CN110470884B CN201910665442.0A CN201910665442A CN110470884B CN 110470884 B CN110470884 B CN 110470884B CN 201910665442 A CN201910665442 A CN 201910665442A CN 110470884 B CN110470884 B CN 110470884B
Authority
CN
China
Prior art keywords
line
power frequency
overvoltage
power
frequency overvoltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910665442.0A
Other languages
Chinese (zh)
Other versions
CN110470884A (en
Inventor
徐慧
刘志坚
余进
王雁红
晏永飞
王一妃
李忠志
余沙
刘瑞光
王畅
陈新源
赵雨梦
图志章
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming University Of Technology Asset Management Co ltd
Original Assignee
Kunming University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming University of Science and Technology filed Critical Kunming University of Science and Technology
Priority to CN201910665442.0A priority Critical patent/CN110470884B/en
Publication of CN110470884A publication Critical patent/CN110470884A/en
Application granted granted Critical
Publication of CN110470884B publication Critical patent/CN110470884B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R19/00Arrangements for measuring currents or voltages or for indicating presence or sign thereof
    • G01R19/0084Arrangements for measuring currents or voltages or for indicating presence or sign thereof measuring voltage only
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R19/00Arrangements for measuring currents or voltages or for indicating presence or sign thereof
    • G01R19/165Indicating that current or voltage is either above or below a predetermined value or within or outside a predetermined range of values
    • G01R19/16533Indicating that current or voltage is either above or below a predetermined value or within or outside a predetermined range of values characterised by the application
    • G01R19/16538Indicating that current or voltage is either above or below a predetermined value or within or outside a predetermined range of values characterised by the application in AC or DC supplies
    • G01R19/16547Indicating that current or voltage is either above or below a predetermined value or within or outside a predetermined range of values characterised by the application in AC or DC supplies voltage or current in AC supplies

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a power frequency overvoltage calculation method applied to power restoration of a high-voltage power transmission line, and belongs to the field of power systems. The method calculates the fitting function of the power frequency overvoltage and the line length of each type of line, and uses the function to calculate the power frequency overvoltage of the high-voltage transmission line for power recovery. The method has good practicability and innovation, is applied to the overvoltage verification in the black start recovery process of a certain power grid, adopts the traditional modeling simulation to calculate the overvoltage in the past, and is not mentioned in the previous overvoltage verification; the method saves a large amount of calculation time for the decision process of the power restoration of the high-voltage transmission line, and has important guidance value.

