CN110514572A - A kind of concrete for construction engineering Anti-leakage instrument - Google Patents

A kind of concrete for construction engineering Anti-leakage instrument Download PDF

Info

Publication number
CN110514572A
CN110514572A CN201910752849.7A CN201910752849A CN110514572A CN 110514572 A CN110514572 A CN 110514572A CN 201910752849 A CN201910752849 A CN 201910752849A CN 110514572 A CN110514572 A CN 110514572A
Authority
CN
China
Prior art keywords
die trial
concrete
module
inner cavity
concrete ndt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910752849.7A
Other languages
Chinese (zh)
Inventor
刘榕副
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910752849.7A priority Critical patent/CN110514572A/en
Publication of CN110514572A publication Critical patent/CN110514572A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N15/00Investigating characteristics of particles; Investigating permeability, pore-volume or surface-area of porous materials
    • G01N15/08Investigating permeability, pore-volume, or surface area of porous materials
    • G01N15/082Investigating permeability by forcing a fluid through a sample

Landscapes

  • Chemical & Material Sciences (AREA)
  • Dispersion Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention relates to concrete NDT apparatus fields, and disclose a kind of concrete for construction engineering Anti-leakage instrument, including base, die trial seat, die trial set and the next casing, set at the top of base there are six die trial seat, the equal flanged joint in top of each die trial seat has die trial set.The concrete for construction engineering Anti-leakage instrument; by the way that the rubber sleeve inside die trial set is arranged in when detecting; it is heaved with the pressure for resisting water to the outside of concrete NDT module and applies identical pressure; to being sealed on the outside of concrete NDT module; ensure that the sealing effect of concrete NDT module is good; it has effectively ensured the accuracy of testing result, and has reduced sealing energy consumption;And when dismounting concrete NDT module afterwards before detection, applies pressure again without waxing and concrete NDT module sleeve is attached in die trial set, so as to the fast assembling-disassembling of concrete NDT module, significantly improve the detection efficiency of concrete NDT module.

Description

A kind of concrete for construction engineering Anti-leakage instrument
Technical field
The present invention relates to concrete NDT apparatus field, specially a kind of concrete for construction engineering Anti-leakage instrument.
Background technique
Concrete is the artificial stone material being widely used under construction, for certain buildings, such as waterwork, underwater, water In, underground and other architectural engineerings, it is desirable that there is building the special so-called anti-permeability performance of performance-anti-permeability performance to refer to structures Used material can resist the performance that water or other liquid (light oil, heavy oil) media permeate under pressure, it is therefore desirable to Use the permeability resistance of Anti-leakage instrument detection concrete.
Existing coagulation body Anti-leakage instrument when in use, needs to be sealed concrete block, by concrete block to be detected Outside waxing, then by set be attached to die trial set in and be compacted, in such cases, concrete block detection before sealing preparation and The taking-up work of concrete block takes a long time, so that efficiency is lower, and since concrete block is in film, outside inevitably has Groove when detecting, resists water and is easy to permeate from groove, or remain in groove although waxing may not necessarily be fully sealed, Influence the accuracy of agent on crack resistance of concrete permeability detection.
Summary of the invention
The present invention provides a kind of concrete for construction engineering Anti-leakage instrument, have detection efficiency and the high advantage of accuracy, Solves the technical issues of mentioning in background technique.
The invention provides the following technical scheme: a kind of concrete for construction engineering Anti-leakage instrument, including base, die trial seat, examination Die sleeve and the next casing are set there are six die trial seat at the top of base, and the equal flanged joint in top of each die trial seat has die trial set, And the inner cavity of die trial set is communicated with the inner cavity of die trial seat, the inside of the die trial set is placed with concrete NDT module, the examination The middle part of die sleeve inner cavity is equipped with the rubber sleeve on the outside of package concrete NDT module, and rubber sleeve is to concrete NDT module outside Pressure value and die trial seat in resist water it is identical to the pressure value of concrete NDT module bottom.
Preferably, it is equipped with doughnut in the inner wall of the die trial set, and the inner cavity of doughnut and the inner cavity of rubber sleeve are come round, The bottom of die trial set offers several permeable holes positioned at die trial seat inner cavity, the inner cavity of the doughnut by permeable hole and The inner cavity of die trial seat communicates.
Preferably, the bottom thread of the concrete NDT module internal cavity is socketed with the next casing, and the top of the next casing Circle is bonded with the bottom of concrete NDT module, and the screw top of the concrete NDT module internal cavity is socketed with upper casing, And the foundation ring of upper casing is bonded with the top of concrete NDT module, the shapes and sizes of die trial set with upper casing It is identical.
Preferably, the two sides of the upper cannula tip are fixedly connected to fixed block, and the top of two fixed blocks is opened Through-hole equipped with identical direction.
The present invention have it is following the utility model has the advantages that
The concrete for construction engineering Anti-leakage instrument, by the way that the rubber sleeve inside die trial set is arranged in when detecting, with resistance The pressure of water and heave and apply identical pressure to the outside of concrete NDT module, the outside of concrete NDT module is carried out Sealing, it is ensured that the sealing effect of concrete NDT module is good, has effectively ensured the accuracy of testing result, and reduces sealing Energy consumption;And when dismounting concrete NDT module afterwards before detection, applies pressure again without waxing and be set with concrete NDT module Into die trial set, so as to the fast assembling-disassembling of concrete NDT module, the detection efficiency of concrete NDT module is significantly improved.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is that structure of the invention die trial covers cut away view;
Fig. 3 is that structure of the invention die trial covers bottom view.
In figure: 1, base;2, die trial seat;3, die trial set;301, doughnut;302, rubber sleeve;303, permeable hole;4, the next Casing;5, upper casing;501, fixed block;6, concrete NDT module.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig. 1-3, a kind of concrete for construction engineering Anti-leakage instrument, including base 1, die trial seat 2, die trial set 3 and The next casing 4, the top of base 1 are set there are six die trial seat 2, and the equal flanged joint in top of each die trial seat 2 has die trial set 3, and The inner cavity of die trial set 3 is communicated with the inner cavity of die trial seat 2, and the middle part that die trial covers 3 inner cavities is equipped with a circle rubber sleeve 302, and die trial set 3 It is reserved with doughnut 301 in inner wall, through-hole is offered between doughnut 301 and rubber sleeve 302, the bottom of die trial set 3 offers The permeable hole 303 of several equidistant arrangements, doughnut 301, rubber sleeve 302, permeable hole 303 are communicated with the inner cavity between die trial seat 2, The water that base 1 presses into die trial seat 2 is entered in doughnut 301 by permeable hole 303, rubber sleeve 302, and die trial covers the bottom of 3 inner cavities Portion's screw thread is socketed with the next casing 4, and the top of the next casing 4 is located exactly at the bottom of doughnut 301, die trial set 3 it is interior Chamber is placed with concrete NDT module 6, and the bottom of concrete NDT module 6 is contacted with the top of the next casing 4, die trial set 3 Screw top is socketed with upper casing 5, and the bottom of upper casing 5 is contacted with the top of concrete NDT module 6, is detecting When, by first placing in concrete NDT module 6 to die trial set 3, because rubber sleeve 302 is in non-punching press state at this time, without applying Plus-pressure can place concrete NDT module 6, improve the installation effectiveness of concrete NDT module 6, to improve concrete The detection efficiency of detection module 6, from the water pump in base 1 into die trial seat 2 for resisting water, resist water under pressure to mixed Solidifying soil detection module 6 application upwards pressure, meanwhile, water is into figure rubber sleeve 302, so that rubber sleeve 302 is heaved and concrete The outside of detection module 6 fits closely, and applies the pressure of same size to the side of concrete NDT module 6, it is ensured that resists Water will not penetrate into top from the outside of concrete NDT module 6, ensure the accurate of the impervious detection of concrete NDT module 6 Property, meanwhile, the sealing in 6 outside of concrete NDT module is realized using the pressure of the water of detection pressure, has ensured detection effect essence While true property, sealing energy consumption is reduced, and the outside of concrete NDT module 6 will not retain resistance water, further ensured The accuracy of testing result, after detection, the pressure of elimination of water, doughnut 301 to the pressure of concrete NDT module 6 with Disappearance further improve the detection efficiency of concrete NDT module 6 consequently facilitating quickly going lower concrete NDT module 6.
Wherein, the shapes and sizes of the next casing 4 and upper casing 5 are all the same, and the two sides at 5 top of upper casing are solid Surely it is connected with fixed block 501, and the top of two fixed blocks 501 offers the through-hole of identical direction, by two fixed blocks 501 through-hole is inserted into straight-bar, rotates to control upper casing 5 using straight-bar rotation, consequently facilitating operator pacifies installation and dismantling Upper casing 5 is unloaded, the installing and dismounting mode of the next casing 4 is identical as upper casing 5.
In use, the next casing 4 to be first packed into the bottom of die trial set 3, it is installed on die trial seat 2 by die trial set 3, and lead to It crosses screw to be fixed, concrete NDT module 6 to be detected is placed into die trial set 3, and be set in the bottom of die trial set 3 Upper casing 5, so that contacted between upper casing 5 and concrete NDT module 6, concrete NDT module 6 and the next casing 4, Apply hydraulic pressure into die trial seat 2 by base 1, resists water and enter in rubber sleeve 302, so that rubber sleeve 302 heaves fitting coagulation The side wall of native detection module 6 realizes sealing, it is ensured that the accuracy of detection saves Sealing period and coagulation without individually sealing The set-up time of native detection module 6 improves detection efficiency, measures the pressure by the water permeated at the top of concrete NDT module 6 Under power, the permeability resistance of concrete NDT module 6 resists water pressure finally, cancelling, and rubber sleeve 302 is shunk, to concrete NDT The pressure of 6 side of module disappears, and upper casing 5 can remove concrete NDT module 6 under turning, and reappose another block concrete Detection module 6 is detected, and the detection efficiency of concrete NDT module 6 is further improved.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (4)

1. a kind of concrete for construction engineering Anti-leakage instrument, including base (1), die trial seat (2), die trial set (3) and the next casing (4), it being set at the top of base (1) there are six die trial seat (2), the equal flanged joint in top of each die trial seat (2) has die trial set (3), And the inner cavity of die trial set (3) is communicated with the inner cavity of die trial seat (2), it is characterised in that: the inside of the die trial set (3) is placed with mixed Solidifying soil detection module (6), the middle part of die trial set (3) inner cavity are equipped with the rubber sleeve on the outside of package concrete NDT module (6) (302), and rubber sleeve (302) on the outside of concrete NDT module (6) pressure value and die trial seat (2) in resist water to concrete The pressure value of detection module (6) bottom is identical.
2. a kind of concrete for construction engineering Anti-leakage instrument according to claim 1, it is characterised in that: the die trial set (3) Inner wall in be equipped with doughnut (301), and the inner cavity of doughnut (301) and the inner cavity of rubber sleeve (302) are come round, the die trial set (3) bottom offers several permeable holes (303) positioned at die trial seat (2) inner cavity, and the inner cavity of the doughnut (301) passes through saturating Water hole (303) is communicated with the inner cavity of die trial seat (2).
3. a kind of concrete for construction engineering Anti-leakage instrument according to claim 1, it is characterised in that: the concrete NDT The bottom thread of module (6) inner cavity is socketed with the next casing (4), and the collar of the next casing (4) and concrete NDT module (6) Bottom fitting, the screw top of concrete NDT module (6) inner cavity is socketed with upper casing (5), and upper casing (5) Foundation ring be bonded with the top of concrete NDT module (6), the shapes and sizes of the die trial set (3) with upper casing (5) It is identical.
4. a kind of concrete for construction engineering Anti-leakage instrument according to claim 3, it is characterised in that: the upper casing (5) two sides at the top of are fixedly connected to fixed block (501), and the top of two fixed blocks (501) offers identical direction Through-hole.
CN201910752849.7A 2019-08-15 2019-08-15 A kind of concrete for construction engineering Anti-leakage instrument Withdrawn CN110514572A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910752849.7A CN110514572A (en) 2019-08-15 2019-08-15 A kind of concrete for construction engineering Anti-leakage instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910752849.7A CN110514572A (en) 2019-08-15 2019-08-15 A kind of concrete for construction engineering Anti-leakage instrument

Publications (1)

Publication Number Publication Date
CN110514572A true CN110514572A (en) 2019-11-29

Family

ID=68625225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910752849.7A Withdrawn CN110514572A (en) 2019-08-15 2019-08-15 A kind of concrete for construction engineering Anti-leakage instrument

Country Status (1)

Country Link
CN (1) CN110514572A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110987757A (en) * 2019-12-07 2020-04-10 苏交科集团检测认证有限公司 Method for quickly and safely disassembling and installing impervious instrument sleeve die
CN112858137A (en) * 2021-02-03 2021-05-28 石家庄宏业交通建设监理有限公司 Automatic pressure-regulating concrete impermeability instrument
CN113029903A (en) * 2021-03-01 2021-06-25 张锦峰 Stagnant water steel sheet impermeability test device
CN116202938A (en) * 2023-04-28 2023-06-02 常州市慧宇建筑工程质量检测有限公司 Full-automatic penetrometer for concrete permeation resistance test

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105716924A (en) * 2016-04-25 2016-06-29 苏州市建设工程质量检测中心有限公司 Concrete anti-permeability test model
CN105738267A (en) * 2016-03-04 2016-07-06 南京德阳科技有限公司 Test block side surface sealing device for concrete anti-permeation instrument
CN107101929A (en) * 2017-05-31 2017-08-29 南京华研智能科技有限公司 Concrete impermeability experimental rig
CN206609762U (en) * 2017-03-29 2017-11-03 镇江市建科工程质量检测中心有限公司 A kind of detection means of die trial mechanism and concrete permeability resistance
CN206945496U (en) * 2017-07-13 2018-01-30 无锡东仪制造科技有限公司 A kind of new oil sac fixture
CN207742065U (en) * 2018-01-29 2018-08-17 呼和浩特市四方工程质量检测试验中心 A kind of concrete impervious instrument
CN209117535U (en) * 2018-09-03 2019-07-16 南通市通佳工程质量检测有限公司 A kind of impervious detection die trial of concrete

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105738267A (en) * 2016-03-04 2016-07-06 南京德阳科技有限公司 Test block side surface sealing device for concrete anti-permeation instrument
CN105716924A (en) * 2016-04-25 2016-06-29 苏州市建设工程质量检测中心有限公司 Concrete anti-permeability test model
CN206609762U (en) * 2017-03-29 2017-11-03 镇江市建科工程质量检测中心有限公司 A kind of detection means of die trial mechanism and concrete permeability resistance
CN107101929A (en) * 2017-05-31 2017-08-29 南京华研智能科技有限公司 Concrete impermeability experimental rig
CN206945496U (en) * 2017-07-13 2018-01-30 无锡东仪制造科技有限公司 A kind of new oil sac fixture
CN207742065U (en) * 2018-01-29 2018-08-17 呼和浩特市四方工程质量检测试验中心 A kind of concrete impervious instrument
CN209117535U (en) * 2018-09-03 2019-07-16 南通市通佳工程质量检测有限公司 A kind of impervious detection die trial of concrete

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110987757A (en) * 2019-12-07 2020-04-10 苏交科集团检测认证有限公司 Method for quickly and safely disassembling and installing impervious instrument sleeve die
CN112858137A (en) * 2021-02-03 2021-05-28 石家庄宏业交通建设监理有限公司 Automatic pressure-regulating concrete impermeability instrument
CN113029903A (en) * 2021-03-01 2021-06-25 张锦峰 Stagnant water steel sheet impermeability test device
CN113029903B (en) * 2021-03-01 2023-11-21 云南科仑工程质量检测有限公司 Impervious performance detection device of stagnant water steel sheet
CN116202938A (en) * 2023-04-28 2023-06-02 常州市慧宇建筑工程质量检测有限公司 Full-automatic penetrometer for concrete permeation resistance test
CN116202938B (en) * 2023-04-28 2023-06-30 常州市慧宇建筑工程质量检测有限公司 Full-automatic penetrometer for concrete permeation resistance test

Similar Documents

Publication Publication Date Title
CN110514572A (en) A kind of concrete for construction engineering Anti-leakage instrument
CN110208115B (en) Seepage module of embeddable interface ring shear apparatus considering soil body seepage corrosion
CN105445168B (en) A kind of pore pressure within asphalt pavement simulating test device and method
CN108318401A (en) One kind being suitable for anisotropy permeability coefficient test device under soil solidifying stress
CN108412472B (en) Fracture-cavity type carbonate reservoir three-dimensional injection and production model, simulation system and experimental method
CN206223619U (en) A kind of permeability coefficient of cement soil tester
CN107436140A (en) The settling column test instrument and test method that vacuum preloading and piling prepressing are combined
CN105651674B (en) A kind of detection method of the leakage-proof performance of waterproof roll
CN209606285U (en) A kind of torus plastic concrete permeability coefficient detection device
CN105699257B (en) A kind of experimental rig and its test method being suitable for native stone contact surface seepage failure
CN105547963B (en) Pore pressure within asphalt pavement simulating test device and method
CN210049864U (en) Packer grouting layered water stop simulation device
CN209148498U (en) The in situ detection instrument of agent on crack resistance of concrete water permeation performance
CN208721546U (en) A kind of antifouling barrier materials chemistry compatibility test device in underground
CN204028067U (en) A kind of soil body that pollutes is sheared infiltration experiment device
CN104155428B (en) A kind of soil body that pollutes shears infiltration experiment device
CN207586100U (en) The test device of cement-based material fluid permeability
CN208091867U (en) A kind of permeation coefficient of permeable concrete test device
CN215218453U (en) Bentonite prevention of seepage pad is able to bear or endure hydrostatic pressure detection device
CN110987635B (en) Test device of soil core wall water conservancy splitting
CN211477994U (en) Geomembrane leakage simulation test instrument considering dynamic water pressure
CN211773953U (en) Model barrel device for indoor vacuum preloading model test
CN210604309U (en) High-pressure sealing extrusion device
CN216746644U (en) Reservoir dam leakage monitoring device
CN207050713U (en) The settling column test instrument that vacuum preloading and piling prepressing are combined

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20191129

WW01 Invention patent application withdrawn after publication