CN110805460A - Waterproof sealing method for bolt hole of shield tunnel segment - Google Patents

Waterproof sealing method for bolt hole of shield tunnel segment Download PDF

Info

Publication number
CN110805460A
CN110805460A CN201910957773.1A CN201910957773A CN110805460A CN 110805460 A CN110805460 A CN 110805460A CN 201910957773 A CN201910957773 A CN 201910957773A CN 110805460 A CN110805460 A CN 110805460A
Authority
CN
China
Prior art keywords
sealing
bolt
bolt hole
gasket
shield
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910957773.1A
Other languages
Chinese (zh)
Inventor
丁超
张稳军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Frontier Technology Research Institute of Tianjin University Co Ltd
Original Assignee
Frontier Technology Research Institute of Tianjin University Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Frontier Technology Research Institute of Tianjin University Co Ltd filed Critical Frontier Technology Research Institute of Tianjin University Co Ltd
Priority to CN201910957773.1A priority Critical patent/CN110805460A/en
Publication of CN110805460A publication Critical patent/CN110805460A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/381Setting apparatus or devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/385Sealing means positioned between adjacent lining members
    • E21D11/386Sealing means positioned between adjacent lining members inflatable sealing means

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention relates to a waterproof sealing method for bolt holes of a shield tunnel segment, which comprises the following steps: (1) slotting the bolt position of the shield segment, and roughening the inner wall of the sealing groove; (2) coating the sealing glue on the gasket thread surface on the outer side wall of the bolt hole sealing gasket, leading the sealing glue into the sealing groove and buckling the sealing groove; (3) bolts penetrate through the inner wall surfaces of the bolt hole sealing gaskets on the two sides between the shield segments; (4) and (5) jacking the end face of the bolt hole of the shield segment by using a nut.

Description

Waterproof sealing method for bolt hole of shield tunnel segment
Technical Field
The invention relates to the technical field of shield tunnel waterproofing, in particular to a waterproof sealing method for bolt holes of a shield tunnel segment.
Background
With the development of urbanization, underground spaces such as urban underground traffic, urban pipe corridors and the like are increasingly developed. Wherein shield tunnel obtains extensive application in underground space construction, and shield tunnel is by the assembled structure that section of jurisdiction and connecting bolt constitute, therefore there are transversal joint and longitudinal joint in the shaping pipe ring, when section of jurisdiction seam emergence infiltration, causes very big threat to the security of tunnel segment structure.
At present, a shield tunnel segment seam waterproof system mainly comprises two aspects: 1. a single-channel or double-channel sealing gasket waterproof system, and a segment caulking waterproof system. Wherein, sealed waterproof system of filling up mainly comprises seal groove and sealed the pad, and sealed waterproof ability is mainly greater than outside design water pressure through waterproof sealing pad compressive contact stress and judges, and when the section of jurisdiction seam takes place to open wrong platform or sealed ageing to lead to sealed pad contact stress can't satisfy design water pressure, then sealed waterproof system of filling up became invalid. The segment caulking waterproof system consists of a segment caulking groove and a sealing material, wherein the segment caulking groove is a notch formed in the inner edge of the segment, and the sealing material, such as unformed building sealant or a formed ethylene propylene diene monomer synthetic sealing element and the like, is filled in the notch, so that the water stopping and draining effects of the segment caulking are realized.
Above-mentioned shield tunnel waterproof system lacks the design to section of jurisdiction seam bolt hole stagnant water, and when section of jurisdiction seam sealed pad waterproof system became invalid, the infiltration leads to the tunnel to take place the infiltration problem along section of jurisdiction seam face inflow bolt hole to according to the statistics of the phenomenon of seeping water during tunnel operation, the discovery bolt hole position has the route of seeping water. Therefore, the engineering field needs to solve the problem of water seepage of the bolt holes of the shield tunnel segment.
Disclosure of Invention
The invention aims to solve the technical problem of water seepage of bolt holes of the existing shield tunnel segment and provide a novel method for sealing the bolt holes of the shield tunnel. In order to achieve the purpose, the invention adopts the technical scheme that:
a waterproof sealing method for bolt holes of a shield tunnel duct piece is characterized in that adopted sealing elements comprise two parts, namely a bolt hole sealing washer 1 and a sealing groove 2, the bolt hole sealing washer 1 comprises a water-swelling rubber part positioned in the middle and an ethylene propylene diene monomer part positioned at the periphery, a gasket hole 10 is reserved in the middle of the water-swelling rubber part, the size of the gasket hole 10 is matched with the diameter of a bolt 3, and the gasket hole 10 is guaranteed to be completely attached to the wall surface of the bolt 3; the sealing groove 2 is grooved at the position of the bolt 3 of the shield segment 5; the outer side wall of the bolt hole sealing washer 1 is distributed with washer threads 11, and the sealing method comprises the following steps:
(1) slotting the bolt position of the shield segment, and roughening the inner wall of the sealing groove;
(2) coating the sealing glue on the gasket thread surface on the outer side wall of the bolt hole sealing gasket, leading the sealing glue into the sealing groove and buckling the sealing groove;
(3) bolts penetrate through the inner wall surfaces of the bolt hole sealing gaskets on the two sides between the shield segments;
(4) and (5) jacking the end face of the bolt hole of the shield segment by using a nut.
Through the above description, the beneficial effects of the present invention are embodied in:
1. the waterproof and anti-seepage performance is good;
2. the bonding quality of the gasket is reliable;
3. the operability is good.
Drawings
FIG. 1 is a schematic view of a bolt hole waterproof sealing method according to the present invention;
FIG. 2 is a cross-sectional view of a bolt hole gasket according to a waterproof bolt hole sealing method of the present invention;
FIG. 3 is a side view of a bolt hole gasket according to a method of waterproof sealing of bolt holes of the present invention;
FIG. 4 is a top view of a bolt hole gasket according to the method of waterproof sealing of bolt holes of the present invention;
FIGS. 1 to 4 include:
1-bolt hole sealing washer
2-sealing groove
3-bolt
4-nut
5-tunnel segment
6-gasket
7-caulking
8-Water swellable rubber
9-ethylene propylene diene monomer
10-gasket hole
11-washer thread
Detailed Description
The invention is described in detail below with reference to the figures and the specific embodiments. The present embodiment is implemented on the premise of the technical solution of the present invention, and a detailed implementation manner and a specific operation process are given, but the scope of the present invention is not limited to the following embodiments.
The invention will now be further elucidated with reference to the drawings described above.
The invention discloses a waterproof sealing method for a shield tunnel bolt hole, which comprises the following steps:
(1) slotting the position of the bolt 3 of the shield segment 5, and roughening the inner wall of the sealing groove 2;
(2) coating the gasket thread 11 surface on the outer side wall of the bolt hole sealing gasket 1 with a sealing glue, and leading the sealing glue into the sealing groove 2 and buckling the sealing groove 2;
(3) bolts 3 penetrate through the inner wall surfaces of the bolt hole sealing gaskets 1 on two sides between the shield segments 5;
(4) and (5) tightly jacking the end face of the bolt hole of the shield segment by using a nut 4.
As shown in fig. 1, when the bolt hole sealing gasket 1 is used in the present invention, the waterproof system for the joint of the tunnel segment 5 includes a gasket waterproof system mainly including a gasket 6, a bolt hole waterproof system mainly including the bolt hole sealing gasket 1, and a caulking waterproof system mainly including a caulking 7. Wherein novel shield tunnel bolt hole waterproof sealing device mainly comprises bolt hole seal ring 1 and seal groove 2, bolt hole seal ring 1 pastes on seal groove 2 surface at sealed gluey brute force, and when section of jurisdiction hand hole department construction bolt, bolt 3 passes the gasket hole 10 of bolt hole waterproof system, is fastening through nut 4 and realizes the connection between the section of jurisdiction. The design size of the bolt hole sealing washer 1 corresponds to the diameter of the bolt, so that the design size is not limited to the case, and the size suitable for actual project engineering can be determined according to actual engineering and construction site conditions.
As shown in figures 2 and 4, the bolt hole sealing washer 1 in the novel waterproof sealing device for the shield tunnel bolt hole is composed of water-swelling rubber 8 and ethylene propylene diene monomer 9, the water-swelling rubber 8 and the ethylene propylene diene monomer 9 are extruded and formed through a microwave vulcanization technology, a washer hole 10 is reserved in the middle of the bolt hole sealing washer 1, and the size of the washer hole 10 corresponds to the diameter of the bolt 3. Bolt hole seal ring 1 thickness is a little higher than 2 heights of seal groove, and bolt hole seal ring 1 compression is in seal groove 2 after tunnel segment 5 is assembled, helps strengthening bolt hole local rigidity on the one hand, and on the other hand is of value to the waterproof ability who proposes bolt hole seal ring 1 contact surface. When the sealing gasket 6 is in water-proof failure, seepage water flows through the gasket hole 10, and the water-swelling rubber 8 expands to increase the contact stress with the wall surface of the bolt 3, so that the water-proof effect is achieved.
The outside of the bolt hole sealing washer 1 is distributed with washer threads 11, such as the side view of the bolt hole sealing washer 1 shown in fig. 2, the gluing area of the side wall of the bolt hole sealing washer 1 and the sealing groove 2 is mainly increased by increasing the washer threads 11, the bolt hole sealing washer 1 is separated when the bolt 3 is not installed, and in addition, the water seepage of the outside contact surface of the bolt hole sealing washer 1 is prevented.

Claims (1)

1. A waterproof sealing method for bolt holes of a shield tunnel duct piece is characterized in that adopted sealing elements comprise two parts, namely a bolt hole sealing washer (1) and a sealing groove (2), the bolt hole sealing washer (1) comprises a water-swelling rubber part positioned in the middle and an ethylene propylene diene monomer part positioned at the periphery, a gasket hole (10) is reserved in the middle of the water-swelling rubber part, the size of the gasket hole (10) is matched with the diameter of a bolt (3), and the gasket hole (10) is guaranteed to be completely attached to the wall surface of the bolt (3); the sealing groove (2) is grooved at the position of the bolt (3) of the shield segment (5); and gasket threads (11) are distributed on the outer side wall of the bolt hole sealing gasket (1). The sealing method comprises the following steps:
(1) slotting the bolt position of the shield segment, and roughening the inner wall of the sealing groove;
(2) coating the sealing glue on the gasket thread surface on the outer side wall of the bolt hole sealing gasket, leading the sealing glue into the sealing groove and buckling the sealing groove;
(3) bolts penetrate through the inner wall surfaces of the bolt hole sealing gaskets on the two sides between the shield segments;
(4) and (5) jacking the end face of the bolt hole of the shield segment by using a nut.
CN201910957773.1A 2019-10-10 2019-10-10 Waterproof sealing method for bolt hole of shield tunnel segment Pending CN110805460A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910957773.1A CN110805460A (en) 2019-10-10 2019-10-10 Waterproof sealing method for bolt hole of shield tunnel segment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910957773.1A CN110805460A (en) 2019-10-10 2019-10-10 Waterproof sealing method for bolt hole of shield tunnel segment

Publications (1)

Publication Number Publication Date
CN110805460A true CN110805460A (en) 2020-02-18

Family

ID=69488133

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910957773.1A Pending CN110805460A (en) 2019-10-10 2019-10-10 Waterproof sealing method for bolt hole of shield tunnel segment

Country Status (1)

Country Link
CN (1) CN110805460A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112761681A (en) * 2021-02-04 2021-05-07 西南交通大学 Bolt hole waterproof structure of high-head shield tunnel segment
CN112761683A (en) * 2021-02-04 2021-05-07 西南交通大学 Inclined bolt hole waterproof structure of high-water-head shield tunnel segment

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01263389A (en) * 1988-04-13 1989-10-19 Yoshiaki Nakajima Water stop structure and execution thereof
JP2002030892A (en) * 2000-07-13 2002-01-31 Ohbayashi Corp Segment
CN203856484U (en) * 2014-05-23 2014-10-01 常州工程职业技术学院 Tunnel segment sealing structure
CN205578004U (en) * 2016-01-28 2016-09-14 杭州建工建材有限公司 Tunnel segment connection structure of high strength
CN106121688A (en) * 2016-08-23 2016-11-16 中铁第四勘察设计院集团有限公司 A kind of shield tunnel segment bolt hole water proof structure and construction method
CN208750002U (en) * 2018-05-29 2019-04-16 浙江神州科技化工有限公司 A kind of elastic rubber gasket
CN110185468A (en) * 2019-07-05 2019-08-30 东北大学 A kind of duct pieces of shield tunnel contact surface bolt hole package water-tight device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01263389A (en) * 1988-04-13 1989-10-19 Yoshiaki Nakajima Water stop structure and execution thereof
JP2002030892A (en) * 2000-07-13 2002-01-31 Ohbayashi Corp Segment
CN203856484U (en) * 2014-05-23 2014-10-01 常州工程职业技术学院 Tunnel segment sealing structure
CN205578004U (en) * 2016-01-28 2016-09-14 杭州建工建材有限公司 Tunnel segment connection structure of high strength
CN106121688A (en) * 2016-08-23 2016-11-16 中铁第四勘察设计院集团有限公司 A kind of shield tunnel segment bolt hole water proof structure and construction method
CN208750002U (en) * 2018-05-29 2019-04-16 浙江神州科技化工有限公司 A kind of elastic rubber gasket
CN110185468A (en) * 2019-07-05 2019-08-30 东北大学 A kind of duct pieces of shield tunnel contact surface bolt hole package water-tight device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112761681A (en) * 2021-02-04 2021-05-07 西南交通大学 Bolt hole waterproof structure of high-head shield tunnel segment
CN112761683A (en) * 2021-02-04 2021-05-07 西南交通大学 Inclined bolt hole waterproof structure of high-water-head shield tunnel segment
CN112761681B (en) * 2021-02-04 2022-04-22 西南交通大学 Bolt hole waterproof structure of high-head shield tunnel segment

Similar Documents

Publication Publication Date Title
CN201606084U (en) Waterproof structure of shield-structured tunnel segment
CN110805460A (en) Waterproof sealing method for bolt hole of shield tunnel segment
CN110159318B (en) Shield tunnel composite waterproof structure
CN110453650A (en) A kind of aqueduct water sealing structure and its construction method
CN211201990U (en) Waterproof sealing device for bolt hole of shield tunnel segment
CN112761683A (en) Inclined bolt hole waterproof structure of high-water-head shield tunnel segment
CN109183847B (en) Underground prefabricated pipe gallery
CN209958531U (en) Deformation joint leakage repairing structure
CN218386642U (en) Wall-penetrating waterproof structure of cable well
CN216766248U (en) Sealing device for outer wall plate gap of prefabricated building
CN112761681B (en) Bolt hole waterproof structure of high-head shield tunnel segment
CN206143936U (en) Basement outer wall post -cast strip shutoff waterproof construction
CN210196712U (en) Sealing assembly and gas sleeve
CN215332885U (en) Shield tunnel pipe circumferential weld seal structure
CN215522283U (en) Piping lane seal structure
CN112459133A (en) Waterproof structure and waterproof method for settlement joint of pipe gallery water delivery culvert
CN218581622U (en) Electric power push pipe coupling waterproof construction
CN216198167U (en) Shield constructs section of jurisdiction bolt hole waterproof construction
CN104975686A (en) Waterproof node structure of air pipe concrete discharge structure cave entrance and construction method of waterproof node structure
CN220623178U (en) PVC drain pipe convenient to equipment
CN209875939U (en) Bellows type diaphragm seal
CN219100349U (en) Water-stopping and seepage-proofing structure for decoration engineering construction
CN210194694U (en) Water stopping groove
CN218479828U (en) Middle-buried composite water stop
CN214695228U (en) Culvert system for urban built-up area

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20200218