CN110985021B - 土压平衡盾构长距离下穿河流施工方法 - Google Patents
土压平衡盾构长距离下穿河流施工方法 Download PDFInfo
- Publication number
- CN110985021B CN110985021B CN201911274555.4A CN201911274555A CN110985021B CN 110985021 B CN110985021 B CN 110985021B CN 201911274555 A CN201911274555 A CN 201911274555A CN 110985021 B CN110985021 B CN 110985021B
- Authority
- CN
- China
- Prior art keywords
- river
- shield
- tunneling
- machine
- bank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 38
- 230000005641 tunneling Effects 0.000 claims abstract description 84
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 53
- 239000002689 soil Substances 0.000 claims abstract description 42
- 238000000034 method Methods 0.000 claims abstract description 14
- 238000007667 floating Methods 0.000 claims abstract description 13
- 230000001360 synchronised effect Effects 0.000 claims abstract description 10
- 229910000831 Steel Inorganic materials 0.000 claims description 7
- 239000010959 steel Substances 0.000 claims description 7
- 239000004927 clay Substances 0.000 claims description 3
- 230000003247 decreasing effect Effects 0.000 claims description 3
- 239000006260 foam Substances 0.000 claims description 3
- 238000002347 injection Methods 0.000 claims description 3
- 239000007924 injection Substances 0.000 claims description 3
- 239000011435 rock Substances 0.000 claims description 3
- 230000015572 biosynthetic process Effects 0.000 claims 2
- 230000036544 posture Effects 0.000 description 7
- 239000002002 slurry Substances 0.000 description 5
- 238000007569 slipcasting Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 235000019353 potassium silicate Nutrition 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 230000000192 social effect Effects 0.000 description 1
- NTHWMYGWWRZVTN-UHFFFAOYSA-N sodium silicate Chemical compound [Na+].[Na+].[O-][Si]([O-])=O NTHWMYGWWRZVTN-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/08—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/08—Lining with building materials with preformed concrete slabs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/0607—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering
- E21D9/0609—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering with means for applying a continuous liner, e.g. sheets of plastics, between the main concrete lining and the rock
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Civil Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911274555.4A CN110985021B (zh) | 2019-12-12 | 2019-12-12 | 土压平衡盾构长距离下穿河流施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911274555.4A CN110985021B (zh) | 2019-12-12 | 2019-12-12 | 土压平衡盾构长距离下穿河流施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110985021A CN110985021A (zh) | 2020-04-10 |
CN110985021B true CN110985021B (zh) | 2022-02-15 |
Family
ID=70092779
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911274555.4A Active CN110985021B (zh) | 2019-12-12 | 2019-12-12 | 土压平衡盾构长距离下穿河流施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110985021B (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08232581A (ja) * | 1995-02-28 | 1996-09-10 | Mitsubishi Heavy Ind Ltd | シールド掘削機およびそれを用いたシールド工法 |
JP2004108094A (ja) * | 2002-09-20 | 2004-04-08 | Daiho Constr Co Ltd | シールドトンネルおよびシールド掘削機 |
CN101131090A (zh) * | 2007-10-09 | 2008-02-27 | 中铁二局股份有限公司 | 盾构隧道下穿浅覆土河床施工方法 |
CN104989412A (zh) * | 2015-06-11 | 2015-10-21 | 北京市市政四建设工程有限责任公司 | 土压平衡式盾构长距离穿湖施工技术 |
CN108049878A (zh) * | 2017-11-13 | 2018-05-18 | 浙江大学城市学院 | 一种粉土地层盾构切桩过河的施工方法 |
CN110259467A (zh) * | 2019-05-21 | 2019-09-20 | 重庆大学 | 泥水平衡盾构下穿江河施工方法 |
-
2019
- 2019-12-12 CN CN201911274555.4A patent/CN110985021B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08232581A (ja) * | 1995-02-28 | 1996-09-10 | Mitsubishi Heavy Ind Ltd | シールド掘削機およびそれを用いたシールド工法 |
JP2004108094A (ja) * | 2002-09-20 | 2004-04-08 | Daiho Constr Co Ltd | シールドトンネルおよびシールド掘削機 |
CN101131090A (zh) * | 2007-10-09 | 2008-02-27 | 中铁二局股份有限公司 | 盾构隧道下穿浅覆土河床施工方法 |
CN104989412A (zh) * | 2015-06-11 | 2015-10-21 | 北京市市政四建设工程有限责任公司 | 土压平衡式盾构长距离穿湖施工技术 |
CN108049878A (zh) * | 2017-11-13 | 2018-05-18 | 浙江大学城市学院 | 一种粉土地层盾构切桩过河的施工方法 |
CN110259467A (zh) * | 2019-05-21 | 2019-09-20 | 重庆大学 | 泥水平衡盾构下穿江河施工方法 |
Non-Patent Citations (1)
Title |
---|
《土压平衡式盾构下穿河流施工技术研究》;王伟等;《铁道标准设计》;20111231;第92-94页 * |
Also Published As
Publication number | Publication date |
---|---|
CN110985021A (zh) | 2020-04-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108547639B (zh) | 隧道临近既有构筑物的超前同孔多导管分层注浆施工方法 | |
CN102787846B (zh) | 海底隧道断层破碎带上堵下排的施工方法 | |
CN102352753B (zh) | 采用冻结加固和堆土灌水的盾构到达接收方法 | |
CN102409997A (zh) | 竖井揭煤与瓦斯突出煤层帷幕注浆防突方法 | |
CN110130936B (zh) | 一种盾构掘进过程中突遇未处理溶洞或裂隙的施工方法 | |
CN103510501B (zh) | 一种防止回灌井中堵塞涌水的方法 | |
CN104631475A (zh) | 一种下穿河流浅埋暗挖隧道的安全快速施工方法 | |
CN203569578U (zh) | 一种能够防止井管堵塞涌水的回灌井 | |
CN105351001B (zh) | 一种基于沿空留巷区域加固瓦斯抽采的方法 | |
CN103967499B (zh) | 一种盾构机带压开舱开挖面的支护方法 | |
CN203961994U (zh) | 土压平衡盾构机下穿已运营盾构隧道的暗挖隧道结构 | |
CN110863833B (zh) | 一种隧道盾构掘进始发端头孤石区盾构机的掘进参数的控制工艺 | |
CN102116169A (zh) | 被保护层卸压瓦斯底板岩巷抽采方法 | |
CN101363228A (zh) | 一种同时用于疏干和减压降水的管井及其工艺 | |
CN101915104A (zh) | 一种采用tbm进行深埋隧洞掘进的岩爆防治方法 | |
CN107091101A (zh) | 海域中部矿山盾构交接隧道叠合型接头结构及施工方法 | |
CN103114599A (zh) | 深基坑封闭降水装置及其施工方法 | |
CN105443098B (zh) | 一种煤矿井下钻孔分段定点水力压裂固孔装置及方法 | |
CN109026010A (zh) | 一种矿山渗井注浆型凿井施工方法 | |
CN105569062A (zh) | 渗透弱化减排降水法 | |
CN110985021B (zh) | 土压平衡盾构长距离下穿河流施工方法 | |
CN113217043A (zh) | 一种导水断层带突水水源的高效快速封堵方法及施工方法 | |
CN106638606B (zh) | 一种深厚覆盖层的快捷灌浆方法 | |
CN104929129A (zh) | 无盖重结合异孔引管混凝土盖重固结灌浆方法 | |
CN109139057B (zh) | 一种采煤巷道底板吸水底鼓治理方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230420 Address after: No. 51, Bosheng Village, Changbin Road, Xiuying District, Haikou City, Hainan Province, 570312 Patentee after: China Railway 12th Bureau Group Hainan Engineering Co.,Ltd. Patentee after: THE 2ND ENGINEERING CO.,LTD. OF CHINA RAILWAY 12TH BUREAU GROUP Patentee after: CHINA RAILWAY 12TH BUREAU GROUP Co.,Ltd. Address before: 030032 No. 19 South Renmin Road, Xiaodian District, Shanxi, Taiyuan Patentee before: THE 2ND ENGINEERING CO.,LTD. OF CHINA RAILWAY 12TH BUREAU GROUP Patentee before: CHINA RAILWAY 12TH BUREAU GROUP Co.,Ltd. |
|