CN110984406A - Waterproof leakage-repairing construction method using non-cured rubber asphalt waterproof coating - Google Patents

Waterproof leakage-repairing construction method using non-cured rubber asphalt waterproof coating Download PDF

Info

Publication number
CN110984406A
CN110984406A CN201911331437.2A CN201911331437A CN110984406A CN 110984406 A CN110984406 A CN 110984406A CN 201911331437 A CN201911331437 A CN 201911331437A CN 110984406 A CN110984406 A CN 110984406A
Authority
CN
China
Prior art keywords
waterproof
rubber asphalt
coating
layer
asphalt waterproof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911331437.2A
Other languages
Chinese (zh)
Inventor
郑发文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Baineng Building Waterproof Material Co Ltd
Original Assignee
Guangzhou Baineng Building Waterproof Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Baineng Building Waterproof Material Co Ltd filed Critical Guangzhou Baineng Building Waterproof Material Co Ltd
Priority to CN201911331437.2A priority Critical patent/CN110984406A/en
Publication of CN110984406A publication Critical patent/CN110984406A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • E02D31/04Watertight packings for use under hydraulic pressure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/665Sheets or foils impervious to water and water vapor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D11/00Roof covering, as far as not restricted to features covered by only one of groups E04D1/00 - E04D9/00; Roof covering in ways not provided for by groups E04D1/00 - E04D9/00, e.g. built-up roofs, elevated load-supporting roof coverings
    • E04D11/02Build-up roofs, i.e. consisting of two or more layers bonded together in situ, at least one of the layers being of watertight composition
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/383Waterproofing; Heat insulating; Soundproofing; Electric insulating by applying waterproof flexible sheets; Means for fixing the sheets to the tunnel or cavity wall
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0045Composites

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A waterproof leakage-repairing construction method using non-cured rubber asphalt waterproof paint has the advantages of self-healing, water seepage prevention, water channeling prevention, aging resistance and never curing; the capillary holes and cracks of the base layer can be filled, the damage of the waterproof layer can be automatically repaired, and the problem of water leakage of the waterproof layer is solved; the used non-cured rubber asphalt waterproof coating has excellent bonding performance, can be bonded on a wet base surface and can be bonded with wood or metal materials; the material can be applied to building roofs, basement top plates and side walls, subways, tunnels, bridges, pipe orifices, internal and external corners and deformation joints.

Description

Waterproof leakage-repairing construction method using non-cured rubber asphalt waterproof coating
Technical Field
The invention relates to the technical field of waterproof construction methods, in particular to a waterproof leakage repairing construction method using a non-cured rubber asphalt waterproof coating.
Background
In the existing building waterproof construction, a waterproof coating or a waterproof coiled material is generally used as a building waterproof layer, while in the existing construction using the waterproof coating as a waterproof layer, all the waterproof coatings are curing waterproof coatings, the waterproof coating is coated to form a coating after the coating is dried, a fixed protective layer is also added on the waterproof coating, but the curing waterproof coating does not have tear resistance, and if the protective layer is torn, the coating is also cracked to lose the waterproof effect.
If use waterproofing membrane as the waterproof layer, need splice after the overlap between the waterproofing membrane, the concatenation position is bloated, and waterproofing membrane concatenation position can take place to scurry the condition of water under the permanent use, loses water-proof effects.
Disclosure of Invention
In order to overcome the above disadvantages of the prior art, it is an object of the present invention to provide a waterproof and leak-stopping construction method using a non-curing rubberized asphalt waterproof paint.
The technical scheme adopted by the invention for solving the technical problems is as follows: a waterproof and leakage-repairing construction method using a non-cured rubber asphalt waterproof coating comprises the following steps:
(1) base layer pretreatment: cleaning the base layer to ensure that the base layer is flat and solid, and the surface has no dust, sundries and clear water;
(2) and (3) base layer local and node processing: reinforcing the joint part, leveling a crack larger than 2mm by using cement mortar, and locally plugging by using the cement mortar;
(3) heating non-curing rubber asphalt waterproof coating: starting heating equipment, and heating the non-cured rubber asphalt waterproof coating to be in a liquid state;
(4) smearing non-curing rubber asphalt waterproof paint: uniformly pouring the heated liquid non-cured rubber asphalt waterproof coating onto a base layer;
(5) laying a single-layer waterproof or composite coiled material, and carrying out water storage inspection;
(6) construction of a protective layer: and after water storage acceptance, carrying out construction on a cement mortar or fine stone concrete protective layer.
As a further improvement of the invention: the cement mortar in the step (2) is 1:2.5 cement mortar; and (4) the cement mortar in the step (6) is 1:2.5 cement mortar.
As a further improvement of the invention: and (3) heating the non-cured rubber asphalt waterproof coating to a liquid state by using a hot melting machine.
As a further improvement of the invention: the solid content of the non-cured rubber asphalt waterproof coating in the step (3) is more than 98 percent.
As a further improvement of the invention: coating non-curing rubber asphalt waterproof in step (4)Every time the coating is coated by 1mm, the spraying is 1.3-1.4kg/m2
As a further improvement of the invention: the thickness of the middle coating scraper of the non-curing rubber asphalt waterproof coating smeared in the step (4) is 2-4mm, and the middle coating scraper is even when large surfaces are scraped, so that a base layer cannot be exposed and accumulated.
As a further improvement of the invention: and (4) uniformly spraying the non-cured rubber asphalt waterproof paint coated in the step (4) by using a spraying process, wherein a spraying machine is used in the spraying process.
As a further improvement of the invention: the step (5) of laying a single layer for water proofing comprises the following steps: and after finishing smearing, paving a non-woven fabric or felt protective layer in the area, and performing water storage inspection on the single-layer waterproof system.
As a further improvement of the invention: the step (5) of laying the composite coiled material comprises the following steps: and after spraying, paving and pasting the waterproof coiled material in the area, wherein the paving and pasting of the waterproof coiled material are smooth, straight and flat, compacting and exhausting by using a compression roller, and sealing and pasting the lap joint part.
As a further improvement of the invention: the sealing and pasting adopts non-curing coating for pasting.
As a further improvement of the invention: the lap length between the single-layer waterproof or composite coiled materials paved in the step (5) is more than 90 mm.
As a further improvement of the invention: the application of the waterproof leakage-repairing construction method using the non-cured rubber asphalt waterproof coating to building roofs, basement roofs and side walls, subways, tunnels, bridges, pipe orifices, internal and external corners and deformation joints.
Compared with the prior art, the invention has the beneficial effects that:
(1) the non-cured rubber asphalt waterproof coating has the advantages of self-healing, water seepage prevention, water channeling prevention, aging resistance and no curing for ever;
(2) the capillary holes and cracks of the base layer can be filled, the damage of the waterproof layer can be automatically repaired, and the problem of water leakage of the waterproof layer is solved;
(3) the adhesive has excellent adhesive property, can be adhered on a wet base surface, and can be adhered with wood or metal materials;
(4) the construction is convenient and fast, and the film is formed quickly.
Detailed Description
The invention will now be further illustrated with reference to the following examples:
a waterproof and leakage-repairing construction method using a non-cured rubber asphalt waterproof coating comprises the following steps:
(1) base layer pretreatment: cleaning the base layer to ensure that the base layer is flat and solid, and the surface has no dust, sundries and clear water;
(2) and (3) base layer local and node processing: reinforcing the joint part, leveling a crack larger than 2mm by using cement mortar, and locally plugging by using the cement mortar;
(3) heating non-curing rubber asphalt waterproof coating: starting heating equipment, and heating the non-cured rubber asphalt waterproof coating to be in a liquid state;
(4) smearing non-curing rubber asphalt waterproof paint: uniformly pouring the heated liquid non-cured rubber asphalt waterproof coating onto a base layer,
(5) laying a single-layer waterproof or composite coiled material, and carrying out water storage inspection;
(6) construction of a protective layer: and after water storage acceptance, carrying out construction on a cement mortar or fine stone concrete protective layer.
Specifically, the cement mortar in the step (2) and the step (6) is 1:2.5 cement mortar.
Specifically, in the step (3), the non-cured rubber asphalt waterproof coating is heated to a liquid state by using a hot melting machine, and the solid content of the non-cured rubber asphalt waterproof coating is more than 98%.
Specifically, the temperature of the non-cured rubber asphalt waterproof coating heated in the step (3) is 120-170 ℃.
Specifically, in the step (4), 1mm is coated and sprayed for each coating construction in the step of coating the non-cured rubber asphalt waterproof coating, and the spraying amount is 1.3-1.4kg/m2The thickness of the middle coating scraper in the coating of the non-cured rubber asphalt waterproof coating is 2-4mm, the coating scraper is uniform when the large surface is coated and scraped, the base layer cannot be exposed and accumulated, the non-cured rubber asphalt waterproof coating is uniformly coated by using a spraying process, and a spraying machine is used in the spraying process.
Specifically, the time for laying the single-layer waterproof or composite coiled material is within 3 minutes after the non-cured rubber asphalt waterproof coating is coated in the step (4).
Specifically, the step of laying the single-layer waterproof layer in the step (5) comprises the following steps: after the coating is finished, paving a non-woven fabric or felt protective layer in the area, and carrying out water storage inspection on the single-layer waterproof system; the steps of laying the composite coiled material are as follows: after spraying, paving and pasting the waterproof coiled material in the area, wherein the paving and pasting of the waterproof coiled material are smooth, straight and flat, compacted and exhausted by a compression roller, and the lap joint part is sealed and pasted by adopting non-curing coating; the lap length between the laid single-layer waterproof or composite coiled materials is more than 90 mm.
Specifically, the composite coiled material is a polymer asphalt waterproof coiled material.
The first embodiment is as follows:
(1) base layer pretreatment: cleaning the base layer to ensure that the base layer is flat and solid, and the surface has no dust, sundries and clear water;
(2) and (3) base layer local and node processing: reinforcing the joint part, leveling a crack larger than 2mm by using cement mortar, and locally plugging by using the cement mortar;
(3) heating non-curing rubber asphalt waterproof coating: starting heating equipment, and heating the non-cured rubber asphalt waterproof coating to be in a 130 ℃ liquid state;
(4) smearing non-curing rubber asphalt waterproof paint: uniformly pouring the heated liquid non-cured rubber asphalt waterproof coating onto a base layer, wherein the coating thickness is 2mm, the coating thickness is 1mm per coating construction, and the spraying is 1.3-1.4kg/m2
(5) Laying a single-layer waterproof layer, laying a non-woven fabric or felt protective layer, and carrying out water storage inspection;
(6) construction of a protective layer: and after water storage acceptance, carrying out construction on a cement mortar or fine stone concrete protective layer.
The second embodiment:
(1) base layer pretreatment: cleaning the base layer to ensure that the base layer is flat and solid, and the surface has no dust, sundries and clear water;
(2) and (3) base layer local and node processing: reinforcing the joint part, leveling a crack larger than 2mm by using cement mortar, and locally plugging by using the cement mortar;
(3) heating non-curing rubber asphalt waterproof coating: starting heating equipment, and heating the non-cured rubber asphalt waterproof coating to a liquid state at 150 ℃;
(4) smearing non-curing rubber asphalt waterproof paint: uniformly pouring the heated liquid non-cured rubber asphalt waterproof coating onto a base layer, wherein the coating thickness is 3mm, the coating thickness is 1mm per coating construction, and the spraying is 1.3-1.4kg/m2
(5) Paving and pasting the waterproof coiled material in the area after spraying is finished, wherein the paving and pasting of the waterproof coiled material are smooth, straight and flat, compacting and exhausting by using a compression roller, sealing and pasting the lap joint part, and performing water storage inspection;
(6) construction of a protective layer: and after water storage acceptance, carrying out construction on a cement mortar or fine stone concrete protective layer.
The third embodiment is as follows:
(1) base layer pretreatment: cleaning the base layer to ensure that the base layer is flat and solid, and the surface has no dust, sundries and clear water;
(2) and (3) base layer local and node processing: reinforcing the joint part, leveling a crack larger than 2mm by using cement mortar, and locally plugging by using the cement mortar;
(3) heating non-curing rubber asphalt waterproof coating: starting heating equipment, and heating the non-cured rubber asphalt waterproof coating to be in a liquid state at 170 ℃;
(4) smearing non-curing rubber asphalt waterproof paint: uniformly pouring the heated liquid non-cured rubber asphalt waterproof coating onto a base layer, wherein the coating thickness is 4mm, the coating thickness is 1mm per coating construction, and the spraying is 1.3-1.4kg/m2
(5) Paving and pasting the waterproof coiled material in the area after spraying is finished, wherein the paving and pasting of the waterproof coiled material are smooth, straight and flat, compacting and exhausting by using a compression roller, sealing and pasting the lap joint part, and performing water storage inspection;
(6) construction of a protective layer: and after water storage acceptance, carrying out construction on a cement mortar or fine stone concrete protective layer.
In summary, after reading the present disclosure, those skilled in the art can make various other corresponding changes without creative mental labor according to the technical solutions and concepts of the present disclosure, and all of them are within the protection scope of the present disclosure.

