CN110607852A - Novel installation process of metal keel composite wall - Google Patents

Novel installation process of metal keel composite wall Download PDF

Info

Publication number
CN110607852A
CN110607852A CN201910781995.2A CN201910781995A CN110607852A CN 110607852 A CN110607852 A CN 110607852A CN 201910781995 A CN201910781995 A CN 201910781995A CN 110607852 A CN110607852 A CN 110607852A
Authority
CN
China
Prior art keywords
wall body
decorative plate
keels
wall
self
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910781995.2A
Other languages
Chinese (zh)
Inventor
肖潇
姜敬先
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhonghe Tiancheng (Dalian) Technology Development Co.,Ltd.
Original Assignee
Zhonghe Tiancheng Construction Services (dalian) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhonghe Tiancheng Construction Services (dalian) Co Ltd filed Critical Zhonghe Tiancheng Construction Services (dalian) Co Ltd
Priority to CN201910781995.2A priority Critical patent/CN110607852A/en
Publication of CN110607852A publication Critical patent/CN110607852A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Acoustics & Sound (AREA)
  • Finishing Walls (AREA)

Abstract

The invention discloses a novel installation process of a metal keel composite wall, which relates to the field of installation processes of building walls and mainly comprises the following steps: firstly, fixing galvanized light steel keels at intervals vertically according to upper and lower guide rails of a main body frame by using self-tapping screws to form a structure that the inner and outer double-row keels of a wall body are pulled oppositely by using connecting pieces, then firmly nailing aluminum alloy cross keels by using self-tapping screws according to the height of a decorative plate surface, simultaneously supporting and hanging the decorative plate, firstly placing vertical seams of the decorative plate into T-shaped adhesive tapes, and uniformly sealing the space between the outer decorative plates by using structural adhesives; then spraying polyurethane foam on the inner side of the decorative plate to enable the thickness of the decorative plate to reach the local thermal engineering standard; then installing a steel plate mesh non-demolding material on the inner side of the wall body, embedding a pipeline control box in the cavity of the wall body, and pouring light aggregate composite foam concrete to form the force reducing wall; finally, spraying and scraping the large white putty on the inner surface of the wall body. The method has the advantages of cross utilization of all links, simple and convenient installation, time and labor saving, and can form the self-insulation solid wall with excellent heat insulation effect.

Description

Novel installation process of metal keel composite wall
Technical Field
The invention relates to the field of building wall installation processes, in particular to a novel installation process of a metal keel composite wall.
Background
The building block wall has serious heat loss, and the external wall has high heat insulation construction difficulty and is easy to fall off. Various problems such as cracking of the heat-insulating layer, water inflow and the like continuously occur in various places, and the theoretical service cycle is short because the heat-insulating layer and the wall body are of a binary structure. The improved heat-insulation decorative integrated board has the problem that the attachment degree of the board to the wall body of the building block is influenced by weather and the local board is peeled off due to expansion with heat and contraction with cold, and the problem of combination of the wall body and the heat-insulation decorative layer is not solved all the time. A large amount of labor investment is needed in the installation process, the installation effect and the expected service life are not ideal all the time, particularly in the south of rainy China, the problems of water seepage and cracking can occur after the wall is used in the near future under the influence of environmental factors, and frost heaving and falling in the north are more serious.
Disclosure of Invention
The invention aims to provide a novel mounting process of a metal keel composite clamp body, which aims to solve the problems in the background technology.
In order to achieve the above object, the present invention is achieved by:
the novel installation process of the metal keel composite wall body comprises the following steps:
(1) fixing galvanized light steel keels by self-tapping screws at intervals vertically according to the upper guide rail and the lower guide rail of the main body frame to form the counter-pulling between the inner double-row keels and the outer double-row keels of the wall body by using connecting pieces;
(2) then the aluminum alloy keel is nailed by a self-tapping nail according to the height of the decorative plate surface and the decorative plate is supported and hung;
(3) firstly, vertically sewing decorative plates into T-shaped adhesive tapes, and uniformly sealing the decorative plates on the outer sides by using structural adhesive;
(4) spraying polyurethane foam on the inner side of the decorative plate to enable the thickness of the decorative plate to reach the local technological parameter standard;
(5) installing a steel plate mesh mould-removal-free material on the inner side of the wall body, embedding a pipeline control box in a wall body cavity, and pouring light aggregate composite foam concrete;
(6) and finally spraying mortar and large white putty on the inner side surface of the wall body.
In a further improvement, the keel joint is driven by a high-strength self-tapping screw electric drill with the diameter of more than 5 mm.
In a further improvement, the step 5 is to spray cement mortar on the inner wall surface, and paint putty after the inner wall surface is strickled off.
In a further improvement, polyurethane foaming or inorganic heat insulation mortar is sprayed on the inner side of the decorative plate, so that the transverse and vertical keels are hidden inside without cavities.
The invention has the beneficial effects that: because the structure integrates heat preservation and decoration, all links can be used in a crossed mode, for example, the construction of the inner leaf and the outer leaf on the surface is finished, the wall body template effect is also finished, the line pipe box is pre-buried in advance, the composite foam concrete slurry is poured on the inner side, the formed solid wall body is excellent in heat preservation effect, and maintenance is never needed. The adopted polyphenyl granules can utilize social white garbage (waste and old recovery) to crush 3-5 mm in diameter as lightweight aggregate, thereby reducing environmental pollution. The reduction links are that the manpower is reduced, the efficiency is improved and the construction period is shortened. No garbage is discharged during construction, and the waste water is recycled and the construction is clean. The solid wall body has stable self-insulation effect, the service life of the solid wall body is the same as that of a building, the surface colors of the stone and ceramic plates are never changed, and the solid wall body is resistant to acid, alkali, ultraviolet and weathering. Vertical steel joist also is wall body bearing structure and bears the weight of and also is the connection fossil fragments of decorative board, links to each other through aluminium alloy fossil fragments and alleviates the horizontal momentum of earthquake wave. The polyurethane foaming heat conductivity coefficient that uses is low, and intensity is high, enables the wall and has stronger water-proof effects, and outside decorative board structure glue closed joint is waterproof again, thoroughly solves the problem of wall body infiltration fracture. The transverse and vertical keels are completely hidden inside, and the corrosion resistance effect is good.
Drawings
FIG. 1 is a schematic view of the connection between metal studs;
FIG. 2 is a schematic structural view of a metal composite frame;
FIG. 3 is a schematic elevational view of an embodiment of the invention after installation;
FIG. 4 is a top view of a wall after installation of an embodiment of the present invention;
the labels in the figure are: 1. galvanizing a light steel C-shaped keel; 2. a polyurethane foam material; 3. a connecting member; 4. compounding the foam concrete; 5. the steel plate is free from die stripping materials; 6. thin stone and ceramic plates; t-shaped adhesive tape; 8. the putty is white; 9. self-tapping screw.
Detailed Description
The invention will be further explained and illustrated with reference to the figures and examples.
Example 1: referring to fig. 1-3, the novel installation process of the metal keel composite wall body is that a galvanized light steel keel 1 is vertically fixed by self-tapping screws 8 at intervals according to upper and lower guide rails of a main body frame to form a double-row keel inside and outside the wall body, the double-row keel is pulled oppositely by a connecting piece 3, a decorative ceramic plate 6 is polished and formed, then the decorative ceramic plate 6 is firmly nailed by the self-tapping screws 8 according to the height of the decorative ceramic plate 6, meanwhile, the decorative ceramic plate 6 is supported and hung on the outer edge of the keel 1, then, a T-shaped adhesive tape 7 or other fixing adhesive tapes are firstly placed in a vertical seam of the decorative ceramic plate 6, and the decorative ceramic plate; and then the polyurethane foam material 2 is sprayed on the inner side of the decorative plate to ensure that the thickness of the decorative plate reaches the local technological parameter standard. Then installing a steel plate mesh non-demolding material 5 on the inner side of the wall body, embedding a pipeline control box in the cavity of the wall body, and pouring light aggregate composite foam concrete 4; and finally spraying mortar and large white putty on the inner side surface of the wall body. And the node of the keel is driven by a high-strength self-tapping screw 9 with the diameter of more than 5 mm through an electric drill. And the concrete operation in the last step is that mortar is sprayed on the inner wall surface, and putty white 8 is smeared after the inner wall surface is strickled off.
Embodiment 2 in another embodiment of the present invention, a steel-aluminum keel with appropriate length and number can be prefabricated in a factory according to drawings and floor height, and matched with corresponding connectors, then the keel 1 is assembled on site, then the decorative ceramic plates 6 which are polished in advance are hoisted in place one by one, and installed on the steel-aluminum keel 1, then the steel-aluminum keel 1 is filled with polyurethane foaming materials 2 to make the steel-aluminum keel meet the local thermal standard, then the wall is filled with light aggregate concrete or other environment-friendly light wall materials, finally the inner wall is sprayed with cement mortar, after leveling, white is scraped, the layer-by-layer construction is performed, and the installation is rapid and labor-saving.
It should be noted that the installation process is suitable for the complete assembly of most of the walls of the shear wall structure containing the metal keels or the metal nets, including the wall structures of buildings and structures.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (4)

1. The novel installation process of the metal keel composite wall body is characterized in that: the method comprises the following steps:
(1) fixing galvanized light steel keels by self-tapping screws at intervals vertically according to the upper guide rail and the lower guide rail of the main body frame to form a counter-pulling support between the inner double-row keels and the outer double-row keels of the wall body by using connecting pieces;
(2) then the aluminum alloy cross keel is nailed by self-tapping nails according to the height of the decorative plate surface and the decorative plate is supported and hung;
(3) firstly, vertically sewing decorative plates into T-shaped adhesive tapes, and uniformly sealing the decorative plates on the outer sides by using structural adhesive;
(4) then spraying polyurethane foam on the inner side of the decorative plate to ensure that the thickness of the decorative plate reaches the local thermal parameter standard; (5) installing a steel plate mesh mould-removal-free material on the inner side of the wall body, embedding a pipeline control box in a wall body cavity, and pouring light aggregate composite foam concrete;
(6) and finally, spraying white putty on the inner side surface of the wall body and scraping.
2. The novel installation process of the metal keel composite wall body according to claim 1, is characterized in that: and (3) driving the keel joint in the step (2) by using a high-strength self-tapping screw electric drill with the diameter of more than 5 mm.
3. The novel installation process of the metal keel composite wall body according to claim 1, is characterized in that: and (6) spraying mortar on the inner wall surface, and smearing putty after the mortar is strickled off.
4. The novel installation process of the metal keel composite wall body according to claim 1, is characterized in that: polyurethane foaming or inorganic heat-insulating mortar is sprayed on the inner side of the decorative plate, so that the transverse and vertical keels are hidden inside without cavities.
CN201910781995.2A 2019-08-23 2019-08-23 Novel installation process of metal keel composite wall Pending CN110607852A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910781995.2A CN110607852A (en) 2019-08-23 2019-08-23 Novel installation process of metal keel composite wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910781995.2A CN110607852A (en) 2019-08-23 2019-08-23 Novel installation process of metal keel composite wall

Publications (1)

Publication Number Publication Date
CN110607852A true CN110607852A (en) 2019-12-24

Family

ID=68889880

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910781995.2A Pending CN110607852A (en) 2019-08-23 2019-08-23 Novel installation process of metal keel composite wall

Country Status (1)

Country Link
CN (1) CN110607852A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1928280A (en) * 2006-03-13 2007-03-14 陈国举 Non-load-bearing lightgage steel joist isolation wall and its construction method
CN201605689U (en) * 2009-10-29 2010-10-13 王海峰 Cast-in-place composite light-weight steel wall
CN103866885A (en) * 2014-03-20 2014-06-18 中国建筑第二工程局有限公司 Energy-saving heat-insulating structure of lighting window and construction method thereof
CN104652668A (en) * 2015-01-04 2015-05-27 谭力 Armored integrated wall and construction method thereof
CN205242653U (en) * 2015-11-19 2016-05-18 文登蓝岛建筑工程有限公司 Steel construction unit -installment wall body and outer wall perps structure node thereof
CN106801483A (en) * 2017-03-02 2017-06-06 青岛科瑞新型环保材料集团有限公司 A kind of non-dismantling formwork heat insulating decorative board external wall protection body system and its construction method
CN107044179A (en) * 2016-12-30 2017-08-15 中国建筑科学研究院 Decorative panel and template integrated heat-preservation decorative composite wall and construction method thereof
CN107795039A (en) * 2016-08-30 2018-03-13 芜湖合建路桥机械有限公司 A kind of construction method of cast-in-situ thermal-insulated combined wall

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1928280A (en) * 2006-03-13 2007-03-14 陈国举 Non-load-bearing lightgage steel joist isolation wall and its construction method
CN201605689U (en) * 2009-10-29 2010-10-13 王海峰 Cast-in-place composite light-weight steel wall
CN103866885A (en) * 2014-03-20 2014-06-18 中国建筑第二工程局有限公司 Energy-saving heat-insulating structure of lighting window and construction method thereof
CN104652668A (en) * 2015-01-04 2015-05-27 谭力 Armored integrated wall and construction method thereof
CN205242653U (en) * 2015-11-19 2016-05-18 文登蓝岛建筑工程有限公司 Steel construction unit -installment wall body and outer wall perps structure node thereof
CN107795039A (en) * 2016-08-30 2018-03-13 芜湖合建路桥机械有限公司 A kind of construction method of cast-in-situ thermal-insulated combined wall
CN107044179A (en) * 2016-12-30 2017-08-15 中国建筑科学研究院 Decorative panel and template integrated heat-preservation decorative composite wall and construction method thereof
CN106801483A (en) * 2017-03-02 2017-06-06 青岛科瑞新型环保材料集团有限公司 A kind of non-dismantling formwork heat insulating decorative board external wall protection body system and its construction method

Similar Documents

Publication Publication Date Title
WO2021253808A1 (en) Building technique for low-carbon society in high-technology era
CN104018598B (en) A kind of external wall structure and construction installation method
CN102425264B (en) Composite decorating concrete and manufacturing method thereof
CN104314204B (en) Non-form stripping lightweight internal partition board and overall grouting construction method thereof
CN204386019U (en) A kind of precast wall panel and the assembling type outer wall system of being assembled by this side fascia
CN110792203B (en) Aerated concrete composite heat-insulation wallboard system and construction method thereof
CN102051923B (en) Fireproofing retardant cement calcium silicate board insulating wall body and construction method thereof
CN101818539A (en) Assembled integral building and construction method thereof
CN104652740A (en) Installation method for thermal insulation and decoration integrated facade panels
CN101586388B (en) Method for mounting insulating and decorating integrative board
CN102505762A (en) Sand aerated concrete heat-insulation block outer wall outer heat-insulation system and construction method thereof
CN107313531A (en) A kind of assembled integral shear wall connecting node and its system and its construction technology
CN104695662A (en) Stone facing prefabricated external wall plate as well as production method and external wall system thereof
CN204491984U (en) Stone facing precast wall panel and external wall system
CN112922272A (en) EPS line construction method
CN201991102U (en) Fire-proof fire retardation cement calcium silicate board thermal-insulation wall
CN110607852A (en) Novel installation process of metal keel composite wall
CN214169600U (en) Laminated floor slab
CN201424719Y (en) Composite heat insulating silicon calcium plate curtain wall
CN211973951U (en) Outer wall system
CN1314870C (en) Method of dry construction of energy saving walls with 3D adjustment
CN109024939B (en) Steel structure external wall heat insulation mortar enclosure system with drawknot piece and construction process thereof
CN206941791U (en) Assembling type steel structure integrates green building
CN206368459U (en) Steel building Side fascia crack stopper
CN205475769U (en) Net strengthening rib external wall insulation board is rolled over to metal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210330

Address after: 116100 room 813, free trade building, Dalian Free Trade Zone, Liaoning Province

Applicant after: Zhonghe Tiancheng (Dalian) Technology Development Co.,Ltd.

Address before: 1 / F, no.36-7-1, Jinyao Road, Dalian Economic and Technological Development Zone, Liaoning Province, 116011

Applicant before: Zhonghe Tiancheng Construction Services (Dalian) Co.,Ltd.

Applicant before: Xiao Xiao

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191224