CN110939063A - Rapid construction method for underwater isolated pier support platform - Google Patents

Rapid construction method for underwater isolated pier support platform Download PDF

Info

Publication number
CN110939063A
CN110939063A CN201911100193.7A CN201911100193A CN110939063A CN 110939063 A CN110939063 A CN 110939063A CN 201911100193 A CN201911100193 A CN 201911100193A CN 110939063 A CN110939063 A CN 110939063A
Authority
CN
China
Prior art keywords
platform
underwater
support
pier
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911100193.7A
Other languages
Chinese (zh)
Inventor
陈相祎
刘涛
盖青山
张建军
于超
刘德鑫
胡利平
孙刚
赵健
杨梦纯
蔡维栋
晏威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Bridge Engineering Bureau Group Co Ltd filed Critical China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority to CN201911100193.7A priority Critical patent/CN110939063A/en
Publication of CN110939063A publication Critical patent/CN110939063A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • E02D5/285Prefabricated piles made of steel or other metals tubular, e.g. prefabricated from sheet pile elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Foundations (AREA)
  • Revetment (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a rapid construction method of a stand platform of an underwater isolated pier, which is used for inserting and driving inclined steel pipe piles in water and manufacturing a platform stand on land at the same time; the platform support mainly comprises a cross beam and a longitudinal beam; after the construction, the platform support is hoisted to the inclined steel pipe pile through hoisting equipment, and welding and reinforcing are carried out; and pouring concrete on the platform support to finish the manufacture of the anchor pier. The invention has simple construction, safety and rapidness, and ensures the smooth construction; and the labor input and the working hours can be reduced, the construction cost input is effectively reduced, and the construction period is shortened.

Description

Rapid construction method for underwater isolated pier support platform
Technical Field
The invention belongs to the field of bridge construction, and particularly relates to a rapid construction method of an underwater isolated pier support platform.
Background
In the double-wall steel suspension box cofferdam positioning construction, independent anchor piers at different positions need to be arranged in water, namely four temporary piers which take inclined steel pipe piles as main bearing structures are arranged at four opposite corners of the cofferdam, and the piers are arranged at a certain distance away from the cofferdam so as to avoid the scouring range of the cofferdam as far as possible. Each abutment is connected with a certain angular point of the cofferdam by a cable so as to accurately control the position of the cofferdam. The inclined steel pipe piles are connected into a whole through pouring concrete on the pier to form an operation platform, and corresponding tackle blocks, windlasses and other facilities are respectively arranged on the platform to facilitate the tension of peripheral pull cables; the position of the cofferdam can be adjusted through the adjustment of the pulling force of the pull cable.
The construction method often causes construction difficulties due to factors such as high construction difficulty, high risk, and incapability of construction in flood tide periods on water and inclined steel pipe piles.
Disclosure of Invention
The invention aims to provide a rapid construction method of a support platform of an underwater isolated pier, which meets the requirements of safety and convenience in construction operation on an inclined steel pipe pile in water.
In order to achieve the purpose, the technical scheme of the invention is realized as follows:
a quick construction method for a support platform of an underwater isolated pier comprises the following steps:
s1, inserting and driving the inclined steel pipe piles in the water and manufacturing platform supports on the land at the same time; the platform support mainly comprises a cross beam and a longitudinal beam;
s2, after the step S1 is completed, the platform support is hoisted to the inclined steel pipe pile through hoisting equipment, and welding and reinforcing are carried out;
and S3, pouring concrete on the platform support to finish the manufacture of the anchor pier.
Further, the method for manufacturing the platform bracket in step S1 includes:
s11, enabling the two main longitudinal beams to be parallel to each other and to be arranged at the lowest layer of the structure;
s12, vertically and uniformly distributing a plurality of transverse distribution beams on the main longitudinal beam, and firmly welding;
and S13, arranging longitudinal frame beams at two ends of the transverse distribution beam.
Further, the welding and reinforcing method for the platform bracket and the inclined steel pipe pile in the step S2 includes:
s21, connecting the inclined steel pipe pile with the platform bracket;
and S22, welding and reinforcing after connection.
Further, the specific method of manufacturing in step S3 includes: and (3) paving a wood bottom die on the platform support, binding reinforcing steel bars, and erecting a steel side die to finish concrete pouring.
The invention also provides a water isolated pier support platform applying the method, wherein a support platform main body structure is formed by two main longitudinal beams which are parallel to each other, a plurality of transverse distribution beams which are vertically arranged with the main longitudinal beams and two longitudinal frame beams at the outermost sides of the transverse distribution beams.
Further, the main structure of the support platform is welded with the inclined steel pipe pile.
Compared with the prior art, the invention has the following beneficial effects:
according to the rapid construction method of the stand platform of the underwater isolated pier, the inclined steel pipe pile in water can be driven in a plugging mode and the stand on the land can be welded at the same time during construction, the welded stand is hoisted to the inclined steel pipe pile through hoisting equipment in the construction process, connection and reinforcement are carried out, construction is simple, safe and rapid, and smooth construction is guaranteed; and the labor input and the working hours can be reduced, the construction cost input is effectively reduced, and the construction period is shortened.
Drawings
Fig. 1 is a top view of an underwater hard pier mounting platform according to an embodiment of the present invention;
fig. 2 is a front view of an underwater hard pier mounting platform according to an embodiment of the present invention.
Wherein:
1-a main longitudinal beam; 2-transverse distribution beams; 3-longitudinal frame beams;
4-concrete anchor piers; 5-a platform support; 6-riverbed; 7-steel pipe pile.
Detailed Description
It should be noted that the embodiments and features of the embodiments may be combined with each other without conflict.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on those shown in the drawings, and are used only for convenience in describing the present invention and for simplicity in description, and do not indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and thus, are not to be construed as limiting the present invention.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.
In the description of the present invention, when an element is referred to as being "secured" to another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. When an element is referred to as being "disposed" on another element, it can be directly on the other element or intervening elements may also be present.
The invention is further illustrated with reference to the following specific embodiments and the accompanying drawings.
As shown in fig. 1, the main structure of the underwater isolated pier support platform provided by the invention, namely a platform support 5, is composed of two main longitudinal beams 1 which are parallel to each other, a plurality of transverse distribution beams 2 which are arranged perpendicular to the main longitudinal beams, and two outermost longitudinal frame beams 3.
The invention provides a rapid construction method, in the positioning construction of a double-wall steel suspension box cofferdam, 6 inclined steel pipe piles 7 are respectively arranged at four opposite corners of the cofferdam and in the water of a riverbed 6, when the inclined steel pipe piles 7 in the water are arranged in a plugging way, a platform bracket 5 can be simultaneously manufactured on land, and the manufacturing process comprises the steps of enabling two main longitudinal beams 1 to be parallel to each other and arranged at the lowest layer of the structure; a plurality of transverse distribution beams 2 are vertically and uniformly distributed on the main longitudinal beam 1 and are firmly welded; longitudinal frame beams 3 are arranged at two ends of the transverse distribution beam 2.
After the platform support 5 is manufactured, the steel pipe piles 7 inclined are hung and placed through hoisting equipment, and the 6 inclined steel pipe piles 7 and the platform support 5 are firmly penetrated, connected and welded through reserved hole grooves. And then, paving a wood bottom die on the platform support 5, binding steel bars, and erecting a steel side die to complete the pouring of the concrete anchor pier 4.
As shown in figure 2, which is a front view after the construction is finished,
the invention solves the problem that the construction of the abutment support platform on the inclined steel pipe pile is unsafe and convenient, and has simple, safe and quick construction.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.

Claims (6)

1. A quick construction method for a support platform of an underwater isolated pier is characterized by comprising the following steps:
s1, inserting and driving the inclined steel pipe piles in the water and manufacturing platform supports on the land at the same time; the platform support mainly comprises a cross beam and a longitudinal beam;
s2, after the step S1 is completed, the platform support is hoisted to the inclined steel pipe pile through hoisting equipment, and welding and reinforcing are carried out;
and S3, pouring concrete on the platform support to finish the manufacture of the anchor pier.
2. The method for rapidly constructing the underwater isolated pier support platform according to claim 1, wherein the method for manufacturing the platform support in the step S1 comprises the following steps:
s11, enabling the two main longitudinal beams to be parallel to each other and to be arranged at the lowest layer of the structure;
s12, vertically and uniformly distributing a plurality of transverse distribution beams on the main longitudinal beam, and firmly welding;
and S13, arranging longitudinal frame beams at two ends of the transverse distribution beam.
3. The method for rapidly constructing the underwater isolated pier support platform according to claim 1, wherein the step S2 of welding and reinforcing the platform support and the inclined steel pipe pile comprises the following steps:
s21, connecting the inclined steel pipe pile with the platform bracket;
and S22, welding and reinforcing after connection.
4. The method for rapidly constructing the underwater isolated pier support platform according to claim 1, wherein the specific method for manufacturing the underwater isolated pier support platform in the step S3 comprises the following steps: and (3) paving a wood bottom die on the platform support, binding reinforcing steel bars, and erecting a steel side die to finish concrete pouring.
5. The underwater pier-supported platform using the method of any one of claims 1-4, wherein the main structure of the supported platform is composed of two main longitudinal beams parallel to each other, a plurality of transverse distribution beams arranged perpendicular to the main longitudinal beams, and two longitudinal frame beams at the outermost sides of the transverse distribution beams.
6. The underwater hard pier cradle platform of claim 5, wherein the cradle platform body structure is welded to an inclined steel pipe pile.
CN201911100193.7A 2019-11-12 2019-11-12 Rapid construction method for underwater isolated pier support platform Pending CN110939063A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911100193.7A CN110939063A (en) 2019-11-12 2019-11-12 Rapid construction method for underwater isolated pier support platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911100193.7A CN110939063A (en) 2019-11-12 2019-11-12 Rapid construction method for underwater isolated pier support platform

Publications (1)

Publication Number Publication Date
CN110939063A true CN110939063A (en) 2020-03-31

Family

ID=69907627

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911100193.7A Pending CN110939063A (en) 2019-11-12 2019-11-12 Rapid construction method for underwater isolated pier support platform

Country Status (1)

Country Link
CN (1) CN110939063A (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101725112A (en) * 2009-12-18 2010-06-09 中铁大桥局集团第三工程有限公司 Construction method for piers
KR101024259B1 (en) * 2010-06-07 2011-03-29 주식회사 하이드로코리아 Temporary bride construction method using pile upper bracket
CN102677592A (en) * 2012-05-24 2012-09-19 中国水电建设集团十五工程局有限公司 Method for erecting deepwater steel trestle and platform on exposed bedrock in shallow sea
JP2013096095A (en) * 2011-10-28 2013-05-20 Nippon Steel & Sumikin Engineering Co Ltd Rigid connection structure and rigid connection method between bridge pier and bridge girder
CN103215962A (en) * 2013-03-22 2013-07-24 中铁大桥局集团第五工程有限公司 Pier stud type pile foundation tie beam steel hanging box cofferdam
CN103388401A (en) * 2013-08-14 2013-11-13 中国建筑第八工程局有限公司 Steel post operation platform and construction method thereof
CN104594352A (en) * 2015-01-14 2015-05-06 中铁大桥局集团有限公司 Stable structure and drilling platform construction method based on stable structure
CN204644882U (en) * 2015-05-07 2015-09-16 中交第二公路工程局有限公司 A kind of water Bridge bearing platform prefabrication bottom board steel lifting box cofferdam fastening devices
CN105649081A (en) * 2016-01-14 2016-06-08 中铁大桥局集团有限公司 Multistage guiding support for oblique inserting piling of super long and large diameter pile
CN108004933A (en) * 2017-12-25 2018-05-08 中铁大桥局集团第五工程有限公司 A kind of bridge construction survey platform that can be recycled and application method
CN110055979A (en) * 2019-04-15 2019-07-26 北京铁科特种工程技术有限公司 For the precast prestressed concrete anchor pier of slope reinforcement and production and construction method

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101725112A (en) * 2009-12-18 2010-06-09 中铁大桥局集团第三工程有限公司 Construction method for piers
KR101024259B1 (en) * 2010-06-07 2011-03-29 주식회사 하이드로코리아 Temporary bride construction method using pile upper bracket
JP2013096095A (en) * 2011-10-28 2013-05-20 Nippon Steel & Sumikin Engineering Co Ltd Rigid connection structure and rigid connection method between bridge pier and bridge girder
CN102677592A (en) * 2012-05-24 2012-09-19 中国水电建设集团十五工程局有限公司 Method for erecting deepwater steel trestle and platform on exposed bedrock in shallow sea
CN103215962A (en) * 2013-03-22 2013-07-24 中铁大桥局集团第五工程有限公司 Pier stud type pile foundation tie beam steel hanging box cofferdam
CN103388401A (en) * 2013-08-14 2013-11-13 中国建筑第八工程局有限公司 Steel post operation platform and construction method thereof
CN104594352A (en) * 2015-01-14 2015-05-06 中铁大桥局集团有限公司 Stable structure and drilling platform construction method based on stable structure
CN204644882U (en) * 2015-05-07 2015-09-16 中交第二公路工程局有限公司 A kind of water Bridge bearing platform prefabrication bottom board steel lifting box cofferdam fastening devices
CN105649081A (en) * 2016-01-14 2016-06-08 中铁大桥局集团有限公司 Multistage guiding support for oblique inserting piling of super long and large diameter pile
CN108004933A (en) * 2017-12-25 2018-05-08 中铁大桥局集团第五工程有限公司 A kind of bridge construction survey platform that can be recycled and application method
CN110055979A (en) * 2019-04-15 2019-07-26 北京铁科特种工程技术有限公司 For the precast prestressed concrete anchor pier of slope reinforcement and production and construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴长才: ""钢吊箱围堰锚墩预应力定位新技术造价分析", 吴长才 ,铁路工程造价管理,第1期,第7页-第9页、第30页", 《铁路工程造价管理》 *

Similar Documents

Publication Publication Date Title
CN110080526B (en) Stage reverse construction method for basement
JP2008014083A (en) Construction method of pier
CN107268669A (en) Piling jacket construction method, rear piling jacket construction component, jacket of driving piles afterwards afterwards
CN214116644U (en) Foundation ditch channel-section steel sheet pile shaped steel braced system
CN111350187A (en) Template system suitable for large-diameter manual hole digging annular foundation pile and construction method
CN110939063A (en) Rapid construction method for underwater isolated pier support platform
WO2023173676A1 (en) Space truss support platform, system and method for super-deep slurry wall
CN112681150B (en) Prefabricated hoisting system for box-type arch bridge and construction method
CN110512609B (en) Riprap system jacket and construction process thereof
CN208472690U (en) A kind of cushion cap system
CN210507509U (en) Prefabricated cushion cap and pier
CN208685457U (en) Cast-in-place box beam bracket device
CN113802461A (en) Steel box girder erection method
CN108411847B (en) Pile cap integral reverse bottom hanging system and use method thereof
CN113684826A (en) Reverse construction method steel pipe upright pile construction casing device and construction method thereof
CN111945756A (en) Filling side slope supporting structure and construction method thereof
CN217480162U (en) Pile foundation steel reinforcement cage temporary fixing device
CN110821040B (en) Steel ladle beam supporting structure
CN216687245U (en) Steel truss hanging device for pouring large-span tie beam of high pile cap
CN219840087U (en) Supporting structure suitable for foundation pit excavation horse way position
CN219906683U (en) Integral forming hoisting structure for column steel mould and reinforcement cage
CN214459662U (en) A construction work platform for double column pier
CN115075273B (en) Reinforced concrete prefabricated pouring jacket cofferdam and construction method
CN117306534B (en) Reverse construction method for assembled marine pile foundation building
CN216007333U (en) Assembled precast beam and post steel sheet connecting piece

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200331

RJ01 Rejection of invention patent application after publication