Claims (9)

1. A waterproof and leakage-repairing construction method using a non-cured rubber asphalt waterproof coating is characterized by comprising the following steps:
(1) base layer pretreatment: cleaning the base layer to ensure that the base layer is flat and solid, and the surface has no dust, sundries and clear water;
(2) and (3) base layer local and node processing: reinforcing the joint part, leveling a crack larger than 2mm by using cement mortar, and locally plugging by using the cement mortar;
(3) heating non-curing rubber asphalt waterproof coating: starting heating equipment, and heating the non-cured rubber asphalt waterproof coating to be in a liquid state;
(4) smearing non-curing rubber asphalt waterproof paint: uniformly pouring the heated liquid non-cured rubber asphalt waterproof coating onto a base layer;
(5) laying a single-layer waterproof or composite coiled material, and carrying out water storage inspection;
(6) construction of a protective layer: and after water storage acceptance, carrying out construction on a cement mortar or fine stone concrete protective layer.
2. The waterproof and leak-stopping construction method using the non-curing rubberized asphalt waterproof paint according to claim 1, wherein the cement mortar in the step (2) is 1:2.5 cement mortar.
3. The method of claim 1, wherein the step (4) of applying the non-curable rubberized asphalt waterproofing paint comprises applying 1.3-1.4kg/m of the non-curable rubberized asphalt waterproofing paint per 1mm of the non-curable rubberized asphalt waterproofing paint applied2
4. The method of claim 1, wherein the thickness of the coating layer in the step (4) of applying the non-curable rubberized asphalt waterproofing paint is 2 to 4 mm.
5. The method for waterproof and leak-stopping construction using the non-curing rubberized asphalt waterproof paint according to claim 1, wherein the non-curing rubberized asphalt waterproof paint applied in the step (4) is uniformly sprayed by using a spraying process.
6. The waterproof and leak-stopping construction method using the non-curing rubberized asphalt waterproof paint according to claim 1, wherein the step of laying a single waterproof layer in the step (5) is: and after finishing smearing, paving a non-woven fabric or felt protective layer in the area, and performing water storage inspection on the single-layer waterproof system.
7. The waterproof and leak-repairing construction method using the non-curing rubber asphalt waterproof coating material as claimed in claim 1, wherein the step of laying the composite coil in the step (5) is: and after spraying, paving and pasting the waterproof coiled material in the area, wherein the paving and pasting of the waterproof coiled material are smooth, straight and flat, compacting and exhausting by using a compression roller, and sealing and pasting the lap joint part.
8. The method as claimed in claim 7, wherein the sealing and adhering are performed by applying a non-curable coating material.
9. The use of the method of claim 1 for water and leakage repair of building roofs, basement roofs and side walls, subways, tunnels, bridges, pipe orifices, internal and external corners and deformation joints.
CN201911331437.2A 2019-12-21 2019-12-21 Waterproof leakage-repairing construction method using non-cured rubber asphalt waterproof coating Pending CN110984406A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911331437.2A CN110984406A (en) 2019-12-21 2019-12-21 Waterproof leakage-repairing construction method using non-cured rubber asphalt waterproof coating

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911331437.2A CN110984406A (en) 2019-12-21 2019-12-21 Waterproof leakage-repairing construction method using non-cured rubber asphalt waterproof coating

Publications (1)

Publication Number Publication Date
CN110984406A true CN110984406A (en) 2020-04-10

Family

ID=70073911

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911331437.2A Pending CN110984406A (en) 2019-12-21 2019-12-21 Waterproof leakage-repairing construction method using non-cured rubber asphalt waterproof coating

Country Status (1)

Country Link
CN (1) CN110984406A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112112290A (en) * 2020-08-06 2020-12-22 深圳市卓宝科技股份有限公司 Waterproof structure construction method
CN112196298A (en) * 2020-09-10 2021-01-08 斯科瑞新材料科技(山东)股份有限公司 Novel building waterproof process and material
CN112343185A (en) * 2020-10-23 2021-02-09 四川鑫桂湖防水保温节能科技有限公司 Construction process of zero-leakage waterproof system
CN113216260A (en) * 2021-06-17 2021-08-06 北京城建集团有限责任公司 Waterproof structure of buried water plant, buried water plant and construction method of buried water plant
CN114575477A (en) * 2022-03-14 2022-06-03 中建八局第二建设有限公司 Basement exterior wall waterproof construction method and waterproof structure

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008303541A (en) * 2007-06-05 2008-12-18 Nisshin Kogyo Co Ltd Waterproofing construction method for asphalt to be laid at normal temperature and waterproofing layered structure
CN106968451A (en) * 2017-04-21 2017-07-21 上海东方雨虹防水工程有限公司 A kind of prestressing force roof boarding leakage maintaining method and its system and surface waterproofing construction method
CN107060226A (en) * 2017-05-12 2017-08-18 武汉建工集团股份有限公司 A kind of construction method of planted roof construction
CN107989287A (en) * 2017-11-24 2018-05-04 中国冶集团有限公司 Inverted roof light and shade drainage system construction method
CN108086684A (en) * 2017-12-30 2018-05-29 肖勇 Utilize the buildings waterproof construction method of uncured rubber asphalt and its application
CN109083337A (en) * 2018-08-16 2018-12-25 庐江荣睿建设工程有限公司 A kind of construction method on waterproof and heat-insulating roof
CN110397173A (en) * 2019-08-05 2019-11-01 桂林理工大学南宁分校 Accomodation ground leak leak-blocking construction method
CN110409513A (en) * 2019-08-06 2019-11-05 东莞市卓宝建筑工程有限公司 A kind of uncured rubber-asphalt coating and the compound construction method of self-adhesive coiled material

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008303541A (en) * 2007-06-05 2008-12-18 Nisshin Kogyo Co Ltd Waterproofing construction method for asphalt to be laid at normal temperature and waterproofing layered structure
CN106968451A (en) * 2017-04-21 2017-07-21 上海东方雨虹防水工程有限公司 A kind of prestressing force roof boarding leakage maintaining method and its system and surface waterproofing construction method
CN107060226A (en) * 2017-05-12 2017-08-18 武汉建工集团股份有限公司 A kind of construction method of planted roof construction
CN107989287A (en) * 2017-11-24 2018-05-04 中国冶集团有限公司 Inverted roof light and shade drainage system construction method
CN108086684A (en) * 2017-12-30 2018-05-29 肖勇 Utilize the buildings waterproof construction method of uncured rubber asphalt and its application
CN109083337A (en) * 2018-08-16 2018-12-25 庐江荣睿建设工程有限公司 A kind of construction method on waterproof and heat-insulating roof
CN110397173A (en) * 2019-08-05 2019-11-01 桂林理工大学南宁分校 Accomodation ground leak leak-blocking construction method
CN110409513A (en) * 2019-08-06 2019-11-05 东莞市卓宝建筑工程有限公司 A kind of uncured rubber-asphalt coating and the compound construction method of self-adhesive coiled material

Non-Patent Citations (7)

* Cited by examiner, † Cited by third party
Title
叶刚: "《防水工初级技能》", 31 March 2009, 金盾出版社 *
杨永起等: "《城市综合管廊防水工程技术手册》", 30 November 2017, 中国建材工业出版 *
杨永起等: "《建筑防水施工技术》", 31 October 2015, 中国建材工业出版社 *
江见鲸等: "《建筑工程事故分析与处理 第二版》", 31 July 2003, 中国建筑工业出版社 *
王云江等: "《工程施工与质量简明手册丛书 建筑加固》", 30 June 2017, 中国建材工业出版社 *
王玉芬: "非固化橡胶沥青防水涂料及复合防水技术", 《 防水堵漏材料及施工技术交流会论文集》 *
齐建忠: "非固化橡胶沥青防水施工技术研究", 《建筑》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112112290A (en) * 2020-08-06 2020-12-22 深圳市卓宝科技股份有限公司 Waterproof structure construction method
CN112196298A (en) * 2020-09-10 2021-01-08 斯科瑞新材料科技(山东)股份有限公司 Novel building waterproof process and material
CN112343185A (en) * 2020-10-23 2021-02-09 四川鑫桂湖防水保温节能科技有限公司 Construction process of zero-leakage waterproof system
CN113216260A (en) * 2021-06-17 2021-08-06 北京城建集团有限责任公司 Waterproof structure of buried water plant, buried water plant and construction method of buried water plant
CN114575477A (en) * 2022-03-14 2022-06-03 中建八局第二建设有限公司 Basement exterior wall waterproof construction method and waterproof structure

Similar Documents

Publication Publication Date Title
CN110984406A (en) Waterproof leakage-repairing construction method using non-cured rubber asphalt waterproof coating
CN110607809B (en) Waterproof construction method for basement of building engineering
CN101481931B (en) Sticking modified asphalt waterproof coiled material and adhesive, as well as preparation method and application thereof
CN104119799A (en) Non-cured rubber asphalt waterproof paint
CN111042348A (en) Waterproof construction process for base layer in various complex forms
CN205421740U (en) Non -cured rubberized asphalt coating combines composite waterproof structure of self -adhesion coiled material
KR20000002469A (en) Spread film of concrete structure and sheet double waterproofing material and method thereof
CN112227755A (en) Waterproof repairing structure and method for old roof
CN107313342A (en) The bridging arrangement and construction method of a kind of waterproof roll
CN110528789A (en) A kind of roof waterproof engineering construction method
CN109372026A (en) A kind of the combination waterproof layer structure and its construction method of greenbelt underground engineering top plate
CN110778062A (en) Facing paving structure of floor heating area and construction method thereof
CN114135068A (en) Construction process of plastering mortar
KR100941747B1 (en) The bridge deck waterproofing system and application method
CN112709380A (en) Construction method and application of coated and rolled composite waterproof system
CN108086684A (en) Utilize the buildings waterproof construction method of uncured rubber asphalt and its application
CN101260725A (en) Water-proof coiled material and its manufacture and construction method
CN113276515A (en) Waterproof and heat-insulating integrated plate and construction process and dry bonding production process thereof
CN113550451A (en) Waterproof construction method for building outer wall
CN111441391A (en) CBF reaction bonding macromolecule waterproof coiled material construction method
CN106894450A (en) The bridging arrangement and construction method of a kind of waterproof roll
CN105672497A (en) Concrete base surface waterproof construction treatment method, concrete base anti-permeation layer and application
WO2022127094A1 (en) Method for overlapping different waterproofing materials of side wall and roof
CN207863199U (en) A kind of waterproof and insulation integrated plate
CN104131663B (en) A kind of Waterproof Construction Technique using hot melt water-repellent paint

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200410

RJ01 Rejection of invention patent application after publication