Description

Power frequency overvoltage calculation method applied to power restoration of high-voltage transmission line
Technical Field
The invention relates to a power frequency overvoltage calculation method applied to power restoration of a high-voltage power transmission line, and belongs to the field of power systems.
Background
Because the dependence of the power grid on the power supply is higher and higher, the consequences caused by a major power failure accident become more serious, once an emergency power failure accident occurs, measures must be taken to recover the normal power supply of the system at the fastest speed, and the loss of the fault power failure is reduced to the lowest. Therefore, the research on prevention and recovery measures of the blackout accident is enhanced, a reasonable and feasible recovery plan is formulated, the training of operators and the overhaul of related equipment are enhanced, reasonable recovery operation can be carried out when the accident happens, and the loss is reduced to the maximum extent. Otherwise, the recovery process may be delayed, even the accident range is expanded, resulting in more serious consequences.
The system constructed in the initial stage of black start is a weak power grid structure, and if any out-of-limit fluctuation occurs, the whole black start can be unsuccessful, and larger loss is caused. Careful verification procedures are important for a safe, efficient black start scheme. At the tail end of the power transmission line, if the voltage amplitude is too large, equipment can be broken down to cause misoperation, so that the recovery of the black start of the system is unsuccessful, and great economic loss is caused. Therefore, the black start path recovery must pay attention to the verification of the power frequency overvoltage of the line, and the basis of the verification is to obtain the power frequency overvoltage.
Disclosure of Invention
The invention provides a power frequency overvoltage calculation method applied to power restoration of a high-voltage transmission line, which is used for obtaining power frequency overvoltage of the line.
The technical scheme of the invention is as follows: a power frequency overvoltage calculation method applied to power restoration of a high-voltage transmission line comprises the following steps:
step 1: extracting generator data, transformer data and line data information contained in a path according to a specified power recovery path of the high-voltage transmission line; the high-voltage transmission line refers to a main transmission line with 220kV and 110kV grades;
step 2: establishing an overvoltage simulation model of a series path consisting of a generator, a transformer and a circuit in a simulation environment;
step 3: fitting is carried out through power frequency overvoltage, and the fitting function of the power frequency overvoltage and the line length of each type of line is obtained as follows: u is al3+bl2+cl+d;
U is the power frequency overvoltage value of the corresponding circuit; l is the line length; a. b, c and d are constants of the fitting function, and the values of the constants are related to the model number and the voltage grade of the line;
step 4: and calculating power frequency overvoltage according to the number of the lines:
if only one line exists, the length of the line is substituted into a fitting function corresponding to the type of the line, and the power frequency overvoltage value of the line is calculated;
if the number of lines is multiple: firstly, calculating a voltage value at the tail end of a first line, and substituting the length of the line into a fitting function corresponding to the model of the line to calculate a power frequency overvoltage value of the line; the calculation process of the power frequency overvoltage value of the rest line is as follows: and (3) bringing the power frequency voltage value at the tail end of the (x-1) th line into a fitting function of the corresponding model of the (x) th line, solving a length value corresponding to the converted length value, bringing the calculated line length and the line length of the (x) th line into the fitting function of the corresponding model of the (x) th line again, finally solving a power frequency overvoltage value of the (x) th line, finishing the calculation of the power frequency overvoltage if the line is the last line, and otherwise, continuing to adopt the calculation process of the power frequency overvoltage values of the rest lines to calculate the power frequency overvoltage until the last line calculates the power frequency overvoltage.
Comparing the power frequency overvoltage value with an overvoltage standard, and verifying whether the overvoltage meets the requirement or not so as to judge to start a corresponding circuit; the overvoltage standard is as follows: in 220kV and 110kV systems, the line side power frequency overvoltage is not more than 1.3 times.
A synchronous generator model is simulated by a relatively simple three-phase voltage source module; the power transformer model is equivalent to the synthesis of an ideal transformer and an RT and LT impedance branch circuit because the excitation branch circuit is often ignored in an actual system; the power transmission line adopts a distributed parameter line model, and a small-loss Bergeron model of the power transmission line is established; the switch element module adopts a calculation switch model with a parallel leakage resistor and a parallel leakage capacitor and an oscilloscope module.
The invention has the beneficial effects that:
1. the method has good practicability and innovation, is applied to overvoltage verification in the black start recovery process of a certain power grid, adopts the traditional modeling simulation to calculate the overvoltage in the past, and is not mentioned in the previous overvoltage verification.
2. A large amount of calculation time is saved for the decision making process of the power restoration of the high-voltage transmission line, and the method has important guiding value.
Drawings
FIG. 1 is a flow chart of the present invention;
fig. 2 is a power transmission line restoration scheme according to embodiment 2 of the present invention.
Detailed Description
Example 1: as shown in fig. 1, a power frequency overvoltage calculation method applied to power recovery of a high-voltage transmission line, the invention firstly mainly aims at the power frequency overvoltage problem in the power recovery path recovery process, analyzes the influence of line parameters on the air charge overvoltage from the distribution parameter characteristics of the line, and analyzes the power frequency overvoltage characteristics when a plurality of branched lines recover power supply according to the capacity lift effect of the transmission line in the power recovery process; and then establishing a simulation model conforming to the reality by using simulation software MATLAB/Simulink, carrying out a simulation experiment aiming at the power frequency overvoltage of the power transmission line models of 220kV and 110kV grades, and obtaining the direct proportion relation between the amplitude of the power frequency overvoltage and the line length according to the simulation result. And finally, calculating a fitting function of the power frequency overvoltage and the line length of each type of line through MATLAB software, and using the function to calculate the power frequency overvoltage of the high-voltage transmission line for power recovery.
The method comprises the following specific steps:
step 1: extracting generator data, transformer data and line data information contained in a path according to a specified power recovery path of the high-voltage transmission line; the high-voltage transmission line refers to a main transmission line with 220kV and 110kV grades;
step 2: establishing an overvoltage simulation model of a series path consisting of a generator, a transformer and a line in an MATLAB simulation environment;
step 3: fitting the power frequency overvoltage through MATLAB to obtain a fitting function of the power frequency overvoltage and the line length of each type of line, wherein the fitting function is as follows:
U=al3+bl2+cl+d(1)
u is the power frequency overvoltage value of the corresponding circuit; l is the line length; a. b, c and d are constants of the fitting function, and the values of the constants are related to the model number and the voltage grade of the line;
step 4: and calculating power frequency overvoltage according to the number of the lines:
if only one line exists, the length of the line is substituted into a fitting function corresponding to the type of the line, and the power frequency overvoltage value of the line is calculated;
if the number of lines is multiple: firstly, calculating a voltage value at the tail end of a first line, and substituting the length of the line into a fitting function corresponding to the model of the line to calculate a power frequency overvoltage value of the line; the calculation process of the power frequency overvoltage value of the rest line is as follows: and (3) bringing the power frequency voltage value at the tail end of the (x-1) th line into a fitting function of the corresponding model of the (x) th line, solving a length value corresponding to the converted length value, bringing the calculated line length and the line length of the (x) th line into the fitting function of the corresponding model of the (x) th line again, finally solving a power frequency overvoltage value of the (x) th line, finishing the calculation of the power frequency overvoltage if the line is the last line, and otherwise, continuing to adopt the calculation process of the power frequency overvoltage values of the rest lines to calculate the power frequency overvoltage until the last line calculates the power frequency overvoltage.
Step 5: the effectiveness of the method is verified for a specific example, and the result shows that the algorithm provided by the method has feasibility by comparing the overvoltage value calculated by a traditional method adopting MATLAB/Simulink model simulation with the overvoltage fitting method provided by the method. And comparing with an overvoltage standard to check whether the overvoltage meets the requirement.
Example 2: the power frequency overvoltage calculation method applied to power restoration of the high-voltage transmission line of 220kV and 110kV grades is described in detail by combining specific examples. And (3) establishing an overvoltage simulation calculation model aiming at the power transmission line recovery scheme shown in FIG. 2. Four lines are arranged, and the model, the voltage grade and the length of the lines are shown in the following table 1.
TABLE 1 line parameters
Line name Model number Length of Voltage class
Line 1 LGJ-300 100km 110kV
Line 2 LGJ-185 60km 110kV
Line 3 LGJ-120 50km 110kV
Line 4 LGJ-150 200km 110kV
Step 1: and establishing an overvoltage simulation model in an MATLAB environment, wherein the simulation model is a series connection path consisting of a generator, a transformer and a line. The simulation model respectively refers to power frequency overvoltage values of the types of 110 kV-level power transmission lines, such as LGJ-300, LGJ-185, LGJ-120 and LGJ-150, under different lengths.
Step 2: fitting is carried out through MATLAB software power frequency overvoltage, and a fitting function of the line power frequency overvoltage and the line length is obtained.
The line model is LGJ-300:
U=1.327×10-7×l3+4.446×10-6×l2+0.03494×l+109.8 (2)
the line model is LGJ-185:
U=1.027×10-7×l3+2.183×10-5×l2+0.03005×l+109.9 (3)
the line model is LGJ-120:
U=7.525×10-8×l3+3.215×10-5×l2+0.02776×l+109.9 (4)
the line model is LGJ-150:
U=9.035×10-8×l3+2.678×10-5×l2+0.02935×l+109.9 (5)
wherein l is the line length (unit: km), and U is the power frequency overvoltage value (unit: kV).
Step 3: and calculating the overvoltage value of the high-voltage transmission line recovery scheme through the fitting function.
Step3.1: firstly, the voltage value of the tail end of the line 1(LGJ-300) is calculated, namely the length 100km of the line is substituted into a fitting function formula (2) of the model to obtain the overvoltage value of the line 1 to be 113.47kV,
step3.2: the corresponding length is obtained according to a fitting function formula (3) of the voltage value obtained by the line 1 and substituted into the line 2(LGJ-185), namely the corresponding length is obtained by substituting U-113.47 kV into the formula (3) and l-106.4795 km;
step3.3: adding the actual length of the 2 nd line to the calculated line length, the length of the 2 nd line finally becomes: 106.4795+60 is 166.4795km, the length value is substituted into the fitting function formula (3) again to obtain the corresponding overvoltage value, and the overvoltage value corresponding to the line 2 is obtained to be 115.98 kV.
Step3.4: the corresponding length is obtained according to a fitting function formula (4) of the voltage value obtained by the line 2 and substituted into the line 3(LGJ-120), namely, the corresponding length is obtained by substituting U-115.98 kV into the formula (4) and l-171.4027 km;
step3.5: adding the actual length of the 3 rd line to the calculated line length, the length of the 3 rd line finally becomes: 171.4027+50 is 221.4027km, the length value is substituted into the fitting function formula (4) again to obtain the corresponding overvoltage value, and the overvoltage value corresponding to the line 3 is 118.44 kV.
Step3.6: the corresponding length is obtained according to a fitting function formula (5) of the voltage value obtained by the line 3 and the line 4(LGJ-120), namely the corresponding length is obtained by substituting U (118.44 kV) into the formula (5) and l (216.7316 km);
step3.7: adding the actual length of the line 4 to the calculated line length, the length of the 4 th line finally becomes: 216.7316+200 is 416.7316km, the length value is substituted into the fitting function formula (5) again to obtain the corresponding overvoltage value, and the overvoltage value corresponding to the line 4 is 133.32 kV.
The power frequency overvoltage values of the four lines are calculated through functions and are shown in table 1.
TABLE 1 Power frequency overvoltage value calculated by fitting function
Figure BDA0002139956970000051
Step 4: to verify the effectiveness of the method, for a specific example, the effectiveness of the method is verified by comparing the overvoltage values calculated by the conventional method using MATLAB/Simulink model simulation with the method using overvoltage fitting proposed herein. And comparing with an overvoltage standard to check whether the overvoltage meets the requirement. The results are shown in Table 2.
TABLE 2 segmentation simulation results
Figure BDA0002139956970000061
As can be seen from table 2, the results show that a value calculated as a function of the line length and the line frequency overvoltage is possible as an overvoltage criterion. The power frequency overvoltage calculated through MATLAB model simulation is not much different from the voltage value calculated by the fitting function because a certain margin is reserved for the calculated value due to various factors such as asynchronous closing, different closing angles and the like in practical application. Four sections of overvoltage of the model are within an allowable range, and line side power frequency overvoltage does not exceed 1.3p.u.
While the present invention has been described in detail with reference to the embodiments shown in the drawings, the present invention is not limited to the embodiments, and various changes can be made without departing from the spirit of the present invention within the knowledge of those skilled in the art.

Claims (3)

1. A power frequency overvoltage calculation method applied to power restoration of a high-voltage transmission line is characterized by comprising the following steps: the method comprises the following steps:
step 1: extracting generator data, transformer data and line data information contained in a path according to a specified power recovery path of the high-voltage transmission line; the high-voltage transmission line refers to a main transmission line with 220kV and 110kV grades;
step 2: establishing an overvoltage simulation model of a series path consisting of a generator, a transformer and a circuit in a simulation environment;
step 3: fitting is carried out through power frequency overvoltage, and the fitting function of the power frequency overvoltage and the line length of each type of line is obtained as follows: u is al3+bl2+cl+d;
U is the power frequency overvoltage value of the corresponding circuit; l is the line length; a. b, c and d are constants of the fitting function, and the values of the constants are related to the model number and the voltage grade of the line;
step 4: and calculating power frequency overvoltage according to the number of the lines:
if only one line exists, the length of the line is substituted into a fitting function corresponding to the type of the line, and the power frequency overvoltage value of the line is calculated;
if the number of lines is multiple: firstly, calculating a voltage value at the tail end of a first line, and substituting the length of the line into a fitting function corresponding to the model of the line to calculate a power frequency overvoltage value of the line; the calculation process of the power frequency overvoltage value of the rest line is as follows: and (3) bringing the power frequency voltage value at the tail end of the (x-1) th line into a fitting function of the corresponding model of the (x) th line, solving a length value corresponding to the converted length value, bringing the calculated line length and the line length of the (x) th line into the fitting function of the corresponding model of the (x) th line again, finally solving a power frequency overvoltage value of the (x) th line, finishing the calculation of the power frequency overvoltage if the line is the last line, and otherwise, continuing to adopt the calculation process of the power frequency overvoltage values of the rest lines to calculate the power frequency overvoltage until the last line calculates the power frequency overvoltage.
2. The power frequency overvoltage calculation method applied to power restoration of the high-voltage transmission line according to claim 1, wherein the power frequency overvoltage calculation method comprises the following steps: comparing the power frequency overvoltage value with an overvoltage standard, and verifying whether the overvoltage meets the requirement or not so as to judge to start a corresponding circuit; the overvoltage standard is as follows: in 220kV and 110kV systems, the line side power frequency overvoltage is not suitable to exceed the overvoltage standard by 1.3 times.
3. The power frequency overvoltage calculation method applied to power restoration of the high-voltage transmission line according to claim 1, wherein the power frequency overvoltage calculation method comprises the following steps: a synchronous generator model is simulated by a relatively simple three-phase voltage source module; the power transformer model is equivalent to the synthesis of an ideal transformer and an RT and LT impedance branch circuit because the excitation branch circuit is often ignored in an actual system; the power transmission line adopts a distributed parameter line model, and a small-loss Bergeron model of the power transmission line is established; the switch element module adopts a calculation switch model with a parallel leakage resistor and a parallel leakage capacitor and an oscilloscope module.
CN201910665442.0A 2019-07-23 2019-07-23 Power frequency overvoltage calculation method applied to power restoration of high-voltage transmission line Active CN110470884B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910665442.0A CN110470884B (en) 2019-07-23 2019-07-23 Power frequency overvoltage calculation method applied to power restoration of high-voltage transmission line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910665442.0A CN110470884B (en) 2019-07-23 2019-07-23 Power frequency overvoltage calculation method applied to power restoration of high-voltage transmission line

Publications (2)

Publication Number Publication Date
CN110470884A CN110470884A (en) 2019-11-19
CN110470884B true CN110470884B (en) 2021-07-20

Family

ID=68508775

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910665442.0A Active CN110470884B (en) 2019-07-23 2019-07-23 Power frequency overvoltage calculation method applied to power restoration of high-voltage transmission line

Country Status (1)

Country Link
CN (1) CN110470884B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6118639A (en) * 1997-05-30 2000-09-12 Goldstein; Richard Fast acting disconnect system for protecting surge suppressors and connected utilization equipment from power line overvoltages
CN101252277A (en) * 2007-12-21 2008-08-27 华北电力大学 Startup method of idle load long line
CN102073795A (en) * 2011-02-18 2011-05-25 昆明理工大学 110kV cable hybrid line switching overvoltage level prediction method
CN102435921A (en) * 2011-09-26 2012-05-02 山西省电力公司忻州供电分公司 Method for determining insulation and lightning impulse withstanding properties of same-tower double-loop power transmission line
CN105005207A (en) * 2015-05-29 2015-10-28 国家电网公司 Black-start overvoltage automatic check method based on ATP-EMTP
CN105207203A (en) * 2015-09-15 2015-12-30 国家电网公司 High-voltage shunt reactor compensation method for typical ultrahigh voltage transmission line
CN105740500A (en) * 2015-11-19 2016-07-06 南方电网科学研究院有限责任公司 Composite tower overvoltage simulation model design method
CN107846013A (en) * 2017-10-04 2018-03-27 国网山东省电力公司淄博供电公司 GIS shells circulation and transient state ground potential rise modeling and analysis method based on PEEC methods
CN108509712A (en) * 2018-03-29 2018-09-07 南方电网科学研究院有限责任公司 A kind of the over-voltage simulation analysis method and system of cable run

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2580815A1 (en) * 2005-01-07 2006-07-13 Sumitomo Electric Industries, Ltd. Dielectric strenght test method of superconducting cable

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6118639A (en) * 1997-05-30 2000-09-12 Goldstein; Richard Fast acting disconnect system for protecting surge suppressors and connected utilization equipment from power line overvoltages
CN101252277A (en) * 2007-12-21 2008-08-27 华北电力大学 Startup method of idle load long line
CN102073795A (en) * 2011-02-18 2011-05-25 昆明理工大学 110kV cable hybrid line switching overvoltage level prediction method
CN102435921A (en) * 2011-09-26 2012-05-02 山西省电力公司忻州供电分公司 Method for determining insulation and lightning impulse withstanding properties of same-tower double-loop power transmission line
CN105005207A (en) * 2015-05-29 2015-10-28 国家电网公司 Black-start overvoltage automatic check method based on ATP-EMTP
CN105207203A (en) * 2015-09-15 2015-12-30 国家电网公司 High-voltage shunt reactor compensation method for typical ultrahigh voltage transmission line
CN105740500A (en) * 2015-11-19 2016-07-06 南方电网科学研究院有限责任公司 Composite tower overvoltage simulation model design method
CN107846013A (en) * 2017-10-04 2018-03-27 国网山东省电力公司淄博供电公司 GIS shells circulation and transient state ground potential rise modeling and analysis method based on PEEC methods
CN108509712A (en) * 2018-03-29 2018-09-07 南方电网科学研究院有限责任公司 A kind of the over-voltage simulation analysis method and system of cable run

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
A New Frequency-Dependent-Model for Cables;C. Rodríguez Valdez et.al;《2008 IEEE International Conference on Electro/Information Technology》;20080627;第151-158页 *
基于随机统计分析的黑启动操作过电压的计算校验;张玉琼 等;《电工技术学报》;20050531;第20卷(第5期);第92-97页 *
电力***恢复过程中的工频过电压动态优化控制;杨孟飞;《电力自动化》;20181231(第6期);第102-103页 *

Also Published As

Publication number Publication date
CN110470884A (en) 2019-11-19

Similar Documents

Publication Publication Date Title
CN103809082B (en) A kind of distance-finding method of the one-phase earthing failure in electric distribution network based on the sudden change of line line ripple
CN105866634A (en) Small current grounding system single-phase grounding fault wire selection method based on transient zero-module current
Hu et al. Power-quality impact assessment for high-speed railway associated with high-speed trains using train timetable—Part II: Verifications, estimations and applications
CN103701106B (en) A kind of relay protecting method suitable for micro-capacitance sensor
CN103926511B (en) A kind of distance-finding method of distribution net work earthing fault based on zero line ripple difference
WO2014089959A1 (en) Dynamic equivalence method for ac/dc hybrid large power grid based on engineering application
CN103163430A (en) Resonant grounding system fault line selection method by combining complex wavelets with ANN (artificial neural network)
CN103384069B (en) Wind power collection system of offshore wind power plant sensitivity regulation method and system
CN105954640A (en) Power distribution network fault line selection method based on dominant frequency zero sequence power
CN105048409A (en) Automatic verification method based on relay protection constant value
CN103226175A (en) Method for achieving double-ended ranging by virtue of resistance characteristics of ground resistor
CN111537839A (en) Transient voltage safety evaluation method and system suitable for high-proportion new energy transmission end power grid
CN101915888A (en) Extensible fusion identification method for lightening interference of +/-800kV direct current transmission line
CN106781929A (en) A kind of power distribution network relay protection training set and method
CN103675536B (en) A kind of thunderbolt interference identification method utilizing instantaneous power and fitting a straight line
CN106353564A (en) Power system short-circuit current acquiring method for meter and V/X wiring traction transformer
Nag et al. Fault classification using Artificial Neural Network in combined underground cable and overhead line
CN104410159B (en) Power grid black start overall process checking method based on real-time digital simulation
CN106356876B (en) The negative-sequence current computation model of electric system is injected under high-speed rail AT power supply mode
CN110470884B (en) Power frequency overvoltage calculation method applied to power restoration of high-voltage transmission line
CN105606955A (en) Numerical differentiation and empirical mode decomposition-based fault line distinguishing method
CN106443334A (en) Zero sequence current difference polarity comparison based power distribution network fault line selection method
CN104361524A (en) Distribution network frame structure analysis method
CN110456218A (en) Fast failure selection method based on power frequency increment coefficient before and after medium resistance switching
CN106227912A (en) Obtain and simplify the analysis method of maximum transient overvoltage under wind energy turbine set cable system asymmetry short circuit fault

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240426

Address after: Room 301-308, Huawei Building, Lianhua Campus, Kunming University of Technology, No. 298 Xuefu Road, Wuhua District, Kunming City, Yunnan Province, 650000

Patentee after: Kunming University of Technology Asset Management Co.,Ltd.

Country or region after: China

Address before: 650093 No. 253, Xuefu Road, Wuhua District, Yunnan, Kunming

Patentee before: Kunming University of Science and Technology

Country or region before: China