CN110512485A CN201910861589.7A CN201910861589A CN110512485A CN 110512485 A CN110512485 A CN 110512485A CN 201910861589 A CN201910861589 A CN 201910861589A CN 110512485 A CN110512485 A CN 110512485A
Authority
CN
China
Prior art keywords
receiving tank
water receiving
road
water
gutter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910861589.7A
Other languages
Chinese (zh)
Inventor
张翼鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei 20 Smelting Construction Co Ltd
China MCC20 Group Corp Ltd
Original Assignee
Hebei 20 Smelting Construction Co Ltd
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei 20 Smelting Construction Co Ltd, China MCC20 Group Corp Ltd filed Critical Hebei 20 Smelting Construction Co Ltd
Priority to CN201910861589.7A priority Critical patent/CN110512485A/en
Publication of CN110512485A publication Critical patent/CN110512485A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/227Gutters; Channels ; Roof drainage discharge ducts set in sidewalks
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/04Pipes or fittings specially adapted to sewers
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • E03F5/0401Gullies for use in roads or pavements

Landscapes

  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)

Abstract

The present invention provides a kind of quick-mounting formula road water collector and construction methods.Road water collector includes water receiving tank, grate plate and drain pipe.Water receiving tank is the trough body structure that two end seals have closure plate, for being placed in the gutter dug on road surface.The size of grate plate and the notch of water receiving tank are consistent, the top for the water receiving tank being mounted in merging let that is harmonious, and are substantially flush the upper face of grate plate with gutter two sides road surface.Drain pipe is embedded in underground, and one end connects with water receiving tank, and the other end connects with underground water well or blow-off line, for the water in water receiving tank to be transported in underground water well or blow-off line.The water collector modularization that the present invention will add on road surface, the breakage of road is smaller, saves duration and the expense on later period reparation road surface, is directly placed on road surface in gutter during installation, simple and convenient, of less demanding to the technical level of construction personnel.

Description

A kind of ready-package road water collector and construction method
Technical field
The present invention relates to road drainage field, specifically a kind of ready-package road water collector and construction method.
Background technique
In municipal works after road pavement, also need in addition to add rainwater water collector sometimes.Currently, add Rainwater water collector is mostly masonry construction, usually first dismantles road surface and road structure layer, then builds and receive well, embedded water collection pipe Line is finally backfilled.Such mode for adding rainwater water collector, excavation area is larger, receives well and deeper, the road Yi Dui is arranged The performance of line structure layer impacts, and the construction time is longer, more demanding to the technical level of construction personnel, after repairing Road surface integraty is poor, influences the aesthetics of road.
Summary of the invention
An object of the present invention is just to provide a kind of ready-package road water collector, to solve to add rainwater water collector Construction time it is longer, the poor problem of the globality of road surface.
One of present invention is achieved in that a kind of quick-mounting formula road water collector, comprising:
Water receiving tank has the trough body structure of closure plate for two end seals, for being placed in the gutter dug on road;
Grate plate, size is consistent with the notch of the water receiving tank, and be harmonious the water receiving tank being mounted in merging let Top, the top surface of the grate plate and the road surface for excavating gutter are substantially flush;And
Drain pipe is embedded in underground, and one end is connected with water receiving tank, and the other end connects with underground water well or drainage pipeline, with One end that water receiving tank connects is the high point of drain pipe, for the water collected in water receiving tank to be transported to underground water well or drainage pipeline It is interior.
The water receiving tank is the U-shaped groove body in section, on its external wall along long to several support plates, the support is distributed with Plate is the U-shaped upright plate body that outer is harmonious in rectangle, interior edge with the water receiving tank shape, and the support plate passes through the U on interior edge Socket joint is distributed in the support plate at the water receiving tank both ends and the port of water receiving tank in the water receiving tank to type mouth from bottom to top Concordantly.
The drainage hole of connection drain pipe is offered on one of closure plate of the water receiving tank.
The water receiving tank is an integral molding structure with several support plates.
The second object of the present invention is just to provide a kind of construction method of ready-package road water collector, to solve to add rain Pavement excavation area is big when water water collector is constructed, the problem of easily impacting to the performance of the structure sheaf of road.
The two of the present invention are achieved in that a kind of construction method of quick-mounting formula road water collector, comprising the following steps:
A, quick-mounting formula road water collector described in claim 1 is purchased, the setting depth of water receiving tank therein is with not exclusively broken Subject to the structure sheaf on bad track road;
B, on the road surface of quasi- installation road water collector, according to the width of water receiving tank, groove unwrapping wire is carried out on road surface, is used Cast-cutting saw cuts road surface along groove unwrapping wire, then, according to the depth of water receiving tank, surface layer and the portion of road is rejected using electric pick Separation structure layered material, finally forms gutter on road surface;
C, after digging to gutter, concrete cushion is laid in the bottom in gutter;
E, water receiving tank is placed in gutter, and one end of drain pipe is connected with rhone, the other end of drain pipe introduces road Drainage inspection well outside road, or be connected with subsoil drain;
F, after the installation is completed, then at the gap between the lateral wall and gutter of water receiving tank casting concrete carries out at the cementation of fissures Reason;
G, grate plate is finally mounted on to the top surface of water receiving tank, to complete the installment work of road water collector.
Several water receiving tanks can dock spelling and use, dock the closure plate that need to be removed at water receiving tank docking when spelling and use.
In step f, the cementation of fissures uses microdilatancy self-compacting concrete material, to have one in neighbouring road deck when the cementation of fissures The vacant reserved part of section carries out reserved portion after concrete strength is met the requirements, then using material identical with road deck The cementation of fissures processing divided.
The water collector modularization that the present invention will add on road surface, whens construction and installation, do not need to dig biggish on road surface Gutter, so that road structure forcible entry construction area minimizes, therefore the breakage of road is smaller, to save later period repair way The duration in face and expense.The present invention is directly put on road surface in gutter during installation, simple and convenient, to the skill of construction personnel Art level requirement is not high.In addition, the present invention is under the premise of guaranteeing to receive water basic function, moreover it is possible to shorten construction period.The present invention The concrete cementation of fissures is used after the installation is completed in water collector, and surface layer carries out surface layer processing with material using road, it is ensured that construction The beauty on road surface afterwards.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Fig. 2 is the attachment structure schematic diagram of water receiving tank and support plate.
Fig. 3 is the structural schematic diagram of grate plate.
Fig. 4 is the attachment structure schematic diagram of water receiving tank and grate plate.
In figure: 1, road;2, closure plate;3, grate plate;4, water receiving tank;5, filler stitches;6, closure plate with holes;7, support plate;8, it dredges Water pipe;9, underground water well.
Specific embodiment
A kind of embodiment 1: quick-mounting formula road water collector.
As shown in Figure 1, a kind of quick-mounting formula road water collector of the present invention includes water receiving tank 4, grate plate 3 and drain pipe 8.
Water receiving tank 4 is trough body structure, and cross section can be semi-circular etc. for rectangle.It is U that water receiving tank 4 of the invention, which is cross section, The trough body structure of type, one end block closure plate 2, and the other end blocks closure plate 6 with holes, for being placed in the gutter dug on road It is interior, so that the rainwater etc. on road surface flows into water receiving tank 4.The inside of the top edge of the two sidewalls of the groove body of water receiving tank 4 is gone respectively Except a part, form the ladder platform at the edge of overlap joint grate plate 3, referring to fig. 2 shown in.
Grate plate 3 is plate structure, and the notch of size and water receiving tank 4 is in the same size, is provided in the plate face of grate plate 3 several Strip through-hole disposed in parallel for from the flowing water to water receiving tank 4, as shown in Figure 3.In use, grate plate 3, which is harmonious, is mounted on receipts water The top of slot 4 is substantially flush the top surface of grate plate 3 with the road surface for digging gutter, guarantees the pedestrian's for passing by the water collector Safety, the connection structure between grate plate 3 and water receiving tank 4 are shown in Figure 4.
Drain pipe 8 is embedded in underground, and one end is connected with the drainage hole of the closure plate with holes 6 of one end of water receiving tank 4, another End is connected with underground water well 9 or blow-off line, and drain pipe 8 of the invention is that water receiving tank 4 connects with underground water well 9, referring to Shown in Fig. 1, the water for collecting water receiving tank 4 is discharged into underground water well 9.The connecting pin of drain pipe 8 and underground water well 9 is hydrophobic The highest point of pipe 8, to guarantee that the water collected in water receiving tank 4 is smoothly discharged in underground water well 9.
Drainage hole on closure plate with holes 6 of the invention is provided with middle part, and the impurity that can avoid precipitating in water receiving tank 4, which enters, to be dredged Drain pipe 8 is blocked in water pipe 8.Grate plate 3 of the invention is overlapped on the top of water receiving tank 4, in easy to disassemble and cleaning water receiving tank 4 The impurity of precipitating.
Several support plates disposed in parallel 7 are additionally provided on along its length in the peripheral wall of water receiving tank 4, support plate 7 is square Shape plate is provided on top edge and is receiving water by U-shaped socket joint with the consistent U-shaped opening of the peripheral shape of water receiving tank 4, support plate 7 On the peripheral wall of slot 4, i.e., water receiving tank 4 is in the U-shaped opening of the support plate 7.Several support plates 7 of the invention and water receiving tank 4 are an integral molding structure, and support plate 7 not only acts as the effect of support to the water receiving tank 4 being mounted in gutter, also to water receiving tank Reinforcement is played the role of in 4 two sidewalls, prevent vehicle from rolling or when pedestrian tramples grate plate 3 damage water receiving tank 4 and cause to collapse.This Invention is distributed in the support plate 7 at 4 both ends of water receiving tank, and the plate face of support plate 7 is concordant with the port of water receiving tank 4.
A kind of embodiment 2: construction method of quick-mounting formula road water collector.
As shown in Figure 1, a kind of construction method of quick-mounting formula road water collector of the invention the following steps are included:
A, it according to road structure feature, checks the thickness of pavement of road and structure sheaf, purchases the quick-mounting formula road of the introduction of embodiment 1 Water collector, the structure of road water collector are described in detail in embodiment 1, do not do excessive introduction herein, water receiving tank 4 is set It sets depth and is subject to the structure sheaf for not exclusively destroying road, to reduce damage of the installation road water collector to road.
B, according to construction drawing, the region of road water collector to be installed is determined on road, in quasi- installation water collector Road surface on groove unwrapping wire carried out on road surface according to the width of water receiving tank 4, road surface is cut along groove unwrapping wire using cast-cutting saw, Then, according to the depth of water receiving tank, the surface layer and part-structure layered material of road are rejected using electric pick, is finally formed on road surface Gutter, the depth and width in the gutter dug are slightly larger than the width and depth of water receiving tank 4, with can be smoothly by water receiving tank 4 It is put into, to reduce the damage of road pavement as far as possible.
C, after gutter is dug, it is laid with concrete cushion in the bottom in gutter, the thickness of bed course should make installation The upper face of the grate plate 3 of 4 upper end of water receiving tank can be substantially flush with the road surface for digging gutter.
E, water receiving tank 4 is placed in the gutter for laying bed course, and the drain pipe 8 and road that will connect with rhone 4 Outer bilge well or underground blow-off line is connected, and drain pipe 8 is finally embedded in earth's surface hereinafter, so that the beauty that road seems It sees clean and tidy.Support plate 7 in water receiving tank 4 is inserted into concrete cushion, can also play fixation to support plate 7 after concrete setting Effect, prevents the deflection in gutter of water receiving tank 4.
F, water receiving tank 4 after the installation is completed, can have the gap between the two sides outer wall of water receiving tank 4 and the inner sidewall in gutter, should Gap is filler seam 5, needs to stitch the casting concrete progress cementation of fissures in 5 in filler.The material that the cementation of fissures uses is microdilatancy self-compaction Concrete material will reserve one section of gap in the cementation of fissures when closing on supercrust, and the intensity to concrete meets and then uses The cementation of fissures that material identical with road carries out reserved part is handled, and guarantees the integration and beauty on road surface after construction.
G, grate plate 3 is finally mounted on to the top of water receiving tank 4, to complete the construction and installation of water collector.
When carrying out construction and installation, when the gutter on road surface is longer, several water receiving tanks 4 can also be docked split and used, Dock the closure plate that need to be removed between adjacent two water receiving tank 4 when split use.
Modularized combination type water receiving tank structure of the invention is simple, and construction method is easy to operate, practicability is stronger, is suitble to a variety of The built road of structure type receives water rebuilding construction, implements the production that best way of the invention is exactly water collector and promotes, applies Work method is promoted the use of.

Claims (7)

1. a kind of quick-mounting formula road water collector, characterized in that include:
Water receiving tank has the trough body structure of closure plate for two end seals, for being placed in the gutter dug on road;
Grate plate, size is consistent with the notch of the water receiving tank, and be harmonious the water receiving tank being mounted in merging let Top, the top surface of the grate plate and the road surface for excavating gutter are substantially flush;And
Drain pipe is embedded in underground, and one end is connected with water receiving tank, and the other end connects with underground water well or drainage pipeline, with One end that water receiving tank connects is the high point of drain pipe, for the water collected in water receiving tank to be transported to underground water well or drainage pipeline It is interior.
2. quick-mounting formula road water collector according to claim 1, characterized in that the water receiving tank is that section is U-shaped Groove body, on its external wall along long to several support plates are distributed with, the support plate is that outer is in rectangle, interior edge and the water receiving tank The U-shaped upright plate body that shape is harmonious, the support plate by the U-shaped mouth on interior edge from bottom to top socket joint in the water receiving tank, The support plate for being distributed in the water receiving tank both ends is concordant with the port of water receiving tank.
3. quick-mounting formula road water collector according to claim 1, characterized in that one of them in the water receiving tank is stifled The drainage hole of connection drain pipe is offered on plate.
4. quick-mounting formula road water collector according to claim 1 or 2, characterized in that the water receiving tank with it is several described Support plate is an integral molding structure.
5. a kind of construction method of quick-mounting formula road water collector, characterized in that the following steps are included:
A, quick-mounting formula road water collector described in claim 1 is purchased, the setting depth of water receiving tank therein is with not exclusively broken Subject to the structure sheaf on bad track road;
B, on the road surface of quasi- installation road water collector, according to the width of water receiving tank, groove unwrapping wire is carried out on road surface, is used Cast-cutting saw cuts road surface along groove unwrapping wire, then, according to the depth of water receiving tank, surface layer and the portion of road is rejected using electric pick Separation structure layered material, finally forms gutter on road surface;
C, after digging to gutter, concrete cushion is laid in the bottom in gutter;
E, water receiving tank is placed in gutter, and one end of drain pipe is connected with rhone, the other end of drain pipe introduces road Drainage inspection well outside road, or be connected with subsoil drain;
F, after the installation is completed, then at the gap between the lateral wall and gutter of water receiving tank casting concrete carries out at the cementation of fissures Reason;
G, grate plate is finally mounted on to the top surface of water receiving tank, to complete the installment work of road water collector.
6. the construction method of quick-mounting formula road water collector according to claim 5, characterized in that several water receiving tanks Spelling and use can be docked, the closure plate that need to be removed at water receiving tank docking when spelling and use is docked.
7. the construction method of quick-mounting formula road water collector according to claim 5, characterized in that in step f, the cementation of fissures Using microdilatancy self-compacting concrete material, there is one section of vacant reserved part in neighbouring road deck when the cementation of fissures, to mixed After solidifying soil intensity is met the requirements, then using the cementation of fissures processing of material identical with road deck progress reserved part.
CN201910861589.7A 2019-09-12 2019-09-12 A kind of ready-package road water collector and construction method Pending CN110512485A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910861589.7A CN110512485A (en) 2019-09-12 2019-09-12 A kind of ready-package road water collector and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910861589.7A CN110512485A (en) 2019-09-12 2019-09-12 A kind of ready-package road water collector and construction method

Publications (1)

Publication Number Publication Date
CN110512485A true CN110512485A (en) 2019-11-29

Family

ID=68632109

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910861589.7A Pending CN110512485A (en) 2019-09-12 2019-09-12 A kind of ready-package road water collector and construction method

Country Status (1)

Country Link
CN (1) CN110512485A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113136755A (en) * 2021-04-25 2021-07-20 索新科技(北京)有限公司 Temporary parking lot laying unit and laying method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3036837A1 (en) * 1980-09-30 1982-05-06 Thyssen Plastik Anger KG, 8000 München Plastic lined concrete pipe - has plastic strip unwound from roll pressed into profiled portion
US6027283A (en) * 1998-06-30 2000-02-22 Strongwell Corporation End caps for drainage system
CN201648912U (en) * 2010-04-26 2010-11-24 吴泽宏 Prefabricated water drainage system groove
CN103556672A (en) * 2013-11-19 2014-02-05 云南农业大学 Rainwater harvesting and water storage system for field road and construction method thereof
CN104746628A (en) * 2015-04-16 2015-07-01 芜湖弛科排水材料贸易有限公司 Drainage system based on HDPE (high-density polyethylene) finished drainage ditches
CN107190836A (en) * 2017-06-05 2017-09-22 绿地集团森茂园林有限公司 A kind of U-shaped gutter in park and its construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3036837A1 (en) * 1980-09-30 1982-05-06 Thyssen Plastik Anger KG, 8000 München Plastic lined concrete pipe - has plastic strip unwound from roll pressed into profiled portion
US6027283A (en) * 1998-06-30 2000-02-22 Strongwell Corporation End caps for drainage system
CN201648912U (en) * 2010-04-26 2010-11-24 吴泽宏 Prefabricated water drainage system groove
CN103556672A (en) * 2013-11-19 2014-02-05 云南农业大学 Rainwater harvesting and water storage system for field road and construction method thereof
CN104746628A (en) * 2015-04-16 2015-07-01 芜湖弛科排水材料贸易有限公司 Drainage system based on HDPE (high-density polyethylene) finished drainage ditches
CN107190836A (en) * 2017-06-05 2017-09-22 绿地集团森茂园林有限公司 A kind of U-shaped gutter in park and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113136755A (en) * 2021-04-25 2021-07-20 索新科技(北京)有限公司 Temporary parking lot laying unit and laying method thereof

Similar Documents

Publication Publication Date Title
CN1963042A (en) Hydraulic sheeting and use method thereof
CN103938512A (en) Reverse construction method of newly built road with existing expressway in underneath penetrating manner
CN208088344U (en) With waterproof, the underground pipe gallery structure of drain function
CN108316354A (en) With waterproof, the underground pipe gallery structure of drain function and its construction method
CN111364444A (en) Shallow-buried rock stratum section diaphragm wall grooving construction method
CN111765318A (en) Pipeline flow guide structure for pipeline repair
CN110512485A (en) A kind of ready-package road water collector and construction method
CN212900365U (en) Pipeline flow guide structure for pipeline repair
CN201943177U (en) Highway tunnel central drainage inspection well
CN113174931A (en) Underground continuous wall construction method based on in-situ pipeline protection
CN210766942U (en) Shaping and excavating device for drainage ditch
CN210561779U (en) Transformation structure of existing abutment
CN112176954A (en) Construction method for newly excavated channel
CN212272300U (en) Water collecting and draining structure of mine method tunnel
CN205206824U (en) Structure is segmented secretly to intercept water by square vertical
CN114319545A (en) High-impermeability concrete drainage ditch system and construction method thereof
CN113266362A (en) Top pipe cover excavation construction method for penetrating through existing dense anchor cable area
CN207989051U (en) A kind of Railway Tunnel structure
CN208152065U (en) A kind of big pre-cast sink well structure of depth
CN103452368B (en) A kind of slurry accident pool and construction method thereof
CN216766148U (en) Railway has tiny fragments of stone, coal, etc. tunnel inspection shaft to keep off tiny fragments of stone, coal, etc. device
CN114198116B (en) Pipe curtain box culvert integration tunnel structure with connect and strengthen
CN216739806U (en) Excavator bucket for excavator and excavator
CN203452433U (en) Slurry accident pool
CN109537632A (en) A kind of seabed tunnel building method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191129

RJ01 Rejection of invention patent application after publication