sheet tape and waterproofing system using it
KR200455222Y1 (en) Composite waterproof sheet and waterproof structure using same
KR101302469B1 (en) Rubberized asphalt waterproofing material and construction methods of the same
CN215367399U (en) Waterproof structure and construction equipment of unilateral formwork of basement side wall
CN109024927A (en) A kind of construction method of the waterproof of prespreading self-adhesion glue film waterproof roll
CN102505947A (en) Construction method for butt-jointing and sealing waterproof rolls
CN204982977U (en) Basement bottom plate and waterproofing membrane integration waterproof construction
CN111456108B (en) Waterproof structure of foundation bearing platform and construction method thereof
CN211548112U (en) Splice joint structure of waterproof layer
CN219622268U (en) Waterproof splicing structure
CN207130636U (en) A kind of prefabricating square culvert joints waterproof construction
CN218880965U (en) Prevent drainage coiled material convenient to concatenation is laid
CN111005739A (en) Tunnel lining structure joint treated by double-sided self-adhesive waterproof adhesive tape and construction method
CN210827605U (en) Waterproof node structure for basement side plate upstream surface and bottom plate junction
CN211421423U (en) Basement waterproof structure
CN216766306U (en) Waterproofing membrane concatenation seam watertight fittings is glued in reaction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200519