CN111130549A - Bridge template on-site intelligent monitoring system and method - Google Patents

Bridge template on-site intelligent monitoring system and method Download PDF

Info

Publication number
CN111130549A
CN111130549A CN202010092447.1A CN202010092447A CN111130549A CN 111130549 A CN111130549 A CN 111130549A CN 202010092447 A CN202010092447 A CN 202010092447A CN 111130549 A CN111130549 A CN 111130549A
Authority
CN
China
Prior art keywords
switch tube
module
controllable
resistor
capacitor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010092447.1A
Other languages
Chinese (zh)
Other versions
CN111130549B (en
Inventor
孔令智
褚兴坤
褚兴民
宋祥蕾
刘展威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Boyuan Heavy Industry Co ltd
Original Assignee
Shandong Boyuan Heavy Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Boyuan Heavy Industry Co ltd filed Critical Shandong Boyuan Heavy Industry Co ltd
Priority to CN202010092447.1A priority Critical patent/CN111130549B/en
Publication of CN111130549A publication Critical patent/CN111130549A/en
Application granted granted Critical
Publication of CN111130549B publication Critical patent/CN111130549B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H03ELECTRONIC CIRCUITRY
    • H03MCODING; DECODING; CODE CONVERSION IN GENERAL
    • H03M1/00Analogue/digital conversion; Digital/analogue conversion
    • H03M1/12Analogue/digital converters
    • H03M1/124Sampling or signal conditioning arrangements specially adapted for A/D converters
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D21/00Measuring or testing not otherwise provided for
    • G01D21/02Measuring two or more variables by means not covered by a single other subclass

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

The invention relates to a bridge template on-site intelligent monitoring system and a method, which comprises a monitoring module, a sensing input module, a DAC reference module and an ADC conversion module, wherein the sensing input module is used for sensing and monitoring a bridge template and inputting monitored data to the ADC conversion module; the monitoring module comprises a data receiving module, a processing module, a reference output module and a field intelligent response module, wherein the data receiving module is used for receiving monitored data and transmitting the monitored data to the processing module, the processing module analyzes and processes the data and determines whether to start the field intelligent response module and the adjusting parameter output module according to an analysis and processing result. The invention can carry out on-site intelligent monitoring on the bridge template and is convenient for on-site control.

Description

Bridge template on-site intelligent monitoring system and method
Technical Field
The invention belongs to the technical field of buildings, and particularly relates to a bridge template on-site intelligent monitoring system and method.
Background
In the prior art, in bridge construction, a template is used for on-site construction, which is a very common method, but how to perform safety protection in the on-site construction process is a current difficulty, and in the on-site construction process, a large number of bridge templates exist, and how to perform on-site intelligent monitoring on the large number of bridge templates is an important way for saving cost and improving efficient safety production.
Disclosure of Invention
The invention discloses a bridge template on-site intelligent monitoring system, which comprises a monitoring module, a sensing input module, a DAC reference module and an ADC conversion module, wherein the sensing input module is used for sensing and monitoring a bridge template and inputting monitored data to the ADC conversion module; the monitoring module comprises a data receiving module, a processing module, a reference output module and a field intelligent response module, wherein the data receiving module is used for receiving monitored data and transmitting the monitored data to the processing module, the processing module analyzes and processes the data and determines whether to start the field intelligent response module and the adjusting parameter output module according to an analysis and processing result.
In the bridge template field intelligent monitoring system, the processing module analyzes and processes data, and determines whether to start the field intelligent response module and the adjusting parameter output module according to an analysis and processing result, and the method specifically includes: judging whether the monitored data is larger than a preset threshold value, if so, starting the field intelligent response module, after the field intelligent response module is started, firstly analyzing the type of the data larger than the preset threshold value, after the type is determined, searching a pre-stored event response table corresponding to the type, comparing the type of the monitored data with the preset threshold value, comparing the comparison result with the event response table to determine the response grade and the response strategy corresponding to the event, then sending the response strategy to the field equipment to perform corresponding protection action, after the field equipment executes the protection action, starting the parameter adjusting module, adjusting the reference value of the DAC reference module, after the adjustment is completed, monitoring the type once again, inputting the type to the processing module to analyze and judge, if the data monitored again is in a normal range, the on-site response event is stored as a historical sample of on-site intelligent monitoring.
In the bridge template on-site intelligent monitoring system, the reference value of the DAC reference module is adjusted to judge whether the original monitoring mode is influenced or not after the field device executes the protection action, and the DAC reference module is adjusted to the original value after the field response time is stored.
The intelligent monitoring system for the bridge template site comprises a sensing input module, a monitoring module and a control module, wherein the sensing input module comprises at least one of a pressure sensor, a wind speed sensor and a rainfall sensor.
The on-site intelligent monitoring system for the bridge template is characterized in that the DAC reference modules and the ADC conversion modules are matched in pairs, have multiple groups and are matched with the types and the number of the sensing input modules.
In the bridge template on-site intelligent monitoring system, the processing module sets different zone bits according to the data of different ADC conversion modules, and the reference output module and the on-site intelligent response module distinguish different data by identifying the zone bits; the flag bits comprise data flag bits and serial number flag bits, the data flag bits are used for marking different data, and the serial number flag bits are used for marking serial numbers of different sensing devices in the same data.
The on-site intelligent monitoring system for the bridge template comprises an ADC conversion module and a monitoring module, wherein the ADC conversion module comprises: the circuit comprises a switch tube 1M1-1M9, a resistor 1R1-1R3, a capacitor 1C1-1C5, a comparator 1U1-1U2, a current source 1I1, a switch tube 2M1-2M9, a resistor 2R1-2R3, a capacitor 2C1-2C5, a comparator 2U1-2U2, a current source 2I1, a resistor R3, a resistor R4 and a resistor R5;
one non-controllable end of the switch tube 1M1, the other non-controllable end of the switch tube 1M5 and one end of the switch tube 1M9 are connected with a power supply VCC, the other non-controllable end of the switch tube 1M1 is respectively connected with one non-controllable end of the switch tube 1M2 and one end of the capacitor 1C1, the other end of the capacitor 1C1 is grounded, the other non-controllable end of the switch tube 1M2 is respectively connected with one non-controllable end of the switch tube 1M3 and one end of the resistor 1R3, the controllable end of the switch tube 1M6 and the controllable end of the switch tube 1M7, the other end of the resistor 1R3 is respectively connected with one end of the capacitor 1C3 and the positive input end of the comparator 1U1, the other end of the capacitor 1C3 is grounded, the other non-controllable end of the switch tube 1M3 is connected with one non-controllable end of the switch tube 1M4, the other non-controllable end of the switch tube 1M4 is grounded, the switch tube 1M2 and the controllable end of the switch tube 1M 6862 are connected with one end of the comparator 2 and the comparator 2 through the capacitor, The negative input end of the comparator 1U2 and the controllable end of the switch tube 1M4 are connected with the output end of the comparator 1U 1;
the other non-controllable end of the switch tube 1M5 is connected to a non-controllable end of the switch tube 1M6 and one end of a capacitor 1C4, respectively, the other end of the capacitor 1C4 is grounded, the other non-controllable end of the switch tube 1M6 is connected to a non-controllable end of the switch tube 1M7 and one end of a resistor 1R2, the controllable end of the switch tube 1M6 and the controllable end of the switch tube 1M7, the other end of the resistor 1R2 is connected to one end of the capacitor 1C5 and the positive input end of the comparator 1U2, the other end of the capacitor 1C5 is grounded, the other non-controllable end of the switch tube 1M7 is connected to a non-controllable end of the switch tube 1M8, and the other non-controllable end of the switch tube 1M8 is grounded; the controllable end of the switching tube 1M8 is connected with the output end of the comparator 1U 2; the controllable ends of the switch tube 1M5, the switch tube 1M9 and the switch tube 1M1 are connected, the other non-controllable end of the switch tube 1M9 is connected with one end of a current source 1I1, and the other end of the current source 1I1 is grounded; and the controllable ends of the switch tube 1M2 and the switch tube 1M3 are connected with a sensing input module.
The intelligent monitoring system for the bridge template field is characterized in that one non-controllable end of each of the switch tube 2M1, the switch tube 2M5 and the switch tube 2M9 is connected with a power supply VCC, the other non-controllable end of the switch tube 2M1 is respectively connected with one non-controllable end of the switch tube 2M2 and one end of the capacitor 2C1, the other end of the capacitor 2C1 is grounded, the other non-controllable end of the switch tube 2M2 is respectively connected with one non-controllable end of the switch tube 2M3 and one end of the resistor 2R3, the controllable end of the switch tube 2M6 and the controllable end of the switch tube 2M7, the other end of the resistor 2R3 is respectively connected with one end of the capacitor 2C3 and the positive input end of the comparator 2U1, the other end of the capacitor 2C3 is grounded, the other non-controllable end of the switch tube 2M5 is connected with one non-controllable end of the switch tube 2M4, the other non-controllable end of the switch tube 2M4 is connected with one end of the switch tube 599, the resistor 599 and the controllable end of the switch tube 599 is connected with the capacitor 592R 59, The negative input ends of the comparator 2U1 and the comparator 2U2, and the controllable end of the switch tube 2M4 are connected with the output end of the comparator 2U 1;
the other non-controllable end of the switch tube 2M5 is connected to a non-controllable end of the switch tube 2M6 and one end of a capacitor 2C4, respectively, the other end of the capacitor 2C4 is grounded, the other non-controllable end of the switch tube 2M6 is connected to a non-controllable end of the switch tube 2M7 and one end of a resistor 2R2, the controllable end of the switch tube 2M6 and the controllable end of the switch tube 2M7, the other end of the resistor 2R2 is connected to one end of the capacitor 2C5 and the positive input end of the comparator 2U2, the other end of the capacitor 2C5 is grounded, the other non-controllable end of the switch tube 2M7 is connected to a non-controllable end of the switch tube 2M8, and the other non-controllable end of the switch tube 2M8 is grounded; the controllable end of the switch tube 2M8 is connected with the output end of the comparator 2U 2; the controllable ends of the switch tube 2M5, the switch tube 2M9 and the switch tube 2M1 are connected, the other non-controllable end of the switch tube 2M9 is connected with one end of the current source 2I1, and the other end of the current source 2I1 is grounded;
and the controllable ends of the switch tube 2M2 and the switch tube 2M3 are connected with the output end of the DAC reference module.
In the intelligent monitoring system for the bridge template site, a resistor R3, a resistor R4 and a resistor R5 are connected in series, one end of the resistor R3 is connected with the other non-controllable end of the switch tube 1M6, the other end of the resistor R3 is connected with one end of a resistor R4, one end of a resistor R4 is connected with the other end of the capacitor 1C2, the other end of a resistor R4 is connected with one end of the resistor R5 and the other end of the capacitor 2C2, and the other end of the resistor R5 is connected with the other non-controllable end of the switch tube 2M 6; one end of the resistor R3 and the other end of the resistor R5 are connected with a monitoring module, and the monitoring module is also connected with the DAC reference module.
A monitoring method of the bridge template on-site intelligent monitoring system,
judging whether the monitored data is larger than a preset threshold value or not, and if so, starting the on-site intelligent response module;
after the field intelligent response module is started, firstly analyzing the type of the data larger than a preset threshold value, after the type is determined, searching a pre-stored event response table corresponding to the type, comparing the size of the monitoring data of the type with the preset threshold value, comparing the comparison result with the event response table to determine the response grade and the response strategy corresponding to the event, then the response strategy is sent to the field device to carry out corresponding protection action, after the field device executes the protection action, starting the adjusting parameter module, adjusting the reference value of the DAC reference module, after the adjustment is completed, the type is monitored once again and is input into the processing module for analysis and judgment, if the data monitored again is in the normal range, storing the field response event as a historical sample of field intelligent monitoring;
and adjusting the reference value of the DAC reference module to judge whether the original monitoring mode is influenced or not after the field device executes the protection action, and adjusting the DAC reference module to be an original value after the field response time is stored.
In order to solve the technical problems: the application provides a monitoring system and a monitoring method of a bridge template on-site intelligent monitoring system, which can carry out on-site intelligent monitoring, carry out analysis and processing according to accurate on-site monitoring data, carry out on-site control protection rapidly and conveniently carry out on-site safety control. As an improvement point of the invention, the monitored data can be compared with the preset value, whether the on-site intelligent response module and the adjusting parameter output module are started or not is determined according to the comparison result, and a corresponding strategy is searched, so that the on-site response control is rapidly carried out, and the on-site protection is realized. As another change point of the invention, the reference value of the DAC reference module is adjusted according to the requirement to ensure that the field protection action is executed and completed. The invention has the further improvement that a low-noise high-precision ADC module is arranged, can perform accurate data conversion, and is matched with an adjustable DAC to meet the requirement of on-site data monitoring.
Drawings
Fig. 1 is a schematic diagram of an intelligent monitoring system for a bridge template field according to the invention.
Fig. 2 is a schematic diagram of an ADC conversion module according to the present invention.
FIG. 3 is a schematic diagram of an intelligent monitoring method for a bridge template in situ according to the present invention.
Detailed Description
The present application will now be described in further detail with reference to the drawings, it should be noted that the following detailed description is given for illustrative purposes only and is not to be construed as limiting the scope of the present application, as those skilled in the art will be able to make numerous insubstantial modifications and adaptations to the present application based on the above disclosure.
Fig. 1 shows a schematic diagram of an intelligent monitoring system for a bridge template in situ, which is disclosed by the invention, and comprises a monitoring module, a sensing input module, a DAC reference module and an ADC conversion module, wherein the sensing input module is used for sensing and monitoring the bridge template and inputting monitored data to the ADC conversion module, the ADC conversion module is used for performing analog-to-digital conversion and inputting the analog-to-digital conversion to the monitoring module, the monitoring module performs intelligent control in situ according to the monitored bridge template data, and the ADC conversion module is a low-noise high-precision conversion module; the monitoring module comprises a data receiving module, a processing module, a reference output module and a field intelligent response module, wherein the data receiving module is used for receiving monitored data and transmitting the monitored data to the processing module, the processing module analyzes and processes the data and determines whether to start the field intelligent response module and the adjusting parameter output module according to an analysis and processing result.
In the bridge template field intelligent monitoring system, the processing module analyzes and processes data, and determines whether to start the field intelligent response module and the adjusting parameter output module according to an analysis and processing result, and the method specifically includes: judging whether the monitored data is larger than a preset threshold value, if so, starting the field intelligent response module, after the field intelligent response module is started, firstly analyzing the type of the data larger than the preset threshold value, after the type is determined, searching a pre-stored event response table corresponding to the type, comparing the type of the monitored data with the preset threshold value, comparing the comparison result with the event response table to determine the response grade and the response strategy corresponding to the event, then sending the response strategy to the field equipment to perform corresponding protection action, after the field equipment executes the protection action, starting the parameter adjusting module, adjusting the reference value of the DAC reference module, after the adjustment is completed, monitoring the type once again, inputting the type to the processing module to analyze and judge, if the data monitored again is in a normal range, the on-site response event is stored as a historical sample of on-site intelligent monitoring.
In the bridge template on-site intelligent monitoring system, the reference value of the DAC reference module is adjusted to judge whether the original monitoring mode is influenced or not after the field device executes the protection action, and the DAC reference module is adjusted to the original value after the field response time is stored.
The intelligent monitoring system for the bridge template site comprises a sensing input module, a monitoring module and a control module, wherein the sensing input module comprises at least one of a pressure sensor, a wind speed sensor and a rainfall sensor.
The on-site intelligent monitoring system for the bridge template is characterized in that the DAC reference modules and the ADC conversion modules are matched in pairs, have multiple groups and are matched with the types and the number of the sensing input modules.
In the bridge template on-site intelligent monitoring system, the processing module sets different zone bits according to the data of different ADC conversion modules, and the reference output module and the on-site intelligent response module distinguish different data by identifying the zone bits; the flag bits comprise data flag bits and serial number flag bits, the data flag bits are used for marking different data, and the serial number flag bits are used for marking serial numbers of different sensing devices in the same data.
Fig. 2 is a schematic diagram of an ADC conversion module according to the present invention. The on-site intelligent monitoring system for the bridge template comprises an ADC conversion module and a monitoring module, wherein the ADC conversion module comprises: the circuit comprises a switch tube 1M1-1M9, a resistor 1R1-1R3, a capacitor 1C1-1C5, a comparator 1U1-1U2, a current source 1I1, a switch tube 2M1-2M9, a resistor 2R1-2R3, a capacitor 2C1-2C5, a comparator 2U1-2U2, a current source 2I1, a resistor R3, a resistor R4 and a resistor R5;
one non-controllable end of the switch tube 1M1, the other non-controllable end of the switch tube 1M5 and one end of the switch tube 1M9 are connected with a power supply VCC, the other non-controllable end of the switch tube 1M1 is respectively connected with one non-controllable end of the switch tube 1M2 and one end of the capacitor 1C1, the other end of the capacitor 1C1 is grounded, the other non-controllable end of the switch tube 1M2 is respectively connected with one non-controllable end of the switch tube 1M3 and one end of the resistor 1R3, the controllable end of the switch tube 1M6 and the controllable end of the switch tube 1M7, the other end of the resistor 1R3 is respectively connected with one end of the capacitor 1C3 and the positive input end of the comparator 1U1, the other end of the capacitor 1C3 is grounded, the other non-controllable end of the switch tube 1M3 is connected with one non-controllable end of the switch tube 1M4, the other non-controllable end of the switch tube 1M4 is grounded, the switch tube 1M2 and the controllable end of the switch tube 1M 6862 are connected with one end of the comparator 2 and the comparator 2 through the capacitor, The negative input end of the comparator 1U2 and the controllable end of the switch tube 1M4 are connected with the output end of the comparator 1U 1;
the other non-controllable end of the switch tube 1M5 is connected to a non-controllable end of the switch tube 1M6 and one end of a capacitor 1C4, respectively, the other end of the capacitor 1C4 is grounded, the other non-controllable end of the switch tube 1M6 is connected to a non-controllable end of the switch tube 1M7 and one end of a resistor 1R2, the controllable end of the switch tube 1M6 and the controllable end of the switch tube 1M7, the other end of the resistor 1R2 is connected to one end of the capacitor 1C5 and the positive input end of the comparator 1U2, the other end of the capacitor 1C5 is grounded, the other non-controllable end of the switch tube 1M7 is connected to a non-controllable end of the switch tube 1M8, and the other non-controllable end of the switch tube 1M8 is grounded; the controllable end of the switching tube 1M8 is connected with the output end of the comparator 1U 2; the controllable ends of the switch tube 1M5, the switch tube 1M9 and the switch tube 1M1 are connected, the other non-controllable end of the switch tube 1M9 is connected with one end of a current source 1I1, and the other end of the current source 1I1 is grounded; and the controllable ends of the switch tube 1M2 and the switch tube 1M3 are connected with a sensing input module.
The intelligent monitoring system for the bridge template field is characterized in that one non-controllable end of each of the switch tube 2M1, the switch tube 2M5 and the switch tube 2M9 is connected with a power supply VCC, the other non-controllable end of the switch tube 2M1 is respectively connected with one non-controllable end of the switch tube 2M2 and one end of the capacitor 2C1, the other end of the capacitor 2C1 is grounded, the other non-controllable end of the switch tube 2M2 is respectively connected with one non-controllable end of the switch tube 2M3 and one end of the resistor 2R3, the controllable end of the switch tube 2M6 and the controllable end of the switch tube 2M7, the other end of the resistor 2R3 is respectively connected with one end of the capacitor 2C3 and the positive input end of the comparator 2U1, the other end of the capacitor 2C3 is grounded, the other non-controllable end of the switch tube 2M5 is connected with one non-controllable end of the switch tube 2M4, the other non-controllable end of the switch tube 2M4 is connected with one end of the switch tube 599, the resistor 599 and the controllable end of the switch tube 599 is connected with the capacitor 592R 59, The negative input ends of the comparator 2U1 and the comparator 2U2, and the controllable end of the switch tube 2M4 are connected with the output end of the comparator 2U 1;
the other non-controllable end of the switch tube 2M5 is connected to a non-controllable end of the switch tube 2M6 and one end of a capacitor 2C4, respectively, the other end of the capacitor 2C4 is grounded, the other non-controllable end of the switch tube 2M6 is connected to a non-controllable end of the switch tube 2M7 and one end of a resistor 2R2, the controllable end of the switch tube 2M6 and the controllable end of the switch tube 2M7, the other end of the resistor 2R2 is connected to one end of the capacitor 2C5 and the positive input end of the comparator 2U2, the other end of the capacitor 2C5 is grounded, the other non-controllable end of the switch tube 2M7 is connected to a non-controllable end of the switch tube 2M8, and the other non-controllable end of the switch tube 2M8 is grounded; the controllable end of the switch tube 2M8 is connected with the output end of the comparator 2U 2; the controllable ends of the switch tube 2M5, the switch tube 2M9 and the switch tube 2M1 are connected, the other non-controllable end of the switch tube 2M9 is connected with one end of the current source 2I1, and the other end of the current source 2I1 is grounded;
and the controllable ends of the switch tube 2M2 and the switch tube 2M3 are connected with the output end of the DAC reference module.
In the intelligent monitoring system for the bridge template site, a resistor R3, a resistor R4 and a resistor R5 are connected in series, one end of the resistor R3 is connected with the other non-controllable end of the switch tube 1M6, the other end of the resistor R3 is connected with one end of a resistor R4, one end of a resistor R4 is connected with the other end of the capacitor 1C2, the other end of a resistor R4 is connected with one end of the resistor R5 and the other end of the capacitor 2C2, and the other end of the resistor R5 is connected with the other non-controllable end of the switch tube 2M 6; one end of the resistor R3 and the other end of the resistor R5 are connected with a monitoring module, and the monitoring module is also connected with the DAC reference module.
Fig. 3 is a schematic diagram of a monitoring method of the intelligent monitoring system for a bridge template site according to any one of the above embodiments.
Judging whether the monitored data is larger than a preset threshold value or not, and if so, starting the on-site intelligent response module;
after the field intelligent response module is started, firstly analyzing the type of the data larger than a preset threshold value, after the type is determined, searching a pre-stored event response table corresponding to the type, comparing the size of the monitoring data of the type with the preset threshold value, comparing the comparison result with the event response table to determine the response grade and the response strategy corresponding to the event, then the response strategy is sent to the field device to carry out corresponding protection action, after the field device executes the protection action, starting the adjusting parameter module, adjusting the reference value of the DAC reference module, after the adjustment is completed, the type is monitored once again and is input into the processing module for analysis and judgment, if the data monitored again is in the normal range, storing the field response event as a historical sample of field intelligent monitoring;
and adjusting the reference value of the DAC reference module to judge whether the original monitoring mode is influenced or not after the field device executes the protection action, and adjusting the DAC reference module to be an original value after the field response time is stored.
The invention provides a monitoring system and a monitoring method of a bridge template on-site intelligent monitoring system, which can carry out on-site intelligent monitoring, carry out analysis and processing according to accurate on-site monitoring data, carry out on-site control protection rapidly and facilitate on-site safety control. As an improvement point of the invention, the monitored data can be compared with the preset value, whether the on-site intelligent response module and the adjusting parameter output module are started or not is determined according to the comparison result, and a corresponding strategy is searched, so that the on-site response control is rapidly carried out, and the on-site protection is realized. As another change point of the invention, the reference value of the DAC reference module is adjusted according to the requirement to ensure that the field protection action is executed and completed. The invention has the further improvement that a low-noise high-precision ADC module is arranged, can perform accurate data conversion, and is matched with an adjustable DAC to meet the requirement of on-site data monitoring.

Claims (10)

1. The bridge template on-site intelligent monitoring system is characterized by comprising a monitoring module, a sensing input module, a DAC reference module and an ADC (analog-to-digital converter) module, wherein the sensing input module is used for sensing and monitoring a bridge template and inputting monitored data to the ADC module; the monitoring module comprises a data receiving module, a processing module, a reference output module and a field intelligent response module, wherein the data receiving module is used for receiving monitored data and transmitting the monitored data to the processing module, the processing module analyzes and processes the data and determines whether to start the field intelligent response module and the adjusting parameter output module according to an analysis and processing result.
2. The bridge template on-site intelligent monitoring system according to claim 1, wherein the processing module analyzes and processes data, and determining whether to start the on-site intelligent response module and the parameter adjustment output module according to the analysis and processing result specifically comprises: judging whether the monitored data is larger than a preset threshold value, if so, starting the field intelligent response module, after the field intelligent response module is started, firstly analyzing the type of the data larger than the preset threshold value, after the type is determined, searching a pre-stored event response table corresponding to the type, comparing the type of the monitored data with the preset threshold value, comparing the comparison result with the event response table to determine the response grade and the response strategy corresponding to the event, then sending the response strategy to the field equipment to perform corresponding protection action, after the field equipment executes the protection action, starting the parameter adjusting module, adjusting the reference value of the DAC reference module, after the adjustment is completed, monitoring the type once again, inputting the type to the processing module to analyze and judge, if the data monitored again is in a normal range, the on-site response event is stored as a historical sample of on-site intelligent monitoring.
3. The intelligent bridge template field monitoring system of claim 2, wherein the adjusting of the reference value of the DAC reference module is used to determine whether the original monitoring mode is affected after the field device performs the protection action, and the DAC reference module is adjusted to the original value after the field response time is stored.
4. The intelligent bridge formwork on-site monitoring system of claim 3, wherein the sensing input module comprises at least one of a pressure sensor, a wind speed sensor and a rainfall sensor.
5. The intelligent bridge template field monitoring system according to claim 4, wherein the DAC reference modules and the ADC conversion modules are matched in pairs, and have multiple groups matched with the types and the number of the sensing input modules.
6. The bridge template on-site intelligent monitoring system according to claim 5, wherein the processing module sets different flag bits according to data of different ADC conversion modules, and the reference output module and the on-site intelligent response module distinguish different data by recognizing the flag bits; the flag bits comprise data flag bits and serial number flag bits, the data flag bits are used for marking different data, and the serial number flag bits are used for marking serial numbers of different sensing devices in the same data.
7. The bridge template field intelligent monitoring system of claim 6, wherein the ADC conversion module comprises: the circuit comprises a switch tube 1M1-1M9, a resistor 1R1-1R3, a capacitor 1C1-1C5, a comparator 1U1-1U2, a current source 1I1, a switch tube 2M1-2M9, a resistor 2R1-2R3, a capacitor 2C1-2C5, a comparator 2U1-2U2, a current source 2I1, a resistor R3, a resistor R4 and a resistor R5;
one non-controllable end of the switch tube 1M1, the other non-controllable end of the switch tube 1M5 and one end of the switch tube 1M9 are connected with a power supply VCC, the other non-controllable end of the switch tube 1M1 is respectively connected with one non-controllable end of the switch tube 1M2 and one end of the capacitor 1C1, the other end of the capacitor 1C1 is grounded, the other non-controllable end of the switch tube 1M2 is respectively connected with one non-controllable end of the switch tube 1M3 and one end of the resistor 1R3, the controllable end of the switch tube 1M6 and the controllable end of the switch tube 1M7, the other end of the resistor 1R3 is respectively connected with one end of the capacitor 1C3 and the positive input end of the comparator 1U1, the other end of the capacitor 1C3 is grounded, the other non-controllable end of the switch tube 1M3 is connected with one non-controllable end of the switch tube 1M4, the other non-controllable end of the switch tube 1M4 is grounded, the switch tube 1M2 and the controllable end of the switch tube 1M 6862 are connected with one end of the comparator 2 and the comparator 2 through the capacitor, The negative input end of the comparator 1U2 and the controllable end of the switch tube 1M4 are connected with the output end of the comparator 1U 1;
the other non-controllable end of the switch tube 1M5 is connected to a non-controllable end of the switch tube 1M6 and one end of a capacitor 1C4, respectively, the other end of the capacitor 1C4 is grounded, the other non-controllable end of the switch tube 1M6 is connected to a non-controllable end of the switch tube 1M7 and one end of a resistor 1R2, the controllable end of the switch tube 1M6 and the controllable end of the switch tube 1M7, the other end of the resistor 1R2 is connected to one end of the capacitor 1C5 and the positive input end of the comparator 1U2, the other end of the capacitor 1C5 is grounded, the other non-controllable end of the switch tube 1M7 is connected to a non-controllable end of the switch tube 1M8, and the other non-controllable end of the switch tube 1M8 is grounded; the controllable end of the switching tube 1M8 is connected with the output end of the comparator 1U 2; the controllable ends of the switch tube 1M5, the switch tube 1M9 and the switch tube 1M1 are connected, the other non-controllable end of the switch tube 1M9 is connected with one end of a current source 1I1, and the other end of the current source 1I1 is grounded; and the controllable ends of the switch tube 1M2 and the switch tube 1M3 are connected with a sensing input module.
8. The intelligent monitoring system for bridge formwork on site as claimed in claim 7, wherein one non-controllable end of the switch tube 2M1, the switch tube 2M5, and the switch tube 2M9 is connected to VCC, the other non-controllable end of the switch tube 2M1 is connected to one non-controllable end of the switch tube 2M2 and one end of the capacitor 2C1, respectively, the other end of the capacitor 2C1 is grounded, the other non-controllable end of the switch tube 2M2 is connected to one non-controllable end of the switch tube 2M3 and one end of the resistor 2R3, the controllable end of the switch tube 2M6, and the controllable end of the switch tube 2M7, the other end of the resistor 2R3 is connected to one end of the capacitor 2C3 and the positive input end of the comparator 2U1, the other end of the capacitor 2C3 is grounded, the other non-controllable end of the switch tube 2M3 is connected to one non-controllable end of the switch tube 2M4, the other controllable end of the switch tube 4, the switch tube 2 is connected to the controllable end of the switch tube 3M 2, the resistor 2R1 is connected with one end of the capacitor 2C2, the comparator 2U1 and the negative input end of the comparator 2U2, and the controllable end of the switch tube 2M4 is connected with the output end of the comparator 2U 1;
the other non-controllable end of the switch tube 2M5 is connected to a non-controllable end of the switch tube 2M6 and one end of a capacitor 2C4, respectively, the other end of the capacitor 2C4 is grounded, the other non-controllable end of the switch tube 2M6 is connected to a non-controllable end of the switch tube 2M7 and one end of a resistor 2R2, the controllable end of the switch tube 2M6 and the controllable end of the switch tube 2M7, the other end of the resistor 2R2 is connected to one end of the capacitor 2C5 and the positive input end of the comparator 2U2, the other end of the capacitor 2C5 is grounded, the other non-controllable end of the switch tube 2M7 is connected to a non-controllable end of the switch tube 2M8, and the other non-controllable end of the switch tube 2M8 is grounded; the controllable end of the switch tube 2M8 is connected with the output end of the comparator 2U 2; the controllable ends of the switch tube 2M5, the switch tube 2M9 and the switch tube 2M1 are connected, the other non-controllable end of the switch tube 2M9 is connected with one end of the current source 2I1, and the other end of the current source 2I1 is grounded;
and the controllable ends of the switch tube 2M2 and the switch tube 2M3 are connected with the output end of the DAC reference module.
9. The intelligent monitoring system for the bridge template site as claimed in claim 8, wherein the resistor R3, the resistor R4 and the resistor R5 are connected in series, one end of the resistor R3 is connected with the other non-controllable end of the switch tube 1M6, the other end of the resistor R3 is connected with one end of the resistor R4, one end of the resistor R4 is connected with the other end of the capacitor 1C2, the other end of the resistor R4 is connected with one end of the resistor R5 and the other end of the capacitor 2C2, and the other end of the resistor R5 is connected with the other non-controllable end of the switch tube 2M 6; one end of the resistor R3 and the other end of the resistor R5 are connected with a monitoring module, and the monitoring module is also connected with the DAC reference module.
10. The monitoring method of the bridge template on-site intelligent monitoring system according to any one of claims 1 to 9,
judging whether the monitored data is larger than a preset threshold value or not, and if so, starting the on-site intelligent response module;
after the field intelligent response module is started, firstly analyzing the type of the data larger than a preset threshold value, after the type is determined, searching a pre-stored event response table corresponding to the type, comparing the size of the monitoring data of the type with the preset threshold value, comparing the comparison result with the event response table to determine the response grade and the response strategy corresponding to the event, then the response strategy is sent to the field device to carry out corresponding protection action, after the field device executes the protection action, starting the adjusting parameter module, adjusting the reference value of the DAC reference module, after the adjustment is completed, the type is monitored once again and is input into the processing module for analysis and judgment, if the data monitored again is in the normal range, storing the field response event as a historical sample of field intelligent monitoring;
and adjusting the reference value of the DAC reference module to judge whether the original monitoring mode is influenced or not after the field device executes the protection action, and adjusting the DAC reference module to be an original value after the field response time is stored.
CN202010092447.1A 2020-02-14 2020-02-14 Bridge template on-site intelligent monitoring system and method Active CN111130549B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010092447.1A CN111130549B (en) 2020-02-14 2020-02-14 Bridge template on-site intelligent monitoring system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010092447.1A CN111130549B (en) 2020-02-14 2020-02-14 Bridge template on-site intelligent monitoring system and method

Publications (2)

Publication Number Publication Date
CN111130549A true CN111130549A (en) 2020-05-08
CN111130549B CN111130549B (en) 2020-09-22

Family

ID=70491991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010092447.1A Active CN111130549B (en) 2020-02-14 2020-02-14 Bridge template on-site intelligent monitoring system and method

Country Status (1)

Country Link
CN (1) CN111130549B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112200708A (en) * 2020-09-25 2021-01-08 张令民 Three-dimensional transfer station type garbage collection, storage and treatment system
CN112235381A (en) * 2020-10-06 2021-01-15 青岛运鸿水利水电工程有限公司 Hydraulic engineering power supply unit based on thing networking

Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101369152A (en) * 2008-10-17 2009-02-18 中国安全生产科学研究院 Safety monitoring early warning and safety management system and method for oil gas extracting, gathering and transporting operation
CN101881001A (en) * 2010-06-08 2010-11-10 重庆城建控股(集团)有限责任公司 Cradle stress and deformation early warning system
CN103033293A (en) * 2012-12-11 2013-04-10 中国水电建设集团路桥工程有限公司 Method monitoring bridge construction quality
CN103246257A (en) * 2013-04-15 2013-08-14 广东惠利普路桥信息工程有限公司 Measurement and control informatization system for road and bridge and tunnel engineering
CN104091430A (en) * 2014-06-26 2014-10-08 华南理工大学 Wireless communication technology-based bridge strain monitoring system and method
CN204423089U (en) * 2015-02-05 2015-06-24 克拉玛依市建业有限责任公司 A kind of remote monitoring center of workover platform
CN105679008A (en) * 2016-03-28 2016-06-15 国网山东省电力公司济宁供电公司 Method and device for multi-meter acquisition simulation on basis of real-time monitoring
CN105926463A (en) * 2016-05-11 2016-09-07 山东博远重工有限公司 Safety monitoring system for hanging basket
CN106919644A (en) * 2017-01-17 2017-07-04 中交第二航务工程局有限公司 bridge construction real-time monitoring system
CN106988231A (en) * 2017-05-09 2017-07-28 中铁二十二局集团第工程有限公司 The T-shaped firm structure line style monitoring point mounting structure of cantilever and its line type control monitoring method
CN107220755A (en) * 2017-05-23 2017-09-29 大连理工大学 The high ferro quick early warning system of arch bridge rigid hanger abnormality and its method
CN107389124A (en) * 2017-06-16 2017-11-24 深圳市盛路物联通讯技术有限公司 Sensor-based road and bridge state monitoring method and system
CN207066704U (en) * 2017-08-01 2018-03-02 高永波 A kind of monitoring and warning system for bridge
CN108487055A (en) * 2018-04-28 2018-09-04 王涛 A kind of expansion joint dust collect plant and its construction method
CN108797356A (en) * 2018-06-22 2018-11-13 谢岚 Bridge construction assembles device and its application method
CN108981602A (en) * 2018-08-16 2018-12-11 中铁八局集团昆明铁路建设有限公司 Bridge supporting structure deformation weather Monitoring System and method based on Internet of Things
CN208420246U (en) * 2018-07-21 2019-01-22 中铁十八局集团有限公司 A kind of CFST Arch Bridge pipe inner concrete monitoring system of stress and strain
CN109680613A (en) * 2018-12-17 2019-04-26 西南交通建设集团股份有限公司 Freely-supported structure changes Continuous Bridge construction monitoring method
CN109709889A (en) * 2019-01-14 2019-05-03 江西集银科技有限公司 A kind of bridge hanging basket construction parameter intelligent monitor system and control method
CN109781057A (en) * 2019-01-16 2019-05-21 武汉楚云端信息科技有限责任公司 A kind of Railway Continuous Bridges Arched Bridge Construction Linear monitoring system and measurement method
CN209069475U (en) * 2018-07-21 2019-07-05 中铁十八局集团有限公司 A kind of real-time distributed monitoring system of arch bridge stiff skeleton external wrapping concrete ess-strain
CN110550167A (en) * 2019-06-04 2019-12-10 上海浦江桥隧运营管理有限公司 Pier safety inspection ROV carrier
CN210005555U (en) * 2019-06-28 2020-01-31 安徽省交通控股集团有限公司 hanging basket traveling speed monitoring system

Patent Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101369152A (en) * 2008-10-17 2009-02-18 中国安全生产科学研究院 Safety monitoring early warning and safety management system and method for oil gas extracting, gathering and transporting operation
CN101881001A (en) * 2010-06-08 2010-11-10 重庆城建控股(集团)有限责任公司 Cradle stress and deformation early warning system
CN103033293A (en) * 2012-12-11 2013-04-10 中国水电建设集团路桥工程有限公司 Method monitoring bridge construction quality
CN103246257A (en) * 2013-04-15 2013-08-14 广东惠利普路桥信息工程有限公司 Measurement and control informatization system for road and bridge and tunnel engineering
CN104091430A (en) * 2014-06-26 2014-10-08 华南理工大学 Wireless communication technology-based bridge strain monitoring system and method
CN204423089U (en) * 2015-02-05 2015-06-24 克拉玛依市建业有限责任公司 A kind of remote monitoring center of workover platform
CN105679008A (en) * 2016-03-28 2016-06-15 国网山东省电力公司济宁供电公司 Method and device for multi-meter acquisition simulation on basis of real-time monitoring
CN105926463A (en) * 2016-05-11 2016-09-07 山东博远重工有限公司 Safety monitoring system for hanging basket
CN106919644A (en) * 2017-01-17 2017-07-04 中交第二航务工程局有限公司 bridge construction real-time monitoring system
CN106988231A (en) * 2017-05-09 2017-07-28 中铁二十二局集团第工程有限公司 The T-shaped firm structure line style monitoring point mounting structure of cantilever and its line type control monitoring method
CN107220755A (en) * 2017-05-23 2017-09-29 大连理工大学 The high ferro quick early warning system of arch bridge rigid hanger abnormality and its method
CN107389124A (en) * 2017-06-16 2017-11-24 深圳市盛路物联通讯技术有限公司 Sensor-based road and bridge state monitoring method and system
CN207066704U (en) * 2017-08-01 2018-03-02 高永波 A kind of monitoring and warning system for bridge
CN108487055A (en) * 2018-04-28 2018-09-04 王涛 A kind of expansion joint dust collect plant and its construction method
CN108797356A (en) * 2018-06-22 2018-11-13 谢岚 Bridge construction assembles device and its application method
CN208420246U (en) * 2018-07-21 2019-01-22 中铁十八局集团有限公司 A kind of CFST Arch Bridge pipe inner concrete monitoring system of stress and strain
CN209069475U (en) * 2018-07-21 2019-07-05 中铁十八局集团有限公司 A kind of real-time distributed monitoring system of arch bridge stiff skeleton external wrapping concrete ess-strain
CN108981602A (en) * 2018-08-16 2018-12-11 中铁八局集团昆明铁路建设有限公司 Bridge supporting structure deformation weather Monitoring System and method based on Internet of Things
CN109680613A (en) * 2018-12-17 2019-04-26 西南交通建设集团股份有限公司 Freely-supported structure changes Continuous Bridge construction monitoring method
CN109709889A (en) * 2019-01-14 2019-05-03 江西集银科技有限公司 A kind of bridge hanging basket construction parameter intelligent monitor system and control method
CN109781057A (en) * 2019-01-16 2019-05-21 武汉楚云端信息科技有限责任公司 A kind of Railway Continuous Bridges Arched Bridge Construction Linear monitoring system and measurement method
CN110550167A (en) * 2019-06-04 2019-12-10 上海浦江桥隧运营管理有限公司 Pier safety inspection ROV carrier
CN210005555U (en) * 2019-06-28 2020-01-31 安徽省交通控股集团有限公司 hanging basket traveling speed monitoring system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112200708A (en) * 2020-09-25 2021-01-08 张令民 Three-dimensional transfer station type garbage collection, storage and treatment system
CN112235381A (en) * 2020-10-06 2021-01-15 青岛运鸿水利水电工程有限公司 Hydraulic engineering power supply unit based on thing networking
CN112235381B (en) * 2020-10-06 2021-09-21 宋斌 Hydraulic engineering power supply unit based on thing networking

Also Published As

Publication number Publication date
CN111130549B (en) 2020-09-22

Similar Documents

Publication Publication Date Title
CN111130549B (en) Bridge template on-site intelligent monitoring system and method
CN104390657B (en) A kind of Generator Unit Operating Parameters measurement sensor fault diagnosis method and system
US20180299944A1 (en) Production Management Method and System Using Power Consumption Features
CN103838202A (en) Parameter control method and parameter control system
CN114965924A (en) Sewage pollutant concentration detection system
CN112130473A (en) Converter control system based on thing networking
CN101229599B (en) Digital pulse power source
CN105466143A (en) Detection method and system for refrigerator
CN102323543A (en) Virtual instrument-based temperature controlled switch testing system and method
CN110824311A (en) Zinc oxide valve plate breakdown point detection device and method based on image recognition
CN113702746B (en) Safe energy-saving type electricity utilization system based on air compression station
CN111176215A (en) System and method for identifying running state of numerical control machine tool
CN111597868A (en) SSD-based substation disconnecting switch state analysis method
CN107247997A (en) A kind of wind electric field blower coulometric analysis method
CN206788191U (en) A kind of waste water automatic sampling monitoring system
CN210293294U (en) Voltage sag influence evaluation system for coating process drying process
CN112630579A (en) Aging test method and system for servo driver
CN112410864A (en) Electroplating solution parameter monitoring and control system design based on NB-IoT technology
CN112094050A (en) Optical fiber preform rod tail wire drawing control system and method
CN205173022U (en) Nuclear power station nuclear island is with intelligent energy -conserving fan system
CN111639450A (en) Tower crane damage identification method based on support vector machine
CN111290267A (en) Thermal power model identification device and identification method based on LabVIEW
CN110595926A (en) System and method for detecting hardness bearing capacity of building material
CN107305357B (en) Novel structure capable of automatically identifying continuous signal and discontinuous signal
CN114035555A (en) PLC controller fault detection system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A field intelligent monitoring system and method for bridge formwork

Effective date of registration: 20220524

Granted publication date: 20200922

Pledgee: Bank of Weifang Limited by Share Ltd. Binzhou branch

Pledgor: SHANDONG BOYUAN HEAVY INDUSTRY Co.,Ltd.

Registration number: Y2022980006236

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230706

Granted publication date: 20200922

Pledgee: Bank of Weifang Limited by Share Ltd. Binzhou branch

Pledgor: SHANDONG BOYUAN HEAVY INDUSTRY Co.,Ltd.

Registration number: Y2022980006236

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A bridge template on-site intelligent monitoring system and method

Effective date of registration: 20230707

Granted publication date: 20200922

Pledgee: Bank of Weifang Limited by Share Ltd. Binzhou branch

Pledgor: SHANDONG BOYUAN HEAVY INDUSTRY Co.,Ltd.

Registration number: Y2023980047836