CN110513084A - Coal bed gas region method for increasing - Google Patents

Coal bed gas region method for increasing Download PDF

Info

Publication number
CN110513084A
CN110513084A CN201910894890.8A CN201910894890A CN110513084A CN 110513084 A CN110513084 A CN 110513084A CN 201910894890 A CN201910894890 A CN 201910894890A CN 110513084 A CN110513084 A CN 110513084A
Authority
CN
China
Prior art keywords
well
shock wave
horizontal well
straight
bed gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910894890.8A
Other languages
Chinese (zh)
Inventor
张永民
刘美娟
张硕
姚伟博
汤俊萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Flash Energy Technology Co Ltd
Original Assignee
Xi'an Flash Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi'an Flash Energy Technology Co Ltd filed Critical Xi'an Flash Energy Technology Co Ltd
Priority to CN201910894890.8A priority Critical patent/CN110513084A/en
Publication of CN110513084A publication Critical patent/CN110513084A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/006Production of coal-bed methane
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimizing the spacing of wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimizing the spacing of wells
    • E21B43/305Specific pattern of wells, e.g. optimizing the spacing of wells comprising at least one inclined or horizontal well

Abstract

The present invention relates to coal bed gas region method for increasing, to solve the problems, such as that coal bed gas straight well can not implement effective well stimulation in this well, while improving straight well yield in region.Coal bed gas region method for increasing, includes the following steps;Straight well existing in setting regions is divided into left and right two rows, and the operation scheme of controllable shock wave equipment is determined according to the physico-mechanical properties in horizontal well coal seam, parameter and tomography situation in the centerline horizontal well drilling of the two rows of straight wells in left and right;Horizontal well section of the linear distance of horizontal well and straight well less than 50 meters, operation intensity, operations number are twice compared with operation intensity that the horizontal well section is set in the operation scheme, operations number increasing;Controllable shock wave is equipped into feeding horizontal well and waits for operation coal seam section, operation coal seam section is treated according to the operation scheme of setting and implements shock wave operation;After completing shock wave operation, act controllable shock wave equipment;Horizontal well is put into mining;Adjust the mining scheme of straight well.

Description

Coal bed gas region method for increasing
Technical field
The invention belongs to energy extraction fields, and in particular to coal bed gas region method for increasing.
Background technique
Coal bed gas is a kind of high fever, cleaning, convenient new energy." the coal bed gas money of Ministry of Land and Resources's tissue in 2015 Source dynamic evaluation " shows that coal bed gas total resources is about 30,000,000,000,000 sides, and mining resources amount is about 12.5 trillion sides, in world coal seam It is number three in gas stock number, accounts for about the 11.2%-13.7% of global resources reserves.
2018, rough estimates in the gas meter of China coal seam, ground narrow sense methane output was 54.63 billion cubic meters, coal mine Underground gas extraction amount is 129 billion cubic meters, and coal bed gas total output is 183.6 billion cubic meters, and gas utilization amount is 10,100,000,000 vertical Square rice, apart from Demand of Nation, there are also very big gaps.
About 18000 mouthfuls of coal bed gas straight well at present of China, after through a long time use, there are about three/second is that stripper well, Even not gas-producing well;Due to foring sand column outside pit shaft, it is difficult to improve yield by doing work to coal seam again, if low at these It produces and opens up straight well again between well, not gas-producing well, can not only expend vast resources, but also newly open straight well and still can after using Stripper well is formed, the exploitation of coal bed gas has been seriously affected.
Summary of the invention
The purpose of the present invention is can not provide aiming at the problem that this well implements effective well stimulation coal bed gas straight well Coal bed gas region method for increasing, to improve straight well yield in setting regions.
To achieve the above object, the technical solution of the invention is as follows:
A kind of coal bed gas region method for increasing, is characterized in that, includes the following steps;
Coal bed gas straight well existing in setting regions is pressed the position of its distribution by S1, and it is two rows of to be divided into left and right;
S2, in left and right, horizontal well borehole track is arranged in the center line of two rows of straight wells;
S3, according to the pithead position of the position distribution of straight well and horizontal well borehole track setting horizontal well straight well section;
S4 passes through the pithead position and the borehole track horizontal well drilling;
S5 determines the operator of controllable shock wave equipment according to the physico-mechanical properties in horizontal well coal seam, parameter and tomography situation Case;The operation scheme includes: the number of shocks of operation intensity, job position and each position;
Horizontal well section of the linear distance of S6, horizontal well and straight well less than 50 meters, operation intensity, operations number are compared with the level Operation intensity that wellblock section is set in step s 5, operations number increasing are twice;
S7, controllable shock wave equipment feeding horizontal well is most deep to operation coal seam section, it is set according to step S5 and step S6 Operation scheme treat operation coal seam section implement shock wave operation;
S8 implements shock wave operation to operation coal seam section to residue in a manner of returning on successively;
S9 after the shock wave operation for completing all coal seam sections, acts controllable shock wave equipment;
Horizontal well is put into mining by S10;
S11 adjusts the mining scheme of straight well in straight well arrangement area in time.
Preferably, the small 120MPa of shock wave peak pressure that the controllable shock wave equipment generates.
The invention has the benefit that
1. coal bed gas region provided by the invention method for increasing, by arranging that the two rows in area's setting regions are straight in coal bed gas straight well Well center line arranges horizontal well, can effectively be released the coal bed gas in straight well distal end coal seam, and then improves yield;Simultaneously Increase twice shock wave operation implementing intensity away from the horizontal well section within the scope of 50 meters of straight well, it is anti-reflection straight with opposition The remote well area of well, effectively relieves the tamper of straight well periphery coal seam seepage channel, improves desorption, the seepage flow energy in straight well coal seam Power, inhibits the adsorption capacity again in coal seam, and then improves coal bed gas well yield and production capacity.
2. the horizontal well that the present invention uses combines method for increasing with straight well, yield can be both obtained from horizontal well, it can also To improve the straight well yield of corresponding region, forming region volume increase.This method has given up the technology road for directly implementing volume increase to straight well Line, while avoiding and opening up the wasting of resources of straight well bring again between straight well and still will form stripper well, do not produce gas The problem of well, the present invention are good for coal bed gas region effect of increasing production, and improvement cost is low, are widely portable to coal bed gas straight well arrangement The volume increase in area.
Detailed description of the invention
Fig. 1 is the layout drawing of coal bed gas horizontal well;
Fig. 2 is the waveform diagram of controllable shock wave equipment;
Fig. 3 is the sectional view that horizontal well implements shock wave operation;
Fig. 4 is the flow chart of coal bed gas region of the present invention method for increasing.
Appended drawing reference is as follows:
The coal seam 1-, 2- screen casing, 3- straight well position, 4- horizontal well, 5- mud, the controllable shock wave equipment of 6-, 8- wellhead assembly.
Specific embodiment
The contents of the present invention are described in further detail below in conjunction with the drawings and specific embodiments:
The coal bed gas region method for increasing, as shown in Figures 1 to 4, comprising the following steps:
Coal bed gas straight well existing in setting regions is pressed the position of its distribution by S1, and it is two rows of to be divided into left and right;
The distribution of straight well position 3 of the coal bed gas straight well arrangement existing coal bed gas straight well in area is as shown in Figure 1, setting first needs to carry out The straight well of region volume increase need to carry out the straight well of region volume increase for the straight well in black surround in Fig. 1, by the position distribution of straight well in black surround It is divided into left and right two rows, the two rows of straight wells in the left and right separated are located at the straight well of 4 left and right sides of horizontal well.
The size and range in the region can determine the water of horizontal well in order to arrange subject to the two rows of horizontal wells in left and right The straight well yield in the region, forming region volume increase are improved by horizontal well in the position of flat section.
S2, in left and right, borehole track is arranged in the center line of two rows of straight wells;
Center line is located at the two rows of straight wells in left and right and is formed in the median plane of plane, according to 1 physico-mechanical properties of coal seam, parameter and tomography Situation determines position of the center line in the median plane, and then determines 4 borehole track of horizontal well.
S3, according to the pithead position of the position distribution of straight well and borehole track setting horizontal well straight well section.
S4 passes through the pithead position and the borehole track horizontal well drilling 4;
The drilling plan of horizontal well 4 is determined by 4 pithead position of horizontal well and 4 borehole track of horizontal well, and successively carries out straight well Section construction, lower curved section construction, horizontal segment construction, during drilling well, reinforce the borehole wall using mud 5;Cheng Jinghou, under Enter screen casing 2 to support 4 borehole wall of horizontal well.
S5 determines controllable shock wave equipment 6 according to the physico-mechanical properties in 4 coal seam 1 of horizontal well, parameter and tomography situation Operation scheme;The operation scheme includes: the number of shocks of operation intensity, job position and each position;
The shock wave waveform diagram that the controllable shock wave equipment 6 of the present embodiment is exported is as shown in Figure 2.It is less than using surge pressure The controllable shock wave of 120MPa.
The horizontal well 4 of two rows of straight well center line settings, can effectively be released the coal bed gas in straight well distal end coal seam 1 It puts, and then improves yield.
S6, horizontal well section of the linear distance less than 50 meters of horizontal well 4 and straight well, operation intensity, operations number compared with Operation intensity that the horizontal well section is set in step s 5, operations number increasing are twice;
Increase twice shock wave operation implementing intensity away from the horizontal well section within the scope of 50 meters of straight well, is increased with opposition The saturating remote well area of straight well, can release the tamper of 1 seepage channel of straight well periphery coal seam, effectively to improve the solution in straight well coal seam 1 It inhales, percolation ability, inhibits the adsorption capacity again in coal seam 1.
S7 checks whether coal bed gas well casing is clear and coherent using gauguste cutter;After inspection meets the requirements, will controllably it be impacted with oil pipe Wave equipment 6 is pushed to the most deep coal seam section to be rebuilt of 4 horizontal segment of coal bed gas horizontal well, and rushing controllable shock wave equipment 6 It hits wave output window and is directed at most deep setting, controllable shock wave equipment 6 is located in screen casing 2 at this time.
S8 is pressed after being installed in place wellhead assembly 8, oil pipe and its control pipeline, and to its each component, each coupling part Its rated operating pressure carries out pressure testing, it is ensured that wellhead assembly 8, oil pipe can work normally.
S9,6 feeding horizontal well 4 of controllable shock wave equipment is most deep to operation coal seam section, according to step S5 and step The operation scheme of S6 setting treats operation coal seam section and implements shock wave operation;
The operation scheme that controllable shock wave equipment 6 is set by step S5 and step S6 implements shock wave to setting in screen casing 2 Operation;
Controllable shock wave equipment 6 is located in screen casing 2, and 13 output window of shock wave is directed at most deep setting, and shock wave 13 is created New crack is made, coal seam 1 and pit shaft are linked up;Shock wave 13 loses portion of energy, dump energy is only when releasing the blocking of mud 5 Coal seam 1 is served it is anti-reflection, the problems such as being not enough to injure coal seam 1, collapse hole will not occur.
S10 carries out shock wave operation to remaining coal seam section to be rebuilt in a manner of returning on successively;
After the shock wave operation for completing upper coal seam section, controllable shock wave is above mentioned by oil pipe and equips 6 underground tool strings, making can It controls shock wave equipment 6 and is located at adjacent coal seam section to be rebuilt, and carry out shock wave operation.
S11 after the shock wave operation for completing all coal seam sections, acts controllable shock wave equipment 6.
By it is same successively on return in a manner of complete the operation of all coal seam sections after, act controllable shock wave and equip 6 underground works Tool string, dismantles wellhead assembly 8, and successively remove each tool, puts the tools away.
S12 descends the complete well of flow string as required, and horizontal well 4 is put into mining.
S13 adjusts the mining scheme of straight well in straight well arrangement area in time;
With the anti-reflection remote well area of straight well of opposition in horizontal well 4,1 seepage channel of straight well periphery coal seam is effectively relieved Tamper so that straight well yield and production capacity improve, staff adjusts the mining scheme of straight well in time to adapt to new production gas Amount.
Horizontal well 4 forms new crack after shock wave operation, and stitches net with cracking initiation of the straight well after anti-reflection, thus real Region combination volume increase is applied, this method both can obtain yield from horizontal well 4, and can also be improved the straight well yield of corresponding region, The present invention is good for coal bed gas region effect of increasing production, and improvement cost is low, is widely portable to the volume increase in coal bed gas straight well arrangement area.
The above description is only an embodiment of the present invention, and it is not intended to limit the protection scope of the present invention, all to utilize the present invention Equivalent structure transformation made by specification and accompanying drawing content, is applied directly or indirectly in other relevant technical fields, and wraps It includes in scope of patent protection of the invention.

Claims (2)

1. a kind of coal bed gas region method for increasing, which comprises the following steps:
Coal bed gas straight well existing in setting regions is pressed the position of its distribution by S1, and it is two rows of to be divided into left and right;
S2, in left and right, horizontal well (4) borehole track is arranged in the center line of two rows of straight wells;
S3, according to the pithead position of the position distribution of straight well and horizontal well (4) borehole track setting horizontal well straight well section;
S4 passes through the pithead position and the borehole track horizontal well drilling (4);
S5 determines controllable shock wave equipment according to the physico-mechanical properties in horizontal well (4) coal seam (1), parameter and tomography situation (6) operation scheme;The operation scheme includes: the number of shocks of operation intensity, job position and each position;
S6, horizontal well section of the linear distance less than 50 meters of horizontal well (4) and straight well, operation intensity, operations number relatively should Operation intensity that horizontal well section is set in step s 5, operations number increasing are twice;
S7, controllable shock wave equipment (6) feeding horizontal well (4) is most deep to operation coal seam section, according to step S5 and step The operation scheme of S6 setting treats operation coal seam section and implements shock wave operation;
S8 implements shock wave operation to operation coal seam section to residue in a manner of returning on successively;
S9 after the shock wave operation for completing all coal seam sections, acts controllable shock wave equipment (6);
Horizontal well (4) are put into mining by S10;
S11 adjusts the mining scheme of straight well in straight well arrangement area in time.
2. coal bed gas region according to claim 1 method for increasing, it is characterised in that: the controllable shock wave equipment (6) The small 120MPa of the shock wave peak pressure of generation.
CN201910894890.8A 2019-09-20 2019-09-20 Coal bed gas region method for increasing Pending CN110513084A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910894890.8A CN110513084A (en) 2019-09-20 2019-09-20 Coal bed gas region method for increasing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910894890.8A CN110513084A (en) 2019-09-20 2019-09-20 Coal bed gas region method for increasing

Publications (1)

Publication Number Publication Date
CN110513084A true CN110513084A (en) 2019-11-29

Family

ID=68633171

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910894890.8A Pending CN110513084A (en) 2019-09-20 2019-09-20 Coal bed gas region method for increasing

Country Status (1)

Country Link
CN (1) CN110513084A (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10364659B1 (en) * 2018-09-27 2019-07-30 Exxonmobil Upstream Research Company Methods and devices for restimulating a well completion

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10364659B1 (en) * 2018-09-27 2019-07-30 Exxonmobil Upstream Research Company Methods and devices for restimulating a well completion

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张永民等: "松软煤层可控冲击波增透瓦斯抽采创新实践—以贵州水城矿区中井煤矿为例", 《煤炭学报》 *
朱庆忠等: "郑庄区块高阶煤层气低效产能区耦合盘活技术", 《煤炭学报》 *

Similar Documents

Publication Publication Date Title
CN102797465B (en) Underground ultra-thin virtual protection layer hydraulic coal mining method
CN106285477B (en) Underground coal mine adopt gas pumping top plate face upward wear layer orientation hole construction method
CN102619552B (en) Directional hydraulic pressing penetration, permeability increase and outburst elimination method of guide groove
CN110566118B (en) Advanced grouting transformation method for combined directional hole of underground deep-buried aquifer bottom plate of coal mine
CN103498696B (en) A kind of method from roadway in the roof grouting filling compacting goaf filling body
CN107905834A (en) A kind of hypotonic high prominent coal seam architecture gas production method
CN102383830B (en) Comprehensive outburst prevention method for outburst coal seam region
CN106545296A (en) A kind of surface drilling grouting treatment method of deep mining coal seam base plate limestone water damage
CN106948843A (en) A kind of double-deck multiple-limb concordant bored grouting transformation dual limestone aquifer method of roof and floor
CN104314610A (en) Coal road stripe region burst-preventing method
CN108301866B (en) Mining of closed distance coal seam group adjacent layer gas pressure relief directional drilling stops pumping method
CN112593999B (en) Directional long-drilling hydraulic permeability-increasing method for soft coal seam and/or soft and hard composite coal seam
CN105804786B (en) A kind of weak seam bottom plate layer-through drilling pressure rushes anti-reflection method
CN108661618A (en) A kind of reservoir reconstruction method of coal bed gas L-type horizontal well
CN102536302A (en) Method for relieving pressure and eliminating outburst of ground butting well
CN102587959A (en) Method for draining coal seam gas
WO2017198109A1 (en) Pitshaft coal uncovering method for coal mines whose coal seam lies in main aquifer
CN105370256A (en) Method for increasing wetting radius of high-pressure water injection of low-air-permeability coal seams through sectioned pre-splitting
CN108316964A (en) A kind of low air permeability coal seam pressure relief gas pumping mining method
CN102635389B (en) Method for gas drainage from high-position roadway coal seam containing shielded soft rock
CN114294046B (en) Coal mine area full-coverage underground three-dimensional extraction method
CN110439525A (en) Coal bed gas horizontal well de-plugging, anti-reflection completion method
CN104819008A (en) Efficient extraction method of coal seam gas
CN204327172U (en) Formula boring goaf extraction structure before and after high-rise position
CN110513084A (en) Coal bed gas region method for increasing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191129

RJ01 Rejection of invention patent application after publication