CN110805409A - Expansion pipe plugging method based on repeated fracturing cased well - Google Patents

Expansion pipe plugging method based on repeated fracturing cased well Download PDF

Info

Publication number
CN110805409A
CN110805409A CN201910629079.7A CN201910629079A CN110805409A CN 110805409 A CN110805409 A CN 110805409A CN 201910629079 A CN201910629079 A CN 201910629079A CN 110805409 A CN110805409 A CN 110805409A
Authority
CN
China
Prior art keywords
pipe
expansion
casing
section
original
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910629079.7A
Other languages
Chinese (zh)
Inventor
赵涛
齐月魁
祝效华
石昌帅
易博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
Dagang Oilfield Group Co Ltd
Original Assignee
Dagang Oilfield Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dagang Oilfield Group Co Ltd filed Critical Dagang Oilfield Group Co Ltd
Priority to CN201910629079.7A priority Critical patent/CN110805409A/en
Publication of CN110805409A publication Critical patent/CN110805409A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/12Packers; Plugs
    • E21B33/127Packers; Plugs with inflatable sleeve
    • E21B33/1277Packers; Plugs with inflatable sleeve characterised by the construction or fixation of the sleeve
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B37/00Methods or apparatus for cleaning boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses an expansion pipe plugging method based on a repeated fracturing cased well, which comprises the following steps: firstly, detecting and positioning an oil well casing (10) of an oil well in a rock stratum (1) and cleaning the inner wall of the oil well casing (10); secondly, correspondingly lowering the expansion pipe (4) and a matched expansion system to the position of the casing pipe of the original perforation section; thirdly, a cement truck connected with the ground is prepared to carry out expansion construction on the original perforation section casing pipe needing to be plugged through an expansion pipe (4); and fourthly, starting the expansion pipe (4) to perform expansion construction, and realizing plugging operation on the casing pipe of the original perforation section. The invention discloses an expansion pipe plugging method based on a repeated fracturing cased well, which can make up for the defects of the conventional fracturing temporary plugging agent, save cost, increase economic benefit, reduce fracturing construction risk and has great production practice significance.

Description

Expansion pipe plugging method based on repeated fracturing cased well
Technical Field
The invention relates to the technical field of petroleum and natural gas industry and mechanical engineering, in particular to an expansion pipe plugging method based on a repeated fracturing cased well.
Background
With the continuous progress of the modern petroleum industry, the petroleum exploitation realizes important breakthrough in process technology, and at present, the fracturing technology of an oil well plays an important role in the process of petroleum production operation for many years, and has an obvious effect of improving the exploitation efficiency of an oil field.
Along with the continuous deepening of the oil and gas reservoir development process, the stratum permeability is gradually reduced along with the development time, so that the oil yield of the oil well after the primary fracturing is continuously reduced, and the oil field yield is severely restricted.
The repeated fracturing is an effective method for solving three problems of low yield, low efficiency, low permeability and the like of an oil field at present, and is also a key means for increasing the yield of a single well, ensuring the stable yield of the oil field and improving the economic benefit of the low permeability oil field. In addition, the repeated fracturing process has obvious effect on the yield increase of the fractured old well. In the repeated fracturing technology, the performance parameters of the fracturing temporary plugging agent play a decisive role in the success of repeated fracturing construction. The fracturing temporary plugging agent is a material for temporarily plugging old fractures, and the design of the temporary plugging agent needs to be designed by combining a target stratum structure, so that the temporary plugging agent has the defects of high cost, low applicability and the like.
In view of the characteristics of high cost, large use risk and no universal applicability of the conventional fracturing temporary plugging agent, a new plugging mode is urgently needed to be developed, so that the defects of the conventional fracturing temporary plugging agent can be overcome, the cost is saved, the economic benefit is increased, and the fracturing construction risk is reduced.
Disclosure of Invention
The invention aims to provide an expansion pipe plugging method based on a repeated fracturing cased well, aiming at the technical defects in the prior art.
Therefore, the invention provides an expansion pipe plugging method based on a repeated fracturing cased well, which comprises the following steps:
firstly, detecting and positioning an oil well casing in a rock stratum, wherein the oil well casing is provided with an original perforation section casing, and cleaning the inner wall of the oil well casing;
secondly, correspondingly lowering the expansion pipe and a matched expansion system to the position of the casing pipe of the original perforation section;
thirdly, connecting a cement truck on the ground, and preparing to perform expansion construction on the original perforation section casing pipe to be plugged through an expansion pipe;
and fourthly, starting the expansion pipe to perform expansion construction, and realizing plugging operation on the casing pipe of the original perforation section.
In the first step, a caliper is adopted to measure the position of a casing pipe of a primary perforation section in an oil well;
the original perforation section casing is an oil well casing part with an original perforation as a center and a first distance preset up and down.
The method comprises the following steps of scraping the oil well casing in the range of a preset original perforation cleaning well section for multiple times by adopting a mode of lowering an external thickened oil pipe, so as to clean the inner wall of the oil well casing;
the preset original perforation cleaning well section is an oil well casing part with an original perforation as a center and with a second distance from top to bottom.
The method comprises the following steps that a conical mill shoe is lowered and an oil pipe is externally thickened, so that the oil well casing in the range of a preset original perforation cleaning well section is scraped for multiple times, and the inner wall of the oil well casing is cleaned;
the preset original perforation cleaning well section is an oil well casing part with an original perforation as a center and with a second distance from top to bottom.
Wherein, in the first step, still include the pressure testing step, specifically be:
after the inner wall of the oil well casing is cleaned, the pressure test is carried out on the external thickened oil pipe column through ball throwing, the test pressure is 45MPa, and when the pressure is not reduced after the pressure is stabilized for 30min, the internal pressure resistance of the external thickened oil pipe is judged to be qualified.
And in the second step, after the expansion pipe and a matched expansion system are installed at the position of the casing pipe of the original perforation section, a fixed anchor and a movable anchor are installed on the expansion pipe, meanwhile, the expansion pipe column is placed while being connected, and after all the expansion pipe columns are connected, the expansion pipe column is magnetically positioned.
And in the third step, before the expansion pipe formally begins to expand, checking whether the oil pipe in the oil well casing is full of water, if not, quickly pumping water to the oil pipe in the oil well casing through the pressure pump, and exhausting air in the oil pipe.
And in the fourth step, the expansion pipe directly faces the casing pipe of the original perforation section to perform expansion action.
Wherein, after the fourth step, the following steps are further included:
fifthly, after the expansion construction is finished, carrying out pressure test on the original perforated section casing pipe, and judging whether the expansion plugging operation on the original perforated section casing pipe is qualified or not;
and sixthly, when the expansion plugging operation of the casing pipe of the original perforation section is qualified, continuing fracturing operation on the new position of the oil well to obtain a new fractured well section position with new cracks, and perforating the new fractured well section position to obtain new perforations.
In the fifth step, after expansion construction of the expansion pipe is completed, pressure testing is carried out on the original perforation section casing pipe needing to be plugged for 60MPa, and when pressure stabilizing is carried out for 30min and the pressure drop is smaller than 1MPa, the expansion plugging operation on the original perforation section casing pipe is judged to be qualified.
Compared with the prior art, the technical scheme provided by the invention has the advantages that the expansion pipe plugging method based on the repeated fracturing cased well can make up for the defects of the conventional fracturing temporary plugging agent, saves the cost, increases the economic benefit, reduces the fracturing construction risk and has great production practice significance.
Drawings
FIG. 1 is a flow chart of an expansion pipe plugging method based on a re-fractured cased well according to the present invention;
FIG. 2 is a schematic diagram of the present invention in cleaning the well wall of an oil well and locating the original perforation position;
FIG. 3 is a schematic view of the present invention in the installation and accurate positioning of an expansion vessel;
FIG. 4 is a schematic diagram of the expansion construction of the expansion pipe and the position of a new perforation according to the invention;
FIG. 5 is a schematic view of the present invention in a fracturing operation;
in the figure: 1. rock stratum, 2. old crack, 3 casing well, 4. expansion pipe, 5. new perforation, 6. new crack;
10. oil well sleeve, 20. original perforation;
Detailed Description
In order that those skilled in the art will better understand the technical solution of the present invention, the following detailed description of the present invention is provided in conjunction with the accompanying drawings and embodiments.
Referring to fig. 1 to 5, the invention provides an expansion pipe plugging method based on a re-fractured cased well, which comprises the following steps:
firstly, detecting and positioning an oil well casing 10 of an oil well in a rock stratum 1 at an original perforation (namely fracturing perforation) section, and cleaning the inner wall of the oil well casing 10 (namely cleaning the wall of the oil well and washing the well);
secondly, correspondingly lowering the expansion pipe 4 and a matched expansion system to the position of the casing of the original perforation section, and referring to fig. 3;
thirdly, a cement truck connected with the ground is prepared to carry out expansion construction on the original perforation section casing pipe (namely the plugging section casing pipe) to be plugged through an expansion pipe 4,
and fourthly, starting the expansion pipe 4 to perform expansion construction, and realizing plugging operation on the casing pipe of the original perforation section.
In the first step, in particular, a caliper is used to measure the position of the casing of the original perforation interval in the well, preferably the portion of the well casing (10) centered at the original perforation 20 and having a first distance (e.g. 5 meters) above and below. In which, the old crack 2 formed by the existing fracturing process is arranged beside the original perforation 20, as shown in fig. 2, so that the inner diameter variation and the accurate position of the casing at the original perforation section can be checked by logging to determine the specification of the expansion pipe and the thickness of the rubber ring, thereby increasing the success rate of expansion.
It should be noted that, for an oil well, the cementing string includes an oil well casing 10, the oil well casing 10 has an oil pipe therein, and an annular space between the oil pipe and the casing is an oil casing annulus.
In the first step, in the concrete implementation, the oil well casing 10 in the range of the preset original perforation cleaning well section is scraped for many times by adopting a mode of lowering an external thickened oil pipe, so that the inner wall (namely the wall of the oil well) of the oil well casing 10 is cleaned, and the inner wall of the casing of the plugging section (namely the patching section) in the oil well is ensured to be clean and have no dead angle;
the pre-set original perforation clean-out interval is preferably a portion of the well casing (10) that is pre-set a second distance (e.g., 10 meters) above and below the original perforation 20, the second distance being greater than the first distance.
In the first step, in the concrete implementation, the mode of lowering a conical mill and externally thickening an oil pipe can be adopted to scrape the oil well casing 10 within the range of the preset original perforation cleaning well section for many times, so that the inner wall of the oil well casing 10 (namely the wall of the oil well) is cleaned, and the inner wall of the casing of the plugging section (namely the patching section) in the oil well is ensured to be clean and have no dead angle;
the pre-set original perforation clean-out interval is preferably a portion of the well casing (10) that is pre-set a second distance (e.g., 10 meters) above and below the original perforation 20, the second distance being greater than the first distance.
In the first step, in concrete realization, still include the pressure testing step, specifically be:
after the inner wall of the oil well casing 10 is cleaned (namely, the well is cleaned), the externally thickened oil pipe column is subjected to pressure test by ball throwing, the test pressure is 45MPa, and when the pressure is stabilized for 30min and does not drop, the internal pressure resistance of the externally thickened oil pipe is judged to be qualified. It should be noted that this step is to ensure that the internal pressure resistance of the tubing is greater than the pressure required for expansion, thereby ensuring success rate.
In the second step, in the concrete realization, in former perforation section sleeve pipe position, with the inflation pipe and supporting expansion system installation back, install fixed anchor and movable anchor on the inflation pipe, simultaneously, the side is connected and is transferred the inflation pipe post, waits to connect whole inflation pipe posts after, carries out the magnetism location to the inflation pipe post.
It should be noted that, for the present invention, the expansion pipe and the matched expansion system may be any one of the common oil expansion pipes and matched expansion systems in the field of oil development, and the expansion pipe and the matched expansion system can only be driven by hydraulic or mechanical means to increase the diameter of the expansion pipe, which is the prior art and is not specifically described. For example, the expansion pipe and the matched expansion system which are produced by Huading hongji oil engineering technology (Beijing) and applied to oil field development can be adopted. Of course, other technically mature expansion pipes and matched expansion systems produced by other manufacturers can also be adopted.
In the present invention, it should be noted that in the expansion pipe and the expansion system, the fixed anchor is immovable and fixed on the oil pipe, and mainly functions to limit the axial displacement of the expansion pipe when the expansion pipe is expanded in the first stroke. The movable anchor is movable as the name suggests, and the main function is that when lifting the oil pipe, the movable anchor can not move along with the oil pipe and always keeps being connected with the expansion pipe, and after the first stroke is finished, the movable anchor has the same function as the fixed anchor and limits the axial movement of the expansion pipe.
It should be noted that the fixed anchor and the movable anchor are common devices used in conjunction with an expansion pipe, which is the prior art and is not specifically described.
In the third step, before the expansion pipe formally begins to expand, whether the oil pipe in the oil well casing 10 is full of water is checked, and if not, the oil pipe in the oil well casing 10 is rapidly pumped with water through the pressure pump to exhaust the air in the oil pipe.
In the present invention, the concrete implementation is that in the fourth step, the expansion tube 4 is expanded against the casing of the original perforation section, for example, in the direction of the arrow shown in fig. 4.
It should be noted that, as shown in fig. 4 and 5, the pressure P1 is the pressure required for expanding the expansion tube 4, and the pressure P2 is the pressure required for fracturing. After the P1 pressure is installed and accurately positioned, the pressure P1 is used for driving an expansion cone in an existing expansion pipe matched expansion system to move axially along the pipe diameter for expansion. When the pressure P2 is pressure, new seam making is carried out on the rock stratum to form a new oil path, and the pressure P2 is generally more than 60 MPa.
In a specific implementation of the present invention, after the fourth step, the method further includes the following steps:
fifthly, after the expansion construction is finished, carrying out pressure test on the original perforated section casing pipe (namely the plugging section casing pipe), and judging whether the expansion plugging operation on the original perforated section casing pipe is qualified or not;
and sixthly, when the expansion plugging operation of the casing pipe of the original perforation section is qualified, continuing fracturing operation (namely, carrying out repeated fracturing process) on the new position of the oil well to obtain a new fractured well section position with a new crack 6, perforating the new fractured well section position to obtain a new perforation 5, namely, repeatedly carrying out the fracturing perforation process. See fig. 4 and 5
In the fifth step, specifically, after the expansion construction of the expansion pipe is completed, the pressure of the casing pipe at the original perforation section to be plugged (namely, the casing pipe at the plugging section) is tested for 60MPa, and when the pressure is stabilized for 30min and the pressure drop is less than 1MPa, the expansion plugging operation of the original perforation section is judged to be qualified.
In particular, the pressure test can be performed on the casing of the original perforation section of the oil well casing 1 in a ball throwing mode.
In the sixth step, specifically, after the fracturing pressure is met, perforating is performed on the new fracturing position, and a repeated fracturing process is performed.
In the present invention, it is to be noted that, in the oil drilling and completion, the oil bed (rock bed) is perforated by using the existing perforating gun.
It should be noted that in the field of oil development, fracturing refers to a method for forming a fracture in an oil and gas layer by using the hydraulic action in the process of oil or gas production, and a fracturing process is a common oil development method and comprises various fracturing methods such as packer separate-layer fracturing, flow-limiting method separate-layer fracturing, plugging ball selective fracturing and the like.
Based on the technical scheme, the invention is an expansion pipe plugging technology based on a repeated fracturing cased well, and the original perforation is plugged by an external rubber ring of the expansion pipe in the fracturing well, so that the perforation and fracturing processes are carried out at a new position. The main process is that the pipe is put to a preset position (namely the position corresponding to the original perforation) and then expanded, perforation is carried out at the new fracturing position, and then the fracturing process is carried out.
Therefore, based on the above expression, compared with the prior art, the expansion pipe plugging method based on the repeated fracturing cased well provided by the invention can make up for the defects of the existing fracturing temporary plugging agent, save the cost, increase the economic benefit, reduce the fracturing construction risk and has great production practice significance.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, various modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.

Claims (10)

1. An expansion pipe plugging method based on a repeated fracturing cased well is characterized by comprising the following steps:
firstly, detecting and positioning an oil well casing (10) of an oil well in a rock stratum (1) and cleaning the inner wall of the oil well casing (10);
secondly, correspondingly lowering the expansion pipe (4) and a matched expansion system to the position of the casing pipe of the original perforation section;
thirdly, a cement truck connected with the ground is prepared to carry out expansion construction on the original perforation section casing pipe needing to be plugged through an expansion pipe (4);
and fourthly, starting the expansion pipe (4) to perform expansion construction, and realizing plugging operation on the casing pipe of the original perforation section.
2. The method of claim 1, wherein in the first step, a caliper is used to measure the position of the casing in the original wellbore section in the well;
the original perforation section casing is an oil well casing (10) part which takes an original perforation (20) as a center and is preset with a first distance from top to bottom.
3. The method of claim 1, characterized in that the inner wall of the well casing (10) is cleaned by scraping the well casing (10) several times within the preset original perforation cleaning interval by lowering the external thickened tubing;
the preset original perforation cleaning well section is an oil well casing (10) part which takes the original perforation (20) as the center and is preset with a second distance from top to bottom.
4. The method of claim 1, characterized in that the inner wall of the well casing (10) is cleaned by scraping the well casing (10) several times within a predetermined original perforation cleaning interval by lowering a conical mill and an external heavy tubing;
the preset original perforation cleaning well section is an oil well casing (10) part which takes the original perforation (20) as the center and is preset with a second distance from top to bottom.
5. The method according to claim 1, characterized in that in the first step, it further comprises a pressure test step, in particular:
after the inner wall of the oil well casing (10) is cleaned, the pressure test is carried out on the external thickened oil pipe column through ball throwing, the test pressure is 45MPa, and when the pressure is not reduced after the pressure is stabilized for 30min, the internal pressure resistance of the external thickened oil pipe is judged to be qualified.
6. The method of claim 1, wherein in the second step, after the expansion pipe and the associated expansion system are installed at the casing position of the original perforation section, the fixed type anchor and the movable type anchor are installed on the expansion pipe, and simultaneously, the expansion pipe string is lowered while being connected, and after the expansion pipe string is connected in its entirety, the expansion pipe string is magnetically positioned.
7. A method according to claim 1, characterized in that in the third step, before the expansion of the expanded pipe has formally started, it is checked whether the oil pipe in the well casing (10) is full of water, and if not, the oil pipe in the well casing (10) is rapidly pumped by means of a pressure pump and the air in the oil pipe is exhausted.
8. A method according to claim 1, characterized in that in the fourth step the expansion vessel (4) is expanded against the casing of the original perforation interval.
9. The method of claim 1, further comprising, after the fourth step, the steps of:
fifthly, after the expansion construction is finished, carrying out pressure test on the original perforated section casing pipe, and judging whether the expansion plugging operation on the original perforated section casing pipe is qualified or not;
and sixthly, when the expansion plugging operation of the casing pipe of the original perforation section is qualified, continuing fracturing operation on the new position of the oil well to obtain a new fractured well section position with a new crack (6), and perforating the new fractured well section position to obtain a new perforation (5).
10. The method as claimed in claim 9, wherein in the fifth step, after the expansion construction of the expansion pipe is completed, the pressure of the casing pipe of the original perforation section to be blocked is tested for 60MPa, and when the pressure is stabilized for 30min and the pressure drop is less than 1MPa, the expansion blocking operation of the casing pipe of the original perforation section is judged to be qualified.
CN201910629079.7A 2019-07-12 2019-07-12 Expansion pipe plugging method based on repeated fracturing cased well Pending CN110805409A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910629079.7A CN110805409A (en) 2019-07-12 2019-07-12 Expansion pipe plugging method based on repeated fracturing cased well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910629079.7A CN110805409A (en) 2019-07-12 2019-07-12 Expansion pipe plugging method based on repeated fracturing cased well

Publications (1)

Publication Number Publication Date
CN110805409A true CN110805409A (en) 2020-02-18

Family

ID=69487391

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910629079.7A Pending CN110805409A (en) 2019-07-12 2019-07-12 Expansion pipe plugging method based on repeated fracturing cased well

Country Status (1)

Country Link
CN (1) CN110805409A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114382455A (en) * 2022-01-12 2022-04-22 北京科源博慧技术发展有限公司 Shale gas horizontal well repeated fracturing method
WO2024002032A1 (en) * 2022-06-27 2024-01-04 中国石油天然气集团有限公司 Wellbore reconstruction method for repeated fracturing of oil-gas well

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998000626A1 (en) * 1996-07-01 1998-01-08 Shell Internationale Research Maatschappij B.V. Method for expanding a steel tubing and well with such a tubing
CN1784534A (en) * 2003-05-05 2006-06-07 国际壳牌研究有限公司 Expansion device for expanding a pipe
CN202194615U (en) * 2011-08-25 2012-04-18 中国石油天然气股份有限公司 Packer packing element protection architecture
US20140027118A1 (en) * 2012-07-30 2014-01-30 Richard W. DeLange Expandable liner
CN104153735A (en) * 2014-07-24 2014-11-19 中国石油天然气股份有限公司 Expansion pipe patching device
CN105484695A (en) * 2015-12-30 2016-04-13 中国石油天然气集团公司 Mechanical hydraulic double-acting expansion device suitable for expansion tube drilling
CN105986776A (en) * 2015-02-05 2016-10-05 中国石油天然气股份有限公司 Method for repairing damaged casing of oil-water well
US20160312557A1 (en) * 2015-04-22 2016-10-27 Baker Hughes Incorporated Disintegrating Expand in Place Barrier Assembly
CN106761593A (en) * 2016-12-14 2017-05-31 中国石油集团长城钻探工程有限公司 A kind of bad ground pretreating process
CN106845043A (en) * 2017-04-07 2017-06-13 东方宝麟科技发展(北京)有限公司 A kind of technological process of shale gas horizontal well refracturing and method for designing
CN107191169A (en) * 2017-06-26 2017-09-22 中国石油天然气股份有限公司 Repeated fracturing method for low-yield and low-efficiency old oil well
CN109538148A (en) * 2018-09-30 2019-03-29 山西晋城无烟煤矿业集团有限责任公司 A kind of soft metal expandable casing patching coal bed gas well suck-back layer method
CN208885235U (en) * 2018-09-28 2019-05-21 中石化石油工程技术服务有限公司 A kind of horizontal well drag fracturing tubing string and its tail end packer

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998000626A1 (en) * 1996-07-01 1998-01-08 Shell Internationale Research Maatschappij B.V. Method for expanding a steel tubing and well with such a tubing
CN1784534A (en) * 2003-05-05 2006-06-07 国际壳牌研究有限公司 Expansion device for expanding a pipe
CN202194615U (en) * 2011-08-25 2012-04-18 中国石油天然气股份有限公司 Packer packing element protection architecture
US20140027118A1 (en) * 2012-07-30 2014-01-30 Richard W. DeLange Expandable liner
CN104153735A (en) * 2014-07-24 2014-11-19 中国石油天然气股份有限公司 Expansion pipe patching device
CN105986776A (en) * 2015-02-05 2016-10-05 中国石油天然气股份有限公司 Method for repairing damaged casing of oil-water well
US20160312557A1 (en) * 2015-04-22 2016-10-27 Baker Hughes Incorporated Disintegrating Expand in Place Barrier Assembly
CN105484695A (en) * 2015-12-30 2016-04-13 中国石油天然气集团公司 Mechanical hydraulic double-acting expansion device suitable for expansion tube drilling
CN106761593A (en) * 2016-12-14 2017-05-31 中国石油集团长城钻探工程有限公司 A kind of bad ground pretreating process
CN106845043A (en) * 2017-04-07 2017-06-13 东方宝麟科技发展(北京)有限公司 A kind of technological process of shale gas horizontal well refracturing and method for designing
CN107191169A (en) * 2017-06-26 2017-09-22 中国石油天然气股份有限公司 Repeated fracturing method for low-yield and low-efficiency old oil well
CN208885235U (en) * 2018-09-28 2019-05-21 中石化石油工程技术服务有限公司 A kind of horizontal well drag fracturing tubing string and its tail end packer
CN109538148A (en) * 2018-09-30 2019-03-29 山西晋城无烟煤矿业集团有限责任公司 A kind of soft metal expandable casing patching coal bed gas well suck-back layer method

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
BILL BUCKLER 等: "Expandable Cased-hole Liner Remediates Prolific Gas Well and Minimizes Loss of Production", 《OFFSHORE TECHNOLOGY CONFERENCE》 *
KAREN BYBEE: "Expandable Tubulars Facilitate Improved Well Stimulation and Production", 《SOCIETY OF PETROLEUM ENGINEERS》 *
光新军 等: "北美页岩油气重复压裂关键技术及建议", 《石油钻采工艺》 *
王玲玲 等: "膨胀管技术在冀东油田大斜度井中的应用", 《石油机械》 *
罗韵东 等: "页岩气可膨胀衬管重复压裂技术现状与发展", 《石油矿场机械》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114382455A (en) * 2022-01-12 2022-04-22 北京科源博慧技术发展有限公司 Shale gas horizontal well repeated fracturing method
CN114382455B (en) * 2022-01-12 2023-10-03 北京科源博慧技术发展有限公司 Shale gas horizontal well repeated fracturing method
WO2024002032A1 (en) * 2022-06-27 2024-01-04 中国石油天然气集团有限公司 Wellbore reconstruction method for repeated fracturing of oil-gas well

Similar Documents

Publication Publication Date Title
CN106223922B (en) Shale gas horizontal well proppant intra-seam shielding temporary plugging staged fracturing process
CN109763804B (en) Staged temporary plugging fracturing method for horizontal well
CN110130867B (en) Staged multi-cluster fracturing method for slim-hole sidetracking horizontal well
CN101305158B (en) Flush mounted tubular patch
CA2833992C (en) Method of controlling a failed well with a ported packer
CN111119826B (en) Coiled tubing staged fracturing string and string fracturing method
NO20180819A1 (en) Casing expansion for well plugging
CN110439524B (en) Repeated fracturing transformation method for oil and gas well
CN104278978A (en) Soluble bridge plug fracturing process pipe column and fracturing method thereof
CN110284865B (en) Process method for completing repeated fracturing and energy supplement of compact oil horizontal well at one time
CN110805409A (en) Expansion pipe plugging method based on repeated fracturing cased well
CN203347766U (en) Sliding sleeve layering fracturing tool of well cementation sleeve
CN105201461A (en) Multistage sand jet perforation and fracture combined operation method adopting coiled tubing and bottom packer
CN110410053B (en) Coal mine roof pressure relief method based on eyelet supporting
CN111058817B (en) Multi-section perforation fracturing horizontal well shaft integrity recovery method
CN104563954A (en) Steel pipe expansion recovery type external casing packer
CN102619496B (en) Method for layering, stage multi-level blasting, hole expanding and crack expanding of oil-gas-bearing rock
CN104234682A (en) Coiled tubing separate-layer fracturing method suitable for multiple thin coal seams
CN107542423A (en) A kind of sieve tube completion horizontal well expansion sleeve pipe shutoff method
RU2533470C2 (en) Procedure for recovery of tightness in flow strings
RU2564316C1 (en) Method of completion of horizontal production well construction with deposit interval hydraulic fracturing
CN109899071B (en) Well and mine salt horizontal well group oil pad control and production process
CN114607313A (en) Solid-phase-free gel plugging method
RU2342516C1 (en) Method of execution of repair-insulating operations in well
CN110939412B (en) Development method for realizing advanced water injection and early water injection by utilizing horizontal well

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20201109

Address after: 300280 No. three, Dagang Oilfield, Binhai New Area, Tianjin

Applicant after: DAGANG OILFIELD GROUP Co.,Ltd.

Applicant after: CHINA NATIONAL PETROLEUM Corp.

Address before: 300280 Dagang three, Binhai New Area, Tianjin

Applicant before: DAGANG OILFIELD GROUP Co.,Ltd.

TA01 Transfer of patent application right
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20200218

WD01 Invention patent application deemed withdrawn after publication