CN110529665A - A kind of toilet combined water proof casing and its installation method - Google Patents

A kind of toilet combined water proof casing and its installation method Download PDF

Info

Publication number
CN110529665A
CN110529665A CN201910847909.3A CN201910847909A CN110529665A CN 110529665 A CN110529665 A CN 110529665A CN 201910847909 A CN201910847909 A CN 201910847909A CN 110529665 A CN110529665 A CN 110529665A
Authority
CN
China
Prior art keywords
pedestal
ring
cover board
water proof
combined water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910847909.3A
Other languages
Chinese (zh)
Inventor
余子盛
郑则宇
邹申
杨玉森
洪德东
陈翔俊
陈海建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Chengbo Construction Engineering Co Ltd
Original Assignee
Zhejiang Chengbo Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Chengbo Construction Engineering Co Ltd filed Critical Zhejiang Chengbo Construction Engineering Co Ltd
Priority to CN201910847909.3A priority Critical patent/CN110529665A/en
Publication of CN110529665A publication Critical patent/CN110529665A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L5/00Devices for use where pipes, cables or protective tubing pass through walls or partitions

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Sink And Installation For Waste Water (AREA)

Abstract

The invention discloses a kind of toilet combined water proof casings, including pedestal, it is provided with water-proof wing-ring outward at the base side wall lower edge, the chassis interior is hollow and upper and lower ends are in communication with the outside, the pedestal lower end forms fixed ring to in-flanges, the fixed ring upper ends have casing cover board, and at least two mounting holes passed through for pipeline are provided on described sleeve pipe cover board.After pedestal is cast in floor, casing cover board is placed on the fixed ring upper surface in pedestal, pipeline is connect with the mounting hole on casing cover board respectively, so that the installation of multiple pipelines is completed, it is time saving and energy saving.

Description

A kind of toilet combined water proof casing and its installation method
Technical field
The present invention relates to the technical field of casing, in particular to a kind of toilet combined water proof casing and its installation side Method.
Background technique
In housing construction, toilet pre-buried casing plays dual parts of Pipe installing and reserves channel and waterproof. Under normal circumstances, service sleeve is usually the single tube casing being independently arranged, and outer wall is usually arranged with water-proof wing-ring.It, will when installation Service sleeve is cast in pipeline threading position, after installing end conduit, needs to hang molding and plugs pipe hole.
The Chinese patent that notification number is CN202227694U discloses to be used in a kind of bathroom floor concrete pouring construction Service sleeve, the casing include upper pipe fitting, middle pipe fitting and lower pipe fitting;Roughened surface treatment is done in the outer surface of service sleeve, increases The contact area of casing and concrete, effectively blocking leak path.Middle pipe fitting be bucket type variable section structure, bucket type lower part it is interior Slotting ring is inserted into PVC-U pipe (PVC-U pipe upper end is installed in inner groove), even if casing is with pvc pipe, there are bonding defects, also It will not leak.The fixation hole position of lower pipe fitting fixed underpan is respectively equipped with the ribbed stiffener of protrusion;So that casing fixation, installation Simply.
But above-mentioned embedded sleeve for concrete pouring construction of bathroom floor has the following deficiencies: the service sleeve only It can be correspondingly connected with a pipeline, when multiple pipelines are installed, need the corresponding multiple service sleeves of installation, it is time-consuming and laborious, therefore need It improves.
Summary of the invention
It in view of the above technical defects, can be simultaneously the object of the present invention is to provide a kind of toilet combined water proof casing Multiple pipelines are connected, it is time saving and energy saving.
To achieve the above object, the present invention provides the following technical scheme that
A kind of toilet combined water proof casing, including pedestal are provided with water-proof wing at the base side wall lower edge outward Ring, the chassis interior is hollow and upper and lower ends are in communication with the outside, and the pedestal lower end forms fixed ring to in-flanges, described Fixed ring upper ends have casing cover board, and at least two mounting holes passed through for pipeline are provided on described sleeve pipe cover board.
By using above-mentioned technical proposal, after pedestal is cast in floor, casing cover board is placed in pedestal Pipeline is connect with the mounting hole on casing cover board by fixed ring upper surface respectively, so that the installation of multiple pipelines is completed, time saving province Power.
The present invention is further arranged to: the water-proof wing-ring includes the connection ring connecting with pedestal lower end outer wall, the company It connects ring edge and is connected with waterproof ring along the vertical direction.
By using above-mentioned technical proposal, connection ring is cast in floor, increases the stability that pedestal is connect with floor, together When connection ring can prevent gap leakage of the fluid between pedestal and floor, waterproof ring can further be prevented along being vertically arranged Fluid stopping body leakage;Meanwhile waterproof ring can also improve the bend resistance ability of connection ring, to prevent the connection in casting concrete Ring deforms.
The present invention is further arranged to: the height of the waterproof ring is 5-15mm.
By using above-mentioned technical proposal, the height of waterproof ring has good waterproof effect when being 5-15mm, works as waterproof ring When more than 15mm, it is easy to happen bending deformation, to influence waterproof effect, when waterproof ring is lower than 5mm, waterproof effect is paid no attention to Think.
The present invention is further arranged to: the two sides of the connection ring upper surface are opened up there are two fixation hole.
By using above-mentioned technical proposal, fixation hole passes through for steel nail, and steel nail is beaten on plank sheathing, thus by pedestal It firmly installs, the concreting after convenience avoids the relative position of pedestal from shifting.
The present invention is further arranged to: the width of the fixed ring is 15-20mm, and the length of described sleeve pipe cover board compares pedestal The small 10-13mm of length.
By using above-mentioned technical proposal, casing cover board can fix ring fine tuning relatively, to facilitate align with tube, improve Installation effectiveness.
The present invention is further arranged to: described sleeve pipe cover board lower end surface edge is integrally formed with positioning ring, the fixation Ring upper surface edge connects restraining position ring block.
By using above-mentioned technical proposal, stop collar and positioning ring can seal the gap between casing cover board and fixed ring It closes, so that convenient carry out concreting in pedestal, avoids Concrete Leakage;Meanwhile positioning ring can increase casing cover board The bend resistance ability at edge, avoid casing cover board deform and can not normal use.
The present invention is further arranged to: the big 2-4mm of outer diameter of the aperture ratio pipeline of the mounting hole.
By using above-mentioned technical proposal, there is the fine tuning space of 2-4mm between pipeline and installation hole wall, it is vertical when pipeline Degree can carry out the normal mounting of pipeline there are when deviation after fine adjustment, not need the position of adjustment pedestal, improve installation effect Rate.
The present invention is further arranged to: the pedestal and casing lid surface are coated with antirust paint.
By using above-mentioned technical proposal, antirust paint can prevent pedestal and casing lid surface from corrosion deformation occurs, and keep away Exempt to influence normal use, while improving the service life of pedestal Yu casing cover board.
The present invention also provides a kind of installation methods of toilet combined water proof casing, comprising the following steps:
S1: after the completion of floor slab formerecting, according to pipeline threading position, with steel nail by the fixation hole on pedestal by pedestal and template into Row is fixed;
S2: before casting concrete, the opening of pedestal upper end is closed with plank sheathing, blend compounds band is shut;
S3: carrying out concreting, when pouring, vibrates, guarantees closely knit to reinforcement around pedestal;
S4: after the completion of concreting, the plank sheathing at base openings is removed, and according to up to lower layer's Pipe installing position core Casing cover board is put into pedestal by the installation site of real pedestal after confirmation is errorless, carries out Pipe installing;
S5: after the completion of Pipe installing, the building waste extra to chassis interior is cleared up, and then pours pea gravel concreten, and Layering is vibrated, last water seasoning 14 days.
In conclusion the invention has the following advantages:
1, the good pedestal of location and installation is only needed, that is, can be connected to few two pipelines, improve the installation effectiveness of pipeline, it is time saving and energy saving;
2, pedestal and casing covering plate structure are simple, easy for installation;
3, when Pipe installing, phase of the casing cover board between the relative position and pipeline and mounting hole of base intracavity can be finely tuned To position, to facilitate pipe laying;
4, antirust paint can prevent pedestal and casing cover board from corroding, and improve the service life of pedestal and casing cover board.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of embodiment;
Fig. 2 is the schematic cross-sectional view in the face A-A in Fig. 1;
Fig. 3 is the enlarged structure schematic diagram of B area in Fig. 2.
Description of symbols: 1, pedestal;11, fixed ring;12, stop collar;2, water-proof wing-ring;21, connection ring;211, fixed Hole;22, waterproof ring;3, casing cover board;31, mounting hole;32, positioning ring.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
A kind of toilet combined water proof casing, as shown in Figure 1, include wall thickness 2mm and be in rectangle pedestal 1, in pedestal 1 Portion is hollow and upper and lower ends are in communication with the outside, and is equipped with wall thickness 1.5mm inside pedestal 1 in the horizontal direction and is in the casing of rectangle Cover board 3,3 upper surface of casing cover board are spaced apart the rounded installation there are three set for connecting with pipeline along length direction Pipeline is attached with the mounting hole 31 on casing cover board 3 by hole 31 respectively, time saving and energy saving.
Pedestal 1 and casing cover board 3 are all made of Q235 steel plate and are made, easy to make convenient for materials, low in cost.1 He of pedestal 3 surface of casing cover board is coated with red lead anti-corrosive paint, and red lead anti-corrosive paint adhesive force is good, and rustless property is high, and water resistance is strong, thus effectively It prevents pedestal 1 and casing cover board 3 from corrosion occurs and deforms, avoids influencing normal use.
As shown in Figure 1, Figure 3, water-proof wing-ring 2 is installed outward, water-proof wing-ring 2 includes and pedestal 1 at 1 lower edge of pedestal Lower end outer wall is fixedly connected with and is in the connection ring 21 of rectangle, and edge of 21 upper surface of connection ring far from pedestal 1 is along the vertical direction The waterproof ring 22 for being 10mm integrally formed with height.Connection ring 21 is cast in floor, increases the stabilization that pedestal 1 is connect with floor Property, while connection ring 21 can prevent fluid from leaking from the gap between pedestal 1 and floor.Waterproof ring 22 can further prevent Fluid leakage;Meanwhile waterproof ring 22 can also improve the bend resistance ability of connection ring 21, to prevent connection ring 21 when pouring It deforms.
As shown in Figure 1, the two sides of 21 upper surface of connection ring are opened up, there are two fixation holes 211.Fixation hole 211 is for steel nail Pass through, steel nail beaten on plank sheathing, so that pedestal 1 be firmly installed, it is convenient after concreting, avoid pedestal 1 with The relative position of plank sheathing shifts.
As shown in Figure 1, Figure 3, the fixed ring 11 that 1 lower end of pedestal is 20mm integrally formed with width to in-flanges, casing cover Plate 3 is placed on 11 upper surface of fixed ring, and it is 5mm's that 11 upper surface edge of fixed ring, which is turned down straight up integrally formed with height, Stop collar 12,3 lower end surface edge of casing cover board are 5mm positioning ring 32, stop collar 12 and positioning ring 32 integrally formed with height Gap between casing cover board 3 and fixed ring 11 can be closed, so that convenient carry out concreting in pedestal 1, be avoided Concrete Leakage;Meanwhile positioning ring 32 can increase the bend resistance ability at 3 edge of casing cover board, avoid casing cover board 3 deform and It can not normal use.
As shown in Figure 1, Figure 3, the width of fixed ring 11 is 20mm, and the length of casing cover board 3 is than between 1 two sides short side of pedestal The small 15mm of distance.Pipeline generallys use 110 drainpipes of PVC material, and the outer diameter of the aperture ratio pipeline of mounting hole 31 is big 3mm.Therefore it can achieve the effect that " secondary fine tuning " at later period Pipe installing, when the verticality of pipeline is there are when deviation, set Tube cover plate 3 can finely tune 15mm along 1 length direction of pedestal in fixed ring 11, also have between pipeline and the hole wall of mounting hole 31 The adjustment space of 3mm, therefore after " secondary fine tuning ", so that pipeline is directed at mounting hole 31, and the normal mounting of pipeline is carried out, The position of adjustment pedestal 1 is not needed, installation effectiveness is improved.
The installation method of above-mentioned toilet combined water proof casing, comprising the following steps:
S1: after the completion of floor slab formerecting, according to pipeline threading position, with steel nail by the fixation hole 211 on pedestal 1 by pedestal 1 with Template is fixed;
S2: before casting concrete, the opening of 1 upper end of pedestal is closed with plank sheathing, blend compounds band is shut;
S3: carrying out concreting, when pouring, vibrates, guarantees closely knit to the reinforcement of 1 surrounding of pedestal;
S4: after the completion of concreting, the plank sheathing of 1 opening of pedestal is removed, and according to up to lower layer's Pipe installing position The installation site of pedestal 1 is verified, casing cover board 3 is put into pedestal 1 after confirmation is errorless, casing cover board 3 is put into consolidating on pedestal 1 After determining ring 11, it is finely adjusted, so that the mounting hole 31 on pipeline alignment sleeve cover board 3, and carry out Pipe installing;
S5: after the completion of Pipe installing, the building waste extra to 1 inside of pedestal is cleared up, and then pours pea gravel concreten, and Layering is vibrated, last water seasoning 14 days.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this All by the protection of Patent Law in the scope of the claims of invention.

Claims (9)

1. a kind of toilet combined water proof casing, including pedestal (1), pedestal (1) the side wall lower ends edge is arranged outward There are water-proof wing-ring (2), it is characterised in that: pedestal (1) inner hollow and upper and lower ends are in communication with the outside, the pedestal (1) lower end forms fixed ring (11) to in-flanges, and fixed ring (11) upper ends have casing cover board (3), described sleeve pipe lid At least two mounting holes (31) passed through for pipeline are provided on plate (3).
2. a kind of toilet combined water proof casing according to claim 1, it is characterised in that: the water-proof wing-ring (2) Including the connection ring (21) connecting with pedestal (1) lower end outer wall, connection ring (21) edge is connected with anti-along the vertical direction Water ring (22).
3. a kind of toilet combined water proof casing according to claim 2, it is characterised in that: the waterproof ring (22) Height is 5-15mm.
4. a kind of toilet combined water proof casing according to claim 2, it is characterised in that: on the connection ring (21) The two sides of end face are opened up there are two fixation hole (211).
5. a kind of toilet combined water proof casing according to claim 1, it is characterised in that: described sleeve pipe cover board (3) Length it is 10-20mm smaller than the length of pedestal (1).
6. a kind of toilet combined water proof casing according to claim 5, it is characterised in that: described sleeve pipe cover board (3) Lower end surface edge connects restraining position ring block (12) integrally formed with positioning ring (32), fixed ring (11) the upper surface edge.
7. a kind of toilet combined water proof casing according to claim 1, it is characterised in that: the mounting hole (31) The big 2-4mm of the outer diameter of aperture ratio pipeline.
8. a kind of toilet combined water proof casing according to claim 1, it is characterised in that: the pedestal (1) and set Tube cover plate (3) surface is coated with antirust paint.
9. a kind of installation method of toilet combined water proof casing according to any one of claims 1 to 8, feature It is: the following steps are included:
S1: after the completion of floor slab formerecting, according to pipeline threading position, pass through the fixation hole (211) on pedestal (1) for pedestal with steel nail (1) it is fixed with template;
S2: before casting concrete, the opening of pedestal (1) upper end is closed with plank sheathing, blend compounds band is shut;
S3: carrying out concreting, when pouring, vibrates, guarantees closely knit to reinforcement around pedestal (1);
S4: after the completion of concreting, the plank sheathing of pedestal (1) opening is removed, and according to up to lower layer's Pipe installing position The installation site for verifying pedestal (1) is set, casing cover board (3) is put into pedestal (1) after confirmation is errorless, carries out Pipe installing;
S5: after the completion of Pipe installing, clearing up the internal extra building waste of pedestal (1), then pour pea gravel concreten, And be layered and vibrate, last water seasoning 14 days.
CN201910847909.3A 2019-09-09 2019-09-09 A kind of toilet combined water proof casing and its installation method Pending CN110529665A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910847909.3A CN110529665A (en) 2019-09-09 2019-09-09 A kind of toilet combined water proof casing and its installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910847909.3A CN110529665A (en) 2019-09-09 2019-09-09 A kind of toilet combined water proof casing and its installation method

Publications (1)

Publication Number Publication Date
CN110529665A true CN110529665A (en) 2019-12-03

Family

ID=68667710

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910847909.3A Pending CN110529665A (en) 2019-09-09 2019-09-09 A kind of toilet combined water proof casing and its installation method

Country Status (1)

Country Link
CN (1) CN110529665A (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05172281A (en) * 1991-12-25 1993-07-09 Ee O Y Syst Kenkyusho:Kk Duct assembling method and seam joint structure of duct
CN1715588A (en) * 2004-06-29 2006-01-04 孙大博 Flat top heat insulation tile
CN201165710Y (en) * 2007-12-28 2008-12-17 方大集团股份有限公司 Curtain wall expansion joint apparatus
CN202227694U (en) * 2011-09-29 2012-05-23 中铁四局集团建筑工程有限公司 Embedded sleeve for concrete pouring construction of bathroom floor
JP2012229598A (en) * 2011-04-22 2012-11-22 Marui Sangyo Co Ltd Concrete mounting hardware for piping through hole
CN203671086U (en) * 2013-11-29 2014-06-25 江山市钧天塑胶厂 PVC embedded waterproof sleeve
CN204577934U (en) * 2015-05-21 2015-08-19 洛阳亚日实业集团有限公司 The quick detachable casing of waterproof of high-low voltage electric power distribution cabinet
CN107237494A (en) * 2017-08-01 2017-10-10 陕西建工第十建设集团有限公司 A kind of adjustable hole to be provided construction mould and construction method
CN207686052U (en) * 2017-12-08 2018-08-03 上海宝尚低碳建筑科技股份有限公司 A kind of waterproof trapping wall body structure with wall feed-through pipeline
CN209227795U (en) * 2018-09-29 2019-08-09 南京奥捷墙体材料有限公司 Waterproof construction is stitched towards day
CN210830800U (en) * 2019-09-09 2020-06-23 浙江诚博建设工程有限公司 Combined waterproof casing pipe for toilet

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05172281A (en) * 1991-12-25 1993-07-09 Ee O Y Syst Kenkyusho:Kk Duct assembling method and seam joint structure of duct
CN1715588A (en) * 2004-06-29 2006-01-04 孙大博 Flat top heat insulation tile
CN201165710Y (en) * 2007-12-28 2008-12-17 方大集团股份有限公司 Curtain wall expansion joint apparatus
JP2012229598A (en) * 2011-04-22 2012-11-22 Marui Sangyo Co Ltd Concrete mounting hardware for piping through hole
CN202227694U (en) * 2011-09-29 2012-05-23 中铁四局集团建筑工程有限公司 Embedded sleeve for concrete pouring construction of bathroom floor
CN203671086U (en) * 2013-11-29 2014-06-25 江山市钧天塑胶厂 PVC embedded waterproof sleeve
CN204577934U (en) * 2015-05-21 2015-08-19 洛阳亚日实业集团有限公司 The quick detachable casing of waterproof of high-low voltage electric power distribution cabinet
CN107237494A (en) * 2017-08-01 2017-10-10 陕西建工第十建设集团有限公司 A kind of adjustable hole to be provided construction mould and construction method
CN207686052U (en) * 2017-12-08 2018-08-03 上海宝尚低碳建筑科技股份有限公司 A kind of waterproof trapping wall body structure with wall feed-through pipeline
CN209227795U (en) * 2018-09-29 2019-08-09 南京奥捷墙体材料有限公司 Waterproof construction is stitched towards day
CN210830800U (en) * 2019-09-09 2020-06-23 浙江诚博建设工程有限公司 Combined waterproof casing pipe for toilet

Similar Documents

Publication Publication Date Title
CN106013228A (en) Overlapping integral type prefabricated assembly structure for comprehensive pipe gallery and construction method thereof
CN207527149U (en) A kind of underground structure embedded wall penetration pipe water-tight device
CN108301466B (en) Integral prefabricated bathroom caisson, bathroom caisson structure and construction method thereof
CN110552431A (en) Induced joint structure for basement crack control and construction method
CN108443590A (en) Side-type direct-burried part and its construction method
CN106013471A (en) Anti-seepage construction method for expansion joint
CN110594493A (en) Structure suitable for rear buried sleeve of existing pool wall and construction method
CN105650357A (en) Disposable embedded water stop joint for constructional engineering drainage and construction method thereof
CN103410318B (en) Washroom pipe well water-leakage construction method
CN110529665A (en) A kind of toilet combined water proof casing and its installation method
CN107504277A (en) A kind of underground structure embedded wall penetration pipe water-tight device
CN103835421B (en) Leakage-proof floor and anti-seepage construction method
KR20120109897A (en) Drain trap sleeve for bath
CN210830800U (en) Combined waterproof casing pipe for toilet
CN208074294U (en) Side-type direct-burried part
CN114922419A (en) Die for plugging reserved hole with fixed pipeline and using method
CN212642759U (en) Quick installation waterstop of tunnel structure seam and lining cutting end template for installation
CN210315913U (en) Floor drain mounting structure
KR20080076279A (en) Box buried in wall having temporary fix member and pipe jointing method using the same
KR200178968Y1 (en) Structure of manhole
CN110043737A (en) A kind of pre-buried type eddy flow connector with percolating water connector
CN111075481A (en) Construction method for primary support and secondary lining of underground excavation construction transverse channel
KR100755997B1 (en) a manhole for prevention water incomming
KR200417100Y1 (en) a manhole for prevention water incomming
CN212776122U (en) Drainage pipe pre-buried connecting piece

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination