CN111074768A CN202010034345.4A CN202010034345A CN111074768A CN 111074768 A CN111074768 A CN 111074768A CN 202010034345 A CN202010034345 A CN 202010034345A CN 111074768 A CN111074768 A CN 111074768A
Authority
CN
China
Prior art keywords
panel
guardrail
outer panel
steel bars
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010034345.4A
Other languages
Chinese (zh)
Inventor
牟廷敏
田波
汪洋
陶齐宇
范碧琨
徐其刚
曹发辉
周霆
张安户
古锐
赵祖军
陈立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Highway Planning Survey and Design Institute Ltd
Original Assignee
Sichuan Highway Planning Survey and Design Institute Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Highway Planning Survey and Design Institute Ltd filed Critical Sichuan Highway Planning Survey and Design Institute Ltd
Priority to CN202010034345.4A priority Critical patent/CN111074768A/en
Publication of CN111074768A publication Critical patent/CN111074768A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/103Parapets, railings ; Guard barriers or road-bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention discloses a template-free rapid construction bridge anti-collision guardrail; the method is characterized in that: the anti-collision guardrail comprises an outer panel and an inner panel, wherein anchoring steel bars are embedded in the inner side of the inner panel, so that the outer panel and the inner panel are fixed through pull rods, and concrete is poured in inner cavities of the outer panel and the inner panel. The inner walls of the outer panel and the inner panel are provided with transverse grooves at certain intervals to increase the bonding between the inner panel and the outer panel and the post-cast concrete. The invention solves the problems of low factory degree, long construction period, poor appearance quality and the like of the traditional guardrail.

Description

Template-free rapid construction bridge anti-collision guardrail
Technical Field
The invention relates to the field of bridge anti-collision guardrail construction, in particular to a template-free rapid construction bridge anti-collision guardrail taking ultra-high performance concrete (UHPC) as a panel.
Background
The traditional bridge reinforced concrete anti-collision guardrail mainly adopts pre-embedded steel bars at the edge of a beam body, after an upper bridge deck is integrally formed, the guardrail steel bars are bound, a template is erected, and concrete is cast in situ.
Traditional reinforced concrete crash barrier batch production degree is low, adopts cast in situ's mode shaping, and the template often need have enough to meet the need the use, and construction cycle is longer. As a later auxiliary structure, construction can be carried out after the main structure is finished, so that the construction period is short, the construction environment has more uncontrollable factors, the appearance quality is difficult to guarantee, and a series of problems of honeycomb pitted surface, color difference, easiness in cracking and the like exist on the outer surface of the guardrail.
The invention adopts a new structural form, and well solves a series of problems of the traditional reinforced concrete guardrail on the premise of not changing the appearance of the guardrail and ensuring the anti-collision grade.
Disclosure of Invention
Therefore, in order to solve the above disadvantages, the present invention provides a template-free rapid construction bridge crash barrier using Ultra High Performance Concrete (UHPC) as a face plate; the problems of low factory degree, long construction period, poor appearance quality and the like of the traditional guardrail are solved.
The invention is realized in such a way that a template-free and rapid construction bridge anti-collision guardrail is constructed, which is characterized in that: the anti-collision guardrail comprises an outer panel and an inner panel, wherein anchoring steel bars are embedded in the inner side of the inner panel, so that the outer panel and the inner panel are fixed through pull rods, and concrete is poured in inner cavities of the outer panel and the inner panel.
The invention discloses a template-free rapid construction bridge anti-collision guardrail, which is characterized in that: the inner walls of the outer panel and the inner panel are provided with transverse grooves at certain intervals to increase the bonding between the inner panel and the outer panel and the post-cast concrete.
The invention discloses a template-free rapid construction bridge anti-collision guardrail, which is characterized in that: positioning steel bars are arranged in the outer panel; the bottom of the outer panel forms a drip edge.
The invention discloses a template-free rapid construction bridge anti-collision guardrail, which is characterized in that: the outer panel, the panel thickness of interior panel is 2 ~ 4cm, and the material is Ultra High Performance Concrete (UHPC).
The invention discloses a template-free rapid construction bridge anti-collision guardrail, which is characterized in that: the installation and construction process is as follows: after the guardrail steel bars are bound on site, the panel is conveyed to the site for installation; the outer panel is positioned through positioning steel bars pre-embedded in the panel, and the connection between the inner panel and the outer panel is stable through anchoring steel bars and pull rods pre-embedded in the inner panel; after the panels are installed, pouring concrete between the panels and vibrating the concrete to finish the construction of the anti-collision guardrail;
the method specifically comprises the following steps:
(1) when a main bridge structure is constructed, UHPC inner and outer panels are prefabricated in a factory;
(2) binding guardrail steel bars after the main body structure meets the bearing requirement, and simultaneously conveying the inner and outer panels to a bridge location area;
(3) hoisting and installing the inner panel and the outer panel, and fixing the inner panel and the outer panel to the main body steel bars of the guardrail through the positioning steel bars and the tie bars;
(4) pouring concrete between the inner panel and the outer panel, and vibrating to finish the construction of the guardrail;
(5) for the precast beam, binding of guardrail steel bars and installation of inner and outer panels can be completed on the boundary beam, and then the boundary beam is integrally hoisted; and (4) finishing the construction of the guardrail.
The invention has the following advantages:
(1) adopt fashioned UHPC prefabricated panel of mill as the skin of anticollision barrier, improved the batch production degree of this structure, ensured appearance quality, when guaranteeing that the structure is pleasing to the eye, solved traditional anticollision barrier and easily cracked, have a series of problems such as honeycomb pitted skin and colour difference.
(2) The UHPC prefabricated panel can be used as a template in the construction process of the anti-collision guardrail, compared with the traditional anti-collision guardrail, the on-site template-free construction is realized, a series of links such as the manufacturing, transportation, installation and dismantling of the template are omitted, the construction speed is increased, and the rapid construction is realized.
(3) The lower end of the outer panel is provided with a water dripping edge which wraps the flange plate to protect the beam body, so that the durability of the main body structure is improved.
(4) For the precast beam structure, the inner and outer panels and the boundary beam can be considered to be installed together, and the precast beam structure is integrally hoisted, so that the construction speed can be further accelerated, and the construction quality can be guaranteed.
Drawings
FIG. 1 is a schematic view of the inner and outer panels of the guardrail of the present invention;
FIG. 2 is a schematic view showing the arrangement of grooves on the inner walls of the inner and outer panels according to the present invention;
figure 3 is a simplified view of the installation of the guard rail of the present invention (only a portion of the reinforcement is shown, the inner wall groove not shown).
In the figure, panel 1 outside, interior panel 2, panel inner wall recess 3, pull rod 4, spacer bar 5, pre-buried anchor reinforcing bar 6, edge 7 drips.
Detailed Description
The present invention will be described in detail with reference to fig. 1 to 3, and the technical solutions in the embodiments of the present invention will be clearly and completely described, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The invention provides a template-free rapid construction bridge anti-collision guardrail taking ultra-high performance concrete (UHPC) as a panel by improvement, which is shown in figures 1-3 and can be implemented as follows; this anticollision barrier includes outer panel 1 and interior panel 2, and the pre-buried anchor reinforcing bar 6 of the inboard of interior panel 2 makes its outer panel 1 and interior panel 2 fixed through pull rod 4, pours the concrete in the inner chamber of outer panel 1 and interior panel 2.
In addition, the inner walls of the outer panel 1 and the inner panel 2 are provided with transverse grooves 3 at certain intervals to increase the bonding between the inner and outer panels and the post-cast concrete.
In addition, when the method is implemented, the positioning steel bars 5 are arranged in the outer panel 1; the bottom of the outer panel 1 forms a drip edge 7.
The thickness of the outer panel 1 and the inner panel 2 is 2-4 cm, and the material is ultra-high performance concrete (UHPC).
The installation and construction process of the template-free rapid construction bridge anti-collision guardrail taking ultra-high performance concrete (UHPC) as the panel comprises the following steps: after the guardrail steel bars are bound on site, the panel is conveyed to the site for installation; the outer panel is positioned through positioning steel bars pre-embedded in the panel, and the connection between the inner panel and the outer panel is stable through anchoring steel bars and pull rods pre-embedded in the inner panel; after the panels are installed, pouring concrete between the panels and vibrating the concrete to finish the construction of the anti-collision guardrail;
the method specifically comprises the following steps:
(1) when a main bridge structure is constructed, UHPC inner and outer panels are prefabricated in a factory;
(2) binding guardrail steel bars after the main body structure meets the bearing requirement, and simultaneously conveying the inner and outer panels to a bridge location area;
(3) hoisting and installing the inner panel and the outer panel, and fixing the inner panel and the outer panel to the main body steel bars of the guardrail through the positioning steel bars and the tie bars;
(4) pouring concrete between the inner panel and the outer panel, and vibrating to finish the construction of the guardrail;
(5) for the precast beam, binding of guardrail steel bars and installation of inner and outer panels can be completed on the boundary beam, and then the boundary beam is integrally hoisted; and (4) finishing the construction of the guardrail.
In conclusion, the invention provides a novel reinforced concrete anti-collision guardrail form on the premise of ensuring the anti-collision grade without changing the appearance of the guardrail, and solves the problems of low factory degree, long construction period, poor appearance quality and the like of the traditional guardrail.
According to the invention, the inner and outer panels (figure 1) of the guardrail are prefabricated in a factory, the thickness of the panels is 2-4 cm, the materials are Ultra High Performance Concrete (UHPC), no steel bars are arranged in the panels, and transverse small grooves (figure 2) are arranged on the inner wall at intervals for increasing the bonding between the inner and outer panels and post-cast concrete. And after the guardrail steel bars are bound on site, conveying the panel to the site for installation. The outer panel realizes the location through the positioning steel bar of pre-buried in the panel to the connection of outer panel and inner panel is firm (fig. 3) through anchor reinforcing bar and the pull rod of pre-buried in the inner panel realization. And after the panels are installed, pouring concrete between the panels and vibrating to finish the construction of the anti-collision guardrail.
The invention has the beneficial effects that:
(1) adopt fashioned UHPC prefabricated panel of mill as the skin of anticollision barrier, improved the batch production degree of this structure, ensured appearance quality, when guaranteeing that the structure is pleasing to the eye, solved traditional anticollision barrier and easily cracked, have a series of problems such as honeycomb pitted skin and colour difference.
(2) The UHPC prefabricated panel can be used as a template in the construction process of the anti-collision guardrail, compared with the traditional anti-collision guardrail, the on-site template-free construction is realized, a series of links such as the manufacturing, transportation, installation and dismantling of the template are omitted, the construction speed is increased, and the rapid construction is realized.
(3) The lower end of the outer panel is provided with a water dripping edge which wraps the flange plate to protect the beam body, so that the durability of the main body structure is improved.
(4) For the precast beam structure, the inner and outer panels and the boundary beam can be considered to be installed together, and the precast beam structure is integrally hoisted, so that the construction speed can be further accelerated, and the construction quality can be guaranteed.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (5)

1. The utility model provides a no template, rapid construction bridge anticollision barrier which characterized in that: the anti-collision guardrail comprises an outer panel (1) and an inner panel (2), wherein anchoring steel bars (6) are embedded in the inner side of the inner panel (2) in a pre-buried mode, so that the outer panel (1) and the inner panel (2) are fixed through a pull rod (4), and concrete is poured in inner cavities of the outer panel (1) and the inner panel (2).
2. The template-free rapid construction bridge anti-collision guardrail of claim 1, which is characterized in that: the inner walls of the outer panel (1) and the inner panel (2) are provided with transverse grooves (3) at certain intervals to increase the bonding between the inner panel and the outer panel and the post-cast concrete.
3. The template-free rapid construction bridge anti-collision guardrail according to claim 1 or 2, characterized in that: positioning steel bars (5) are arranged in the outer panel (1); the bottom of the outer panel (1) forms a drip edge (7).
4. The template-free rapid construction bridge anti-collision guardrail according to claim 1 or 2, characterized in that: the panel thickness of the outer panel (1) and the inner panel (2) is 2-4 cm, and the material is Ultra High Performance Concrete (UHPC).
5. The template-free rapid construction bridge anti-collision guardrail of claim 1, which is characterized in that: the installation and construction process is as follows: after the guardrail steel bars are bound on site, the panel is conveyed to the site for installation; the outer panel is positioned through positioning steel bars pre-embedded in the panel, and the connection between the inner panel and the outer panel is stable through anchoring steel bars and pull rods pre-embedded in the inner panel; after the panels are installed, pouring concrete between the panels and vibrating the concrete to finish the construction of the anti-collision guardrail;
the method specifically comprises the following steps:
(1) when a main bridge structure is constructed, UHPC inner and outer panels are prefabricated in a factory;
(2) binding guardrail steel bars after the main body structure meets the bearing requirement, and simultaneously conveying the inner and outer panels to a bridge location area;
(3) hoisting and installing the inner panel and the outer panel, and fixing the inner panel and the outer panel to the main body steel bars of the guardrail through the positioning steel bars and the tie bars;
(4) pouring concrete between the inner panel and the outer panel, and vibrating to finish the construction of the guardrail;
(5) for the precast beam, binding of guardrail steel bars and installation of inner and outer panels can be completed on the boundary beam, and then the boundary beam is integrally hoisted; and (4) finishing the construction of the guardrail.
CN202010034345.4A 2020-01-14 2020-01-14 Template-free rapid construction bridge anti-collision guardrail Pending CN111074768A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010034345.4A CN111074768A (en) 2020-01-14 2020-01-14 Template-free rapid construction bridge anti-collision guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010034345.4A CN111074768A (en) 2020-01-14 2020-01-14 Template-free rapid construction bridge anti-collision guardrail

Publications (1)

Publication Number Publication Date
CN111074768A true CN111074768A (en) 2020-04-28

Family

ID=70323135

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010034345.4A Pending CN111074768A (en) 2020-01-14 2020-01-14 Template-free rapid construction bridge anti-collision guardrail

Country Status (1)

Country Link
CN (1) CN111074768A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111593660A (en) * 2020-05-28 2020-08-28 宁波市交通规划设计研究院有限公司 Device for improving anti-collision capacity of existing guardrail and construction method thereof
CN111827112A (en) * 2020-09-08 2020-10-27 重庆长赛新材料科技有限公司 Construction method of concrete railing upright post in middle of bridge road
CN111877229A (en) * 2020-08-06 2020-11-03 湖南大学 Functionally-gradient anti-collision guardrail and construction method thereof
CN113152339A (en) * 2021-04-28 2021-07-23 北京华路安交通科技有限公司 Concrete guardrail attached type fixed die pouring construction method
CN113957787A (en) * 2021-12-06 2022-01-21 中交公路长大桥建设国家工程研究中心有限公司 Semi-assembly type concrete guardrail and mounting method thereof
CN114635355A (en) * 2022-03-28 2022-06-17 东南大学 Bridge guardrail with prefabricated UHPC (ultra high performance polycarbonate) formwork filled with concrete and construction method thereof
WO2022166164A1 (en) * 2021-02-05 2022-08-11 上海核工程研究设计院有限公司 Cast-in-place ultra-high performance concrete (uhpc) composite shielding shell
WO2022166163A1 (en) * 2021-02-05 2022-08-11 上海核工程研究设计院有限公司 Semi-fabricated ultra-high performance concrete (uhpc) combined shielding housing
CN115075170A (en) * 2022-07-15 2022-09-20 正升环境科技股份有限公司 Sound absorption anti-collision guardrail
CN115478476A (en) * 2021-05-31 2022-12-16 上海浦东建筑设计研究院有限公司 Steel shell anti-collision guardrail and bridge deck integrated combined bridge deck system structure and construction method
CN115652781A (en) * 2022-12-26 2023-01-31 北京新桥技术发展有限公司 Bridge anti-collision guardrail, bridge anti-collision panel and construction method

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111593660A (en) * 2020-05-28 2020-08-28 宁波市交通规划设计研究院有限公司 Device for improving anti-collision capacity of existing guardrail and construction method thereof
CN111593660B (en) * 2020-05-28 2022-03-22 宁波市交通规划设计研究院有限公司 Device for improving anti-collision capacity of existing guardrail and construction method thereof
CN111877229A (en) * 2020-08-06 2020-11-03 湖南大学 Functionally-gradient anti-collision guardrail and construction method thereof
CN114232475A (en) * 2020-09-08 2022-03-25 重庆长赛新材料科技有限公司 Concrete railing post in middle of bridge road
CN111827112A (en) * 2020-09-08 2020-10-27 重庆长赛新材料科技有限公司 Construction method of concrete railing upright post in middle of bridge road
CN114232475B (en) * 2020-09-08 2024-03-01 重庆长赛新材料科技有限公司 Bridge road middle concrete railing post
WO2022166163A1 (en) * 2021-02-05 2022-08-11 上海核工程研究设计院有限公司 Semi-fabricated ultra-high performance concrete (uhpc) combined shielding housing
WO2022166164A1 (en) * 2021-02-05 2022-08-11 上海核工程研究设计院有限公司 Cast-in-place ultra-high performance concrete (uhpc) composite shielding shell
CN113152339A (en) * 2021-04-28 2021-07-23 北京华路安交通科技有限公司 Concrete guardrail attached type fixed die pouring construction method
CN115478476A (en) * 2021-05-31 2022-12-16 上海浦东建筑设计研究院有限公司 Steel shell anti-collision guardrail and bridge deck integrated combined bridge deck system structure and construction method
CN113957787A (en) * 2021-12-06 2022-01-21 中交公路长大桥建设国家工程研究中心有限公司 Semi-assembly type concrete guardrail and mounting method thereof
CN114635355A (en) * 2022-03-28 2022-06-17 东南大学 Bridge guardrail with prefabricated UHPC (ultra high performance polycarbonate) formwork filled with concrete and construction method thereof
CN115075170A (en) * 2022-07-15 2022-09-20 正升环境科技股份有限公司 Sound absorption anti-collision guardrail
CN115075170B (en) * 2022-07-15 2024-05-17 正升环境科技股份有限公司 Sound absorption anti-collision guardrail
CN115652781A (en) * 2022-12-26 2023-01-31 北京新桥技术发展有限公司 Bridge anti-collision guardrail, bridge anti-collision panel and construction method

Similar Documents

Publication Publication Date Title
CN111074768A (en) Template-free rapid construction bridge anti-collision guardrail
CN201687125U (en) Precast concrete wallboard
CN208473116U (en) A kind of partial precast assembly steel reinforced concrete holes in soffit beam
CN105088937B (en) Hollow slab bridge with hinge joint having opposite grooves and building method of hollow slab bridge
CN109518858A (en) Fabricated Beam-Slab connection structure and its construction method
CN105484403B (en) Assembly concrete two-way ribbed slab floor and its method of construction
CN201687127U (en) Prefabricated composite outer heat preservation wallboard
CN107859223A (en) A kind of novel precast floor slab and the casting method of monoblock floor is built up by it
CN206888506U (en) The cast-in-place system of formwork structure and shear wall of shear wall angle node
CN110005200A (en) The closely knit construction technology of horizontal concealed beam concreting
CN212000616U (en) Template-free rapid construction bridge anti-collision guardrail
CN106965302B (en) Precast beam type stair, special mold and construction method thereof
CN101748893B (en) Method for manufacturing high-rise building balcony boards
CN216689076U (en) A prefabricated apron that is used for hollow mound top to pour construction
CN107476477A (en) A kind of assembled hollow floor and its construction method
CN208328647U (en) A kind of durable lower flange hollow slab bridge of the quick prefabricated assembled light in city
CN207348280U (en) A kind of novel precast floor slab
CN109868751A (en) Notch, template and construction method are poured after a kind of assembled track girder concrete
CN210151577U (en) Assembled track beam concrete post-cast groove mouth and template
CN105952044B (en) Fully-prefabricated prestressed concrete floor structure and prestressed assembly method
CN214696362U (en) Prefabricated reinforced concrete composite floor slab with tooth form and without formwork
CN205382595U (en) Integral shear force wall of steel pipe concrete edge constraint coincide
CN210597874U (en) Cast-in-place beam steel bar arrangement
CN210828837U (en) Prefabricated window component that wafts of assembled building
CN210482079U (en) Cast-in-place reinforced concrete flower groove type anti-collision guardrail

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination