CN110565681A - Prefabricated foundation for cable ring main unit - Google Patents

Prefabricated foundation for cable ring main unit Download PDF

Info

Publication number
CN110565681A
CN110565681A CN201910789792.8A CN201910789792A CN110565681A CN 110565681 A CN110565681 A CN 110565681A CN 201910789792 A CN201910789792 A CN 201910789792A CN 110565681 A CN110565681 A CN 110565681A
Authority
CN
China
Prior art keywords
wall
bottom plate
grouting
steel bars
main unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910789792.8A
Other languages
Chinese (zh)
Inventor
唐自晶
李明
侯宜润
朱兴龙
刘籍蔚
赖海斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Electric Power Design And Research Institute Co Ltd
Original Assignee
Nanjing Electric Power Design And Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Electric Power Design And Research Institute Co Ltd filed Critical Nanjing Electric Power Design And Research Institute Co Ltd
Priority to CN201910789792.8A priority Critical patent/CN110565681A/en
Publication of CN110565681A publication Critical patent/CN110565681A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • E02D27/016Flat foundations made mainly from prefabricated concrete elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention discloses a prefabricated foundation for a cable ring main unit, which comprises a bottom plate, a transverse wall and a longitudinal wall, wherein the bottom plate is provided with a plurality of through holes; the transverse wall and the longitudinal wall are arranged on the bottom plate; a plurality of grouting holes are formed in the bottom plate; a plurality of vertical reinforcing steel bars in the wall are vertically arranged in the transverse wall and the longitudinal wall; the vertical steel bars in the wall protrude out of the bottom surfaces of the transverse wall and the longitudinal wall; the vertical steel bars in the wall protruding out of the bottom surfaces of the transverse wall and the longitudinal wall are arranged in the grouting holes; the grouting hole is used for filling grouting material. The prefabricated wall panel is manufactured in a unified mode in a workshop and then is transported to a construction site, construction can be carried out only by using a small crane and auxiliary component supports and a slurry stirring tool, construction is rapid, the requirement on the technical capability of workers is low, the working efficiency can be greatly improved, the construction period is shortened, and the engineering cost is reduced.

Description

Prefabricated foundation for cable ring main unit
Technical Field
The invention relates to the field of infrastructure, in particular to a prefabricated foundation of a cable ring main unit.
Background
In traditional cable engineering construction, the looped netowrk cabinet basis generally adopts on-the-spot manual brick or on-the-spot concrete placement, because civil engineering construction team skill level is uneven, is not convenient for manage and control construction quality. In addition, the manual brick laying or on-site concrete casting is large in engineering quantity, slow in speed and long in construction period, and the engineering progress is severely restricted.
Disclosure of Invention
The invention aims to solve the problems in the prior art, and provides a prefabricated foundation for a cable ring main unit, which has the advantages that prefabricated wall boards are manufactured in a unified manner in a workshop and then are transported to a construction site, construction can be carried out only by using a small crane and auxiliary component supports and a slurry stirring tool, construction is rapid, the requirement on the technical capability of workers is low, the working efficiency can be greatly improved, the construction period is shortened, and the engineering cost is reduced.
In order to solve the problems, the invention adopts the following scheme: a prefabricated foundation for a cable ring main unit is characterized by comprising a bottom plate, a transverse wall and a longitudinal wall; the transverse wall and the longitudinal wall are arranged on the bottom plate; a plurality of grouting holes are formed in the bottom plate; a plurality of vertical reinforcing steel bars in the wall are vertically arranged in the transverse wall and the longitudinal wall; the vertical steel bars in the wall protrude out of the bottom surfaces of the transverse wall and the longitudinal wall; the vertical steel bars in the wall protruding out of the bottom surfaces of the transverse wall and the longitudinal wall are arranged in the grouting holes; the grouting hole is used for filling grouting material.
Further, according to the above design scheme, the prefabricated foundation for the cable ring main unit is characterized in that a reserved wall slot is formed in the bottom plate; the reserved wall slot is matched with the transverse wall and the longitudinal wall.
Further, according to the above design scheme, the prefabricated foundation for the cable ring main unit is characterized in that a plurality of reinforcing steel bars are arranged inside the bottom plate; the reinforcing steel bars are arranged close to the inner wall of the bottom plate.
Further, according to the design scheme, the prefabricated foundation for the cable ring main unit is characterized in that the bottom plate and the grouting hole are integrally made of sheet iron; the grouting hole is of a cone frustum structure with an opening at the upper part and a small upper part and a big lower part.
Further, according to above-mentioned design the prefabricated foundation for cable looped netowrk cabinet, its characterized in that, vertical reinforcing bar protrusion transverse wall and vertical wall ground part are helical structure in the wall.
Further, according to the above design scheme, the prefabricated foundation for the cable ring main unit is characterized in that the grouting hole is formed in the reserved wall groove. Furthermore, grout holes arranged in the reserved wall groove are evenly distributed into two circles.
The invention has the following technical effects: the prefabricated wall panel is manufactured in a factory and transported to the site, the site foundation is leveled, and the bottom plate is laid; then, grouting materials are pre-injected into the grouting holes, and a layer of grouting materials is pre-laid at the middle position of the two circles of grouting holes; and the transverse wall and the longitudinal wall are arranged along the reserved wall slot on the bottom plate, and vertical steel bars in the wall are inserted into the grouting holes.
Vertical reinforcing bar protrusion transverse wall and vertical wall ground part divide into helical structure in the wall of this application, can increase anchor length, improve the anchoring performance of reinforcing bar.
The utility model provides a be equipped with on the bottom plate and reserve the wall groove, guarantee that horizontal wall and vertical wall can accurately install, have the convenient advantage of assembling, improve horizontal bearing capacity of horizontal wall and vertical wall and bottom plate connection position simultaneously.
The utility model provides a grout hole sets to big end up's circular truncated cone shape, when downthehole grout material and reinforcing bar received ascending pulling force, can cramp the reinforcing bar anchor body automatically, especially when inside grout material and edge bonding quality are not good, still can undertake the vertical pulling force of wall body, guarantees the anchoring performance of wall reinforcing bar.
Grouting materials are fully injected into the grouting holes in advance, and can be manually inserted and tamped, so that the compactness of the grouting materials is guaranteed. During construction, the vertical steel bars in the wall are inserted, and redundant slurry is automatically discharged, so that the vertical steel bars in the wall are completely contacted with the slurry, and the pouring connection quality is improved. And the grouting material is laid in advance between the two circles of grouting holes, after the transverse wall and the longitudinal wall are assembled into the reserved wall slot, the grouting material and the slurry overflowing from the grouting holes are pressed and spread out together, the redundant part is extruded out of the reserved wall slot, the contact surfaces of the transverse wall and the longitudinal wall and the bottom plate are automatically grouted, the post grouting process is omitted, the grouting compactness is good, the seepage is prevented, and the bearing performance and the durability of the connection are greatly enhanced.
Drawings
Fig. 1 is a schematic diagram of a prefabricated foundation structure of a cable ring main unit.
Fig. 2 is a schematic structural diagram of a prefabricated foundation section of the cable ring main unit.
Wherein, 1 is the bottom plate, 2 is the vertical wall, 3 is the horizontal wall, 4 is vertical reinforcing bar in the wall, 5 is the grout hole, 6 is the reinforcing bar.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Example 1: a prefabricated foundation for a cable ring main unit is characterized by comprising a bottom plate, a transverse wall and a longitudinal wall; the transverse wall and the longitudinal wall are arranged on the bottom plate; a plurality of grouting holes are formed in the bottom plate; a plurality of vertical reinforcing steel bars in the wall are vertically arranged in the transverse wall and the longitudinal wall; the vertical steel bars in the wall protrude out of the bottom surfaces of the transverse wall and the longitudinal wall; the vertical steel bars in the wall protruding out of the bottom surfaces of the transverse wall and the longitudinal wall are arranged in the grouting holes; the grouting hole is used for filling grouting material.
As the simplest implementation mode of the application, firstly, the bottom plate is made of the thin iron plate, the bottom plate is provided with a plurality of grouting holes, the transverse wall and the longitudinal wall can be arranged on the bottom plate, and the protruding part of the vertical steel bar in the wall can be inserted into the grouting holes, so that the vertical steel bar in the wall and the grouting holes are matched with each other. The prefabricated wall boards are manufactured in a unified mode in a workshop and then are transported to a construction site, construction can be conducted only by using a small crane and auxiliary component supports and a slurry stirring tool, construction is rapid, the requirement on the technical capacity of workers is low, the working efficiency can be greatly improved, the construction period is shortened, and the engineering cost is reduced.
Example 2: a prefabricated foundation for a cable ring main unit is characterized by comprising a bottom plate, a transverse wall and a longitudinal wall; the transverse wall and the longitudinal wall are arranged on the bottom plate; a plurality of grouting holes are formed in the bottom plate; a plurality of vertical reinforcing steel bars in the wall are vertically arranged in the transverse wall and the longitudinal wall; the vertical steel bars in the wall protrude out of the bottom surfaces of the transverse wall and the longitudinal wall; the vertical steel bars in the wall protruding out of the bottom surfaces of the transverse wall and the longitudinal wall are arranged in the grouting holes; the grouting hole is used for filling grouting material, and a reserved wall slot is formed in the bottom plate; the reserved wall slot is matched with the transverse wall and the longitudinal wall, and a plurality of reinforcing steel bars are arranged inside the bottom plate; the reinforcing steel bars are arranged close to the inner wall of the bottom plate, and the bottom plate and the grouting holes are integrally made of sheet iron; the grout hole is upper portion opening, and big end down's circular cone structure, vertical reinforcing bar protrusion transverse wall and vertical wall ground part are helical structure in the wall, the grout hole sets up in reserving the wall inslot, and the grout hole evenly distributed who sets up in reserving the wall inslot becomes two circles.
Most one optimization scheme in this application design, vertical reinforcing bar, grout hole, bottom plate all optimized the improvement in the wall in this embodiment, at first the bottom of vertical reinforcing bar in the wall, specifically indicate that protrusion horizontal wall and vertical wall ground part design into helical structure. Then design into big end down's circular truncated cone structure with the grout hole, consolidate the grout hole, set up many reinforcing bars simultaneously on the inner wall of bottom plate, strengthen the structural strength of bottom plate.

Claims (5)

1. A prefabricated foundation for a cable ring main unit is characterized by comprising a bottom plate, a transverse wall and a longitudinal wall; the transverse wall and the longitudinal wall are arranged on the bottom plate; a plurality of grouting holes are formed in the bottom plate; a plurality of vertical reinforcing steel bars in the wall are vertically arranged in the transverse wall and the longitudinal wall; the vertical steel bars in the wall protrude out of the bottom surfaces of the transverse wall and the longitudinal wall; the vertical steel bars in the wall protruding out of the bottom surfaces of the transverse wall and the longitudinal wall are arranged in the grouting holes; the grouting hole is used for filling grouting material.
2. The prefabricated foundation for a cable ring main unit as claimed in claim 1, wherein the bottom plate is provided with a reserved wall slot; the reserved wall slot is matched with the transverse wall and the longitudinal wall.
3. The prefabricated foundation for a cable ring main unit as claimed in claim 1, wherein the bottom plate and the grouting holes are integrally made of sheet iron; the grouting hole is of a cone frustum structure with an opening at the upper part and a small upper part and a big lower part.
4. The prefabricated foundation for a cable ring main unit as claimed in claim 1, wherein the vertical steel bars in the wall protrude out of the horizontal wall and the vertical wall ground parts to form a spiral structure.
5. The prefabricated foundation for a cable ring main unit as claimed in claim 2, wherein the grouting hole is formed in the reserved wall groove.
CN201910789792.8A 2019-08-26 2019-08-26 Prefabricated foundation for cable ring main unit Pending CN110565681A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910789792.8A CN110565681A (en) 2019-08-26 2019-08-26 Prefabricated foundation for cable ring main unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910789792.8A CN110565681A (en) 2019-08-26 2019-08-26 Prefabricated foundation for cable ring main unit

Publications (1)

Publication Number Publication Date
CN110565681A true CN110565681A (en) 2019-12-13

Family

ID=68775948

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910789792.8A Pending CN110565681A (en) 2019-08-26 2019-08-26 Prefabricated foundation for cable ring main unit

Country Status (1)

Country Link
CN (1) CN110565681A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112064528A (en) * 2020-09-04 2020-12-11 上海建工二建集团有限公司 Prefabricated box culvert connecting joint and construction method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107742830A (en) * 2017-10-11 2018-02-27 内蒙古利元管涵工程有限责任公司 A kind of prefabricated ring main unit basis
CN107882051A (en) * 2017-10-29 2018-04-06 北京工业大学 A kind of conical pipe anchor bar connecting structure for precast assembly structure

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107742830A (en) * 2017-10-11 2018-02-27 内蒙古利元管涵工程有限责任公司 A kind of prefabricated ring main unit basis
CN107882051A (en) * 2017-10-29 2018-04-06 北京工业大学 A kind of conical pipe anchor bar connecting structure for precast assembly structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112064528A (en) * 2020-09-04 2020-12-11 上海建工二建集团有限公司 Prefabricated box culvert connecting joint and construction method thereof

Similar Documents

Publication Publication Date Title
CN109356173A (en) A kind of pin-connected panel anchor bolt frame girder construction and its construction method
CN203701334U (en) Reinforced and prefabricated type shear wall structure
CN103790267A (en) Reinforcement type prefabricated assembly type shear wall structure and construction method thereof
CN104631440A (en) Stiffening core lengthening foundation pit support structure for existing large-diameter bored concrete pile and construction method
CN105421449A (en) Construction method of composite pile composed of nail-shaped active material plastic sleeve and concrete stiffened core
CN112695795A (en) Precast concrete T shape post rim of a cup basis
CN201512810U (en) Retaining wall
CN105369799A (en) Concrete precast pile of precast pile underground diaphragm wall and construction method of precast pile underground diaphragm wall
CN209114658U (en) A kind of precast concrete partition plate structure for staircase
CN104762967A (en) Improved anchor rod static pressure pile sealing device and construction method
CN215106098U (en) Prefabricated post connection structure
CN110565681A (en) Prefabricated foundation for cable ring main unit
CN109914589A (en) A kind of prestressed reinforced concrete prefabricated post vertical connection structure and its construction method
CN203684457U (en) Light assembled shear wall structure
CN205742262U (en) Concrete prefabricated board pin-connected panel underground structure
CN113585336B (en) Quick construction method of sinking type concrete mixing station in soft foundation environment
CN206220121U (en) Assembled point anchor barricade
CN216865281U (en) Heavy equipment ground subsides-preventing reinforced structure
CN102296620A (en) Curtain water-stop slope wall and construction method thereof
CN207211388U (en) The vertical connection structure of precast shear wall
CN214460578U (en) Precast concrete L shape post rim of a cup basis
CN211395734U (en) Straight anchor and group anchor composite rock anchoring foundation for power transmission tower
CN210507502U (en) Prefabricated assembled concrete slab bed structure
CN204551470U (en) A kind of envelope stake device of anchor jacked pile of improvement
CN202148530U (en) Curtain water stop slope wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191213

RJ01 Rejection of invention patent application after publication