CN110529154A - Prefabricated assembled space grid structure and its construction method for tunnel support - Google Patents

Prefabricated assembled space grid structure and its construction method for tunnel support Download PDF

Info

Publication number
CN110529154A
CN110529154A CN201910868684.XA CN201910868684A CN110529154A CN 110529154 A CN110529154 A CN 110529154A CN 201910868684 A CN201910868684 A CN 201910868684A CN 110529154 A CN110529154 A CN 110529154A
Authority
CN
China
Prior art keywords
tunnel
support structure
rack
tunnel support
prefabricated assembled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910868684.XA
Other languages
Chinese (zh)
Inventor
雷升祥
张旭东
夏明锬
梅灿
彭星新
张志勇
杨旭
董云生
黄明利
宋远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jiaotong University
China Railway 11th Bureau Group Co Ltd
China Railway Fifth Survey and Design Institute Group Co Ltd
China Railway Construction Corp Ltd CRCC
Original Assignee
Beijing Jiaotong University
China Railway 11th Bureau Group Co Ltd
China Railway Fifth Survey and Design Institute Group Co Ltd
China Railway Construction Corp Ltd CRCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jiaotong University, China Railway 11th Bureau Group Co Ltd, China Railway Fifth Survey and Design Institute Group Co Ltd, China Railway Construction Corp Ltd CRCC filed Critical Beijing Jiaotong University
Priority to CN201910868684.XA priority Critical patent/CN110529154A/en
Publication of CN110529154A publication Critical patent/CN110529154A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • E21D11/083Methods or devices for joining adjacent concrete segments
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • E21D11/152Laggings made of grids or nettings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of prefabricated assembled space grid structure and construction method for tunnel support provided by the invention.The prefabricated assembled space net rack supporting construction includes at least two blocks prefabricated rack support units, passes through connecting elements connection Formation cross-section closing supporting construction identical with supporting tunnel cross-section shape between rack support unit;When it is constructed, the interior force parameter of tunnel support structure is calculated according to the parameters setting value and tunnel model of tunnel support structure, obtain the construction parameter value of final tunnel support structure, prepare the rack support unit of the prefabricated assembled space net rack supporting construction of every ring, after tunnel excavation, tunnel support close ring is formed in the prefabricated rack support unit of the excavation section quick-assembling completed, the assembly of multi-ring network frame member is completed and carries out gunite concrete again.Structure of the invention is simple, easy to assembly, is not necessarily to gunite concrete, can undertake whole tunnel loads by grid structure itself, improve construction efficiency.

Description

Prefabricated assembled space grid structure and its construction method for tunnel support
Technical field
The invention belongs to tunnel construction technical fields, and in particular to a kind of prefabricated assembled sky for tunnel support Between grid structure and its construction method.
Background technique
Tunnel construction because of landform, complex geologic conditions are changeable that different degrees of disaster easily occurs, lead to tunnel support Structure deforms, and generates threat to Tunnel Stability to some extent, serious to be unable to satisfy design lining section requirement, shadow Tunnel safety construction is rung, especially brings great difficulty to the constructing tunnel that span is big, structure is complicated, deformation requirements are stringent.At present Traditional Tunnel structure has shotcrete structure, grid supporting, armored concrete supporting construction etc., existing supporting construction It is not able to satisfy its requirement in terms of bearing capacity and support time.By taking most commonly seen grid supporting construction as an example, grid Supporting construction is to spray mixed, anchor pole, steel mesh collective effect with grid steel frame, profile steel frame cooperation, and steelframe is indulged as unit of Pin To the general 0.5~1.5m/ Pin of spacing.Due to the weak characteristic of its discreteness and grid steel frame self-bearing capacity along longitudinal direction, Time before gunite concrete, the ability that steelframe bears country rock load are weaker, it is necessary to which gunite concrete rear can be carried out down Procedure will extend the duration in this way, reduce support construction efficiency.
With the development of element precast mounting technology, be increasingly becoming must for the prefabrication and assembly construction of supporting construction in constructing tunnel It so, is the major measure that construction quality can be provided He build speed, reduce cost.It is exactly to assemble that shield method, which builds Tunnel Engineering, The Typical Representative of formula liner supporting, but due to shield method tunnel construction higher cost, so current mining method construction tunnel is still Sizable ratio is so accounted for, but it is less for the precast assembly technical research of Tunneling by mining method supporting construction.Mining Method at present The most commonly used is the Composite Supporting System being made of gunite concrete, anchor pole, steel arch-shelf etc., common steel arch-shelf tools for tunnel support There are biggish supporting intensity and rigidity, can enhance preliminary bracing structural capacity, but the longitudinally connected reinforcing bar of traditional steel arch-shelf And lock foot and steelframe are all made of welded connecting, speed of application is slow, does not meet the requirement of " the early closing " of constructing tunnel, scene overhead welding Working space is narrow, and quality can be to guarantee, although moreover, section-steel support technology maturation, it is easy to happen due to lateral Rigidity is low and weak axis distortion unstability occurs.Under the premise of meeting safe and reliable, current transit tunnel shield segment assembling is used for reference Technology researches and develops a kind of precast splice type supporting construction for reducing each process alternately operating time, improves construction efficiency, it appears ten Divide necessity.
For space grid structure, as a kind of Spacial Frame Structures, there is three-dimensional loading characteristic, can bear each The effect in direction, and grid structure is generally high order statically indeterminate structure, if a bar partial failure, only few primary indeterminate time Number, internal force can be readjusted, and total does not fail generally, safety stock with higher.Due to its good integrity, stablize Property it is good, space stiffness is big, can effectively bear non-symmetrical load, load and dynamic load, and have preferable anti-seismic performance.Its Space grid structure have been widely used for gymnasium, cinema, show room, Waiting Lounge, Stadium canopy, hangar, The roof system of the buildings such as two-way Large Column Spacing workshop.But to intersect at the rod piece quantity on node more for space grid structure, production peace Dress is compared with planar structure complexity, along with the particularity of tunnel support structure, the limitation of construction space and tunnel support for The restriction of calculating and the requirement of its bearing capacity, there is no space grid structure is applied in constructing tunnel at present.
Summary of the invention
The present invention is directed to the long problem with bearing capacity deficiency of traditional supporting type construction time, and the present invention proposes a kind of suitable For the prefabricated assembled space grid structure and its construction method of tunnel support, which gives full play to space net rack knot The construction convenience of the good stress performance of structure and quick assembled type can guarantee safety for tunnel engineering, improve construction efficiency.
A kind of prefabricated assembled space grid structure for tunnel support provided by the invention, it is characterised in that: described Prefabricated assembled space net rack supporting construction includes at least two blocks prefabricated rack support units, and the two of every block of rack support unit End is respectively equipped with the connecting elements connecting with adjacent rack support unit, and at least two pieces of rack support unit head and the tail pass through connection structure Part connects Formation cross-section closing supporting construction identical with supporting tunnel cross-section shape;Every block of rack support unit be by winding up The lattice support structure of bar, lower boom and web member composition, what top boom formation rack support unit was contacted with tunnel inner wall meets Native wire side, lower boom form the back soil wire side of rack support unit, and web member is connected between top boom and lower boom, and is being winded up It is separated to form multiple grid cells between bar and lower boom, is equipped with metal mesh in the native wire side of meeting of every block of rack support unit.
The present invention preferably technical solution: it is triangle that the grid cell of the rack support unit, which meets native face and carries on the back native face, Shape, square, rectangle, pentagon or hexagon, facade are triangle.
The present invention preferably technical solution: the rack support unit is by multiple triangular pyramids or multiple rectangular pyramids or multiple The grid type support frame of hexagonal pyramid composition.
The present invention preferably technical solution: the top boom and lower boom of the rack support unit are by steel pipe, fashioned iron, steel Any one or a few rod piece in muscle, concrete filled steel tube passes through welding or the arc for being directly bent or being formed by connecting by connector The shape body of rod;And web member is connected by welding or connector between top boom and lower boom and forms arch-shaped space truss structure, the abdomen Bar is steel pipe, fashioned iron, reinforcing bar, any one or a few rod piece in concrete filled steel tube.
The present invention preferably technical solution: the connecting elements be the joggle connector being mutually matched or sleeve connector or Bayonet connection or grafting or welded connections, the first connector and the second connector difference that each connecting elements is mutually matched The docking site of two neighboring rack support unit, and the connecting elements at the both ends of each rack support unit are set It is mutually matched;At least two rack support units pass through the first connector and the splicing of the second connector or welding or splicing and welding Combined mode connects into section annular identical with supporting tunnel cross sectional shape, rectangle, the shape of a hoof or polygon closed branch Protection structure.
A kind of construction method of prefabricated assembled space grid structure for tunnel support provided by the invention, feature It is, including the prefabricated assembled space net rack supporting construction at least two ring claim 1 to 5 any one, specifically applies Steps are as follows for work:
(1) the parameters setting value and tunnel model of tunnel support structure are obtained;And according to the parameter item setting value The load load of the tunnel support structure and the elasticity modulus of equivalent space shell are calculated with tunnel model;By the load lotus Load and input of the elasticity modulus as finite element algorithm, calculate the interior force parameter of the tunnel support structure, according to described Interior force parameter verifies the safety of the tunnel support structure, obtains corresponding verification result, is finally tied according to the verifying Fruit adjusts the value of the parameter item, obtains the construction parameter value of final tunnel support structure;
(2) according to the construction parameter value of the tunnel support structure calculated in step (1), determine that every ring is prefabricated assembled The segmentation of space net rack supporting construction, and select suitable rod piece according to segmentation situation in factory or the every prefabricated dress of ring of field fabrication The connector of monolithic rack support unit and rack support unit with formula space net rack supporting construction;
(3) after tunnel excavation, tunnel is formed in the prefabricated monolithic rack support unit of the excavation section quick-assembling completed Road supporting close ring, the connector that adjacent two blocks of rack support units directly pass through its end quickly connect, and connector includes The joggle connector or sleeve connector or bayonet connection or disk being mutually matched buckle connection or connector, connector according to The end of rack support unit is welded on after rack support unit is directly prefabricated;
(4) continue tunneling, and in the assembled next prefabricated assembled space net rack supporting construction of ring of excavation section, adjacent two Longitudinally connected bar splicing can be used in annular space rack supporting construction;
(5) according to engineering practice, after the assembly for completing multi-ring network frame member, fill-before-fire or casting concrete form branch Protection structure.
The present invention preferably technical solution: the parameter of tunnel support structure includes monolithic prefabrication and assembly construction in the step (1) Longitudinal supporting length of formula space net rack supporting construction, the longitudinal cross-section body of rod radical of every linear meter(lin.m.) tunnel support structure, initial stage branch The thickness of shield, the material thickness of the body of rod, the diameter of connector, the circumferential spacing of connector, rod piece and the material of fitting, bar repeatedly Whole parameters or any several parameters in the geometric dimension of part and connector.
The present invention preferably technical solution: the load load packet of the tunnel support structure calculated in the step (1) Include the gravity load of tunnel support structure and the external load of tunnel support structure;
Wherein, 1. the gravity load f of the tunnel support structure is calculated using formula:
F=γ1bh1;①
Formula 1. in, γ1Indicate the concrete severe of the tunnel support structure, b indicates computing unit longitudinal width, h1It indicates The thickness of the tunnel support structure;
The external load of the tunnel support structure includes the stratum drag and tunnel support knot that tunnel support structure is born The calculating of at least one in the pressure from surrounding rock that structure is born;Wherein, the pressure from surrounding rock that tunnel support structure is born includes tunnel The vertical well-distributed pressure of the country rock that road supporting construction is born and horizontal well-distributed pressure;
After the pressure from surrounding rock that tunnel support structure is born calculates completion, the country rock pressure is adjusted according to load factor Power, wherein the load factor is the ratio of payload values and maxium load value that tentative calculation passes through.
The present invention preferably technical solution: the stratum drag calculating process that the tunnel support structure is born is as follows:
(1) Winkler's assumption algorithm is used, the stratum resistance coefficient of the tunnel model is calculated;
(2) by rigid bar method, it is anti-that the stratum that the tunnel support structure is born is calculated according to the stratum resistance coefficient Power.
The present invention preferably technical solution:
In the case where the tunnel model is deep tunnel:
2. the vertical well-distributed pressure q of the country rock that the tunnel support structure is born is calculated using following formula,
Q=γ2hq
Formula 2. in, hq=first constant × 2S-1W, w=second constant+i (B- three constant);γ2Indicate country rock weight Degree, hqIt indicates that country rock collapses and encircles computed altitude, S indicates that Grades of Surrounding Rock, w indicate that widths affect coefficient, B indicate that tunnel excavation is wide Degree, i indicate every pressure from surrounding rock gradient for increasing unit length;
The horizontal even cloth pressure of the country rock that the tunnel support structure is born is held by the tunnel support structure of above-mentioned calculating The product of the country rock received vertical well-distributed pressure q and particular factor;Wherein, the value of the particular factor is related to Grades of Surrounding Rock.
The present invention preferably technical solution:
In the case where the tunnel model is shallow tunnel:
3. the vertical well-distributed pressure q of the country rock that the tunnel support structure is born is calculated using formula,
Wherein,
γ2Indicate country rock severe, h2Indicate the height of tunnel top from the ground, λ indicates that lateral pressure coefficient, θ indicate tunnel top The angle of friction of portion two sides, B indicate that tunnel excavation width, β indicate angle of rupture when maximum thrust,Indicate that country rock calculates friction Angle;
The horizontal even cloth pressure e of the country rock that the tunnel support structure is borniIt is 4. calculated using formula,
ei2hiλ ④
Wherein, γ2Indicate country rock severe, hiIndicate the distance on outside arbitrary point to ground in tunnel, λ indicates lateral pressure system Number.
The parameter of tunnel support structure includes the vertical of the prefabricated assembled space net rack supporting construction of monolithic in the step (1) Material to supporting length, the longitudinal cross-section body of rod radical of every linear meter(lin.m.) tunnel support structure, the thickness of preliminary bracing, the body of rod is thick Degree, the circumferential spacing of the diameter of connector, connector, rod piece and the geometric dimension of the material of fitting, rod piece and connector repeatedly In whole parameters or any several parameters, the wherein type of attachment of rod piece, bar material, geometric dimension (length, diameter or thickness Degree etc.) material and geometric dimension of connecting elements
Beneficial effects of the present invention:
(1) supporting construction in the present invention utilizes and gives full play to the good stress performance of space grid structure and quick assembling Traditional steel arch-shelf etc. " line supporting " is changed to " face supporting " by the construction convenience of formula, promotes tunnel safety and stability;
(2) the prefabricated assembled space net rack supporting construction in the present invention is not necessarily to gunite concrete, certainly by grid structure Body can undertake whole tunnel loads, assembled quick, and can carry out injection coagulation after carrying out multiple excavations and assembled recycle Soil reduces working procedure alternating, improves construction efficiency, ensured safety for tunnel engineering, is particularly suitable for complicated geology, becomes Shape control is stringent to wait tunnel excavations section;
(3) the space net rack supporting construction in the present invention is to be connected by multi-disc arc supporting construction by quick-assembling connector It forms, arc supporting construction can directly be processed in advance according to parameters for tunnel or scene processing, and then quick-assembling forms one Whole ring structure avoids the problems such as construction tunnel caused by welding is slow, quality can be difficult to ensure, improves construction effect Rate;
(4) the space net rack supporting construction in the present invention is made of multiple pyramidal structures, each pyramidal structure wherein one Side is planar, the other side be it is dotted, connected between face and point by more pull rods, under joint load effect, each rod piece is main Axial pulling force and pressure are born, the intensity of material can be given full play to, multiple pyramid components are regular to be combined, whole Body is good, and stability is good, and space stiffness is big, can effectively bear non-symmetrical load, load and dynamic load, and has preferable Anti-seismic performance;
(5) in the construction process in advance for the bearing capacity of the tunnel needs before gunite concrete to rack in the present invention The parameter of supporting construction carries out calculating design, guarantees that the supporting construction designed can satisfy construction safety, it is ensured that prefabricated branch Protection structure is just capable of providing larger bearing capacity before gunite concrete, it can be achieved that mixed without injection in certain job area Solidifying soil can carry out next procedure, improve construction efficiency.
(6) the space grid structure combination in the present invention is regular, and great deal of nodes is identical with shape, the size of rod piece, and And rod piece and node specification are less, easy to produce, product quality is high.
The present invention can complete the assembly of multi-ring network frame member according to the actual situation and carry out gunite concrete again, the structure and apply Support unit batch production in work method is prefabricated, easy to produce, quality controllable, and on-site consolidation construction is convenient, and mixed without injection Solidifying soil can undertake whole tunnel loads by grid structure itself, and greatly the alt time of reduction each process is, it can be achieved that tunnel The rapid construction of road supporting improves construction efficiency.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of prefabricated assembled space net rack supporting construction of the invention;
Fig. 2 is the structural schematic diagram of rack support unit in the present invention;
Fig. 3 is the splicing schematic diagram of rack support unit in the present invention;
The structural schematic diagram of different connecting elements in Fig. 4 a to Fig. 4 e present invention;
Fig. 5 is the floor map of rack support unit of the invention;
Fig. 6 is the diagrammatic cross-section of rack support unit of the invention;
Fig. 7 a to 7c is the structural schematic diagram of the different grid cells of rack support unit;
Fig. 8 a to Fig. 8 c is the spelling schematic diagram of Fig. 7 a grid cell into 7c respectively.
Fig. 9 is rack framework supporting width and apart from schematic diagram;
Figure 10 is Construction State schematic diagram of the invention.
In figure: 1-rack support unit, 2-to supporting tunnel, 3-top booms, 4-lower booms, 5-web members, 6-gold Belong to net, 7-connecting elements, the first connector of 7-1-, the second connector of 7-2-, 8-concrete lining-ups, a-rack supporting structure The width of part, the spacing of the adjacent two looped networks frame supporting construction of b-.
Specific embodiment
Present invention will be further explained below with reference to the attached drawings and examples.Attached drawing 1 is the attached drawing of embodiment to Fig. 8, It is drawn by the way of simplified, is only used for purpose that is clear, compactly illustrating the embodiment of the present invention.Below to exhibition in the accompanying drawings Existing technical solution is the concrete scheme of the embodiment of the present invention, it is not intended that limits the range of claimed invention.Base Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts it is all its His embodiment, shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that, term " on ", "lower", "inner", "outside", "left", "right" etc. indicate Orientation or positional relationship be based on the orientation or positional relationship shown in the drawings or the invention product using when usually put Orientation or positional relationship or the orientation or positional relationship that usually understands of those skilled in the art, be merely for convenience of retouching It states the present invention and simplifies description, rather than the equipment of indication or suggestion meaning or element must have a particular orientation, with specific Orientation construction and operation, therefore be not considered as limiting the invention.
As shown in Figures 1 to 6, a kind of prefabricated assembled space net rack knot for tunnel support that the invention patent provides Structure, specifically includes at least two blocks prefabricated rack support units 1, the both ends of every block of rack support unit 1 be respectively equipped with it is adjacent The connecting elements 7 that rack support unit 1 connects, the connecting elements 7 is joggle connector (such as Fig. 4 a and the figure being mutually matched 4b) or sleeve connector or bayonet connection (such as Fig. 4 c is buckled with Fig. 4 d) or connector or disk and is connected (such as Fig. 4 e), each The the first connector 7-1 and the second connector 7-2 that connecting elements 7 is mutually matched are separately positioned on two neighboring rack support unit 1 docking site, and the connecting elements 7 at the both ends of each rack support unit 1 is also mutually matched;At least two racks It is identical with 2 cross sectional shape of supporting tunnel that support unit 1 by the first connector 7-1 and the second connector 7-2 is spliced into section Annular, rectangle, the shape of a hoof or polygon closed supporting construction.Prefabricated rack support unit 1 is according to tunnel cross-section shape point Section is prefabricated, compatible with tunnel cross-section shape, does not limit the concrete shape being assembled into.
Every block of rack support unit 1 in the prefabricated assembled space net rack supporting construction of tunnel support provided in the present invention For the lattice support structure being made of top boom 3, lower boom 4 and web member 5, top boom 3 forms rack support unit 1 and tunnel Native wire side is met in the contact of 6 inner wall of road, and lower boom 4 forms the back soil wire side of rack support unit 1, web member 5 be connected to top boom 3 with Between lower boom 4, and multiple grid cells are separated to form between top boom 3 and lower boom 4, in every block of rack support unit 1 Meet native wire side equipped with metal mesh 6.Wherein, the native wire side of meeting of rack support unit 1 is respectively formed entire bracket with native wire side is carried on the back Outer ring structure and inner ring structure can guarantee so outer since the body of rod on outer ring structure and inner ring structure is uniformly arranged Uniform force on coil structures and inner ring structure.
The meet native face and the native face of back of 1 grid cell of rack support unit are triangle, square, rectangle, five in the present invention Side shape or hexagon, facade are triangle, it is ensured that it is met native wire side and carries on the back what the rod piece in native wire side was surrounded by web member 5 Minimum shape unit is triangle, can further improve the support strength of prefabricated components by triangle rock-steady structure.The net The top boom 3 and lower boom 4 of frame support unit 1 are by any one or a few in steel pipe, fashioned iron, reinforcing bar, concrete filled steel tube Rod piece passes through welding or the arc body of rod for being directly bent or being formed by connecting by connector;And between top boom 3 and lower boom 4 Web member 5 is connected by welding or connector and forms arch-shaped space truss structure, and the web member 5 is steel pipe, fashioned iron, reinforcing bar, steel tube concrete Any one or a few rod piece in soil.
Rack support unit 1 provided in the present invention is made of multiple triangular pyramids or multiple rectangular pyramids or multiple hexagonal pyramids Grid type support frame, for triangular pyramid as shown in Fig. 7 a and 8a, the triangle bottom surface of two neighboring triangular pyramid is linked as a curved surface, should Curved surface is the native face of meeting of rack support unit 1, forms three support rods, that is, rack support unit 1 of triangular pyramid triangle bottom surface The cone of top boom, two neighboring triangular pyramid is linked together by interior chord member 4, and three supports of triangular pyramid cone are formed after connection Bar, that is, rack support unit 1 web member.Its rectangular pyramid is as illustrated in figures 7 b and 8b, the same with triangular pyramid, and quadrangular bottom is linked as One curved surface, the plane are the native face of meeting of rack support unit 1, form four support rod, that is, racks of rectangular pyramid quadrangle bottom surface The cone of the top boom of support unit 1, two neighboring rectangular pyramid is linked together by interior chord member 4, and rectangular pyramid cone is formed after connection Four support rods, that is, rack support unit 1 web member of body.For hexagonal pyramid as shown in Fig. 7 c and 8c, hexagon bottom surface is linked as one Curved surface, the curved surface are the native face of meeting of rack support unit 1, form six roots of sensation support rod, that is, rack supporting of hexagonal pyramid hexagonal bottom surface The cone of the top boom of component 1, two neighboring hexagonal pyramid is linked together by interior chord member 4, and hexagonal pyramid cone is formed after connection Six roots of sensation support rod, that is, rack support unit 1 web member.
Below with reference to embodiment, the present invention is further described, and the middle parameter value of the embodiment of the present invention determines that scheme calculating can To be realized using various computer languages, for example, object oriented program language Java and literal translation formula scripting language JavaScript etc..
A kind of construction method for prefabricated assembled space grid structure for tunnel support that embodiment provides, this is applied The grid type support frame that work method is made of primarily directed to rack support unit 1 multiple rectangular pyramids, adjacent two looped networks frame supporting The spacing b's of structure can be taken as 0 according to the actual situation, as shown in Figure 1, its tunnel cross-section perimeterWherein n is tunnel Road section member segments number, Li are the length of i-th section of component, and connecting elements 7 can mutually splice on rack support unit 1 Joggle connector, steps are as follows for the Specific construction of the supporting construction:
(1) the construction parameter value of tunnel support structure is determined:
A. the parameters setting value and tunnel model of tunnel support structure are obtained;Its parameter item includes but is not limited to: every Longitudinal supporting length of piece space net rack supporting construction, every linear meter(lin.m.) space net rack supporting construction longitudinal cross-section match reinforcing bar (pipe) root Number (unilateral side), the thickness of preliminary bracing, the material thickness (such as bar diameter, thickness of steel pipe) of the body of rod, connector diameter and Circumferential spacing of connector etc..The setting value of these parameters can be parameter empirical value, be also possible to design value.The present invention is implemented The tunnel model of example is designed for simulating actual tunnel situation with Tunnel Engineering geology, hydrological geological conditions and existing tunnel And the correlations such as construction experience, tunnel situation extend mode, tunnel depth, tunnel cross-section shape with Grades of Surrounding Rock, tunnel at tunnel Etc. parameters it is related;
B. according to the setting value of parameter item and tunnel model, the load load and equivalent space shell of tunnel support structure are calculated The elasticity modulus of body, load load mainly include gravity load and external load, and external load specifically includes that stratum drag and country rock Pressure etc.;Tunnel support structure can be equivalent to space shell structure, using the setting value of each parameter item of tunnel support structure, come The elasticity modulus for calculating equivalent space shell, can preferably simulate tunnel support structure using which, the bullet being calculated Property modulus can be equivalent to the elasticity modulus of tunnel support structure entirety;
C. using load load and elasticity modulus as the input of finite element algorithm, the internal force ginseng of tunnel support structure is calculated Number, interior force parameter include: moment of flexure, axle power (axial force) and shearing etc.;According to interior force parameter, the peace of tunnel support structure is verified Quan Xing obtains corresponding verification result, according to verification result, the value of adjusting parameter item, if verification result instruction is unsatisfactory for safety Property require, then need the value for adjusting each parameter item to continue to verify, to determine the parameter item for meeting safety.If verification result refers to Show and meet security requirement, and is more beyond security requirement, then the value for needing to adjust a parameter item continues to verify, to save material Material, reduces cost;
D. the value of the parameter item is finally adjusted according to the verification result, obtains the construction of final tunnel support structure Parameter value;
(2) according to the construction parameter value of the tunnel support structure calculated in step (1), determine that every ring is prefabricated assembled The segmentation of space net rack supporting construction, and suitable rod piece and connector are selected, according to segmentation situation in factory or field fabrication The monolithic rack support unit of every prefabricated assembled space net rack supporting construction of ring and the connector of rack support unit;
(3) after tunnel excavation, tunnel is formed in the prefabricated monolithic rack support unit of the excavation section quick-assembling completed Road supporting close ring, adjacent two blocks of rack support units are connected by connecting elements 7, and connecting elements 7 includes being mutually matched Joggle connector or sleeve connector or bayonet connection or disk buckle connection or connector, when connecting elements is joggle connection When part, as shown in figures 4 a and 4b, the first connector 7-1 and the second connector 7-2 of composition connecting elements 7 are mutually matched Convex block and groove, in connection, it is only necessary to two parts directly be docked to its convex block and be mutually embedded in clamping in the groove of other side; When connecting elements is bayonet connection, as shown in Fig. 4 c and Fig. 4 d, including being equipped with the first connecting elements of bayonet and being equipped with lockhole The second connecting elements, in the second connecting elements the first connecting elements of corresponding insertion, and pass through a lock interlocking;When connection structure When part is that disk buckles connection, as shown in Fig. 4 e, the first connecting elements is equipped with disc type aperture, and the second connecting elements first connects After connection member clamping, locked by closing piece;Connecting elements 7 in embodiment according to rack support unit it is directly prefabricated after be welded on The end of rack support unit;When carrying out the installation of rack support unit, the present invention uses multifunctional electric arch fitting machine generation For traditional stand trolley, is risen by multi-functional arch erecting bed roof and the operational means such as arm crawl are installed automatically, it is more There is function arch fitting machine multi-functional arch installation trolley to have automatically walk, automatic station-keeping system, using arm plus hanging basket It combines, realizes multi-functional arch trolley all-around mobile, accurately lifts arch, complete arch construction technique, entirety Movement is efficient and convenient, and applicability is wide, and arch all-around mobile may be implemented, and any position is in place, and whole equipment uses safe liquid Pressure, electric control system controls;
(4) continue tunneling, and continue in excavation section using the assembled next ring prefabrication and assembly construction of multi-functional arch fitting machine Formula space net rack supporting construction;Longitudinally connected bar splicing can be used in adjacent two annular spaces rack supporting construction;
(5) according to engineering practice, complete after the prefabricated assembled space net rack supporting construction of monocycle or complete several rings After prefabricated assembled space net rack supporting construction, injection or casting concrete in rack supporting construction, and will be prefabricated assembled Space net rack supporting construction is wrapped to form liner structure;Since space net rack supporting construction has stronger rigidity, it can undertake and apply Country rock relaxation load between duration, can also carry out next procedure without horse back gunite concrete, in order to accelerate excavation progress, distance Within the scope of face certain distance, delay to apply gunite concrete, it can be only using space net rack supporting construction as preliminary bracing Bearing structure.
In an embodiment of the present invention, as shown in Figure 10, at least two panels space net rack supporting construction is needed, is tentatively drafted every Reinforcing bar (pipe) is matched in longitudinal supporting length L of piece space net rack supporting construction, every linear meter(lin.m.) space net rack supporting construction longitudinal cross-section Radical (unilateral side) n, preliminary bracing thickness h and other constructing variables, these parameter items can use industry experience value.And for other Parameter item can be assumed that a setting value, and such as rod body material thickness, Lai Jinhang structure mechanics analysis, whether inspection calculates design margin evaluation It meets the requirements.By carrying out tentative calculation to these parameter items, the value for the parameter item for meeting security requirement is obtained.
In the above-described embodiments by gravity load and external load, it is determined as the load load of tunnel support structure, and is directed to The calculating process of load load is specific as follows:
One, the calculating of gravity load
Wherein, according to the setting value of parameter item, the step of calculating the gravity load of tunnel support structure includes: using formula 1. calculating the gravity load f of tunnel support structure;Wherein, formula is 1. are as follows:
F=γ1bh1
Wherein, γ1Indicate the concrete severe of tunnel support structure, b indicates computing unit longitudinal width, h1Indicate tunnel support The thickness of structure.
Two, the calculating of external load
According to tunnel model, the step of calculating the external load of tunnel support structure, include at least one of the following: according to tunnel Model calculates the stratum drag that tunnel support structure is born;According to the type of tunnel model, calculates tunnel support structure and held The pressure from surrounding rock received.
1, the calculating of stratum drag
According to tunnel model, the step of calculating the stratum drag that tunnel support structure is born, comprising: false using Wen Keer Determine algorithm, calculates the stratum resistance coefficient of tunnel model;By rigid bar method, tunnel support structure is calculated according to stratum resistance coefficient The stratum drag born.Specifically, in rigid bar method, stratum drag is simulated with stratum spring.Stratum resistance coefficient root It determines according to soil layer condition, is calculated by Winkler's assumption.In calculating, the spring of tension is eliminated.
2, the calculating of pressure from surrounding rock
According to the type of tunnel model, the step of calculating the pressure from surrounding rock that tunnel support structure is born includes: according to tunnel The type of road model calculates separately the vertical well-distributed pressure of country rock and horizontal even cloth pressure that tunnel support structure is born.Wherein, Vertical well-distributed pressure is different with the calculation of horizontal even cloth pressure under tunnel model.The type of tunnel model is different, vertical equal The calculating of cloth pressure is different, and the calculation of horizontal even cloth pressure is also different.The present embodiment will be in conjunction with deep tunnel and shallow below Tunnel is buried to be described further the calculating of pressure from surrounding rock.
2-1, deep tunnel situation
Deep tunnel situation refers to the case where tunnel center line, top or bottom and surface distance are more than certain value, In The case where being referred in the present embodiment in addition to shallow tunnel situation.Calculating for vertical well-distributed pressure: it is in tunnel model In the case where deep tunnel, 2. using formula, calculating the vertical well-distributed pressure q of country rock that tunnel support structure is born, (unit can Think kPa);Wherein, formula is 2. are as follows:
Q=γ2hq
Wherein, hq=first constant × 2S-1W, w=second constant+i (B- three constant);
Wherein, γ2Indicate that (unit can be kN/m to country rock severe3), hqIndicate that (unit can for country rock slump arch computed altitude Think m), S indicates that Grades of Surrounding Rock, w indicate that widths affect coefficient, B indicate tunnel excavation width (unit can be m), and i indicates every Increase the pressure from surrounding rock gradient of unit length.
Optionally, first constant can be 0.45, and second constant can be 1, and three constant can be 5.Correspondingly, hq= 0.45×2S-1W, w=1+i (B-5).Wherein, it as B < 5m, takes i=0.2, when B >=5m, takes i=0.1.
For horizontal even cloth calculation of pressure: in the case where tunnel model is deep tunnel, tunnel support structure being held The product of the vertical well-distributed pressure of the country rock received and particular factor is determined as the horizontal even cloth pressure of country rock that tunnel support structure is born Power, wherein the value of particular factor is related to Grades of Surrounding Rock.For example, even cloth pressure horizontal in this case can be true by the following table 1 It is fixed:
Table 1
Grades of Surrounding Rock I~II
Horizontal even cloth pressure 0 <0.15q (0.15~0.30) q (0.30~0.50) q
2-2, deep tunnel situation
Shallow tunnel refers to the case where tunnel center line, top or bottom and surface distance are lower than certain value, as tunnel buries It is deep to be greater than hqAnd it is less than 2.5hqThe case where.
Calculating for vertical well-distributed pressure: in the case where tunnel model is shallow tunnel, 3. using formula, tunnel is calculated The vertical well-distributed pressure q of the country rock that road supporting construction is born;Wherein, formula is 3. are as follows:
Wherein,
γ2Indicate that (unit can be kN/m to country rock severe3), h2Indicate that (unit can be with for the height of tunnel top from the ground For m), λ indicates lateral pressure coefficient, θ indicate tunnel top two sides angle of friction (unit can for °, generally take empirical value), B It indicates tunnel excavation width or be tunnel span (unit can be m), (unit can be with for angle of rupture when β expression maximum thrust For °),Indicate that country rock calculates angle of friction (unit can be °).
Optionally, the 4th constant can be 1, and the 5th constant can be 1, and the 6th constant can be 1.Correspondingly,
Calculating for horizontal even cloth pressure: it in the case where tunnel model is shallow tunnel, 4. using formula, calculates The horizontal even cloth pressure e of the country rock that tunnel support structure is borni;Wherein, formula is 4. are as follows:
ei2hiλ
Wherein, γ2Indicate that (unit can be kN/m to country rock severe3), hiIndicate tunnel on the outside of arbitrary point to ground away from From (unit can be m), λ indicates lateral pressure coefficient.
Further, the maximum relaxation load that the pressure from surrounding rock being calculated above is born by tunnel-liner, but consider To the supporting role of front of tunnel heading country rock and rear preliminary bracing and secondary lining, there are certain three-dimensional effects, actually apply During work, space net rack supporting construction is not subject to so big load, therefore in the design, rolls over to above-mentioned load Subtract.Specifically, after calculating pressure from surrounding rock, pressure from surrounding rock is adjusted according to load factor, wherein load factor passes through for tentative calculation Payload values and maxium load value ratio.For example, it is assumed that country rock load is q, q=μ q ', wherein μ indicates load factor, is The ratio between payload values that tentative calculation passes through and maxium load value, q ' expression acts in tunnel support structure (space net rack supporting construction) Relaxation load.
It is worth noting that erecting space net rack supporting construction stage and gunite concrete stage, by using difference Load factor μ, carry out load of the corrective action on tunnel support structure, to obtain meeting supporting construction actual loading situation Load.
The calculation of load load under different scenes is described above, it below will be further combined with application scenarios to step The example that the elasticity modulus of tunnel support structure is calculated in 1 is explained.
Specifically, by taking the u-shaped cross-section Structural Lining of bored tunnel shown in FIG. 1 as an example, structure stress mode is with bias Based on compression, according to tension and compression principle of rigidity equivalent, supporting construction stage and the supporting construction in gunite concrete stage etc. will be erected Effect is with certain thickness space shell structure.
Erecting supporting construction stage, EA=Eg(Ag+A‘g), A=Lh, correspondingly, step 13 include: using formula 5., Calculate the elastic modulus E of the equivalent space shell of tunnel support structure;Wherein, formula is 5. are as follows:
Wherein, Ag、A‘g(unit can be m to the area of section of expression tension and the compressive region body of rod2), EgIndicate the material of the body of rod Expect modulus, L indicates that the longitudinal length of a piece of rack supporting construction in tunnel support structure, h indicate the thickness of equivalent space shell Degree.
Wherein, in the case where the body of rod is reinforcing bar,Wherein, n indicates a linear meter(lin.m.) The quantity of the included body of rod in the longitudinal cross-section of rack supporting construction, D indicate the diameter of reinforcing bar.
In the case where the body of rod is steel pipe,N indicates a linear meter(lin.m.) The quantity of the included body of rod in the longitudinal cross-section of rack supporting construction, D indicate that the diameter of steel pipe, t indicate the wall thickness of steel pipe.
The calculating for erecting steelframe stage elasticity modulus is described above, for the gunite concrete stage, according to existing design Experience, in this stage, the equivalent stiffness contribution of the rigidity pair cross-section of steel almost be can be ignored.Therefore, this stage can be straight Connect the rigidity using the rigidity of pneumatically placed concrete as representative section.
Calculating for interior force parameter is the calculating knot of the elasticity modulus based on above-mentioned load load and equivalent space shell Fruit is existing, and the embodiment of the present invention is according to Elasticity basic principle, and the Solve problems of tunnel force on cross-section, it is flat for can simplify Face strain problems.Using Finite Element, the supporting construction for erecting steelframe stage and gunite concrete stage is calculated separately out Internal force (moment M, axle power N and shearing Q).
After obtaining interior force parameter, the safety of tunnel support structure can be verified based on interior force parameter.Below originally Inventive embodiments will verify safety in conjunction with the different construction stages, to obtain the design value of suitable structural parameters.
6. using formula corresponding verification result is calculated in the erection space net rack supporting construction stage;It is in verification result When safety coefficient is greater than or equal to the first value, determine that the safety of tunnel support structure is met the requirements.Assuming that the first value is 2.4, So when K is greater than or equal to 2.4, then the value of the parameter item of tunnel support structure meets security requirement;Conversely, then executing step Rapid 16, the value of adjusting parameter item carries out tentative calculation next time, until being suitably worth.
Wherein, formula is 6. are as follows: KN=α RgA, wherein K indicates safety coefficient, and N indicates axle power, and α indicates the eccentric shadow of axle power Ring coefficient, RgIndicate the tension and compression ultimate strength of the material of rack supporting construction, A indicates the area of section of equivalent space shell.
Optionally, the Eccentric Effect Factor of axle power is related to the thickness of axle power eccentricity and equivalent space shell.For example,Wherein, e0Indicate axis To power eccentricity, h indicates the thickness of equivalent space shell.
It can also include the steps that calculating other parameters entry value after the step of being verified result, specifically, according to Interior force parameter verifies the safety of tunnel support structure, obtains corresponding verification result.Then 7. using formula, connection is calculated The structural parameters of part;Wherein, formula is 7. are as follows:
K indicates safety coefficient, and Q indicates shearing, RgIndicate the tension and compression ultimate strength of the material of rack supporting construction, AkIt indicates The sectional area of connector and body of rod junction, leIndicate the length of the beam element selected in finite element algorithm, θ indicates tunnel top The angle of friction of two sides, c indicate the circumferential spacing of connector.Optionally, the 7th constant can be 0.8, correspondingly,
In this way, connector diameter d and circumferential spacing c, the shearing resistance for meeting structure can be made strong by shear Strength Calculation Degree requires.
The security verification mode for erecting the space net rack supporting construction stage is described above, spray is described further below Security verification mode after penetrating the concrete stage.
After the gunite concrete stage, in the case where the height in concrete compression area is less than or equal to threshold value, using public affairs 8. formula calculates corresponding verification result;When verification result is that safety coefficient is greater than or equal to the first value, tunnel support knot is determined The safety of structure is met the requirements.
Wherein, formula is 8. are as follows:
KNe≤Rwbx(h0-x/2)+RgA‘g(h0-a’)
Wherein,
K indicates safety coefficient, and N indicates axle power, e, eIndicate the center of gravity of the body of rod in tension and compressive region to axle power position Distance, RwIndicate Bending Concrete ultimate compressive strength, b indicates computing unit longitudinal width, and x indicates concrete compression area Highly (unit can be m), RgIndicate the tension and compression ultimate strength of the material of rack supporting construction, Ag、A‘gIndicate tension and compression (unit can be m to the area of section of the body of rod in area2), a, a ' indicate the center of gravity of the body of rod in tension and compressive region to equivalent space shell The minimum distance (unit can be m) of the section edges of body, h0Indicate the effective height in the section of equivalent space shell, h0=h- a。
Specifically, the stress stage after the gunite concrete stage takes square to have R the position of axle powerg(Age-A‘ge’) =Rwbx(e-h0- x/2), it can be derived by the formula: Its In, RwIndicate Bending Concrete ultimate compressive strength, x indicates the height in concrete compression area, Rg, R 'gIndicate rack supporting construction The tension and compression of material, resistance to compression calculate intensity, Ag、A‘gIndicate the area of section of the body of rod in tension and compressive region, e, e ' indicate tension Distance with the center of gravity of the body of rod in compressive region to axle power position, a, a ' indicate Ag、A‘gCenter of gravity to equivalent space shell cut The minimum distance at face edge, h0Indicate the effective height in the section of equivalent space shell.
Correspondingly, it is assumed that threshold value 0.55h0, then when x is less than or equal to 0.55h0When, it is compression member with large eccentricity, presses 8th formula is calculated, i.e. KNe≤Rwbx(h0-x/2)+RgA‘g(h0- a '), when calculating, need to meet x >=2a ', if not meeting, That is when x < 2a ', according to KNe '≤RgAg(h0- a ') it calculates.
After the gunite concrete stage, in the case where the height in concrete compression area is greater than threshold value, 9. using formula, meter Calculate corresponding verification result;When verification result is that safety coefficient is greater than or equal to the first value, the peace of tunnel support structure is determined Full property is met the requirements.Wherein, formula is 9. are as follows:Wherein, K indicates safety coefficient, and N indicates axle power, and e indicates distance of the center of gravity of the body of rod to axle power position, RaIndicate concrete anti-compression pole Intensity is limited, b indicates computing unit longitudinal width, RgIndicate the tension and compression ultimate strength of the material of rack supporting construction, A 'gIndication rod The area of section of body, a ' indicate the body of rod center of gravity to equivalent space shell section edges minimum distance, h0Indicate equivalent sky Between shell section effective height.
Correspondingly, it is assumed that threshold value 0.55h0, then when x is greater than 0.55h0When, it is compression member with small eccentricity, cross-sectional strength It is calculated by the 9th formula, the 8th constant can be 0.5, i.e.,
The calculation of the construction stage main reinforcement is described above, the safety coefficient after arrangement of reinforcement is described further below:
Assume that the first value is 2.4 in the present embodiment, that is to say, that when K is greater than or equal to 2.4, illustrate tunnel support The design value of the parameter item of structure meets security requirement.
It is designed and verifies mainly for the value of the parameter item of the body of rod in tunnel support structure above, it below will be into one Step combines example to be designed and verify the value of the parameter item of connector.
Specifically, according to interior force parameter, the safety of tunnel support structure is verified, the step of corresponding verification result is obtained After rapid, further includes: 10. using formula, calculate the structural parameters of connector;Wherein, formula is 10. are as follows:
K indicates safety coefficient, and Q indicates shearing, RaIndicate concrete anti-compression ultimate strength, b indicates that computing unit is longitudinal wide Degree, h0Indicate the effective height in the section of equivalent space shell, RgIndicate the tension and compression ultimate strength of the material of rack supporting construction, AkIndicate the sectional area of connector and body of rod junction, leIndicate the length of the beam element selected in finite element algorithm, θ indicates tunnel The angle of friction of two sides at the top of road, c indicate the circumferential spacing of connector.Assuming that the 9th constant is 0.07, the tenth constant is 0.8, phase Ying Di, the tenth formula are as follows:It can be calculated according to the formula and meet shearing resistance The limiting value of the circumferential spacing of the connector of force request.
In embodiments of the present invention when verification result is that safety coefficient is less than security requirement threshold value, by the value of parameter item Increase;When verification result is that safety coefficient reaches particular value beyond security requirement threshold value, the value of parameter item is reduced;It is testing When card result is that safety coefficient is not up to particular value beyond security requirement threshold value, keep the setting value of parameter item constant.With peace For overall coefficient K, it is assumed that the first value is 2.4, if K < 2.4, illustrates the current design value of the parameter item of tunnel support structure not Safety, need to increase the design value, recalculate;If K > > 2.4, illustrate that the bearing capacity affluence of tunnel support structure is more, need to subtract The design value of small parameter item, is recalculated;When K is slightly larger than 2.4, then illustrates that the bearing capacity of tunnel support structure is able to satisfy and want It asks, and relatively inexpensive.
It is worth noting that preliminary bracing in the construction time as temporary structure, the proportionality coefficient of country rock load is undertaken, two After secondary lining cutting performs, stress will be improved, and therefore, the construction time is not required to carry out fracture width inspection calculation, but in design, can As a reference index.Reinforced concrete for tension strain, by curved and eccentric compression member, to e0≤0.55h0Eccentric compression member, Calculation fracture width can not be examined.Fracture width is calculated in the case of other according to the following formula:
Wherein, ωmaxIt indicates maximum crack width (unit can be mm);α indicates that the member stress of tunnel support structure is special Coefficient is levied, tunnel is eccentric compression member, and α can be 1.9;Non-uniformly distributed strain coefficient of longitudinal tensile reinforcement between expression crack,WhenWhen,0.2 is taken, whenWhen,0.2 is taken, whenWhen,1.0 are taken, for directly bearing the component of reloading,Take 1.0;ρteIt indicates to press effective tension concrete The longitudinal tensile rebar ratio of areal calculation, ρte=As/Ace, work as ρteWhen < 0.01, ρteTake 0.01;AsIndicate that muscle is indulged in tensile region Area of section;AceIndicate effective tension concrete section area, Ace=0.5bh;CsIt indicates outside outermost layer longitudinal tensile kilogram Edge works as C to the distance (unit can be mm) on tensile region bottom edgesWhen < 20, Cs20 are taken, C is worked assWhen > 65, CsTake 65;D indicates steel Muscle diameter (unit can be mm), when using the reinforcing bar of different-diameter, d=4As/ (γ μ), μ indicate that longitudinal tensile reinforcing bar is cut The summation of face perimeter;γ indicates that longitudinal tensile rebar surface characteristic coefficient, deformed bar take 1, and plain steel-bar takes 0.7;EsIt indicates The elasticity modulus of reinforcing bar (unit can be MPa);σsIndicate the stress (unit can be MPa) of longitudinal tensile reinforcing bar, σs=Ns (e-z)/(AsZ), NsIt indicates to press the calculated axle power value of Load Combination, z indicates tension kilogram Resultant force to compressive region Resultant force Distance, z=[0.12 (h of 0.87-0/e)2]h0, and z < 0.87h0
Space net rack supporting construction, can be by above-mentioned calculating process according to tunnel geology feelings before construction in the present invention Condition calculates supporting construction stress condition in conjunction with the assembled ability and tunnel cross-section size of assembled trolley and determines tunnel support structure Parameters, it is then prefabricated and be spliced into supporting construction identical with tunnel cross-section shape, before realizing to gunite concrete It is just capable of providing the parameter designing of the supporting construction of larger bearing capacity, guarantees that the supporting construction designed can satisfy construction peace Entirely, larger bearing capacity is just capable of providing before gunite concrete due to supporting construction, it can be achieved that in certain job area Next procedure can be carried out without gunite concrete, improves construction efficiency.
Although preferred embodiments of the present invention have been described, it is created once a person skilled in the art knows basic Property concept, then additional changes and modifications may be made to these embodiments.So it includes excellent that the following claims are intended to be interpreted as It selects embodiment and falls into all change and modification of the scope of the invention.It should be pointed out that for the ordinary skill of this field For personnel, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the present invention Protection scope.Therefore, protection scope of the present invention should be determined by the appended claims.

Claims (11)

1. a kind of prefabricated assembled space grid structure for tunnel support, it is characterised in that: the prefabricated assembled space Rack supporting construction includes at least two blocks prefabricated rack support units (1), and the both ends of every piece of rack support unit (1) are set respectively There is the connecting elements (7) connecting with adjacent rack support unit (1), at least two pieces of rack support units (1) pass through connection from beginning to end Component (7) connects Formation cross-section closing supporting construction identical with supporting tunnel (2) section configuration;Every block of rack support unit It (1) is the lattice support structure being made of top boom (3), lower boom (4) and web member (5), top boom (3) forms rack branch What shield component (1) was contacted with tunnel (6) inner wall meets native wire side, and lower boom (4) forms the back soil wire side of rack support unit (1), Web member (5) is connected between top boom (3) and lower boom (4), and is separated to form between top boom (3) and lower boom (4) more A grid cell is equipped with metal mesh (6) in the native wire side of meeting of every piece of rack support unit (1).
2. a kind of prefabricated assembled space grid structure for tunnel support according to claim 1, it is characterised in that: It is triangle, square, rectangle, pentagon or six sides that the grid cell of the rack support unit (1), which meets native face and carries on the back native face, Shape, facade are triangle.
3. a kind of prefabricated assembled space grid structure for tunnel support according to claim 1, it is characterised in that: The grid type support frame that the rack support unit (1) is made of multiple triangular pyramids or multiple rectangular pyramids or multiple hexagonal pyramids.
4. a kind of prefabricated assembled space grid structure for tunnel support according to claim 1, it is characterised in that: The top boom (3) and lower boom (4) of the rack support unit (1) are by appointing in steel pipe, fashioned iron, reinforcing bar, concrete filled steel tube One or more of rod pieces of anticipating pass through welding or the arc body of rod for being directly bent or being formed by connecting by connector;And in top boom (3) arch-shaped space truss structure is formed by welding or connector connection web member (5) between lower boom (4), the web member (5) is steel Pipe, fashioned iron, reinforcing bar, any one or a few rod piece in concrete filled steel tube.
5. a kind of prefabricated assembled space grid structure for tunnel support according to claim 1, it is characterised in that: The connecting elements (7) is the joggle connector being mutually matched or sleeve connector or bayonet connection or grafting or welded connecting Part, the first connector (7-1) and the second connector (7-2) that each connecting elements (7) is mutually matched are separately positioned on adjacent two The docking site of a rack support unit (1), and the connecting elements (7) at the both ends of each rack support unit (1) also phase Mutually matching;At least two rack support units (1) by the first connector (7-1) and the second connector (7-2) using splicing or It welds or splices the mode combined with welding and connect into section annular identical with supporting tunnel (2) cross sectional shape, rectangle, horseshoe Shape or polygon closed supporting construction.
6. a kind of construction method of the prefabricated assembled space grid structure for tunnel support, which is characterized in that the right It is required that the prefabricated assembled space net rack supporting construction in 1 to 5 any one includes at least two rings, Specific construction step is such as Under:
(1) the parameters setting value and tunnel model of tunnel support structure are obtained;And according to the parameter item setting value and tunnel Road model calculates the load load of the tunnel support structure and the elasticity modulus of equivalent space shell;By the load load and Input of the elasticity modulus as finite element algorithm calculates the interior force parameter of the tunnel support structure, according to the internal force Parameter verifies the safety of the tunnel support structure, obtains corresponding verification result, finally according to the verification result, adjusts The value of the whole parameter item obtains the construction parameter value of final tunnel support structure;
(2) according to the construction parameter value of the tunnel support structure calculated in step (1), the prefabricated assembled space of every ring is determined The segmentation of rack supporting construction, and select suitable rod piece prefabricated assembled in factory or the every ring of field fabrication according to segmentation situation The monolithic rack support unit of space net rack supporting construction and the connector of rack support unit;
(3) after tunnel excavation, tunnel branch is formed in the prefabricated monolithic rack support unit of the excavation section quick-assembling completed Protect close ring;
(4) continue tunneling, and in the assembled next prefabricated assembled space net rack supporting construction of ring of excavation section;
(5) it according to engineering practice, completes after the prefabricated assembled space net rack supporting construction of monocycle or to complete several rings prefabricated After assembled space net rack supporting construction, injection or casting concrete in rack supporting construction, and by prefabricated assembled space Rack supporting construction is wrapped to form liner structure.
7. a kind of construction method of prefabricated assembled space grid structure for tunnel support according to claim 6, It is characterized by: the parameter of tunnel support structure includes the prefabricated assembled space net rack supporting construction of monolithic in the step (1) Longitudinal supporting length, the longitudinal cross-section body of rod radical of every linear meter(lin.m.) tunnel support structure, the thickness of preliminary bracing, the body of rod material Thickness, the diameter of connector, the circumferential spacing of connector, rod piece and the dimensioning of the material of fitting, rod piece and connector repeatedly Whole parameters or any several parameters in very little.
8. a kind of construction method of prefabricated assembled space grid structure for tunnel support according to claim 6, It is characterized in that the load load of the tunnel support structure calculated in the step (1) includes the self weight of tunnel support structure The external load of load and tunnel support structure;
Wherein, 1. the gravity load f of the tunnel support structure is calculated using formula
F=γ1bh1;①
Formula 1. in, γ1Indicate the concrete severe of the tunnel support structure, b indicates computing unit longitudinal width, h1Described in expression The thickness of tunnel support structure;
The external load of the tunnel support structure includes the stratum drag that tunnel support structure is born and tunnel support structure institute The calculating of at least one in the pressure from surrounding rock of receiving;Wherein, the pressure from surrounding rock that tunnel support structure is born includes tunnel branch The vertical well-distributed pressure of the country rock that protection structure is born and horizontal well-distributed pressure;
After the pressure from surrounding rock that tunnel support structure is born calculates completion, the pressure from surrounding rock is adjusted according to load factor, Wherein, the load factor is the ratio of payload values and maxium load value that tentative calculation passes through.
9. a kind of construction method of prefabricated assembled space grid structure for tunnel support according to claim 8, It is characterized in that the stratum drag calculating process that the tunnel support structure is born is as follows:
(1) Winkler's assumption algorithm is used, the stratum resistance coefficient of the tunnel model is calculated;
(2) by rigid bar method, the stratum drag that the tunnel support structure is born is calculated according to the stratum resistance coefficient.
10. a kind of construction method of prefabricated assembled space grid structure for tunnel support according to claim 8, It is characterized in that in the case where the tunnel model is deep tunnel:
2. the vertical well-distributed pressure q of the country rock that the tunnel support structure is born is calculated using following formula,
Q=γ2hq
Formula 2. in, hq=first constant × 2S-1W, w=second constant+i (B- three constant);γ2Indicate country rock severe, hqTable Show that country rock collapses and encircle computed altitude, S indicates that Grades of Surrounding Rock, w indicate that widths affect coefficient, B indicate that tunnel excavation width, i indicate Every pressure from surrounding rock gradient for increasing unit length;
The horizontal even cloth pressure of the country rock that the tunnel support structure is born is born by the tunnel support structure of above-mentioned calculating The product of country rock vertical well-distributed pressure q and particular factor;Wherein, the value of the particular factor is related to Grades of Surrounding Rock.
11. a kind of construction method of prefabricated assembled space grid structure for tunnel support according to claim 8, It is characterized in that, in the case where the tunnel model is shallow tunnel:
3. the vertical well-distributed pressure q of the country rock that the tunnel support structure is born is calculated using formula,
Wherein,
γ2Indicate country rock severe, h2Indicate the height of tunnel top from the ground, λ indicates that lateral pressure coefficient, θ indicate tunnel top two The angle of friction of side, B indicate that tunnel excavation width, β indicate angle of rupture when maximum thrust,Indicate that country rock calculates angle of friction;
The horizontal even cloth pressure e of the country rock that the tunnel support structure is borniIt is 4. calculated using formula,
ei2hiλ ④
Wherein, γ2Indicate country rock severe, hiIndicate the distance on outside arbitrary point to ground in tunnel, λ indicates lateral pressure coefficient.
CN201910868684.XA 2019-09-16 2019-09-16 Prefabricated assembled space grid structure and its construction method for tunnel support Pending CN110529154A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910868684.XA CN110529154A (en) 2019-09-16 2019-09-16 Prefabricated assembled space grid structure and its construction method for tunnel support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910868684.XA CN110529154A (en) 2019-09-16 2019-09-16 Prefabricated assembled space grid structure and its construction method for tunnel support

Publications (1)

Publication Number Publication Date
CN110529154A true CN110529154A (en) 2019-12-03

Family

ID=68668688

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910868684.XA Pending CN110529154A (en) 2019-09-16 2019-09-16 Prefabricated assembled space grid structure and its construction method for tunnel support

Country Status (1)

Country Link
CN (1) CN110529154A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111445777A (en) * 2020-04-08 2020-07-24 安徽建筑大学 Non-circular tunnel model test tunneling gradual excavation device and using method thereof
CN111775715A (en) * 2020-07-13 2020-10-16 中铁第五勘察设计院集团有限公司 Ultra-high-speed magnetic suspension transportation system for underground low-vacuum pipeline and construction method thereof
CN111911165A (en) * 2020-07-16 2020-11-10 中国水利水电第三工程局有限公司 Soft rock single-track railway tunnel large deformation control method
CN111963216A (en) * 2020-07-30 2020-11-20 中铁十七局集团第三工程有限公司 Assembly type tunnel trolley and assembly method
CN112431357A (en) * 2020-11-12 2021-03-02 李天北 Supporting type cage net steel bar module
CN113187519A (en) * 2021-06-01 2021-07-30 重庆大学 Variable prestress supporting method for controlling deformation of tunnel excavation surrounding rock mass
CN113198560A (en) * 2021-05-06 2021-08-03 佳木斯大学 Blood specimen test tube rack and identification alarm method
CN113369412A (en) * 2021-06-24 2021-09-10 中铁十一局集团桥梁有限公司 Method, device and equipment for bending steel bar and readable storage medium
CN114880755A (en) * 2022-07-07 2022-08-09 西南交通大学 Surrounding rock grading method, device and equipment for railway tunnel and readable storage medium

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1306150A (en) * 2000-06-11 2001-08-01 郭兰波 Steel bar reticulated shell support and reticulated shell anchor-shotcrete support
KR20030096697A (en) * 2002-06-17 2003-12-31 허정원 A tunnel lining structure system using curved corrugated steel plates and consrution method therof
CN102493360A (en) * 2011-12-29 2012-06-13 浙江大东吴集团建设有限公司 Reinforced concrete arch bridge construction method
CN105041332A (en) * 2015-07-13 2015-11-11 三峡大学 Grid lining structure for tunnels and mounting method thereof
CN204827463U (en) * 2015-07-13 2015-12-02 三峡大学 A rack lining cutting structure for tunnel
CN107044288A (en) * 2017-05-22 2017-08-15 中铁第勘察设计院集团有限公司 Prefabricated support lining structure and construction method for large-deformation tunnel in soft rock
CN207017435U (en) * 2017-07-31 2018-02-16 中建安装工程有限公司 Large span bolt-ball net frame
CN210660133U (en) * 2019-09-16 2020-06-02 中铁十一局集团有限公司 Prefabricated assembly type space grid structure for tunnel support

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1306150A (en) * 2000-06-11 2001-08-01 郭兰波 Steel bar reticulated shell support and reticulated shell anchor-shotcrete support
KR20030096697A (en) * 2002-06-17 2003-12-31 허정원 A tunnel lining structure system using curved corrugated steel plates and consrution method therof
CN102493360A (en) * 2011-12-29 2012-06-13 浙江大东吴集团建设有限公司 Reinforced concrete arch bridge construction method
CN105041332A (en) * 2015-07-13 2015-11-11 三峡大学 Grid lining structure for tunnels and mounting method thereof
CN204827463U (en) * 2015-07-13 2015-12-02 三峡大学 A rack lining cutting structure for tunnel
CN107044288A (en) * 2017-05-22 2017-08-15 中铁第勘察设计院集团有限公司 Prefabricated support lining structure and construction method for large-deformation tunnel in soft rock
CN207017435U (en) * 2017-07-31 2018-02-16 中建安装工程有限公司 Large span bolt-ball net frame
CN210660133U (en) * 2019-09-16 2020-06-02 中铁十一局集团有限公司 Prefabricated assembly type space grid structure for tunnel support

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111445777A (en) * 2020-04-08 2020-07-24 安徽建筑大学 Non-circular tunnel model test tunneling gradual excavation device and using method thereof
CN111775715A (en) * 2020-07-13 2020-10-16 中铁第五勘察设计院集团有限公司 Ultra-high-speed magnetic suspension transportation system for underground low-vacuum pipeline and construction method thereof
CN111775715B (en) * 2020-07-13 2024-03-15 中铁第五勘察设计院集团有限公司 Ultra-high-speed magnetic levitation traffic system of underground low-vacuum pipeline and construction method thereof
CN111911165A (en) * 2020-07-16 2020-11-10 中国水利水电第三工程局有限公司 Soft rock single-track railway tunnel large deformation control method
CN111963216A (en) * 2020-07-30 2020-11-20 中铁十七局集团第三工程有限公司 Assembly type tunnel trolley and assembly method
CN111963216B (en) * 2020-07-30 2022-06-14 中铁十七局集团第三工程有限公司 Assembly type tunnel trolley and assembly method
CN112431357A (en) * 2020-11-12 2021-03-02 李天北 Supporting type cage net steel bar module
CN113198560A (en) * 2021-05-06 2021-08-03 佳木斯大学 Blood specimen test tube rack and identification alarm method
CN113187519A (en) * 2021-06-01 2021-07-30 重庆大学 Variable prestress supporting method for controlling deformation of tunnel excavation surrounding rock mass
CN113369412A (en) * 2021-06-24 2021-09-10 中铁十一局集团桥梁有限公司 Method, device and equipment for bending steel bar and readable storage medium
CN114880755A (en) * 2022-07-07 2022-08-09 西南交通大学 Surrounding rock grading method, device and equipment for railway tunnel and readable storage medium
CN114880755B (en) * 2022-07-07 2022-09-20 西南交通大学 Surrounding rock grading method, device and equipment for railway tunnel and readable storage medium

Similar Documents

Publication Publication Date Title
CN110529154A (en) Prefabricated assembled space grid structure and its construction method for tunnel support
CN105926764B (en) A kind of industrialization preprocessing regenerative structural system and its construction method
CN105332452B (en) Cable curtain wall supporting system and its construction method of a kind of top provided with steel truss
CN206769052U (en) A kind of New Types of Beam column Connections
CN105113537B (en) The vertical supporting system and its method of reverse construction
CN205669255U (en) A kind of industrialization preprocessing regenerative structural system
CN101200916A (en) Construction method of prestressed suspension type building structure
CN104499567B (en) Frame structure, frame structure assembly and prefabricating and constructing methods of frame structure assembly
CN103397695B (en) The concrete filled steel tube coupled column high-position conjoined structure of two-way steel truss is set
CN105298100A (en) Construction method of cantilever construction platform with ultrahigh cast-in-place flaring structure in cylindrical building
CN207944590U (en) A kind of assembled steel frame-prefabricated steel reinforced concrete shear wall structure system
CN114718325A (en) Stadium hyperboloid cantilever space pipe truss construction method
CN106284838A (en) A kind of lattice Honeycomb Beam sections and large span lattice girder steel and fabrication and installation method thereof
CN210660133U (en) Prefabricated assembly type space grid structure for tunnel support
CN109424072A (en) The connecting node and construction method of spacer bar concrete column on a kind of girder steel
CN206360399U (en) The existing reinforced concrete coupling beam bracing means of one species &#34; doubly-linked beam &#34;
CN110159323A (en) The construction method fixed with steel arch-shelf is excavated suitable for extra-large cross-section underground chamber
CN206529892U (en) A kind of architectural structure system applied to high-level structure
CN114837483B (en) High-low span portal steel frame building structure and construction process thereof
CN206784406U (en) A kind of prefabricated assembling type reinforced concrete side slope protection modular assembly
CN207363681U (en) A kind of drag-line steel grating bow member
CN109653517A (en) A kind of multidirectional Load Relief System and the construction method with the system assembly steel vestibule
CN209443577U (en) A kind of steel structure member
CN208137136U (en) A kind of conversion beam that unidirectional diagonal brace is set
JPH0518192A (en) Construction method for tunnel and lining segment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination