CN110780681B - Unmanned aerial vehicle autonomous routing inspection insulator path planning method based on laser point cloud - Google Patents

Unmanned aerial vehicle autonomous routing inspection insulator path planning method based on laser point cloud Download PDF

Info

Publication number
CN110780681B
CN110780681B CN201911176682.0A CN201911176682A CN110780681B CN 110780681 B CN110780681 B CN 110780681B CN 201911176682 A CN201911176682 A CN 201911176682A CN 110780681 B CN110780681 B CN 110780681B
Authority
CN
China
Prior art keywords
point cloud
tower
power line
coordinates
points
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201911176682.0A
Other languages
Chinese (zh)
Other versions
CN110780681A (en
Inventor
毛先胤
马晓红
彭赤
黄�良
黄欢
张伟
陈凤翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Power Grid Co Ltd
Original Assignee
Guizhou Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Power Grid Co Ltd filed Critical Guizhou Power Grid Co Ltd
Priority to CN201911176682.0A priority Critical patent/CN110780681B/en
Publication of CN110780681A publication Critical patent/CN110780681A/en
Application granted granted Critical
Publication of CN110780681B publication Critical patent/CN110780681B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D1/00Control of position, course or altitude of land, water, air, or space vehicles, e.g. automatic pilot
    • G05D1/10Simultaneous control of position or course in three dimensions
    • G05D1/101Simultaneous control of position or course in three dimensions specially adapted for aircraft
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01SRADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
    • G01S17/00Systems using the reflection or reradiation of electromagnetic waves other than radio waves, e.g. lidar systems
    • G01S17/02Systems using the reflection of electromagnetic waves other than radio waves
    • G01S17/06Systems determining position data of a target
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The invention discloses a laser point cloud-based unmanned aerial vehicle autonomous routing inspection insulator path planning method, which comprises the following steps: collecting laser point cloud data of a power corridor to obtain power line point cloud and pole tower point cloud data; calculating an OBB (on-board diagnostics) direction bounding box of each base tower point cloud and taking the center of the bounding box as a tower coordinate; calculating two-side vertical plane equations passing through the coordinates of each base tower and perpendicular to the trend line; carrying out proximity search on the power line points from the vertical plane, and reserving power line point clouds within a threshold range; clustering and curve fitting are carried out on the reserved power line points to obtain a curve fitting equation; calculating and obtaining tower hanging point coordinates through a curve fitting equation, and simplifying the hanging point coordinates to be regarded as insulator coordinates; setting a camera focal length and a safe flight distance according to the coordinates of the insulator, and forming an unmanned aerial vehicle flight track connected with each photographing point; the technical problems of poor inspection path planning, large workload and the like in the autonomous inspection path planning of the insulator unmanned aerial vehicle are solved.

Description

Unmanned aerial vehicle autonomous routing inspection insulator path planning method based on laser point cloud
Technical Field
The invention belongs to an unmanned aerial vehicle autonomous patrol insulator path planning technology, and particularly relates to an unmanned aerial vehicle autonomous patrol insulator path planning method based on laser point cloud.
Background
An insulator in the power transmission line is used as a special insulation control, and plays an important role in supporting a wire and preventing current from flowing back to the ground in the overhead power transmission line. Once the insulator breaks down, the contact between the transmission lines or between the transmission lines and the tower is caused, and then the power supply is interrupted due to short circuit, and even a large-range power failure accident can occur in serious cases, so that huge property loss is caused. Therefore, it is very important to patrol the insulator of the transmission line to perform state detection and maintenance, but autonomous patrol of the insulator unmanned aerial vehicle under a complex background is still difficult.
In recent years, students at home and abroad utilize computer vision and digital image processing technology to conduct various researches on unmanned aerial vehicle autonomous tour path planning of insulators, but the unmanned aerial vehicle autonomous tour path planning method generally starts from color, shape and texture characteristics of insulators, has the problems that the requirements on aerial image quality are high, the recognition result contains more noise, the calculation amount is large, a large amount of manual assistance is needed, an insulator standard chart library is needed to be established, the unmanned aerial vehicle autonomous tour effect on insulator strings of high-capacity ultra-high voltage transmission lines is poor, and the like.
The invention comprises the following steps:
the invention aims to solve the technical problems that: the unmanned aerial vehicle autonomous patrol insulator path planning method based on the laser point cloud is provided to solve the technical problems of poor patrol path planning, large workload and the like existing in the unmanned aerial vehicle autonomous patrol insulator path planning in the prior art.
The technical scheme of the invention is as follows:
a unmanned aerial vehicle autonomous routing inspection insulator path planning method based on laser point cloud comprises the following steps:
step 1, acquiring laser point cloud data of a power corridor to obtain power line point cloud and tower point cloud data;
step 2, calculating an OBB direction bounding box of each base tower point cloud, and taking the center of the bounding box as a tower coordinate;
step 3, constructing a tower trend line between every two foundation towers, and calculating two-side vertical plane equations passing through the coordinates of each foundation tower and perpendicular to the trend line;
step 4, setting a distance threshold to be 10-20 m, carrying out proximity search on the power line points obtained in the step 1 from a vertical plane, and reserving power line point clouds within the threshold range;
step 5, performing Euclidean distance clustering on the power line points reserved in the step 4, and performing curve fitting on each clustered power line point to obtain a curve fitting equation;
step 6, calculating and obtaining the coordinates of the hanging points of the pole tower through a curve fitting equation, and simplifying the coordinates of the hanging points to be regarded as the coordinates of the insulator;
step 7, circularly step 3-step 6, obtaining coordinates of all insulators of the electric power corridor and guiding out the coordinates in a side-by-side manner;
and 8, setting a camera focal length and a safe flight distance according to the derived insulator coordinates, and forming an unmanned aerial vehicle flight track connected with each photographing point.
The method for obtaining the power line point cloud and the pole tower point cloud data in the step 1 is as follows: the three-dimensional point cloud data of the electric power corridor channel are obtained through carrying laser equipment on an unmanned aerial vehicle, and the original corridor channel point cloud data are segmented through a least square method, a RANSAC algorithm, a triangular mesh division algorithm or a curved surface clustering segmentation algorithm, so that the electric power line and pole tower point cloud data are obtained.
And step 2, calculating an OBB direction bounding box of each base tower point cloud, and taking the center of the bounding box as a tower coordinate, wherein the method comprises the following steps: and acquiring point cloud data of each base tower by adopting an Euclidean clustering extraction algorithm, constructing an OBB direction bounding box of each base tower by using a PCA principal component analysis method, and acquiring a central coordinate of the bounding box as a tower coordinate.
And 3, constructing a tower trend line between every two base towers, and calculating two-side vertical plane equations passing through the coordinates of each base tower and perpendicular to the trend line, wherein the method comprises the following steps of:
using the coordinates (x) of the continuous two-base towers obtained in step 2 1 ,y 1 ,z 1 )(x 2 ,y 2 ,z 2 ) Constructing a horizontal trend line, wherein the slope of the trend line is as follows
Figure GDA0004052148850000031
Pass (x) 1 ,y 1 ,z 1 ) And the plane equation perpendicular to the trend line is
Figure GDA0004052148850000032
Pass (x) 2 ,y 2 ,z 2 ) And the plane equation perpendicular to the trend line is
Figure GDA0004052148850000033
And 4, setting a distance threshold value of 10m to 20m, and carrying out proximity search on the power line points from the vertical plane obtained in the step 1, wherein the method for reserving the power line points within the distance threshold value range comprises the following steps: and constructing an octree on the power line point cloud, adopting octree adjacent search, setting a search radius, and reserving power line points in the search radius.
And 5, performing Euclidean distance clustering on the power line points reserved in the step 4, and performing curve fitting on each clustered power line point to obtain a curve fitting equation, wherein the method comprises the following steps of: and acquiring each piece of power line point cloud data by using an Euclidean clustering extraction algorithm, and performing curve equation fitting on each piece of power line point cloud data by using a least square method.
In step 6, the method for calculating and obtaining the coordinates of the hanging points of the towers through the curve equation formed at the left side and the right side of each base tower comprises the following steps: obtaining the angle plane of the vertical plane of the trend connecting line at two sides of the pole tower; and calculating the intersection point of the curve fitting equation on two sides and the bisector of the angle, wherein two points closest to the intersection point on two sides are regarded as points on the same power line, calculating the coordinate average value of the two intersection points to obtain the coordinates of the hanging points of the power line and the tower, and the like to obtain the coordinates of all the hanging points of all the power lines on the foundation tower.
The invention has the beneficial effects that:
the invention realizes unmanned aerial vehicle route autonomous planning, autonomous generation and unmanned aerial vehicle control system of the insulator based on high-precision three-dimensional laser point cloud data and realizes full autonomous flight operation according to route planning, the unmanned aerial vehicle operation threshold is reduced, the influence of personnel experience on the power transmission line inspection work is reduced, the inspection work efficiency of the elevator is further improved, and unmanned aerial vehicle full-process unmanned inspection work flying is truly realized. The automatic power grid inspection system is changed from 'manual type' to 'automatic type', the capability of operating personnel in handling the power grid is effectively improved, the potential risk of the power grid is reduced, the safety of the system is ensured, the power supply reliability is improved, the safety operation and the protection of the national power grid line are ensured, and the technical problems that the inspection path planning is poor, the workload is large and the like in the automatic inspection path planning of the insulator unmanned aerial vehicle in the prior art are solved. The method supports 'what you see is what you get' type flight preview, has the flight route setting of a continuous line multi-base tower, and provides safe position guidance for unmanned aerial vehicle broken point continuous voyage; the device has the capabilities of space collision monitoring and automatic avoidance, and effectively ensures the flight safety.
The specific embodiment is as follows:
a power transmission line dangerous point calculation method based on laser point cloud radar data comprises the following steps:
step 1, collecting laser point cloud data of a power corridor, and performing data processing to obtain power line point cloud and pole tower point cloud data;
the three-dimensional point cloud data of the electric power corridor channel are obtained through carrying laser equipment on an unmanned aerial vehicle, and the original corridor channel point cloud data are segmented through a least square method, a RANSAC algorithm, a triangular mesh division algorithm, a curved surface clustering segmentation algorithm and the like, so that the electric power line and pole tower point cloud data are obtained.
And acquiring three-dimensional point cloud data of the electric power corridor channel through carrying laser equipment on the unmanned aerial vehicle, and directly acquiring three-dimensional information of the electric power corridor channel to form an accurate digital model. The method has the advantages that the mature technical means is adopted, the classification of the point cloud data of the electric power corridor channels can be realized rapidly, the point cloud data of the electric power lines, towers, vegetation and the like are obtained, the effect is good, the precision is high, and the misclassification probability is low. And providing accurate data support for subsequent insulator coordinate extraction.
Step 2, calculating bounding boxes in the OBB (Oriented bounding box) direction of the point cloud of each base tower and taking the centers of the bounding boxes as tower coordinates;
and acquiring point cloud data of each base tower by adopting an Euclidean clustering extraction algorithm, constructing an OBB direction bounding box of each base tower by using a PCA principal component analysis method, and acquiring a central coordinate of the bounding box as a tower coordinate.
Because of the distance and shape specificity between towers in the electric power corridor, euclidean clustering is adopted to rapidly extract point cloud data of each base tower, PCA principal component analysis is adopted to construct an OBB bounding box for the point cloud data of each base tower, the constructed OBB direction bounding box can be tightly attached to the periphery of the towers according to the shape characteristics of the enclosed towers, the central coordinates of the bounding box are obtained to serve as tower coordinates, and the result is more accurate and more attached to the real central coordinates of the towers. And providing accurate coordinates for calculating the trend line and a vertical plane equation perpendicular to the trend line in the step 3.
Step 3, constructing a tower trend line between every two foundation towers, and calculating a vertical plane equation passing through the coordinates of the two foundation towers and perpendicular to the trend line;
using the coordinates (x) of the continuous two-base towers obtained in step 2 1 ,y 1 ,z 1 )(x 2 ,y 2 ,z 2 ) Constructing a horizontal trend line, wherein the slope of the trend line is as follows
Figure GDA0004052148850000061
Pass (x) 1 ,y 1 ,z 1 ) And the plane equation perpendicular to the trend line is
Figure GDA0004052148850000062
Pass through in the same way (x) 2 ,y 2 ,z 2 ) And the plane equation perpendicular to the trend line is
Figure GDA0004052148850000063
And (3) constructing a tower trend line by utilizing the tower coordinates in the step (2), calculating a vertical plane equation which passes through the tower coordinates and is perpendicular to the trend line, and providing a calculation basis for the adjacent points reserved in the step (4).
Step 4, setting a distance threshold value of 10-20 m, carrying out proximity search on the power line points obtained in the step 1 from a vertical plane, and reserving the power line points within the distance threshold value range;
setting a distance threshold value of 10 m-20 m, and carrying out proximity search on the power line points from the vertical plane, wherein the method for reserving the power line points within the distance threshold value range comprises the following steps: and constructing an octree on the power line point cloud, adopting octree adjacent search, setting a search radius, and reserving power line points in the search radius.
Setting a distance threshold value of 10-20 m, reserving adjacent points in the distance threshold value, reducing the number of the power line point clouds, reducing the calculated amount, reserving the linear characteristics of the power line, not affecting the fitting effect in the step 5, and improving the processing efficiency; and constructing an octree point cloud, adopting octree adjacent search, reducing the calculated amount and accelerating the operation speed.
Step 5, performing Euclidean distance clustering on the power line points reserved in the step 4, and performing curve fitting on the clustered point sets to obtain a curve fitting equation;
and acquiring each piece of power line point cloud data by using an Euclidean clustering extraction algorithm, and performing curve equation fitting on each piece of power line point cloud data by using a least square method.
And clustering the power line points reserved on one side of the pole tower, so that one piece of power line point cloud data can be quickly acquired, the data quantity is reduced in the step 4, the points within the threshold range are reserved, and the Euclidean clustering extraction speed is high, so that the precision is high. After the single power line point cloud data is obtained, a least square method is adopted to perform curve equation fitting, and a power line curve equation can be obtained. Providing a calculation basis for extracting the hanging point coordinates in the step 6.
Step 6, calculating and obtaining tower hanging point coordinates through curve equations formed on the left side and the right side of each base tower, wherein the hanging point coordinates can be simplified to be regarded as insulator coordinates due to the position specificity of the hanging points and insulators;
obtaining the angle plane of the vertical plane of the trend connecting line at two sides of the pole tower; and calculating the intersection point of the curve fitting equation on two sides and the bisector of the angle, wherein two points closest to the intersection point on two sides are regarded as points on the same power line, calculating the coordinate average value of the two intersection points, namely obtaining the coordinates of the hanging points of the power line and the tower, and the like, and obtaining the coordinates of all the hanging points of all the power lines on the foundation tower.
And (3) calculating the angle bisection plane of the vertical plane of the connecting line of the trend at two sides of the tower, wherein the angle between the curve equation obtained by the step (6) at two sides of the tower and the angle bisection plane is the same, so that the intersection point of different curve equations of the same power line at two sides of the tower is ensured to be nearest. And calculating the intersection point of the curve equation and the angular bisector, wherein two points closest to the intersection point are regarded as points on the same power line. And calculating the average value of the coordinates of two points, reducing errors in the calculation process, and ensuring the calculation accuracy.
Step 7, circularly step 2-step 5, obtaining coordinates of all insulators of the electric power corridor, and guiding out the coordinates in a side-by-side manner;
sorting and grouping according to the acquired elevation information and left and right side position information of the hanging point coordinates; the inspection sequence of the insulator from bottom to top and from left to right is obtained.
And 8, setting a camera focal length and a safe flight distance according to the insulator coordinates derived in the step 6, and forming an unmanned aerial vehicle flight track connected with each photographing point.

Claims (4)

1. A unmanned aerial vehicle autonomous routing inspection insulator path planning method based on laser point cloud comprises the following steps:
step 1, acquiring laser point cloud data of a power corridor to obtain power line point cloud and tower point cloud data;
the method for obtaining the power line point cloud and the pole tower point cloud data in the step 1 is as follows: acquiring three-dimensional point cloud data of an electric power corridor channel through carrying laser equipment on an unmanned aerial vehicle, and dividing the point cloud data of the original corridor channel through a least square method, a RANSAC algorithm, a triangular mesh division algorithm or a curved surface clustering division algorithm to acquire power line and tower point cloud data;
step 2, calculating an OBB direction bounding box of each base tower point cloud, and taking the center of the bounding box as a tower coordinate;
and step 2, calculating an OBB direction bounding box of each base tower point cloud, and taking the center of the bounding box as a tower coordinate, wherein the method comprises the following steps: acquiring point cloud data of each base tower by using an Euclidean clustering extraction algorithm, constructing an OBB direction bounding box of each base tower by using a PCA principal component analysis method, and acquiring a central coordinate of the bounding box as a tower coordinate;
step 3, constructing a tower trend line between every two foundation towers, and calculating two-side vertical plane equations passing through the coordinates of each foundation tower and perpendicular to the trend line;
step 4, setting a distance threshold to be 10-20 m, carrying out proximity search on the power line points obtained in the step 1 from a vertical plane, and reserving power line point clouds within the threshold range;
step 5, performing Euclidean distance clustering on the power line points reserved in the step 4, and performing curve fitting on each clustered power line point to obtain a curve fitting equation;
step 6, calculating and obtaining the coordinates of the hanging points of the pole tower through a curve fitting equation, and simplifying the coordinates of the hanging points to be regarded as the coordinates of the insulator;
in step 6, the method for calculating and obtaining the coordinates of the hanging points of the towers through the curve equation formed at the left side and the right side of each base tower comprises the following steps: obtaining the angle plane of the vertical plane of the trend connecting line at two sides of the pole tower; calculating intersection points of curve fitting equations on two sides and the angle bisecting plane, wherein two points closest to the intersection points on two sides are regarded as points on the same power line, calculating the coordinate average value of the two intersection points to obtain the hanging point coordinates of the power line and the tower, and the like to obtain all the hanging point coordinates of all the power lines on the foundation tower;
step 7, circularly step 3-step 6, obtaining coordinates of all insulators of the electric power corridor and guiding out the coordinates in a side-by-side manner;
and 8, setting a camera focal length and a safe flight distance according to the derived insulator coordinates, and forming an unmanned aerial vehicle flight track connected with each photographing point.
2. The unmanned aerial vehicle autonomous routing inspection insulator path planning method based on the laser point cloud according to claim 1, wherein the method is characterized by comprising the following steps of: and 3, constructing a tower trend line between every two base towers, and calculating two-side vertical plane equations passing through the coordinates of each base tower and perpendicular to the trend line, wherein the method comprises the following steps of:
using the coordinates (x) of the continuous two-base towers obtained in step 2 1 ,y 1 ,z 1 )(x 2 ,y 2 ,z 2 ) Constructing a horizontal trend line, wherein the slope of the trend line is as follows
Figure FDA0004052148840000021
Pass (x) 1 ,y 1 ,z 1 ) And the plane equation perpendicular to the trend line is
Figure FDA0004052148840000022
Pass (x) 2 ,y 2 ,z 2 ) And the plane equation perpendicular to the trend line is
Figure FDA0004052148840000023
3. The unmanned aerial vehicle autonomous routing inspection insulator path planning method based on the laser point cloud according to claim 1, wherein the method is characterized by comprising the following steps of: and 4, setting a distance threshold value of 10m to 20m, and carrying out proximity search on the power line points from the vertical plane obtained in the step 1, wherein the method for reserving the power line points within the distance threshold value range comprises the following steps: and constructing an octree on the power line point cloud, adopting octree adjacent search, setting a search radius, and reserving power line points in the search radius.
4. The unmanned aerial vehicle autonomous routing inspection insulator path planning method based on the laser point cloud according to claim 1, wherein the method is characterized by comprising the following steps of: and 5, performing Euclidean distance clustering on the power line points reserved in the step 4, and performing curve fitting on each clustered power line point to obtain a curve fitting equation, wherein the method comprises the following steps of: and acquiring each piece of power line point cloud data by using an Euclidean clustering extraction algorithm, and performing curve equation fitting on each piece of power line point cloud data by using a least square method.
CN201911176682.0A 2019-11-26 2019-11-26 Unmanned aerial vehicle autonomous routing inspection insulator path planning method based on laser point cloud Active CN110780681B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911176682.0A CN110780681B (en) 2019-11-26 2019-11-26 Unmanned aerial vehicle autonomous routing inspection insulator path planning method based on laser point cloud

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911176682.0A CN110780681B (en) 2019-11-26 2019-11-26 Unmanned aerial vehicle autonomous routing inspection insulator path planning method based on laser point cloud

Publications (2)

Publication Number Publication Date
CN110780681A CN110780681A (en) 2020-02-11
CN110780681B true CN110780681B (en) 2023-05-12

Family

ID=69392781

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911176682.0A Active CN110780681B (en) 2019-11-26 2019-11-26 Unmanned aerial vehicle autonomous routing inspection insulator path planning method based on laser point cloud

Country Status (1)

Country Link
CN (1) CN110780681B (en)

Families Citing this family (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111650599B (en) * 2020-05-07 2022-09-02 国家电网有限公司 Power transmission line information extraction and safety detection method based on airborne laser radar remote sensing technology
CN112033393A (en) * 2020-08-25 2020-12-04 国网天津市电力公司 Three-dimensional route planning method and device based on laser radar point cloud data
CN111982123B (en) * 2020-08-26 2023-10-31 云南电网有限责任公司迪庆供电局 Unmanned aerial vehicle routing planning method and device
CN112034878B (en) * 2020-11-05 2021-02-26 北京云圣智能科技有限责任公司 Unmanned aerial vehicle-based power inspection method and device and electronic equipment
CN112365570A (en) * 2020-11-13 2021-02-12 广东电网有限责任公司 Method, device and equipment for quickly displaying point cloud of power line channel
CN112414409B (en) * 2020-11-16 2022-08-02 天津航天中为数据***科技有限公司 Autonomous inspection path planning method based on string structure and aircraft
CN112729312A (en) * 2020-12-25 2021-04-30 云南电网有限责任公司昆明供电局 Unmanned aerial vehicle inspection method for high-voltage chamber of transformer substation
CN112991303B (en) * 2021-03-22 2023-08-18 武汉大学 Automatic extraction method of electric tower insulator string based on three-dimensional point cloud
CN113110577A (en) * 2021-04-15 2021-07-13 中国南方电网有限责任公司超高压输电公司柳州局 Unmanned aerial vehicle flight route planning management system is patrolled and examined to electric wire netting
CN113205116B (en) * 2021-04-15 2024-02-02 江苏方天电力技术有限公司 Automatic extraction and track planning method for inspection shooting target point of unmanned aerial vehicle of power transmission line
CN112990235B (en) * 2021-05-06 2021-08-20 北京云圣智能科技有限责任公司 Point cloud data processing method and device and electronic equipment
CN113238578B (en) * 2021-05-11 2022-12-16 上海电力大学 Routing planning method and system for power tower unmanned aerial vehicle inspection route
CN113345094A (en) * 2021-05-18 2021-09-03 武汉大学 Electric power corridor safety distance analysis method and system based on three-dimensional point cloud
CN113485424B (en) * 2021-07-19 2023-04-18 武汉中测晟图遥感技术有限公司 Design method of pole tower inspection route
CN113534844B (en) * 2021-08-18 2024-02-27 广东电网有限责任公司 Method and device for inspecting transmission line of rotorcraft in unknown environment
CN113534845B (en) * 2021-08-18 2022-06-21 国网湖南省电力有限公司 Unmanned aerial vehicle autonomous inspection method and system for overhead distribution line based on GNSS positioning
CN113494913A (en) * 2021-09-07 2021-10-12 中国南方电网有限责任公司超高压输电公司检修试验中心 Unmanned aerial vehicle power inspection planning method and device, computer equipment and storage medium
CN113885558B (en) * 2021-09-27 2023-07-04 湖南德森九创科技有限公司 Automatic safety acquisition method and system for dam surface image unmanned aerial vehicle
CN113808145B (en) * 2021-09-30 2023-09-26 深圳市优必选科技股份有限公司 Inspection road network acquisition method of inspection mobile device and inspection mobile device
CN114167203B (en) * 2021-11-16 2023-05-26 国网福建省电力有限公司泉州供电公司 Rapid power line extraction method based on laser point cloud
CN114721419B (en) * 2022-02-22 2023-09-19 广州中科云图智能科技有限公司 Tower inspection method, device and equipment based on unmanned aerial vehicle power transmission line
CN116627164B (en) * 2023-04-13 2024-04-26 北京数字绿土科技股份有限公司 Terrain-height-based unmanned aerial vehicle ground-simulated flight control method and system
CN117389293A (en) * 2023-10-31 2024-01-12 广州天海翔航空科技有限公司 Flight control management method and system for inspection unmanned aerial vehicle

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101621191A (en) * 2009-08-06 2010-01-06 重庆市电力公司超高压局 Three-dimensional visual processing method and system for extra high voltage transmission line
WO2013096704A1 (en) * 2011-12-20 2013-06-27 Sadar 3D, Inc. Systems, apparatus, and methods for acquisition and use of image data
CN103730864A (en) * 2013-12-31 2014-04-16 广东电网公司电力科学研究院 Cooperative control method for unmanned aerial vehicle power line routing inspection
CN106504362A (en) * 2016-10-18 2017-03-15 国网湖北省电力公司检修公司 Power transmission and transformation system method for inspecting based on unmanned plane
CN106774392A (en) * 2016-12-13 2017-05-31 中国南方电网有限责任公司超高压输电公司检修试验中心 The dynamic programming method of flight path during a kind of power circuit polling
CN107480373A (en) * 2017-08-11 2017-12-15 国家电网公司 Transmission line of electricity selection method and system
CN107675897A (en) * 2017-10-25 2018-02-09 徐伟 It is exclusively used in the apparatus for examination and repair of transmission tower
CN108181635A (en) * 2017-12-11 2018-06-19 中国南方电网有限责任公司超高压输电公司广州局 A kind of laser point cloud sorting technique for transmission line of electricity scissors crossing analysis
CN108230432A (en) * 2017-12-12 2018-06-29 中国南方电网有限责任公司超高压输电公司广州局 A kind of insulator laser point cloud three-dimensional rebuilding method based on CS-RBF
CN109062233A (en) * 2018-08-15 2018-12-21 广东电网有限责任公司 A kind of power transmission line unmanned machine automatic drive method for inspecting
CN109447371A (en) * 2018-11-12 2019-03-08 北京中飞艾维航空科技有限公司 Polling path planing method, device, electronic equipment and readable storage medium storing program for executing
CN109633674A (en) * 2018-12-17 2019-04-16 云南电网有限责任公司带电作业分公司 Three-dimensional Track automatic planning is maked an inspection tour in transmission of electricity based on laser point cloud data
CN109671174A (en) * 2018-12-20 2019-04-23 北京中飞艾维航空科技有限公司 A kind of pylon method for inspecting and device
CN109978820A (en) * 2019-01-31 2019-07-05 广州中科云图智能科技有限公司 Unmanned plane course line acquisition methods, system and equipment based on laser point cloud

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9575341B2 (en) * 2014-06-28 2017-02-21 Intel Corporation Solid state LIDAR circuit with waveguides tunable to separate phase offsets
TWI571718B (en) * 2015-09-08 2017-02-21 Nat Chin-Yi Univ Of Tech Automatic cruise spray cleaning method and system for unmanned aerial vehicles
US10340983B2 (en) * 2016-12-09 2019-07-02 At&T Intellectual Property I, L.P. Method and apparatus for surveying remote sites via guided wave communications

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101621191A (en) * 2009-08-06 2010-01-06 重庆市电力公司超高压局 Three-dimensional visual processing method and system for extra high voltage transmission line
WO2013096704A1 (en) * 2011-12-20 2013-06-27 Sadar 3D, Inc. Systems, apparatus, and methods for acquisition and use of image data
CN103730864A (en) * 2013-12-31 2014-04-16 广东电网公司电力科学研究院 Cooperative control method for unmanned aerial vehicle power line routing inspection
CN106504362A (en) * 2016-10-18 2017-03-15 国网湖北省电力公司检修公司 Power transmission and transformation system method for inspecting based on unmanned plane
CN106774392A (en) * 2016-12-13 2017-05-31 中国南方电网有限责任公司超高压输电公司检修试验中心 The dynamic programming method of flight path during a kind of power circuit polling
CN107480373A (en) * 2017-08-11 2017-12-15 国家电网公司 Transmission line of electricity selection method and system
CN107675897A (en) * 2017-10-25 2018-02-09 徐伟 It is exclusively used in the apparatus for examination and repair of transmission tower
CN108181635A (en) * 2017-12-11 2018-06-19 中国南方电网有限责任公司超高压输电公司广州局 A kind of laser point cloud sorting technique for transmission line of electricity scissors crossing analysis
CN108230432A (en) * 2017-12-12 2018-06-29 中国南方电网有限责任公司超高压输电公司广州局 A kind of insulator laser point cloud three-dimensional rebuilding method based on CS-RBF
CN109062233A (en) * 2018-08-15 2018-12-21 广东电网有限责任公司 A kind of power transmission line unmanned machine automatic drive method for inspecting
CN109447371A (en) * 2018-11-12 2019-03-08 北京中飞艾维航空科技有限公司 Polling path planing method, device, electronic equipment and readable storage medium storing program for executing
CN109633674A (en) * 2018-12-17 2019-04-16 云南电网有限责任公司带电作业分公司 Three-dimensional Track automatic planning is maked an inspection tour in transmission of electricity based on laser point cloud data
CN109671174A (en) * 2018-12-20 2019-04-23 北京中飞艾维航空科技有限公司 A kind of pylon method for inspecting and device
CN109978820A (en) * 2019-01-31 2019-07-05 广州中科云图智能科技有限公司 Unmanned plane course line acquisition methods, system and equipment based on laser point cloud

Non-Patent Citations (7)

* Cited by examiner, † Cited by third party
Title
Characterization and modeling of power line corridor elements from LiDAR point clouds;Sebastián Ortega etal.;《ISPRS Journal of Photogrammetry and Remote Sensing》;20190430;第24-33页 *
Work environments construction for an autonomous robot;Kengo Emoto etal.;《2014 International Symposium on Micro-NanoMechatronics and Human Science (MHS)》;20150131;第1-2页 *
基于LiDAR点云特征和模型拟合的高压线提取;杨渊等;《中国科学院大学学报》;20180930;第612-616页 *
基于空间模型匹配的飞行机器人精细化电塔巡检方法研究;张晟;《中国优秀博硕士学位论文全文数据库(硕士)信息科技辑》;20160315;第I138-8948页 *
基于输电线路三维信息的无人机智能巡检技术研究;严文涛等;《中国高新科技》;20181231;第76-78页 *
基于高密度机载激光点云的输电线路杆塔信息提取;陈亮;《中国优秀博硕士学位论文全文数据库(硕士)工程科技Ⅱ辑》;20190515;第C042-1004页 *
电力线激光点云的分割及安全检测研究;时磊等;《激光技术》;20190531;第341-356页 *

Also Published As

Publication number Publication date
CN110780681A (en) 2020-02-11

Similar Documents

Publication Publication Date Title
CN110780681B (en) Unmanned aerial vehicle autonomous routing inspection insulator path planning method based on laser point cloud
CN110031818B (en) Point cloud data-based method for extracting contour line of transmission line to ground surface clearance distance
CN106709946B (en) LiDAR point cloud-based automatic multi-split conductor extraction and fine modeling method
CA2839165C (en) Method and system for processing image data
CN114114314A (en) Power transmission line inspection detection system and detection method based on laser point cloud
CN109447371A (en) Polling path planing method, device, electronic equipment and readable storage medium storing program for executing
CN106774392A (en) The dynamic programming method of flight path during a kind of power circuit polling
CN113641187B (en) Automatic naming method for power transmission line unmanned aerial vehicle routing inspection track planning
CN113205116B (en) Automatic extraction and track planning method for inspection shooting target point of unmanned aerial vehicle of power transmission line
CN113963276A (en) Unmanned aerial vehicle autonomous inspection method and system for power transmission line
CN111913495A (en) Unmanned aerial vehicle autonomous inspection method and device for power transmission line
CN111490489A (en) Unmanned aerial vehicle trajectory planning method and device for power transmission line inspection
CN107958486A (en) A kind of generation method and device of conducting wire vector model
CN113050696A (en) Method, device and equipment for determining routing inspection route of power transmission line and storage medium
CN114187297A (en) Power transmission line wind deflection checking method and checking system
CN112883878A (en) Automatic point cloud classification method under transformer substation scene based on three-dimensional grid
CN115435791A (en) Patrol route planning method for vectorization analysis of point cloud of ground wire of power transmission line
CN111258331A (en) Unmanned aerial vehicle power line operation and maintenance system and method
CN113345094A (en) Electric power corridor safety distance analysis method and system based on three-dimensional point cloud
CN111932618A (en) Transmission tower infrared shooting route generation method and related device
CN112033393A (en) Three-dimensional route planning method and device based on laser radar point cloud data
CN116520881A (en) Unmanned plane continuous tower foundation three-dimensional inspection path planning method based on laser point cloud
CN116309828A (en) Three-dimensional laser point cloud data-based power pole information extraction method
CN116482700A (en) Robust unmanned plane laser radar line-imitating tower recognition method and device
CN115793695A (en) Generation method and device of substation patrol route

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant