CN110722516B - Auxiliary device for installing LNG ship insulation box and using method thereof - Google Patents

Auxiliary device for installing LNG ship insulation box and using method thereof Download PDF

Info

Publication number
CN110722516B
CN110722516B CN201910909925.0A CN201910909925A CN110722516B CN 110722516 B CN110722516 B CN 110722516B CN 201910909925 A CN201910909925 A CN 201910909925A CN 110722516 B CN110722516 B CN 110722516B
Authority
CN
China
Prior art keywords
detachable
pull rod
auxiliary device
lng ship
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910909925.0A
Other languages
Chinese (zh)
Other versions
CN110722516A (en
Inventor
陈诚
鲁德智
吉李祥
王晓霞
程海涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hudong Zhonghua Shipbuilding Group Co Ltd
Original Assignee
Hudong Zhonghua Shipbuilding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hudong Zhonghua Shipbuilding Group Co Ltd filed Critical Hudong Zhonghua Shipbuilding Group Co Ltd
Priority to CN201910909925.0A priority Critical patent/CN110722516B/en
Publication of CN110722516A publication Critical patent/CN110722516A/en
Application granted granted Critical
Publication of CN110722516B publication Critical patent/CN110722516B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B29/00Accessories
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B27/00Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention discloses an auxiliary device for installing an LNG ship insulation box and a using method thereof, wherein a plurality of rows of parallel T-shaped clamping grooves are arranged on the side wall of an insulation box panel, and the device comprises: the detachable hand-held pull rod is provided with at least two through holes, and the distance of the through holes is equal to the distance between any two rows of the clamping grooves; the embeddable movable clamping tongue comprises a bottom with a T-shaped cross section matched with the clamping groove and a protruding edge stud connected to the bottom and extending out of the clamping groove, the embeddable movable clamping tongue is arranged in the clamping groove in a sliding manner, and the protruding edge stud penetrates through the through hole and protrudes out of the through hole; and a lock nut. The invention has the beneficial effects that the installation efficiency of the insulation box can be improved, the production cost is effectively reduced, the field labor intensity is reduced, and the potential safety hazard is reduced.

Description

Auxiliary device for installing LNG ship insulation box and using method thereof
Technical Field
The invention belongs to the technical field of ship construction, and particularly relates to an auxiliary device for installing an LNG ship insulation box and a using method thereof.
Background
With the increasing demand of the market for the ship-handing period of the LNG ship, how to further shorten the construction period of the LNG ship, especially the construction period of the maintenance system of the cargo hold in the core area of the LNG ship, has become an important task for enterprises to win orders and obtain expected economic benefits in the fierce competition of the ship market. In the installation process of the secondary insulation boxes, 6000 secondary insulation boxes are arranged in the whole cabin, 24000 multiple secondary plane boxes and 23788 main plane boxes are arranged in the whole ship. Install for the unit is mutually supported through 4 people, and the installation phase needs to use connecting rod and spider to press from both sides and fix the insulating case, and the insulating case quantity of the constructor of every group unit installation every day is 35 (every insulating case of installation all need connect and the spider presss from both sides and fix).
In a new ship type Yamal LNG ship project, the primary insulation of the secondary insulation box is optimized and improved by GTT on the original process standard, and the main purpose is to reduce the evaporation rate in the actual ship operation process. And China is the only country in the world at the experimental installation stage adopting the new technology. Compared with the prior insulation box, the insulation box optimized by the process increases the difficulty in the installation stage, the two sides of the insulation box before improvement are provided with the protruding wood blocks, also commonly called as 'ears', the insulation box can be lifted by taking the 'ears' as the force points to carry out the installation of the upper layer and the lower layer, but the method can generate subsequent uncontrollable factors, for example, resin coated on the insulation box is damaged due to the fact that constructors do not firmly grasp the insulation box, resin strips need to be coated again, raw materials are lost, if the insulation box body is damaged, the insulation box body needs to return to Korea to be repaired (because China does not obtain repair quality temporarily), a large amount of manpower and material waste can be caused by the operation method, and the damage rate of the insulation box is increased.
Disclosure of Invention
In order to solve the problems in the prior art, the invention provides an auxiliary device for installing an LNG ship insulation box, and some embodiments of the auxiliary device can be used for improving the installation precision of an insulation box plane region in an LNG ship cargo hold region in ship construction, effectively improving the overall assembly working efficiency of an insulation box work type, effectively reducing the loss rate of resin and an insulation box body, and effectively reducing the production cost.
In order to achieve the purpose, the invention adopts the following technical scheme:
the utility model provides an auxiliary device of LNG ship insulation case installation usefulness, be provided with the parallel T shape draw-in groove of multirow on the lateral wall of insulation case panel, the device includes: the detachable hand-held pull rod is provided with at least two through holes, and the distance of the through holes is equal to the distance between any two rows of the clamping grooves; the embeddable movable clamping tongue comprises a bottom with a T-shaped cross section matched with the clamping groove and a protruding edge stud connected to the bottom and extending out of the clamping groove, the embeddable movable clamping tongue is arranged in the clamping groove in a sliding manner, and the protruding edge stud penetrates through the through hole and protrudes out of the through hole; and
the locking nut is in threaded connection with the protruding edge stud, and the locking nut and the embedded movable clamping tongue clamp the detachable handheld pull rod.
Preferably, a plurality of sets of the devices are arranged on the side wall of the insulation box.
Preferably, one side of the detachable handhold pull rod, which is tightly attached to the panel of the insulating box, is provided with a groove matched with the embedded movable clamping tongue.
Preferably, the lower end of the detachable handhold pull rod comprises a hand-held handle.
Preferably, the upper end of the detachable walking pull rod comprises an annular handle.
A method of using an auxiliary device for installation of an LNG ship insulation tank, the method comprising: the embeddable movable clamping tongue is arranged in the clamping groove of the panel of the insulating box in a penetrating way; one side of the detachable handhold pull rod with the groove faces the insulating box panel and penetrates through the protruding edge stud through the through hole on the detachable handhold pull rod; after the detachable hand pull rod is tightly attached to the panel of the insulating box, the detachable hand pull rod is locked through the locking nut, meanwhile, the embedded movable clamping tongue is ensured to be embedded into the groove, and the insulating box is installed through the auxiliary device after confirmation.
Preferably, two sets of the devices are arranged on each insulating box, and the hand-held handles at the lower ends of the detachable hand-held pull rods in the two devices are arranged oppositely in a mirror image mode.
Compared with the prior art, the invention has the beneficial effects that: the device is used for the supplementary pull rod device of LNG ship insulating case plane region installation stage in shipbuilding, the device simple structure, high durability and convenient use, can effectively promote insulating case installation effectiveness and precision, avoid insulating case resin and body to receive destruction, reduce manpower, material resources, waste in man-hour, reduce unnecessary work procedure, avoid insulating case damage report rate and reduce the emergence of safe risk and incident, this device is comparatively simple when using, and is convenient, can inlay formula activity latch and set for to constructor's operation custom, can adjust the mounted position of supplementary pull rod by oneself, and improve the stability and the security of supplementary pull rod through lock nut, thereby guarantee insulating case is not destroyed in the installation.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
Fig. 1 is a schematic overall structure diagram of an embodiment of the present invention.
Fig. 2 is a schematic view of an embeddable movable tongue according to an embodiment of the present invention.
Fig. 3 is a schematic view of a lock nut according to an embodiment of the present invention.
Fig. 4 is an assembly view of the embeddable movable tongue and the lock nut according to the embodiment of the present invention.
Fig. 5 is a schematic view of a detachable handhold lever according to an embodiment of the present invention.
Fig. 6 is a schematic view of a detachable walking stick according to another view of the embodiment of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be obtained by a person skilled in the art without inventive effort based on the embodiments of the present invention, are within the scope of the present invention.
In the description of the present invention, it is to be understood that the terms "longitudinal", "lateral", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on those shown in the drawings, and are used merely for convenience of description and for simplicity of description, and do not indicate or imply that the referenced devices or elements must have a particular orientation, be constructed in a particular orientation, and be operated, and thus, are not to be construed as limiting the present invention.
As shown in fig. 1-6, the present embodiment provides an auxiliary pull rod device for an installation stage of an LNG ship insulation box, the device includes a detachable walking pull rod 1 tightly attached to an insulation box panel 15, the detachable walking pull rod 1 is provided with two through holes 5 corresponding to slots 16 on the insulation box panel 15, internal threads are provided in the through holes 5, the slots 16 on the insulation box panel 15 are provided with embeddable movable latches 2, protruding studs 6 are provided at protruding portions of the embeddable movable latches 2, the protruding studs 6 can be inserted into the through holes 5 on the detachable walking pull rod 1 and locked by locking nuts 3, and a groove 7 engaged with the embeddable movable latches 2 is provided at one side of the detachable walking pull rod 1 tightly attached to the insulation box panel 15.
Two through holes 5 are arranged on the detachable walking pull rod 1, and the set positions of the through holes 5 on the detachable walking pull rod 1 correspond to the clamping grooves 16 on the insulating box panel 15.
The embeddable movable clamping tongue can penetrate through a clamping groove 16 on an insulating box panel 15 and can move left and right in the clamping groove, meanwhile, an edge protruding stud 6 is arranged on the embeddable movable clamping tongue 2, and the edge protruding stud 6 can penetrate through a through hole 5 arranged on the detachable pull rod 1.
The upper position and the lower position of the detachable walking pull rod 1 are respectively provided with a handle, the insulation box 4 is installed from top to bottom in the installation stage, so that the handle is arranged at the upper end of the detachable walking pull rod 1, a field constructor can conveniently pull the insulation box 4 and slowly place the insulation box 4 towards the lower layer, the hand-held handle 8 at the lower end of the detachable walking pull rod 1 is set to be used for supporting the insulation box 4 by the set handle when the insulation box 4 is placed towards the lower layer, the insulation box 4 can be stably placed at the installed position, and the damage to the insulation box resin and the insulation box body can be reduced by applying the detachable walking pull rod.
The embodiment also comprises a use method of the auxiliary pull rod device used in the installation stage of the LNG ship insulation box, which comprises the following steps: step one, arranging the embeddable movable clamping tongue penetrating piece 2 in a clamping groove 16 of an insulating box panel 15, and adjusting the embedded movable clamping tongue penetrating piece to a position required by a constructor; secondly, enabling one side of the detachable walking pull rod 1 with the groove 7 to face the insulating box panel 15, and penetrating the side of the detachable walking pull rod 1 through the protruding stud 6 through the through hole 5 in the detachable walking pull rod 1; and step three, after the detachable hand pull rod 1 is tightly attached to the panel 15 of the insulation box, locking is carried out through the locking nut 3, meanwhile, the groove 7 is ensured to be embedded into the clamping tongue 2, and the insulation box is installed through the auxiliary pull rod after confirmation.
The embodiment of the invention can improve the installation efficiency of the insulation box, effectively reduce the production cost, reduce the field labor intensity and reduce the potential safety hazard.
Although the present invention has been described in detail with respect to the above embodiments, it will be understood by those skilled in the art that modifications or improvements based on the disclosure of the present invention may be made without departing from the spirit and scope of the invention, and these modifications and improvements are within the spirit and scope of the invention.

Claims (7)

1. Auxiliary device for installation of LNG ship insulation tanks, characterized in that the side walls of the panels (15) of the insulation tank (4) are provided with rows of parallel T-shaped slots (16), said device comprising:
the detachable handheld pull rod (1) is provided with at least two through holes (5), and the distance between the through holes (5) is equal to the distance between any two rows of the clamping grooves (16);
the embedded movable clamping tongue (2) comprises a bottom with a T-shaped cross section matched with the clamping groove (16) and a protruding edge stud (6) connected to the bottom and extending out of the clamping groove (16), the embedded movable clamping tongue (2) is arranged in the clamping groove (16) in a sliding mode, and the protruding edge stud (6) penetrates through the through hole (5) and protrudes out of the through hole (5); and
the locking nut (3) is in threaded connection with the protruding edge stud (6), and the locking nut (3) and the embedded movable clamping tongue (2) clamp the detachable hand-held pull rod (1).
2. Auxiliary device for installation of LNG ship insulation tanks according to claim 1, characterized in that the side walls of the insulation tank (4) are provided with sets of said device.
3. Auxiliary device for installation of LNG ship insulation tanks according to claim 2, characterized in that the side of the detachable handhold lever (1) that is in close contact with the panel (15) of the insulation tank (4) is provided with a groove (7) that is matched with the embeddable movable latch tongue (2).
4. Auxiliary device for installation of LNG ship insulation tanks according to claim 3, characterized in that the lower end of the detachable handhold lever (1) comprises a hand-held handle (8).
5. Auxiliary device for installation of LNG ship insulation tanks according to claim 4, characterized in that the upper end of the detachable handhold lever (1) comprises an annular handle.
6. A method for using the auxiliary device for installation of the LNG ship insulation tank according to claim 5, comprising:
the embeddable movable clamping tongue (2) is arranged in a clamping groove (16) of a panel (15) of the insulating box (4) in a penetrating way;
one side of the detachable handhold pull rod (1) with the groove (7) faces a panel (15) of the insulation box (4), and is arranged on the protruding edge stud (6) in a penetrating way through a through hole (5) on the detachable handhold pull rod (1);
after the detachable hand pull rod (1) is tightly attached to the panel (15) of the insulating box (4), the insulating box is locked through the locking nut (3), meanwhile, the embedded movable clamping tongue (2) is ensured to be embedded into the groove (7), and the insulating box (4) is installed through the auxiliary device after confirmation.
7. Method for using auxiliary means for installation of LNG ship tanks according to claim 6, characterized in that two sets of said means are provided on each tank (4), the two sets of said means being arranged with the hand-held handles (8) of the lower ends of the detachable handhold tie rods (1) mirror-inverted.
CN201910909925.0A 2019-09-25 2019-09-25 Auxiliary device for installing LNG ship insulation box and using method thereof Active CN110722516B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910909925.0A CN110722516B (en) 2019-09-25 2019-09-25 Auxiliary device for installing LNG ship insulation box and using method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910909925.0A CN110722516B (en) 2019-09-25 2019-09-25 Auxiliary device for installing LNG ship insulation box and using method thereof

Publications (2)

Publication Number Publication Date
CN110722516A CN110722516A (en) 2020-01-24
CN110722516B true CN110722516B (en) 2021-06-01

Family

ID=69219355

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910909925.0A Active CN110722516B (en) 2019-09-25 2019-09-25 Auxiliary device for installing LNG ship insulation box and using method thereof

Country Status (1)

Country Link
CN (1) CN110722516B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2234479A (en) * 1989-07-29 1991-02-06 Polymark Int Ltd Support ring for a collapsible bag
CN101204796A (en) * 2007-12-12 2008-06-25 沪东中华造船(集团)有限公司 Spider clip and insulation box installing method for liquefy natural gas boat insulation install
CN204368397U (en) * 2014-11-10 2015-06-03 沪东中华造船(集团)有限公司 The erecting equipment of cargo tank end face insulated case
CN206766896U (en) * 2017-08-25 2017-12-19 重庆大江动力设备制造有限公司 A kind of built-in handle mechanism
CN109958691A (en) * 2019-04-28 2019-07-02 上海交通大学 A kind of underlying component assembling manufacturing method of LNG ship large scale polyurethane insulating case
CN109968026A (en) * 2019-04-28 2019-07-05 上海交通大学 The cabinet assembly system and method for LNG ship polyurethane insulating case

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2234479A (en) * 1989-07-29 1991-02-06 Polymark Int Ltd Support ring for a collapsible bag
CN101204796A (en) * 2007-12-12 2008-06-25 沪东中华造船(集团)有限公司 Spider clip and insulation box installing method for liquefy natural gas boat insulation install
CN204368397U (en) * 2014-11-10 2015-06-03 沪东中华造船(集团)有限公司 The erecting equipment of cargo tank end face insulated case
CN206766896U (en) * 2017-08-25 2017-12-19 重庆大江动力设备制造有限公司 A kind of built-in handle mechanism
CN109958691A (en) * 2019-04-28 2019-07-02 上海交通大学 A kind of underlying component assembling manufacturing method of LNG ship large scale polyurethane insulating case
CN109968026A (en) * 2019-04-28 2019-07-05 上海交通大学 The cabinet assembly system and method for LNG ship polyurethane insulating case

Also Published As

Publication number Publication date
CN110722516A (en) 2020-01-24

Similar Documents

Publication Publication Date Title
CN204913137U (en) Preceding wheel casing welding set
CN204754243U (en) Pre -buried mounting structure of channel -section steel
CN204728715U (en) The pre-buried mounting structure of channel-section steel for channel-section steel is nuzzled in concrete component in advance
CN110722516B (en) Auxiliary device for installing LNG ship insulation box and using method thereof
CN203201569U (en) Positioning device for arch centering connection plate used for tunnel
CN112681727A (en) Template structure of special-shaped column in limited space and construction method thereof
CN211621625U (en) Assembled lattice beam side slope supporting construction
CN112942827A (en) Stupefied connection structure of steel formwork frame back of body for building
CN202896824U (en) Detachable angle-adjustable temporary safety railing
CN201573917U (en) Fixture of container
CN206545269U (en) The beam prefabricated floor connection structure of full assembled steel
CN201738566U (en) Shaped steel beam applicable to system for horizontally supporting templates
CN105908970A (en) Light steel mold plate supporting system
CN213173791U (en) Assembled landing stage pile cap
CN211229548U (en) Quick form removal tool for aluminum template
CN212105137U (en) Building construction template structure
CN209942217U (en) Reinforced template for constructional engineering
CN210369902U (en) Building template with corner
CN215717228U (en) Stair pouring template
CN112096069A (en) A bolt formula connecting device for aluminum alloy template is connected
CN220521983U (en) Aluminum template negative and positive angle shape reinforcing apparatus that preapring for an unfavorable turn of events
CN219569540U (en) Aluminum template with angle aluminum
CN206428899U (en) A kind of photovoltaic special-purpose metal die mould roof boarding
CN212316683U (en) Bridge tie beam template and locating rack fixing device
CN211286046U (en) Light house top and bottom corner fitting and corner post

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant