CN110644364A - Hoop construction platform and using method thereof - Google Patents

Hoop construction platform and using method thereof Download PDF

Info

Publication number
CN110644364A
CN110644364A CN201910759947.3A CN201910759947A CN110644364A CN 110644364 A CN110644364 A CN 110644364A CN 201910759947 A CN201910759947 A CN 201910759947A CN 110644364 A CN110644364 A CN 110644364A
Authority
CN
China
Prior art keywords
hoop
platform
guardrail
arc
construction platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910759947.3A
Other languages
Chinese (zh)
Inventor
王士晓
冯祥
欧阳毅
赵广才
向建芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201910759947.3A priority Critical patent/CN110644364A/en
Publication of CN110644364A publication Critical patent/CN110644364A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention provides a hoop construction platform and a using method thereof, wherein the hoop construction platform comprises a platform base, guardrails and patches; the platform base is composed of at least two connecting plates with concave parts, and the concave parts of the connecting plates are detachably butted to form a hollow part matched with the shape of a workpiece to be constructed so as to penetrate through the workpiece to be constructed; the edge of each connecting plate is provided with a section of guardrail, and each section of guardrail is butted into a closed fence in a detachable mode; the patch is arranged along the outer edge of the hollow part and is detachably sleeved between the outer wall of the workpiece to be applied and the hollow part. The platform base with the hollow part is formed by detachably butting a plurality of plates, so that the platform base is connected to a workpiece to be applied on the ground; and set up the paster of dismantling on hollow portion to fasten the paster on treating the outer wall of executing the work piece, be favorable to guaranteeing construction platform's stability.

Description

Hoop construction platform and using method thereof
Technical Field
The invention relates to the technical field of building construction, in particular to a hoop construction platform and a using method thereof.
Background
The anchor ear method is commonly applied to the construction of beam tying and bent cap between columns of a bridge pier column, and when the pier height is low, anchor ear installation can adopt a temporary support to set up an anchor ear installation working platform; for the pier column with higher pier height, no longer be suitable for the temporary support method, the general adoption is hoist and mount work platform at present, but because this platform is either in the side, or take out from the top, seriously influence construction safety, the workman is very laboursome when operating, and inefficiency moreover, especially the connection effect is difficult to obtain the assurance.
Disclosure of Invention
In view of this, the invention provides a hoop construction platform and a using method thereof, and aims to solve the problems that the existing hoop construction platform is low in safety and construction efficiency.
In one aspect, the present invention provides a hoop construction platform, including: a platform base, a guardrail and a patch; the platform base is composed of at least two connecting plates with concave parts, and the concave parts of the connecting plates are detachably butted to form a hollow part matched with the shape of a workpiece to be constructed so as to penetrate through the workpiece to be constructed; the edge of each connecting plate is provided with a section of guardrail, and each section of guardrail is butted into a closed fence in a detachable mode; the patch is arranged along the outer edge of the hollow part and is detachably sleeved between the outer wall of the workpiece to be applied and the hollow part.
Further, in the hoop construction platform, the connecting plates are arc-shaped plates, the arc-shaped plates are butted to form an annular plate structure, and a hollow part of the annular plate structure is used for penetrating the piece to be constructed.
Furthermore, in the hoop construction platform, the number of the arc-shaped plates is two, and the cross section of the butt joint of the two arc-shaped plates is provided with mutually matched step surfaces.
Furthermore, in the hoop construction platform, the two arc-shaped plates sequentially penetrate through the two step surfaces from top to bottom to realize butt joint.
Further, in the hoop construction platform, the guardrail comprises a plurality of transverse arc-shaped pieces and a plurality of vertical arc-shaped pieces; the transverse arc-shaped pieces are arranged in parallel, the vertical arc-shaped pieces are arranged in parallel, and the transverse arc-shaped pieces and the vertical arc-shaped pieces are connected to form a well-shaped structure.
Furthermore, in the hoop construction platform, every two guardrails on the connecting plates are connected through the transverse arc-shaped pieces of the guardrail positioned at the end parts in an inserting manner.
Further, in the hoop construction platform, the patches are of a hoop structure.
Furthermore, in the hoop construction platform, the guardrail is provided with a plurality of traction cables for hoisting the platform base.
Furthermore, in the hoop construction platform, the traction cables are uniformly distributed along the circumferential direction of the guardrail.
In the invention, the platform base with the hollow part is formed by detachably butting a plurality of plates, so that the platform base can be conveniently connected to a workpiece to be applied on the ground, and the construction safety performance is improved by workers, materials and tools on and off the ground; and set up the paster of dismantling on hollow portion to fasten the paster on treating the outer wall of executing the work piece, be favorable to guaranteeing construction platform's stability.
On the other hand, the invention also provides a using method of the hoop construction platform, which comprises the following steps: step 1, installing a guardrail on a platform base, and butting a structure formed by assembling the platform base and the guardrail on a workpiece to be applied through a connecting piece; step 2, placing material tools and operators required for installing the hoop on the platform base; step 3, conveying the structure formed by assembling the platform base and the guardrail to a preset construction position, mounting a patch above the hollow part of the platform base, fixing the patch on the workpiece to be constructed through a fastener, and then performing construction operation of a hoop; and 4, loosening the fastening piece after the operation is finished, then lowering the construction platform to the ground, and then removing the platform base through removing the connecting piece.
Compared with the prior art, the invention has the advantages that the platform base is manufactured by butt joint connection of the connecting plates with the concave parts, so that workers, materials and tools can be placed on the ground, and the safety of construction operation is improved; each part of the construction platform is assembled in a detachable connection mode, and the construction platform is dismantled by descending the construction platform when the hoop is installed, so that the time is saved, and the adaptability of the construction platform is improved; the platform is matched with the pier stud in height, so that the construction difficulty is reduced, the operability of workers in the construction process is improved, and the construction precision of the hoop is improved; through the fine control of paster and fixing bolt construction platform's operation height, improved the stability of platform, reduced the time of installation, dismantlement staple bolt, convenient and fast.
Drawings
Various other advantages and benefits will become apparent to those of ordinary skill in the art upon reading the following detailed description of the preferred embodiments. The drawings are only for purposes of illustrating the preferred embodiments and are not to be construed as limiting the invention. Also, like reference numerals are used to refer to like parts throughout the drawings. In the drawings:
fig. 1 is a schematic view of a use state of a hoop construction platform according to an embodiment of the present invention;
fig. 2 is a schematic structural diagram of the hoop construction platform according to the embodiment of the present invention.
Detailed Description
Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art. It should be noted that the embodiments and features of the embodiments may be combined with each other without conflict. The present invention will be described in detail below with reference to the embodiments with reference to the attached drawings.
Referring to fig. 1 and 2, the hoop construction platform according to the embodiment of the present invention includes: the device comprises a platform base 1, a guardrail 2 and a patch 3; the platform base 1 is composed of at least two connecting plates 11 with concave parts, and the concave parts of the connecting plates 11 are detachably butted to form a hollow part matched with the shape of the piece 4 to be constructed and used for penetrating the piece 4 to be constructed; the edge of each connecting plate 11 is provided with a section of guardrail 2, and each section of guardrail 2 is butted into a closed fence in a detachable mode; the patch 3 is arranged along the outer edge of the hollow part and is detachably sleeved between the outer wall of the piece to be constructed 4 and the hollow part.
Particularly, platform base 1 can be formed by the polylith has the connecting plate 11 butt joint of the portion of establishing of concavity, and for example connecting plate 11 can be one side and seted up the square board of the portion of establishing of concavity, also can be the arc. The shape of the recess of the connecting plate 11 may be determined according to the shape of the member 4 to be worked. In this embodiment, the member to be constructed 4 is a pier. Therefore, preferably, the connecting plate 11 is an arc-shaped plate, and each arc-shaped plate is butted to form an annular plate-shaped structure, and a hollow part of the annular plate-shaped structure is used for penetrating the element to be constructed 4. That is, the concave portions of the arc plates are oppositely arranged to enclose a circular channel.
The arc can be semicircle arc, 1/4 arc etc. and according to the quantity of the shape of waiting to be under construction 4 and the shape determination arc of arc, in this embodiment, the arc is semicircle arc, and two blocks of arc can be butt joint into a circular well kenozooecium to with wait to be under construction 4 phase-matchs. Taking two arc-shaped plates as an example, the butt-joint section of the two arc-shaped plates is provided with mutually matched step surfaces. Namely, the step parts with matched shapes can be respectively cut on the end surfaces of the two arc plates which need to be butted.
Two the arc wears to locate two through top-down in proper order the 5 realization butt joints of connecting piece of step face, and connecting piece 5 can be the bolt assembly, and two arcs can be dismantled and connect, are favorable to whole construction platform's dismantlement and recycle to be favorable to improving the efficiency of construction.
Be connected with guardrail 2 on every connecting plate 11, a plurality of guardrails 2 can enclose and connect into square or circular rail, can weld guardrail 2 the same with the connecting plate 11 profile on connecting plate 11, and in this embodiment, every section guardrail 2 is circular-arcly. For example, set up one section guardrail 2 on every arc, two sections guardrails 2 set up relatively, and dock into with circular space, for the required material instrument of operation personnel and staple bolt 8 installation provides the accommodation space, the safety problem that exists in the aspect of workman and the material transportation when effectively having solved the installation staple bolt.
In particular, the guard rail 2 comprises a plurality of transverse arcs 21 and a plurality of vertical arcs 22; each of the transverse arc-shaped pieces 21 is arranged in parallel, each of the vertical arc-shaped pieces 22 is arranged in parallel, and each of the transverse arc-shaped pieces 21 is connected with each of the vertical arc-shaped pieces 22 to form a well-shaped structure. The transverse arc 21 and the vertical arc 22 may both be steel pipes having a certain curvature.
More specifically, the guardrail 2 is provided with a plurality of traction ropes 7 for hoisting the platform base 1. The traction cable 5 may be a steel wire rope. In order to ensure the stable operation of the hoisting, the steel cables can be symmetrically arranged on the oppositely arranged guardrails 2, for example, the steel cables can be arranged on the transverse arc-shaped members 21 at the top of the guardrails 2. Preferably, the traction cables 7 are uniformly distributed along the circumferential direction of the guardrail 2 to ensure smooth hoisting.
The guardrails 2 on every two connecting plates 11 are connected through the transverse arc-shaped pieces 21 at the end parts of the guardrails 2 in an inserting mode, so that the subsequent disassembling work is facilitated. In this embodiment, platform base 1, guardrail 2 and paster 3 all can be dismantled, and each part has enough to meet the need the convenience, and the construction is swift, is favorable to shortening construction period, improves production efficiency.
The paster 3 in this embodiment can be staple bolt formula structure to when the structure of base platform 1 and 2 equipment of guardrail removed the operation position to the pier stud, cup jointed between the outer wall of pier stud and the hollow portion of platform base through fastener 6, reduce the gap of pier stud and 1 hollow portion of platform base, in order to guarantee whole construction platform's stability. The diameter of the patch 3 in this embodiment can be selected according to the diameter of the member 4 to be constructed, so as to ensure the tight connection between the two.
As is apparent from the above description, the hoop construction platform provided in this embodiment forms the platform base with the hollow portion by detachably butting the plurality of plates, so that the platform base is conveniently connected to a workpiece to be constructed on the ground, and the construction safety performance is improved by workers, materials and tools on and off the ground; and set up the paster of dismantling on hollow portion to fasten the paster on treating the outer wall of executing the work piece, be favorable to guaranteeing construction platform's stability.
The invention also provides a using method of the hoop construction platform, which comprises the following steps:
and step S1, installing the guardrail on the platform base, and butting the structure formed by assembling the platform base and the guardrail on the workpiece to be applied through the connecting piece.
Specifically, a section of guardrail is welded on each connecting plate to form an assembly unit, then the two assembly units are respectively sleeved on the pier stud of the part to be constructed and aligned, then the two sections of guardrails are connected in an inserting mode, and finally the two connecting plates are connected through connecting bolts.
And step S2, placing material tools and operators required by hoop installation on the platform base.
Particularly, because the staple bolt structure is complicated, it is inconvenient to install, consequently, after preparing the required material of installation staple bolt and instrument earlier, place on the platform base.
And step S3, conveying the structure formed by assembling the platform base and the guardrail to a preset construction position, mounting a patch above the hollow part of the platform base, fixing the patch on the workpiece to be applied through a fastener, and then performing construction operation of the hoop.
Particularly, according to the position of highly selecting good staple bolt construction operation of pier stud, transport the structure of platform base and guardrail equipment this and predetermine the construction position after, cup joint the paster at treating construction outer wall to guarantee whole construction platform's stability.
Step S4, loosening the fasteners after the job is completed, then removing the platform base by lowering the construction platform to the ground, and then removing the connectors.
Particularly, the staple bolt operation finishes the back, can loosen the fastener respectively, takes out the paster after, transfers construction platform to ground after, can tear the connecting piece down to demolish the back with the platform base, use next work piece of waiting to do, through the specification of changing the paster in this embodiment, can use on the work piece of waiting to do of different sizes.
In conclusion, the hoop construction platform provided by the invention has the advantages that the connecting plates with the concave parts are in butt joint connection to manufacture the platform base, so that workers, materials and tools can be placed on the ground, and the safety of construction operation is improved; each part of the construction platform is assembled in a detachable connection mode, and the construction platform is dismantled by descending the construction platform when the hoop is installed, so that the time is saved, and the adaptability of the construction platform is improved; the platform is matched with the pier stud in height, so that the construction difficulty is reduced, the operability of workers in the construction process is improved, and the construction precision of the hoop is improved; through the fine control of paster and fixing bolt construction platform's operation height, improved the stability of platform, reduced the time of installation, dismantlement staple bolt, convenient and fast.
It will be apparent to those skilled in the art that various changes and modifications may be made in the present invention without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (10)

1. The utility model provides a staple bolt construction platform which characterized in that includes: a platform base, a guardrail and a patch; wherein the content of the first and second substances,
the platform base is composed of at least two connecting plates with concave parts, and the concave parts of the connecting plates are detachably butted to form a hollow part matched with the shape of a workpiece to be constructed so as to penetrate through the workpiece to be constructed;
the edge of each connecting plate is provided with a section of guardrail, and each section of guardrail is butted into a closed fence in a detachable mode;
the patch is arranged along the outer edge of the hollow part and is detachably sleeved between the outer wall of the workpiece to be applied and the hollow part.
2. The hoop construction platform according to claim 1, wherein the connecting plates are arc-shaped plates, the arc-shaped plates are butted to form an annular plate structure, and a hollow portion of the annular plate structure is used for penetrating the member to be constructed.
3. The hoop construction platform according to claim 1, wherein the number of the arc-shaped plates is two, and step surfaces matched with each other are formed on the butt-joint cross sections of the two arc-shaped plates.
4. The hoop construction platform according to claim 3, wherein the two arc-shaped plates are butted by a connecting piece sequentially penetrating through the two step surfaces from top to bottom.
5. The hoop construction platform of claim 1, wherein the guardrail includes a plurality of transverse arcs and a plurality of vertical arcs; wherein the content of the first and second substances,
each horizontal arc-shaped piece is arranged in parallel, each vertical arc-shaped piece is arranged in parallel, and each horizontal arc-shaped piece is connected with each vertical arc-shaped piece to form a well-shaped structure.
6. The hoop construction platform according to claim 5, wherein the guard rails on every two connecting plates are connected through the insertion of the transverse arc-shaped pieces at the ends of the guard rails.
7. The hoop construction platform of claim 1, wherein the tiles are hoop-style structures.
8. The hoop construction platform of claim 7, wherein a plurality of traction cables are arranged on the guardrail for hoisting the platform base.
9. The hoop construction platform of claim 8, wherein each of the hauling cables is evenly distributed along a circumference of the guardrail.
10. Use method of the hoop construction platform according to any one of claims 1 to 9, comprising the steps of:
step 1, installing a guardrail on a platform base, and butting a structure formed by assembling the platform base and the guardrail on a workpiece to be applied through a connecting piece;
step 2, placing material tools and operators required for installing the hoop on the platform base;
step 3, conveying the structure formed by assembling the platform base and the guardrail to a preset construction position, mounting a patch above the hollow part of the platform base, fixing the patch on the workpiece to be constructed through a fastener, and then performing construction operation of a hoop;
and 4, loosening the fastening piece after the operation is finished, then lowering the construction platform to the ground, and then removing the platform base through removing the connecting piece.
CN201910759947.3A 2019-08-16 2019-08-16 Hoop construction platform and using method thereof Pending CN110644364A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910759947.3A CN110644364A (en) 2019-08-16 2019-08-16 Hoop construction platform and using method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910759947.3A CN110644364A (en) 2019-08-16 2019-08-16 Hoop construction platform and using method thereof

Publications (1)

Publication Number Publication Date
CN110644364A true CN110644364A (en) 2020-01-03

Family

ID=68990136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910759947.3A Pending CN110644364A (en) 2019-08-16 2019-08-16 Hoop construction platform and using method thereof

Country Status (1)

Country Link
CN (1) CN110644364A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114525786A (en) * 2022-02-21 2022-05-24 中国建筑第八工程局有限公司 Adjustable auxiliary operation platform for pile head circular cutting method construction

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007068231A1 (en) * 2005-12-16 2007-06-21 Peri Gmbh Work platform with post attachment
ES2288074A1 (en) * 2005-06-24 2007-12-16 Jose Luis Antuña Suarez Shaping device for annular and adjustable working platform, has multiple supports, which are radially hooked to cable that surrounds chimney, where each support has stringer with upper clamp, hooking to cable and inferior roller
CN202755317U (en) * 2012-08-29 2013-02-27 山西路桥建设集团有限公司 Operating deck basket tool for anchor ear installation
CN203441073U (en) * 2013-08-23 2014-02-19 广州建筑股份有限公司 Hoop-type high-altitude guard platform suitable for super high-rise building outline boarder structural column
CN203640247U (en) * 2013-10-30 2014-06-11 五冶集团上海有限公司 Hoop type detachable operating platform for blast furnace granulating slag steam exhaust barrel
CN204112695U (en) * 2014-07-25 2015-01-21 陈志顺 For removing the mobile work platform of high-rise buildings
CN206052555U (en) * 2016-08-17 2017-03-29 中国建筑第六工程局有限公司 Hood type safe operation platform
CN109385957A (en) * 2018-11-22 2019-02-26 中建七局安装工程有限公司 A kind of pier stud bent cap protective platform

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2288074A1 (en) * 2005-06-24 2007-12-16 Jose Luis Antuña Suarez Shaping device for annular and adjustable working platform, has multiple supports, which are radially hooked to cable that surrounds chimney, where each support has stringer with upper clamp, hooking to cable and inferior roller
WO2007068231A1 (en) * 2005-12-16 2007-06-21 Peri Gmbh Work platform with post attachment
CN202755317U (en) * 2012-08-29 2013-02-27 山西路桥建设集团有限公司 Operating deck basket tool for anchor ear installation
CN203441073U (en) * 2013-08-23 2014-02-19 广州建筑股份有限公司 Hoop-type high-altitude guard platform suitable for super high-rise building outline boarder structural column
CN203640247U (en) * 2013-10-30 2014-06-11 五冶集团上海有限公司 Hoop type detachable operating platform for blast furnace granulating slag steam exhaust barrel
CN204112695U (en) * 2014-07-25 2015-01-21 陈志顺 For removing the mobile work platform of high-rise buildings
CN206052555U (en) * 2016-08-17 2017-03-29 中国建筑第六工程局有限公司 Hood type safe operation platform
CN109385957A (en) * 2018-11-22 2019-02-26 中建七局安装工程有限公司 A kind of pier stud bent cap protective platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114525786A (en) * 2022-02-21 2022-05-24 中国建筑第八工程局有限公司 Adjustable auxiliary operation platform for pile head circular cutting method construction

Similar Documents

Publication Publication Date Title
CN103061506B (en) Construction method of steel structure dome
US6347903B1 (en) Fly clamp for reinforcing bars in concrete construction
CN108755442B (en) Guide and positioning device for high-altitude installation of large steel member
JP2004315234A (en) Device for disassemblable assembly composed of jib element of tower crane
US10883233B2 (en) Work platform system including suspended paneled portion and method of implementing same
KR101665482B1 (en) Method for Constructing Long Span Continuous Bridge of Spliced Prestressed Concrete Girders without Temporary Supports
KR101948470B1 (en) Method for building aerial scaffolding
JP3181041U (en) Mounting member for scaffolding for bridge
CN110644364A (en) Hoop construction platform and using method thereof
JP6294601B2 (en) Suspended scaffolding panel, suspension scaffold construction method and suspended scaffold panel unit
KR20190014813A (en) Construction method for cantilever in steel composite girder bridge
CN208328705U (en) Multi-joint pier operating platform
CN211572504U (en) Aerial work platform
JP4175737B2 (en) How to connect piles
CN109083395B (en) Large-span suspension cable operation platform and erecting method thereof
CN110700573A (en) Construction method, device and application of formwork support system adopting steel beam
CN206477359U (en) Open trench tunnel tripod template system
JP4091947B2 (en) Temporary connecting jig used for dismantling of tower-like structure and dismantling method of tower-like structure using this temporary connecting jig
CN110805308B (en) Method for installing and dismantling temporary support at top center of silo
KR20020018401A (en) A scaffolding clamp and the temporary work method for construction of steel bridge using the same
CN112127281A (en) Portable construction hanging basket system for arch bridge
CN214238098U (en) Reinforcing bar sleeve grout connects test piece preparation rack
CN117489130B (en) Annular steel truss construction process
CN213804952U (en) Deviation correcting device for beam structure
CN212612033U (en) Portable construction hanging basket system for arch bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200103

RJ01 Rejection of invention patent application after publication