CN110835991A - Construction method for packaging house flue and drainage pipeline - Google Patents

Construction method for packaging house flue and drainage pipeline Download PDF

Info

Publication number
CN110835991A
CN110835991A CN201911197350.0A CN201911197350A CN110835991A CN 110835991 A CN110835991 A CN 110835991A CN 201911197350 A CN201911197350 A CN 201911197350A CN 110835991 A CN110835991 A CN 110835991A
Authority
CN
China
Prior art keywords
keels
vertical
keel
flue
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911197350.0A
Other languages
Chinese (zh)
Inventor
张洪建
聂建芳
陈财
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201911197350.0A priority Critical patent/CN110835991A/en
Publication of CN110835991A publication Critical patent/CN110835991A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/072Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of specially adapted, structured or shaped covering or lining elements
    • E04F13/073Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of specially adapted, structured or shaped covering or lining elements for particular building parts, e.g. corners or columns
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0875Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements having a basic insulating layer and at least one covering layer

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Abstract

The invention discloses a construction method for packaging a residential flue and a drainage pipeline, which comprises the steps of firstly measuring and setting out according to the positions of the flue and the drainage pipeline, and installing a top keel and a bottom keel at the setting-out positions; installing a plurality of vertical keels between the top keel and the bottom keel, laying PE waterproof and moistureproof membranes on two sides of the vertical keels, and filling rock wool in the PE waterproof and moistureproof membranes; and transverse keels are installed between the adjacent vertical keels at intervals along the length direction of the vertical keels, and after the transverse keels are installed, coating plates are laid along the outer vertical surfaces of the vertical keels and the transverse keels. The method overcomes the defects of traditional flue and drainage pipeline encapsulation, is easy to operate, short in construction period, environment-friendly and economical, provides an operation surface and construction conditions for subsequent construction of home decoration, and greatly reduces encapsulation construction cost.

Description

Construction method for packaging house flue and drainage pipeline
Technical Field
The invention relates to a construction method for packaging a residential flue and a drainage pipeline.
Background
Residential kitchens and toilets are usually provided with flues, also called exhaust ducts, ventilation ducts for exhaust gases and fumes, and drainage ducts for waste water discharge, which are usually arranged vertically in the corners of the walls. At home, the flue and drain ducts are often enclosed to improve cleanliness and aesthetics. Generally, most of built walls are sealed by flues and drainage pipelines, bricks are stuck on the surfaces of the walls, and the method has the advantages of more materials, waste of materials, labor consumption and long construction period.
Disclosure of Invention
The technical problem to be solved by the invention is to provide a construction method for packaging the residential flue and the drainage pipeline, the method overcomes the defects of the traditional flue and drainage pipeline packaging, is easy to operate, short in construction period, environment-friendly and economical, provides an operation surface and construction conditions for subsequent construction of home decoration, and greatly reduces packaging construction cost.
In order to solve the technical problem, the construction method for encapsulating the residential flue and the drainage pipeline comprises the following steps:
step one, after the construction of a flue and a drainage pipeline is finished, measuring and paying off are carried out according to an encapsulation design drawing, and a top keel and a bottom keel are installed at the paying off positions;
step two, vertically installing a plurality of vertical keels at intervals between the top keel and the bottom keel, laying PE waterproof and moistureproof membranes on two sides of the vertical keels, and filling rock wool between the PE waterproof and moistureproof membranes;
and step three, installing transverse keels between the adjacent vertical keels at intervals along the length direction of the vertical keels, and laying coating plates along the vertical keels and the outer vertical surfaces of the transverse keels after the transverse keels are installed.
Further, the vertical keel is a 50-type light steel keel.
Furthermore, the joints of the vertical keels and the wall are connected through expansion bolts.
Further, the coating plate is a calcium silicate coating plate, and corners of the calcium silicate coating plate are connected through external corner strips.
The construction method for encapsulating the residential flue and the drainage pipeline adopts the technical scheme that the method firstly measures and lays out according to the positions of the flue and the drainage pipeline, and the top and bottom keels are installed at the laying-out positions; installing a plurality of vertical keels between the top keel and the bottom keel, laying PE waterproof and moistureproof membranes on two sides of the vertical keels, and filling rock wool in the PE waterproof and moistureproof membranes; and transverse keels are installed between the adjacent vertical keels at intervals along the length direction of the vertical keels, and after the transverse keels are installed, coating plates are laid along the outer vertical surfaces of the vertical keels and the transverse keels. The method overcomes the defects of traditional flue and drainage pipeline encapsulation, is easy to operate, short in construction period, environment-friendly and economical, provides an operation surface and construction conditions for subsequent construction of home decoration, and greatly reduces encapsulation construction cost.
Drawings
The invention is described in further detail below with reference to the following figures and embodiments:
FIG. 1 is a schematic view of the construction method for packing the residential flue and the drainage pipeline according to the present invention.
Detailed Description
Embodiment as shown in fig. 1, the construction method for enveloping the residential flue and the drainage pipeline of the invention comprises the following steps:
step one, after the construction of the flue 1 and the drainage pipeline 2 is finished, measuring and paying off are carried out according to an encapsulation design drawing, and a top keel and a bottom keel are installed at paying off positions;
step two, vertically installing a plurality of vertical keels 3 between the top keel and the bottom keel at intervals, laying PE waterproof and moistureproof membranes 4 on two sides of the vertical keels 3, and filling rock wool 5 between the PE waterproof and moistureproof membranes 4;
and step three, installing transverse keels between the adjacent vertical keels 3 at intervals along the length direction of the vertical keels 3, and laying coating plates 6 along the vertical keels 3 and the outer vertical surfaces of the transverse keels after the transverse keels are installed.
Preferably, the vertical keel 3 is a type 50 light steel keel.
Preferably, the joints of the vertical keels 3 and the wall 7 are connected by expansion bolts 8.
Preferably, the coating plate 6 is a calcium silicate coating plate, and corners of the calcium silicate coating plate are connected by using an external corner strip 9.
The present example is a cross-sectional view of the encapsulated structure, and thus the top and transverse keels are not shown.
In the method, the vertical keel is a framework encapsulated by the flue and the drainage pipeline, and the joint of the vertical keel and the wall body is connected by expansion bolts so as to improve the rigidity of the whole framework; the PE waterproof and moistureproof diaphragms on the two sides of the vertical keel play roles in fixing rock wool and preventing water and moisture, and the rock wool is used for heat preservation and sound insulation; the transverse keel is used as a reinforcing rib of the vertical keel and provides support for the coating plate, so that the coating plate is ensured to be reliably laid on the outer vertical surfaces of the vertical keel and the transverse keel.
The method is simple to operate, the construction period is short, the workload and the construction period of the traditional masonry wall construction are greatly reduced, favorable conditions are created for the subsequent home decoration construction, the construction cost is reduced, the used materials are environment-friendly and economical, the generation of construction waste is reduced, and the neatness and the attractiveness of the decoration of residential kitchens and toilets are improved.

Claims (4)

1. A construction method for packaging house flues and drainage pipelines is characterized by comprising the following steps:
step one, after the construction of a flue and a drainage pipeline is finished, measuring and paying off are carried out according to an encapsulation design drawing, and a top keel and a bottom keel are installed at the paying off positions;
step two, vertically installing a plurality of vertical keels at intervals between the top keel and the bottom keel, laying PE waterproof and moistureproof membranes on two sides of the vertical keels, and filling rock wool between the PE waterproof and moistureproof membranes;
and step three, installing transverse keels between the adjacent vertical keels at intervals along the length direction of the vertical keels, and laying coating plates along the vertical keels and the outer vertical surfaces of the transverse keels after the transverse keels are installed.
2. The construction method for residential flue and drain pipe enclosure of claim 1, wherein: the vertical keel is a 50-type light steel keel.
3. The construction method for residential flue and drain pipe enclosure of claim 1, wherein: the joints of the vertical keels and the wall bodies are connected through expansion bolts.
4. The construction method for residential flue and drain pipe enclosure of claim 1, wherein: the coating plate is a calcium silicate coating plate, and corners of the calcium silicate coating plate are connected by adopting an external corner strip.
CN201911197350.0A 2019-11-29 2019-11-29 Construction method for packaging house flue and drainage pipeline Pending CN110835991A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911197350.0A CN110835991A (en) 2019-11-29 2019-11-29 Construction method for packaging house flue and drainage pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911197350.0A CN110835991A (en) 2019-11-29 2019-11-29 Construction method for packaging house flue and drainage pipeline

Publications (1)

Publication Number Publication Date
CN110835991A true CN110835991A (en) 2020-02-25

Family

ID=69577810

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911197350.0A Pending CN110835991A (en) 2019-11-29 2019-11-29 Construction method for packaging house flue and drainage pipeline

Country Status (1)

Country Link
CN (1) CN110835991A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201535039U (en) * 2009-07-03 2010-07-28 浙江杭萧钢构股份有限公司 Outer wall column-wrapped structure
CN102061789A (en) * 2010-12-06 2011-05-18 北京六建集团有限责任公司 Column packing structure of concrete column in clean zone and construction method thereof
CN103603471A (en) * 2013-12-04 2014-02-26 中建一局集团装饰工程有限公司 Sawtooth hanging piece upright post encapsulating device and construction method thereof
CN204510741U (en) * 2015-02-06 2015-07-29 洛阳师范学院 A kind of washroom bag vertical tube structure
US20180328051A1 (en) * 2017-05-15 2018-11-15 Joshua George SINGH System and method for wall panel trim installation
CN209179255U (en) * 2018-10-10 2019-07-30 中建八局第一建设有限公司 A kind of keel partition wall pipeline leakage preventing structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201535039U (en) * 2009-07-03 2010-07-28 浙江杭萧钢构股份有限公司 Outer wall column-wrapped structure
CN102061789A (en) * 2010-12-06 2011-05-18 北京六建集团有限责任公司 Column packing structure of concrete column in clean zone and construction method thereof
CN103603471A (en) * 2013-12-04 2014-02-26 中建一局集团装饰工程有限公司 Sawtooth hanging piece upright post encapsulating device and construction method thereof
CN204510741U (en) * 2015-02-06 2015-07-29 洛阳师范学院 A kind of washroom bag vertical tube structure
US20180328051A1 (en) * 2017-05-15 2018-11-15 Joshua George SINGH System and method for wall panel trim installation
CN209179255U (en) * 2018-10-10 2019-07-30 中建八局第一建设有限公司 A kind of keel partition wall pipeline leakage preventing structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
杨永起: "《建筑防水施工技术》", 30 October 2015 *
邢君: "《建筑结构消防安全基础》", 31 March 2016 *

Similar Documents

Publication Publication Date Title
CN102758509A (en) Horizontal seam waterproof plate of prefabricated exterior wall cladding
CN208918072U (en) Prefabricated outer wall of assembled concrete building optimizes cross seam node structure
CN102409768B (en) Vacuum heat insulation plate installation system and installation method
CN209129176U (en) A kind of assembly concrete building prefabrication exterior wall cross seam node structure
CN202660067U (en) Waterproof sleeve preventing wall body leakage
CN203257005U (en) Exhaust structure of roof
CN111305377A (en) Ultra-low energy consumption building treatment method for assembled steel structure
CN111851595B (en) Basement outer wall post-cast strip steel plate sealing structure and construction method thereof
CN110835991A (en) Construction method for packaging house flue and drainage pipeline
CN210459560U (en) Structure for heat bridge treatment of assembled passive room and assembled passive room
CN210263453U (en) Precast concrete externally-hung wallboard structure bottom drainage structures
CN216041748U (en) Rural box integrally assembled building
CN211775777U (en) A waterproof embedded structure for exhaust passage
CN211900255U (en) Window structure that wafts of building
CN109057076B (en) Assembled combined energy-saving wall body capable of replacing phase-change materials and manufacturing and mounting method
CN209874144U (en) Evaporate and press aerated concrete embedded wallboard structure
CN202208977U (en) Vacuum insulating board installing system
CN208056620U (en) Modularization is without heat bridge Self-insulation wall plate
CN219794255U (en) Waterproof construction between prefabricated wall body
CN217204251U (en) Piping lane ditch reinforced structure
CN204112670U (en) The ventilating shaft that do not leak out in a kind of building
CN219604770U (en) Building construction pipeline encapsulation structure
CN204876309U (en) Take prefabricated wallboard of water -proof type of door opening
CN218990548U (en) Dry-wet combined secondary wall structure
CN210291120U (en) Silencing pipe wrapping structure for sewer pipe

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200225