CN110908414A - System and method for controlling temperature of pipeline confluence liquid - Google Patents

System and method for controlling temperature of pipeline confluence liquid Download PDF

Info

Publication number
CN110908414A
CN110908414A CN201911030573.8A CN201911030573A CN110908414A CN 110908414 A CN110908414 A CN 110908414A CN 201911030573 A CN201911030573 A CN 201911030573A CN 110908414 A CN110908414 A CN 110908414A
Authority
CN
China
Prior art keywords
fluid
temperature
pipeline
liquid
confluence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911030573.8A
Other languages
Chinese (zh)
Inventor
庄园
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hudong Heavy Machinery Co Ltd
Original Assignee
Hudong Heavy Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hudong Heavy Machinery Co Ltd filed Critical Hudong Heavy Machinery Co Ltd
Priority to CN201911030573.8A priority Critical patent/CN110908414A/en
Publication of CN110908414A publication Critical patent/CN110908414A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D23/00Control of temperature
    • G05D23/19Control of temperature characterised by the use of electric means
    • G05D23/20Control of temperature characterised by the use of electric means with sensing elements having variation of electric or magnetic properties with change of temperature

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Flow Control (AREA)
  • Measuring Volume Flow (AREA)

Abstract

A control system and method for the temperature of pipeline confluence liquid comprises a console, a control valve, a first differential pressure sensor, a second differential pressure sensor, a first temperature sensor, a second temperature sensor, a third temperature sensor, a first flowmeter and a second flowmeter; on the basis of measuring the flow field characteristics of the pipeline, the flow of the liquid before confluence is automatically calculated and controlled in real time by applying the thermodynamic principle according to the working condition of the liquid before confluence, so that the temperature of the liquid after confluence is accurately reached and stably kept at the set target temperature. The invention realizes real-time accurate control of the liquid temperature after pipeline confluence, and can automatically adjust the opening of the control valve when the working condition of the confluence liquid changes so as to keep the temperature of the liquid after confluence stable and unchanged, thereby improving the stability of a pipeline system, avoiding the defect that the stability of the liquid temperature after pipeline confluence is reduced due to time difference of liquid temperature detection feedback after the confluence in the prior art, and having the advantages of quick, accurate and stable control.

Description

System and method for controlling temperature of pipeline confluence liquid
Technical Field
The invention relates to control of liquid temperature, in particular to a system and a method for controlling the temperature of pipeline confluence liquid, and belongs to the technical field of automatic control.
Background
In recent years, with the development of socio-economic, the application of industrial pipelines is more and more extensive, and the control requirement on the fluid in the pipelines is higher and higher. In a pipeline for conveying liquid, two liquid streams are often mixed and converged, and certain requirements are imposed on the temperature of the mixed liquid stream. In the prior art, a temperature sensor is usually used for detecting the temperature of fluid in a pipeline, and then the opening of the temperature control valve is directly controlled according to a preset simple program.
However, when the fluid condition changes, the above-mentioned fluid control method often generates two error situations: 1. the action of the temperature control valve and the feedback of the fluid temperature sensor after confluence generally have a certain time difference, and if the time difference is not properly set, the fluctuation of a confluence fluid temperature curve can be caused, so that the temperature stability is reduced. 2. The conventional control method uses the temperature of the merged fluid as a control basis, and the temperature of the merged fluid deviates from the target temperature at this time, and the merged fluid can be recovered after a period of time elapses after the opening degree of the temperature control valve is adjusted. Both of these situations may have the following serious consequences: 1) improper setting of the time difference may cause the temperature of the converged fluid to oscillate or even diverge, resulting in the loss of the temperature control capability of the thermostatic valve. 2) Sudden changes in the liquid conditions before confluence result in sudden changes in the liquid conditions after confluence, and at this time, the fluid has already flowed to the rear, which can have a significant adverse effect on the rear system.
Disclosure of Invention
In order to solve the above problems caused by the prior art, the present invention provides a system and a method for controlling the temperature of a pipeline confluence liquid, which can realize real-time and accurate control of the temperature of the confluence liquid, so as to improve the stability of the temperature of the pipeline system.
In order to achieve the purpose, the technical scheme of the invention is as follows:
a system for controlling the temperature of a liquid flowing in a pipe comprising a first pipe for flowing a first fluid, a second pipe for flowing a second fluid, and a manifold pipe for flowing the fluid out of the pipe, the first pipe and the second pipe being connected downstream of the first pipe and downstream of the second pipe and upstream of the manifold pipe, the system comprising: the control system comprises a console, a control valve, a first differential pressure sensor, a second differential pressure sensor, a first temperature sensor, a second temperature sensor, a third temperature sensor, a first flowmeter and a second flowmeter; the control valve is connected to the first pipeline for regulating the flow of the first fluid, the first differential pressure sensor is connected to the first pipeline and connected in parallel to two ends of the control valve for measuring the pressure difference of the first fluid, the second differential pressure sensor is connected to the second pipeline for measuring the pressure difference of the second fluid, the first temperature sensor is connected to the first pipeline for measuring the temperature of the first fluid, the second temperature sensor is connected to the second pipeline for measuring the temperature of the second fluid, the third temperature sensor is connected to the confluence pipeline for measuring the temperature of the confluence liquid, the first flowmeter is connected to the first pipeline for measuring the flow of the first fluid, and the second flowmeter is connected to the second pipeline, the first differential pressure sensor, the second differential pressure sensor, the first temperature sensor, the second temperature sensor, the third temperature sensor, the first flowmeter and the second flowmeter are respectively connected with the console and used for conveying real-time test data, and the console is connected with the control valve and used for controlling the opening of the control valve so as to adjust the flow of the first fluid and accurately control the temperature of the confluence liquid after confluence in real time.
Further, the first flow meter and the second flow meter are dismantled after debugging is completed.
Furthermore, the control console is internally provided with a control program in advance.
Furthermore, a plurality of pipelines form a pipeline system, and the control systems with the same number as the pipelines are respectively connected with the pipelines and control the temperature of the confluence liquid of the whole pipeline system.
The other technical scheme of the invention is as follows:
a control method for the temperature of the pipeline confluence liquid by adopting the control system is characterized in that: on the basis of measuring the flow field characteristics of the pipeline, according to the working condition of the liquid before confluence, the flow of the liquid before confluence is automatically calculated and controlled in real time by applying the thermodynamic principle, so that the real-time accurate control of the liquid temperature after the pipeline confluence is realized; the specific content comprises the following steps:
measuring and recording the flow field characteristics of the pipeline in a debugging stage, and obtaining a function corresponding relation between the opening of the control valve and the resistance coefficient of the first pipeline; the method comprises the steps of obtaining a pressure difference value and a temperature of a first fluid and a second fluid before confluence through detection in an operation stage, calculating the opening of a control valve necessary for reaching the target temperature of the confluent liquid after confluence according to a function corresponding relation obtained in a debugging stage, an energy conservation equation and a mass conservation equation, controlling the temperature of the confluent liquid to accurately reach the set target temperature by adjusting the opening of the control valve, and automatically calculating and adjusting the opening of the control valve in real time by a control system when the working condition of the confluent liquid changes so as to keep the temperature of the confluent liquid stable and unchanged.
Further, the debugging phase comprises the steps of:
1) setting the control valve to a certain opening degree, respectively measuring the flow rate of the first fluid and the flow rate of the second fluid through the first flow meter and the second flow meter, and respectively measuring the pressure difference value of the first fluid and the pressure difference value of the second fluid through the first differential pressure sensor and the second differential pressure sensor; calculating the drag coefficient of the first conduit and the drag coefficient of the second conduit by the following formulas:
S1=Q1 2/H1
S2=Q2 2/H2
wherein the content of the first and second substances,
S1is the drag coefficient, Q, of the first conduit1Is the flow rate of the first fluid, H1Is the pressure difference of the first fluid,
S2is the drag coefficient, Q, of the second conduit2Is the flow rate of the second fluid, H2Is the pressure difference of the second fluid, S2、Q2And H2Are all constant values;
recording the corresponding value of the control valve on the opening degree and the resistance coefficient of the first pipeline and the resistance coefficient of the second pipeline;
2) setting the control valve on different opening degrees, respectively repeating the step 1), obtaining the change of the flow rate and the pressure difference value of the first fluid caused by the change of the opening degree of the control valve, and recording the resistance coefficient of the first pipeline of the control valve under each opening degree, thereby obtaining the functional corresponding relation between the opening degree of the control valve and the resistance coefficient of the first pipeline;
3) and after debugging is completed, the first flow meter and the second flow meter are dismantled.
Further, the operation phase comprises the steps of:
1) setting a target temperature of the confluence liquid after confluence and inputting the target temperature into the console;
2) respectively measuring the real-time temperature of the first fluid, the real-time temperature of the second fluid and the real-time temperature of the confluence liquid through the first temperature sensor, the second temperature sensor and the third temperature sensor, inputting the measured real-time temperatures into the console, respectively calculating the enthalpy value of the first fluid and the enthalpy value of the second fluid by the console according to the measured real-time temperature of the first fluid and the measured real-time temperature of the second fluid according to the thermodynamic principle, and calculating the target enthalpy value of the confluence liquid according to the target temperature of the confluence liquid set in the step 1);
3) respectively measuring the real-time pressure difference value of the first fluid and the real-time pressure difference value of the second fluid by the first differential pressure sensor and the second differential pressure sensor, and inputting the real-time pressure difference values into the console, wherein the console calculates the real-time flow of the second fluid by the following formula:
H20=S2Q20 2
wherein Q is20Is the real-time flow of the second fluid, H20Is the real-time pressure difference of the second fluid, S2Setting the resistance coefficient of the second pipeline;
4) according to the energy conservation equation and the mass conservation equation, the console calculates the target flow rate of the first fluid through the following formula:
Q1mh1+Q20h2=Q3mh3m
Q1m+Q20=Q3m
wherein the content of the first and second substances,
Q1mis the first streamTarget flow rate of body, Q20Is the real-time flow rate, Q, of the second fluid3mIn order to converge the target flow rate of the liquid,
h1is the enthalpy of the first fluid, h2Is the enthalpy of the second fluid, h3mIs the target enthalpy of the sink flow liquid;
5) the console calculates a target resistance coefficient of the first pipeline by the following formula:
H10=S1mQ1m 2
wherein S is1mIs the target drag coefficient of the first conduit, H10Is the real-time pressure difference of the first fluid, Q1mIs the target flow rate of the first fluid,
then the console determines the target opening degree of the control valve according to the calculated target resistance coefficient of the first pipeline according to the function corresponding relation between the opening degree of the control valve and the resistance coefficient of the first pipeline obtained in the step 2) of the debugging stage;
6) and (3) the console controls and adjusts the control valve to reach the target opening degree obtained in the step 5) in real time, so that the real-time temperature of the confluence liquid after confluence accurately reaches the set target temperature, and when the working condition of the pipeline confluence liquid changes, the console automatically calculates and controls the control valve to adjust the opening degree in real time, so that the temperature of the confluence liquid is stably kept constant at the target temperature.
Compared with the prior art, the invention has the beneficial effects that:
the control system for the pipeline confluence liquid temperature is based on the measurement of the flow field characteristics of the pipeline, automatically calculates and controls the flow of the liquid before confluence in real time by applying the thermodynamic principle according to the working condition of the liquid before confluence, so that the real-time accurate control of the liquid temperature after the pipeline confluence is realized, and when the working condition of the confluence liquid changes, the control system can automatically calculate and immediately adjust the opening of the control valve so as to keep the temperature of the liquid after confluence stable and unchanged, thereby improving the stability of the pipeline system.
The invention changes the traditional regulation and control mode based on the liquid temperature after confluence, avoids the defects of the prior art that the liquid temperature after confluence is detected and fed back for time difference, so that the stability of the liquid temperature after pipeline confluence is reduced, and the serious adverse effect is generated on the rear pipeline, and has the advantages of quick, accurate and stable control.
Drawings
FIG. 1 is a schematic of the present invention.
Detailed Description
The control system for the pipeline confluence liquid temperature automatically calculates and controls the flow of the liquid before confluence in real time by applying the thermodynamic principle according to the liquid working condition before confluence on the basis of measuring the flow field characteristics of the pipeline, thereby realizing the real-time accurate control of the liquid temperature after the pipeline confluence.
The invention is further illustrated with reference to the following figures and specific examples, which should not be taken to limit the scope of the invention.
Referring to fig. 1, the illustrated pipes include a first pipe a, a second pipe b, and a confluence pipe c, and the downstream of the first pipe a and the second pipe b are connected to the upstream of the confluence pipe c, so that a first fluid flowing into the first pipe a and a second fluid flowing into the second pipe b are merged into a confluence liquid to flow out of the confluence pipe c. Larger duct systems may be made up of multiple illustrated duct structures.
The control system for the temperature of the pipeline confluence liquid is connected to the pipeline and comprises a control console (not shown in the figure), a control valve 1, a first differential pressure sensor 2, a second differential pressure sensor 3, a first temperature sensor 4, a second temperature sensor 5, a third temperature sensor 8, a first flowmeter 6 and a second flowmeter 7.
The control valve 1 is connected to the first pipe a for regulating the flow rate of the first fluid. The first differential pressure sensor 2 is connected to the first pipe a and connected in parallel to both ends of the control valve 1, for measuring a pressure difference of the first fluid. The first temperature sensor 4 is connected to the first pipe a for measuring the temperature of the first fluid. The first flow meter 6 is connected to the first pipe a for measuring the flow rate of the first fluid.
The second differential pressure sensor 3, the second temperature sensor 5 and the second flow meter 7 are connected to the second pipeline b and are respectively used for measuring the pressure difference, the temperature and the flow of the second fluid.
The third temperature sensor 8 is connected to the confluence pipe c for measuring the temperature of the confluence liquid.
The first differential pressure sensor 2, the second differential pressure sensor 3, the first temperature sensor 4, the second temperature sensor 5, the third temperature sensor 8, the first flowmeter 6 and the second flowmeter 7 are respectively connected with the console and used for transmitting real-time test data. The first flow meter 6 and the second flow meter 7 are removed after the commissioning is completed.
The control console is internally provided with a control program in advance, is connected with the control valve 1 and controls the opening of the control valve 1 so as to adjust the flow of the first fluid and accurately control the temperature of the converged liquid.
In the pipeline system, each pipeline is connected with a control system, so that the temperature of the confluence liquid is controlled for the whole pipeline system.
The control system is used for controlling the temperature of the confluence liquid by adjusting the opening of the control valve 1 to change the flow of the first fluid in the first pipeline a.
The specific content of the method for controlling the temperature of the pipeline confluence liquid comprises the following steps: measuring and recording the flow field characteristics of the pipeline in a debugging stage, and obtaining a function corresponding relation between the opening of the control valve and the resistance coefficient of the first pipeline; and in the operation stage, the pressure difference and the temperature of the first fluid and the second fluid before confluence are obtained through detection, the opening degree of a control valve necessary for reaching the target temperature of the confluent liquid after confluence is calculated according to the function corresponding relation obtained in the debugging stage, an energy conservation equation and a mass conservation equation, and the opening degree of the control valve is adjusted to control the temperature of the confluent liquid to accurately reach and stably keep the temperature at the set target temperature.
The debugging stage comprises the following steps:
1) the control valve 1 is set to a certain opening degree, and the flow rate Q of the first fluid is measured by the first flow meter 6 and the second flow meter 7, respectively1And flow rate Q of the second fluid2Measuring the pressure difference H of the first fluid by the first differential pressure sensor 2 and the second differential pressure sensor 3 respectively1And the pressure difference H of the second fluid2
The pipeline has the formula H-SQ2Expressed flow field characteristics, so that the console automatically calculates the drag coefficient S of the first pipeline a by the following formula1And the drag coefficient S of the second pipe b2
S1=Q1 2/H1
S2=Q2 2/H2
Wherein the content of the first and second substances,
S1is the drag coefficient, Q, of the first conduit a1Is the flow rate of the first fluid, measured by the first flow meter 6, H1Is the pressure difference of the first fluid, measured by the first differential pressure sensor 2;
S2is the drag coefficient, Q, of the second conduit b2Measured by a second flow meter 7 for the flow of a second fluid, H2Is the pressure difference of the second fluid, measured by the second differential pressure sensor 3, S, since there is no element in the second pipe b that changes the flow rate2、Q2And H2All are fixed values that are not changed during the debugging phase.
The console then compares the resistance coefficient S of the control valve 1 at this opening with the resistance coefficient S of the first conduit a1And the drag coefficient S of the second pipeline b2Automatic recording is performed.
2) Sequentially setting the control valve 1 at different opening degrees, and repeating the step 1) to obtain a flow rate Q of the first fluid caused by the change of the opening degree of the control valve 11And the pressure difference H1And the coefficient of resistance of the first duct a at each opening of the control valve 1 is recordedS1So as to obtain the opening degree of the control valve 1 and the resistance coefficient S of the first pipeline a1And automatically recorded in a control program in the console.
3) And after debugging is completed, the first flow meter 6 and the second flow meter 7 are detached.
The operating phase comprises the steps of:
1) setting a target temperature T of the confluence liquid after confluence3mAnd inputting a control program of the console;
2) the real-time temperature T of the first fluid is measured by the first temperature sensor 4, the second temperature sensor 5 and the third temperature sensor 8 respectively10The real-time temperature T of the second fluid20And the real-time temperature T of the confluence liquid30And input into the console;
according to the thermodynamic principle, the console is then based on the measured real-time temperature T of the first fluid10And the real-time temperature T of the second fluid20Separately calculating the enthalpy value h of the first fluid1And enthalpy h of the second fluid2The target temperature T of the confluence liquid set according to the step 1)3mCalculating target enthalpy value h of confluence liquid3m
3) The first differential pressure sensor 2 and the second differential pressure sensor 3 are used for respectively measuring the real-time pressure difference value H of the first fluid10And a second fluid H20And input to the console; the console calculates the real-time flow Q of the second fluid through the following formula20
H20=S2Q20 2
Wherein Q is20Is the real-time flow of the second fluid, H20Is a real-time pressure difference of the second fluid, measured by the second differential pressure sensor 3, S2The resistance coefficient and the fixed value of the second pipeline b are obtained in the step 1) of the debugging stage;
4) according to the energy conservation equation and the mass conservation equation, the console obtains the first fluid through the following formula calculationTarget flow rate Q of1m
Q1mh1+Q20h2=Q3mh3m
Q1m+Q20=Q3m
Wherein the content of the first and second substances,
Q1mis the target flow rate of the first fluid, Q20Calculated from step 3) for the real-time flow of the second fluid, Q3mIs the target flow rate of the confluence liquid;
h1is the enthalpy of the first fluid, h2Is the enthalpy of the second fluid, h3mThe target enthalpy value of the confluence liquid is obtained by calculation in the step 2).
5) The console calculates a target resistance coefficient S of the first pipeline through the following formula1m
H10=S1mQ1m 2
Wherein S is1mIs the target drag coefficient of the first conduit, H10Measured as a real-time pressure difference of the first fluid by the first differential pressure sensor 2, Q1mThe target flow rate of the first fluid is calculated in the step 4);
then the console obtains the opening degree of the control valve and the resistance coefficient S of the first pipeline a according to the step 2) in the debugging stage1Functional correspondence between the first and second pipes, target resistance coefficient S of the first pipe a obtained by calculation1mA target opening degree of the control valve 1 is determined.
6) The console controls and adjusts the control valve 1 to reach the target opening obtained in the step 5) in real time, so that the real-time temperature T of the converged liquid is achieved30Accurately reaches the set target temperature T3mWhen the working condition of the pipeline confluence liquid changes, the console automatically calculates and controls the control valve 1 to adjust the opening in real time, so that the temperature T of the confluence liquid30Stably maintained at the target temperature T3mIt is not changed.
It is apparent that the present invention is not limited to the above-described embodiments and various obvious modifications, variations and adaptations, which are made by those skilled in the art, are also included in the scope of the present invention claimed.

Claims (7)

1. A system for controlling the temperature of a liquid flowing in a pipe comprising a first pipe for flowing a first fluid, a second pipe for flowing a second fluid, and a manifold pipe for flowing the fluid out of the pipe, the first pipe and the second pipe being connected downstream of the first pipe and downstream of the second pipe and upstream of the manifold pipe, the system comprising: the control system comprises a console, a control valve, a first differential pressure sensor, a second differential pressure sensor, a first temperature sensor, a second temperature sensor, a third temperature sensor, a first flowmeter and a second flowmeter; the control valve is connected to the first pipeline for regulating the flow of the first fluid, the first differential pressure sensor is connected to the first pipeline and connected in parallel to two ends of the control valve for measuring the pressure difference of the first fluid, the second differential pressure sensor is connected to the second pipeline for measuring the pressure difference of the second fluid, the first temperature sensor is connected to the first pipeline for measuring the temperature of the first fluid, the second temperature sensor is connected to the second pipeline for measuring the temperature of the second fluid, the third temperature sensor is connected to the confluence pipeline for measuring the temperature of the confluence liquid, the first flowmeter is connected to the first pipeline for measuring the flow of the first fluid, and the second flowmeter is connected to the second pipeline, the first differential pressure sensor, the second differential pressure sensor, the first temperature sensor, the second temperature sensor, the third temperature sensor, the first flowmeter and the second flowmeter are respectively connected with the console and used for conveying real-time test data, and the console is connected with the control valve and used for controlling the opening of the control valve so as to adjust the flow of the first fluid and accurately control the temperature of the confluence liquid after confluence.
2. The system of claim 1, wherein the controller is configured to: and the first flow meter and the second flow meter are dismantled after debugging is finished.
3. The system of claim 1, wherein the controller is configured to: the control console is internally provided with a control program in advance.
4. The system of claim 1, wherein the controller is configured to: the control systems with the same number as the pipelines are respectively connected with the pipelines and control the temperature of the confluence liquid of the whole pipeline system.
5. A method for controlling the temperature of a liquid flowing in a pipeline by using the control system of claim 1, comprising the steps of: on the basis of measuring the flow field characteristics of the pipeline, according to the working condition of the liquid before confluence, the flow of the liquid before confluence is automatically calculated and controlled in real time by applying the thermodynamic principle, so that the real-time accurate control of the liquid temperature after the pipeline confluence is realized; the specific content comprises the following steps:
measuring and recording the flow field characteristics of the pipeline in a debugging stage, and obtaining a function corresponding relation between the opening of the control valve and the resistance coefficient of the first pipeline; the method comprises the steps of obtaining a pressure difference value and a temperature of a first fluid and a second fluid before confluence through detection in an operation stage, calculating the opening of a control valve necessary for reaching the target temperature of the confluent liquid after confluence according to a function corresponding relation obtained in a debugging stage, an energy conservation equation and a mass conservation equation, controlling the temperature of the confluent liquid to accurately reach the set target temperature by adjusting the opening of the control valve, and automatically calculating and adjusting the opening of the control valve in real time by a control system when the working condition of the confluent liquid changes so as to keep the temperature of the confluent liquid stable and unchanged.
6. The method for controlling the temperature of liquid merged into a pipe according to claim 5, wherein: the debugging stage comprises the following steps:
1) setting the control valve to a certain opening degree, respectively measuring the flow rate of the first fluid and the flow rate of the second fluid through the first flow meter and the second flow meter, and respectively measuring the pressure difference value of the first fluid and the pressure difference value of the second fluid through the first differential pressure sensor and the second differential pressure sensor; calculating the drag coefficient of the first conduit and the drag coefficient of the second conduit by the following formulas:
S1=Q1 2/H1
S2=Q2 2/H2
wherein the content of the first and second substances,
S1is the drag coefficient, Q, of the first conduit1Is the flow rate of the first fluid, H1Is the pressure difference of the first fluid,
S2is the drag coefficient, Q, of the second conduit2Is the flow rate of the second fluid, H2Is the pressure difference of the second fluid, S2、Q2And H2Are all constant values;
recording the corresponding value of the control valve on the opening degree and the resistance coefficient of the first pipeline and the resistance coefficient of the second pipeline;
2) setting the control valve on different opening degrees, respectively repeating the step 1), obtaining the change of the flow rate and the pressure difference value of the first fluid caused by the change of the opening degree of the control valve, and recording the resistance coefficient of the first pipeline of the control valve under each opening degree, thereby obtaining the functional corresponding relation between the opening degree of the control valve and the resistance coefficient of the first pipeline;
3) and after debugging is completed, the first flow meter and the second flow meter are dismantled.
7. The method for controlling the temperature of liquid merged into a pipe according to claim 6, wherein: the operating phase comprises the steps of:
1) setting a target temperature of the confluence liquid after confluence and inputting the target temperature into the console;
2) respectively measuring the real-time temperature of the first fluid, the real-time temperature of the second fluid and the real-time temperature of the confluence liquid through the first temperature sensor, the second temperature sensor and the third temperature sensor, inputting the measured real-time temperatures into the console, respectively calculating the enthalpy value of the first fluid and the enthalpy value of the second fluid by the console according to the measured real-time temperature of the first fluid and the measured real-time temperature of the second fluid according to the thermodynamic principle, and calculating the target enthalpy value of the confluence liquid according to the target temperature of the confluence liquid set in the step 1);
3) respectively measuring the real-time pressure difference value of the first fluid and the real-time pressure difference value of the second fluid by the first differential pressure sensor and the second differential pressure sensor, and inputting the real-time pressure difference values into the console, wherein the console calculates the real-time flow of the second fluid by the following formula:
H20=S2Q20 2
wherein Q is20Is the real-time flow of the second fluid, H20Is the real-time pressure difference of the second fluid, S2Setting the resistance coefficient of the second pipeline;
4) according to the energy conservation equation and the mass conservation equation, the console calculates the target flow rate of the first fluid through the following formula:
Q1mh1+Q20h2=Q3mh3m
Q1m+Q20=Q3m
wherein the content of the first and second substances,
Q1mis the target flow rate of the first fluid, Q20Is the real-time flow rate, Q, of the second fluid3mIn order to converge the target flow rate of the liquid,
h1is the enthalpy of the first fluid, h2Is the enthalpy of the second fluid, h3mIs the target enthalpy of the sink flow liquid;
5) the console calculates a target resistance coefficient of the first pipeline by the following formula:
H10=S1mQ1m 2
wherein S is1mIs the target drag coefficient of the first conduit, H10Is the real-time pressure difference of the first fluid, Q1mIs the target flow rate of the first fluid,
then the console determines the target opening degree of the control valve according to the calculated target resistance coefficient of the first pipeline according to the function corresponding relation between the opening degree of the control valve and the resistance coefficient of the first pipeline obtained in the step 2) of the debugging stage;
6) and (3) the console controls and adjusts the control valve to reach the target opening degree obtained in the step 5) in real time, so that the real-time temperature of the confluence liquid after confluence accurately reaches the set target temperature, and when the working condition of the pipeline confluence liquid changes, the console automatically calculates and controls the control valve to adjust the opening degree in real time, so that the temperature of the confluence liquid is stably kept constant at the target temperature.
CN201911030573.8A 2019-10-28 2019-10-28 System and method for controlling temperature of pipeline confluence liquid Pending CN110908414A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911030573.8A CN110908414A (en) 2019-10-28 2019-10-28 System and method for controlling temperature of pipeline confluence liquid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911030573.8A CN110908414A (en) 2019-10-28 2019-10-28 System and method for controlling temperature of pipeline confluence liquid

Publications (1)

Publication Number Publication Date
CN110908414A true CN110908414A (en) 2020-03-24

Family

ID=69816178

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911030573.8A Pending CN110908414A (en) 2019-10-28 2019-10-28 System and method for controlling temperature of pipeline confluence liquid

Country Status (1)

Country Link
CN (1) CN110908414A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113268824A (en) * 2021-04-23 2021-08-17 上海卫星工程研究所 Fluid loop numerical simulation method, system and medium based on flow field in temperature control valve
CN117472116A (en) * 2023-12-26 2024-01-30 徐州鸿丰高分子材料有限公司 Intelligent material conveying control system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113268824A (en) * 2021-04-23 2021-08-17 上海卫星工程研究所 Fluid loop numerical simulation method, system and medium based on flow field in temperature control valve
CN117472116A (en) * 2023-12-26 2024-01-30 徐州鸿丰高分子材料有限公司 Intelligent material conveying control system
CN117472116B (en) * 2023-12-26 2024-03-19 徐州鸿丰高分子材料有限公司 Intelligent material conveying control system

Similar Documents

Publication Publication Date Title
TWI420568B (en) Flow ratio controller
JP5564043B2 (en) Method for controlling the gas flow rate between multiple gas streams
CN112304554B (en) Method for improving practicability of characteristic curve of annular gap pressure regulating valve of wind tunnel
CN103307342A (en) Method for determining a fluid flow rate with a fluid control valve
CN103529869A (en) Pressure control means, flow control devices, pressure and flow control method
CN211015169U (en) Control system for temperature of pipeline confluence liquid
CN105247433A (en) Flow volume control device equipped with flow rate monitor
CN110908414A (en) System and method for controlling temperature of pipeline confluence liquid
JP2013156801A5 (en)
CN103900646A (en) Flow operation device and flow control device
JP2020021176A (en) Flow controller
US11592430B2 (en) Method for estimating a combustion characteristic of a gas that may contain dihydrogen
CN204115829U (en) A kind of combine detection system
US11982556B2 (en) Wet gas flow rate metering method based on a coriolis mass flowmeter and device thereof
CN106704163A (en) Water pump frequency conversion speed regulation control method, device and system
CN103674541B (en) A kind of valve for pressure difference performance test methods
JP2008506116A (en) Method and system for flow measurement and mass flow regulator validation
CN104019852A (en) Method for accurately testing feed water flow based on throttling element characteristic coefficient K
CN111103020A (en) Flow detection device, flow control system and flow detection method
CN105067155A (en) Flow test device pressure and flow velocity double closed loop control system
JP5037443B2 (en) Flow control method
CN112444307A (en) Carbon dioxide pipeline flow regulation and differential pressure flowmeter precision testing and calibrating system
CN211476791U (en) Real-time control system for operation efficiency of horizontal high-pressure heater
JPH0132525B2 (en)
CN110940205B (en) Real-time control system and method for operation efficiency of horizontal high-pressure heater

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination