CN110748146A - Installation method of building engineering pouring template - Google Patents

Installation method of building engineering pouring template Download PDF

Info

Publication number
CN110748146A
CN110748146A CN201911070922.9A CN201911070922A CN110748146A CN 110748146 A CN110748146 A CN 110748146A CN 201911070922 A CN201911070922 A CN 201911070922A CN 110748146 A CN110748146 A CN 110748146A
Authority
CN
China
Prior art keywords
baffle
outer baffle
triangle
interior
pouring template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911070922.9A
Other languages
Chinese (zh)
Inventor
冯胜荣
张勇
冯英杰
于法浩
刘艳晶
胡存美
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong National Construction Engineering Group Co Ltd
Shandong Guojian Engineering Group Co Ltd
Original Assignee
Shandong National Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong National Construction Engineering Group Co Ltd filed Critical Shandong National Construction Engineering Group Co Ltd
Priority to CN201911070922.9A priority Critical patent/CN110748146A/en
Publication of CN110748146A publication Critical patent/CN110748146A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G9/00Forming or shuttering elements for general use
    • E04G9/02Forming boards or similar elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Abstract

The invention discloses a building engineering pouring template which comprises an outer baffle, an inner baffle and a fixing buckle, wherein the outer baffle and the inner baffle are rectangular, the thicknesses of the outer baffle and the inner baffle are at least 5cm, one side of the outer baffle is fixed in parallel with the inner baffle, the top ends of the outer baffle and the inner baffle are provided with the fixing buckle, two sides of the fixing buckle are provided with clamping bars, the top ends of the clamping bars are provided with square holes, the top ends of the clamping bars are provided with connecting bars, the top ends of the connecting bars are provided with triangular ridge fixing pieces, the triangular ridge fixing pieces and the connecting bars are integrally arranged, the top ends of the inner sides of the square holes are provided with triangular grooves, and the triangular grooves are matched with the triangular ridge fixing pieces.

Description

Installation method of building engineering pouring template
Technical Field
The invention relates to the technical field of constructional engineering, in particular to a constructional engineering pouring template.
Background
The building formwork is a temporary supporting structure, which is manufactured according to the design requirements, so that the concrete structure and the members are formed according to the specified positions and geometric dimensions, the correct positions of the concrete structure and the members are kept, and the self weight of the building formwork and the external load acting on the building formwork are borne. The purpose of the template engineering is to ensure the quality and the construction safety of the concrete engineering, accelerate the construction progress and reduce the engineering cost.
However, the existing building template is labor-consuming to install, inconvenient to use, heavy in structural body and inconvenient for people to use.
Therefore, how to design a pouring template for construction engineering becomes a problem to be solved currently.
Disclosure of Invention
The invention aims to provide a building engineering pouring template to solve the problems in the background technology.
In order to realize the purpose, the invention provides the following technical scheme: the utility model provides a building engineering pouring template, includes outer baffle, interior baffle and fixed buckle, outer baffle all is rectangle with interior baffle, just the thickness of outer baffle and interior baffle is 5cm at least, outer baffle one side is fixed with interior baffle parallel, outer baffle is equipped with fixed buckle with interior baffle top, fixed buckle both sides are equipped with the card thick stick, card thick stick top is equipped with the square hole, and card thick stick top is equipped with the connecting bar, the connecting bar top is equipped with the stupefied mounting of triangle, the stupefied mounting of triangle sets up with connecting bar as an organic whole, the inboard top in square hole is equipped with the triangle recess, the triangle recess matches with the stupefied mounting of triangle.
Preferably, the outer fixing plate and the inner fixing plate are provided with corner closing plates at two ends, a straight plate is arranged at one end of each corner closing plate, an s-shaped bayonet is arranged at one end of each corner closing plate, a concave-convex block is arranged at the top end of the s-shaped bayonet, the top end of the concave-convex block is arc-shaped, a groove is formed in one side of the concave-convex block, and the shapes of the concave-convex block and the groove are complementary.
Preferably, the two ends of the straight plate are respectively provided with a first return hook and a second return hook, the first return hook and the second return hook are opposite reverse hooks, and the protruding parts of the first return hook and the second return hook are both arc-shaped.
Preferably, outer baffle and interior baffle are the composite sheet, just outer baffle and interior baffle top are equipped with first steel sheet, first steel sheet bottom fire prevention polyethylene layer, fire prevention polyethylene layer bottom is equipped with the second steel sheet.
Preferably, the triangular prism fixing pieces are in an inclined angle triangle shape, and the distance between the triangular prism fixing pieces is smaller than 1 cm.
Preferably, the two ends of the outer baffle and the inner baffle are provided with corner closing plates, and the inner sides of the corner closing plates are connected and fixed by straight plates
Preferably, the square hole is at least 2cm higher than the connecting bar.
The invention also provides an installation method of the building engineering pouring template, which is characterized by comprising the following steps: the method specifically comprises the following steps:
s1, firstly, fixing the outer baffle 1 and the inner baffle 2 to a required thickness;
s2, fixing the fixing buckle 3 between the outer baffle plate 1 and the inner baffle plate 2;
and S3, finally, the triangular ridge fixing piece 14 on the connecting rod 12 tightly fixes the clamping rod 13 on the outer baffle plate 1 and the inner baffle plate 2.
Compared with the prior art, the invention has the beneficial effects that:
1. this copper alloy shift fork, outer baffle and interior baffle top are equipped with fixed buckle for should pour the template through the firm of fixed interior baffle of fixed buckle and outer baffle, it is hard to have solved the installation in the past, uses inconvenient problem, thereby has made things convenient for people's work, has reduced people's working strength.
2. This copper alloy shift fork, triangle arris mounting are angle of inclination triangle-shaped, and the interval is less than 1cm between the stupefied mounting of triangle for the width of this pouring template can be adjusted, has solved template width regulation difficulty in the past, can not satisfy the problem of construction requirement, thereby makes the suitability of this pouring template promote by a wide margin, makes people's work simpler.
3. This copper alloy shift fork closes scute one end and is equipped with s shape bayonet socket top is equipped with unsmooth piece, and unsmooth piece top is the arc, has solved and has pour the problem that the template angle is difficult to adjust in the past to make and pour the template in the course of the work and can change the size of angle according to people's different demands, make things convenient for construction on next step.
4. This copper alloy shift fork, outer baffle and interior baffle top are equipped with first steel sheet, and first steel sheet bottom fire prevention polyethylene layer, fire prevention polyethylene layer bottom are equipped with the second steel sheet, and it is heavy to have solved and pour the template structure in the past, use inconvenient problem to make this template transportation all lighter with the installation, made things convenient for people's work and reduced people's working strength.
5. This copper alloy shift fork, outer baffle and interior baffle both ends are equipped with and close the scute, close the scute inboard and connect fixedly by the craspedodrome board, have solved in the past and pour the problem that the template is difficult to orderly range for operational environment is regular more, and makes things convenient for the construction on people next step.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the invention;
FIG. 2 is a schematic view of the inventive baffle structure;
FIG. 3 is a schematic view of the internal structure of the inventive baffle;
fig. 4 is a schematic view of the fixing buckle structure of the invention.
In the figure: 1. an outer baffle; 2. an inner baffle; 3. fixing the buckle; 4. closing the angle plate; 5. a straight board; 6. an s-shaped buckle; 7. a first back hook; 8. a second back hook; 9. a first steel plate; 10. a protective polyethylene layer; 11. a second steel plate; 12. a connecting bar; 13. clamping the lever; 14. triangular ridge fixing pieces; 15. a square hole; 16. a triangular groove; 601. a concave-convex block; 602. and (4) a groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The first embodiment,
Referring to fig. 1-4, the invention provides a building engineering pouring template, which comprises an outer baffle plate 1, an inner baffle plate 2 and a fixing buckle 3, wherein the outer baffle plate 1 and the inner baffle plate 2 are both rectangular, the thicknesses of the outer baffle plate 1 and the inner baffle plate 2 are at least 5cm, one side of the outer baffle plate 1 is fixed in parallel with the inner baffle plate 2, the fixing buckle 3 is arranged at the top ends of the outer baffle plate 1 and the inner baffle plate 2, clamping bars 13 are arranged at two sides of the fixing buckle 3, a square hole 15 is arranged at the top end of each clamping bar 13, a connecting bar 12 is arranged at the top end of each clamping bar 13, a triangular ridge fixing piece 14 is arranged at the top end of each connecting bar 12, the triangular ridge fixing pieces 14 and the connecting bars 12 are integrally arranged, a triangular groove 16 is arranged at the top end of the inner side of each square hole 15, and the triangular groove 16 is matched.
Example II,
The utility model provides a building engineering pouring template, includes outer baffle 1, interior baffle 2 and fixed buckle 3, outer baffle 1 all is rectangle with interior baffle 2, just the thickness of outer baffle 1 and interior baffle 2 is 5cm at least, 1 one side of outer baffle is parallel fixed with interior baffle 2, outer baffle 1 is equipped with fixed buckle 3 with 2 tops of interior baffle, 3 both sides of fixed buckle are equipped with card thick stick 13, card thick stick 13 top is equipped with square hole 15, and card thick stick 13 top is equipped with connecting bar 12, connecting bar 12 top is equipped with the stupefied mounting 14 of triangle, the stupefied mounting 14 of triangle sets up as an organic whole with connecting bar 12, the inboard top in square hole 15 is equipped with triangle recess 16, the stupefied mounting 14 phase-match of triangle recess 16 and triangle.
Preferably, the two ends of the outer fixing plate 1 and the inner fixing plate 2 are provided with corner closing plates 4, one end of each corner closing plate 4 is provided with a straight plate 5, one end of each corner closing plate 4 is provided with an s-shaped bayonet 6, the top end of each s-shaped bayonet 6 is provided with a concave-convex block 601, the top end of each concave-convex block 601 is arc-shaped, one side of each concave-convex block 601 is provided with a groove 602, and the shapes of the concave-convex blocks 601 and the grooves 602 are complementary.
Example III,
The utility model provides a building engineering pouring template, includes outer baffle 1, interior baffle 2 and fixed buckle 3, outer baffle 1 all is rectangle with interior baffle 2, just the thickness of outer baffle 1 and interior baffle 2 is 5cm at least, 1 one side of outer baffle is parallel fixed with interior baffle 2, outer baffle 1 is equipped with fixed buckle 3 with 2 tops of interior baffle, 3 both sides of fixed buckle are equipped with card thick stick 13, card thick stick 13 top is equipped with square hole 15, and card thick stick 13 top is equipped with connecting bar 12, connecting bar 12 top is equipped with the stupefied mounting 14 of triangle, the stupefied mounting 14 of triangle sets up as an organic whole with connecting bar 12, the inboard top in square hole 15 is equipped with triangle recess 16, the stupefied mounting 14 phase-match of triangle recess 16 and triangle.
Preferably, a first return hook 7 and a second return hook 8 are respectively arranged at two ends of the straight-moving plate 5, the first return hook 7 and the second return hook 8 are opposite hooks, and protruding parts of the first return hook 7 and the second return hook 8 are both arc-shaped.
Example four,
The utility model provides a building engineering pouring template, includes outer baffle 1, interior baffle 2 and fixed buckle 3, outer baffle 1 all is rectangle with interior baffle 2, just the thickness of outer baffle 1 and interior baffle 2 is 5cm at least, 1 one side of outer baffle is parallel fixed with interior baffle 2, outer baffle 1 is equipped with fixed buckle 3 with 2 tops of interior baffle, 3 both sides of fixed buckle are equipped with card thick stick 13, card thick stick 13 top is equipped with square hole 15, and card thick stick 13 top is equipped with connecting bar 12, connecting bar 12 top is equipped with the stupefied mounting 14 of triangle, the stupefied mounting 14 of triangle sets up as an organic whole with connecting bar 12, the inboard top in square hole 15 is equipped with triangle recess 16, the stupefied mounting 14 phase-match of triangle recess 16 and triangle.
Preferably, outer baffle 1 and interior baffle 2 are the composite sheet, just outer baffle 1 is equipped with first steel sheet 9 with 2 tops of interior baffle, first steel sheet 9 bottom fire prevention polyethylene layer 10, fire prevention polyethylene layer bottom is equipped with second steel sheet 11.
Example V,
The utility model provides a building engineering pouring template, includes outer baffle 1, interior baffle 2 and fixed buckle 3, outer baffle 1 all is rectangle with interior baffle 2, just the thickness of outer baffle 1 and interior baffle 2 is 5cm at least, 1 one side of outer baffle is parallel fixed with interior baffle 2, outer baffle 1 is equipped with fixed buckle 3 with 2 tops of interior baffle, 3 both sides of fixed buckle are equipped with card thick stick 13, card thick stick 13 top is equipped with square hole 15, and card thick stick 13 top is equipped with connecting bar 12, connecting bar 12 top is equipped with the stupefied mounting 14 of triangle, the stupefied mounting 14 of triangle sets up as an organic whole with connecting bar 12, the inboard top in square hole 15 is equipped with triangle recess 16, the stupefied mounting 14 phase-match of triangle recess 16 and triangle.
Preferably, the triangular prism fixing pieces 14 are triangular with an inclined angle, and the distance between the triangular prism fixing pieces 14 is less than 1 cm.
Example six,
The utility model provides a building engineering pouring template, includes outer baffle 1, interior baffle 2 and fixed buckle 3, outer baffle 1 all is rectangle with interior baffle 2, just the thickness of outer baffle 1 and interior baffle 2 is 5cm at least, 1 one side of outer baffle is parallel fixed with interior baffle 2, outer baffle 1 is equipped with fixed buckle 3 with 2 tops of interior baffle, 3 both sides of fixed buckle are equipped with card thick stick 13, card thick stick 13 top is equipped with square hole 15, and card thick stick 13 top is equipped with connecting bar 12, connecting bar 12 top is equipped with the stupefied mounting 14 of triangle, the stupefied mounting 14 of triangle sets up as an organic whole with connecting bar 12, the inboard top in square hole 15 is equipped with triangle recess 16, the stupefied mounting 14 phase-match of triangle recess 16 and triangle.
Preferably, the two ends of the outer baffle plate 1 and the inner baffle plate 2 are provided with corner closing plates 4, and the inner sides of the corner closing plates 4 are connected and fixed by straight plates 5
Example seven,
The utility model provides a building engineering pouring template, includes outer baffle 1, interior baffle 2 and fixed buckle 3, outer baffle 1 all is rectangle with interior baffle 2, just the thickness of outer baffle 1 and interior baffle 2 is 5cm at least, 1 one side of outer baffle is parallel fixed with interior baffle 2, outer baffle 1 is equipped with fixed buckle 3 with 2 tops of interior baffle, 3 both sides of fixed buckle are equipped with card thick stick 13, card thick stick 13 top is equipped with square hole 15, and card thick stick 13 top is equipped with connecting bar 12, connecting bar 12 top is equipped with the stupefied mounting 14 of triangle, the stupefied mounting 14 of triangle sets up as an organic whole with connecting bar 12, the inboard top in square hole 15 is equipped with triangle recess 16, the stupefied mounting 14 phase-match of triangle recess 16 and triangle.
Preferably, the square hole is at least 2cm higher than the connecting bar.
The mounting method of the building engineering pouring template is characterized by comprising the following steps of: the method specifically comprises the following steps:
s1, firstly, fixing the outer baffle 1 and the inner baffle 2 to a required thickness;
s2, fixing the fixing buckle 3 between the outer baffle plate 1 and the inner baffle plate 2;
and S3, finally, the triangular ridge fixing piece 14 on the connecting rod 12 tightly fixes the clamping rod 13 on the outer baffle plate 1 and the inner baffle plate 2.
When the outer baffle plate 1 and the inner baffle plate 2 are fixed to a required thickness, the fixing buckle 3 is fixed between the outer baffle plate 1 and the inner baffle plate 2, and the triangular ridge fixing piece 14 on the connecting rod 12 can tightly fix the clamping rod 13 on the outer baffle plate 1 and the inner baffle plate 2. This copper alloy shift fork, outer baffle 1 is equipped with fixed buckle 3 with 2 tops of interior baffle for should pour the template through the firm of fixed buckle 3 fixed interior baffle 2 and outer baffle 1, it is hard to have solved the installation in the past, uses inconvenient problem, thereby has made things convenient for people's work, has reduced people's working dynamics. This copper alloy shift fork, triangle arris mounting 14 are angle of inclination triangle-shaped, and the interval is less than 1cm between the stupefied mounting of triangle 14 for the width of this pouring template can be adjusted, has solved template width regulation difficulty in the past, can not satisfy the problem of construction requirement, thereby makes the suitability of this pouring template promote by a wide margin, makes people's work simpler. This copper alloy shift fork closes scute one end and is equipped with s shape bayonet socket 6 the 6 tops of s shape bayonet socket are equipped with unsmooth piece 601, and unsmooth piece 601 top is the arc, has solved and has pour the problem that the template angle is difficult to the regulation in the past to make and pour the template in the course of the work and can change the size at angle according to people's different demands, make things convenient for construction on next step. This copper alloy shift fork, outer baffle 1 and 2 tops of interior baffle are equipped with first steel sheet 9, and first steel sheet 9 bottom fire prevention polyethylene layer 10, fire prevention polyethylene layer 10 bottom are equipped with second steel sheet 11, and it is heavy to have solved and pour the template structure body in the past, use inconvenient problem to make this template transportation all light more with the installation, made things convenient for people's work and reduced people's working strength. This copper alloy shift fork, outer baffle 1 and 2 both ends of interior baffle are equipped with closes scute 4, close 4 inboards of scute and connect fixedly by strake 5, have solved in the past and have pour the problem that the template is difficult to orderly range for operational environment is regular more, and makes things convenient for people's construction on next step.
It will be apparent to those skilled in the art that various changes and modifications may be made in the present invention without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (8)

1. The utility model provides a building engineering pours template, includes outer baffle (1), interior baffle (2) and fixed buckle (3), its characterized in that: outer baffle (1) and interior baffle (2) all are rectangle, just the thickness of outer baffle (1) and interior baffle (2) is 5cm at least, outer baffle (1) one side is fixed with interior baffle (2) parallel, outer baffle (1) is equipped with fixed buckle (3) with interior baffle (2) top, fixed buckle (3) both sides are equipped with card thick stick (13), card thick stick (13) top is equipped with square hole (15), and card thick stick (13) top is equipped with connecting bar (12), connecting bar (12) top is equipped with the stupefied mounting of triangle (14), the stupefied mounting of triangle (14) sets up as an organic whole with connecting bar (12), the inboard top in square hole (15) is equipped with triangle recess (16), the stupefied mounting of triangle (16) and triangle (14) phase-match.
2. The construction work pouring template as claimed in claim 1, wherein: outer fixed plate (1) and inner fixed plate (2) both ends are equipped with closes scute (4) close scute (4) one end and be equipped with strake board (5), close scute (4) one end and be equipped with s shape bayonet socket (6) top is equipped with unsmooth piece (601), unsmooth piece (601) top is the arc, unsmooth piece (601) one side is equipped with recess (602), unsmooth piece (601) and recess (602) shape complementary.
3. The construction work pouring template as claimed in claim 2, wherein: the two ends of the straight-moving plate (5) are respectively provided with a first return hook (7) and a second return hook (8), the first return hook (7) and the second return hook (8) are opposite hooks, and the protruding parts of the first return hook (7) and the second return hook (8) are both arc-shaped.
4. The construction work pouring template as claimed in claim 1, wherein: outer baffle (1) and interior baffle (2) are the composite sheet, just outer baffle (1) and interior baffle (2) top are equipped with first steel sheet (9), first steel sheet (9) bottom fire prevention polyethylene layer (10), fire prevention polyethylene layer bottom is equipped with second steel sheet (11).
5. The construction work pouring template as claimed in claim 1, wherein: the triangular prism fixing pieces (14) are inclined angles (triangles), and the distance between the triangular prism fixing pieces (14) is smaller than 1 cm.
6. The construction work pouring template as claimed in claim 1, wherein: the outer baffle (1) and the inner baffle (2) are provided with corner closing plates (4) at two ends, and the inner sides of the corner closing plates (4) are connected and fixed by straight-going plates (5).
7. The construction work pouring template as claimed in claim 1, wherein: the square hole (15) is at least 2cm higher than the connecting bar (12).
8. The mounting method of the building engineering pouring template is characterized by comprising the following steps of: the method specifically comprises the following steps:
s1, firstly, fixing the outer baffle 1 and the inner baffle 2 to a required thickness;
s2, fixing the fixing buckle 3 between the outer baffle plate 1 and the inner baffle plate 2;
and S3, finally, the triangular ridge fixing piece 14 on the connecting rod 12 tightly fixes the clamping rod 13 on the outer baffle plate 1 and the inner baffle plate 2.
CN201911070922.9A 2019-11-05 2019-11-05 Installation method of building engineering pouring template Pending CN110748146A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911070922.9A CN110748146A (en) 2019-11-05 2019-11-05 Installation method of building engineering pouring template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911070922.9A CN110748146A (en) 2019-11-05 2019-11-05 Installation method of building engineering pouring template

Publications (1)

Publication Number Publication Date
CN110748146A true CN110748146A (en) 2020-02-04

Family

ID=69282267

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911070922.9A Pending CN110748146A (en) 2019-11-05 2019-11-05 Installation method of building engineering pouring template

Country Status (1)

Country Link
CN (1) CN110748146A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3900929A1 (en) * 1989-01-14 1990-07-19 Wolfgang Baumann Apparatus which is to be used in the building industry and is intended for assembling a clamping or retaining device
CN201050190Y (en) * 2007-06-01 2008-04-23 林光明 Formwork clamp for building construction
CN203921571U (en) * 2014-05-20 2014-11-05 侯南菁 A kind of novel bottle cap
CN205276856U (en) * 2015-11-17 2016-06-01 中国三冶集团有限公司 Combined -type building template
CN207348464U (en) * 2017-10-24 2018-05-11 亿诚(天津)建筑安装有限公司 One kind is readily disassembled building template fixture
CN209145280U (en) * 2018-12-03 2019-07-23 福建船政交通职业学院 A kind of beam form board supporting structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3900929A1 (en) * 1989-01-14 1990-07-19 Wolfgang Baumann Apparatus which is to be used in the building industry and is intended for assembling a clamping or retaining device
CN201050190Y (en) * 2007-06-01 2008-04-23 林光明 Formwork clamp for building construction
CN203921571U (en) * 2014-05-20 2014-11-05 侯南菁 A kind of novel bottle cap
CN205276856U (en) * 2015-11-17 2016-06-01 中国三冶集团有限公司 Combined -type building template
CN207348464U (en) * 2017-10-24 2018-05-11 亿诚(天津)建筑安装有限公司 One kind is readily disassembled building template fixture
CN209145280U (en) * 2018-12-03 2019-07-23 福建船政交通职业学院 A kind of beam form board supporting structure

Similar Documents

Publication Publication Date Title
CN101878341B (en) Frame structure for installation of wall panel of building, and wall panel installation device and wall panel installation method using same
CN101550674A (en) Bridge of steel truss-concrete and construction method thereof
CN208618791U (en) A kind of construction formwork for placing
CN110748146A (en) Installation method of building engineering pouring template
CN205804758U (en) Steel construction plate
CN211922136U (en) Assembled panel with trapezoidal wedge block
CN215888782U (en) Steel bar truss floor support plate
CN202295031U (en) Side plate of semi-trailer carriage body
CN209642231U (en) NFMC corrosion resistant composite coining coloured silk reinforced plastic cable bridge frame
CN211622203U (en) Roofing component and assembled multilayer house
CN114195007A (en) Semi-arc structure girder and manufacturing method thereof
CN212773061U (en) Concatenation formula prefabricated reinforced concrete superimposed sheet
CN114562140A (en) Seam structure of assembled integral pool with laminated plate type structure
CN210737355U (en) Expansion joint of riding seam reinforced multidirectional displacement comb plate
CN208280414U (en) A kind of steel skeleton hollow pre-fabricated panels
CN113482219A (en) Assembly type disassembly-free floor bearing plate
CN215406918U (en) Prestressed steel base type T-shaped steel concrete composite beam
CN202577785U (en) High-strength water-proof metal roofing board
CN208604811U (en) A kind of floor slab structure of steel plastic compount assembled architecture
CN214062327U (en) Light single-side wall template
CN211286589U (en) Novel frame section bar
CN217897018U (en) Measure reinforcing steel bar for thick and large raft support
CN219826098U (en) Fillet template system
CN216893293U (en) Outer wall face brick connecting hanging piece
CN215482225U (en) Bridge device based on combination of concrete box girder and steel box girder

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200204

RJ01 Rejection of invention patent application after publication