CN110469272B - Reaming and recovering device for pile foundation casing follow-up construction - Google Patents

Reaming and recovering device for pile foundation casing follow-up construction Download PDF

Info

Publication number
CN110469272B
CN110469272B CN201910698052.3A CN201910698052A CN110469272B CN 110469272 B CN110469272 B CN 110469272B CN 201910698052 A CN201910698052 A CN 201910698052A CN 110469272 B CN110469272 B CN 110469272B
Authority
CN
China
Prior art keywords
pile foundation
casing
construction
foundation casing
short steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910698052.3A
Other languages
Chinese (zh)
Other versions
CN110469272A (en
Inventor
张平
方耀辉
王磊
杨胜文
呙于平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201910698052.3A priority Critical patent/CN110469272B/en
Publication of CN110469272A publication Critical patent/CN110469272A/en
Application granted granted Critical
Publication of CN110469272B publication Critical patent/CN110469272B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D11/00Methods or apparatus specially adapted for both placing and removing sheet pile bulkheads, piles, or mould-pipes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B10/00Drill bits
    • E21B10/26Drill bits with leading portion, i.e. drill bits with a pilot cutter; Drill bits for enlarging the borehole, e.g. reamers
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B10/00Drill bits
    • E21B10/62Drill bits characterised by parts, e.g. cutting elements, which are detachable or adjustable
    • E21B10/627Drill bits characterised by parts, e.g. cutting elements, which are detachable or adjustable with plural detachable cutting elements
    • E21B10/633Drill bits characterised by parts, e.g. cutting elements, which are detachable or adjustable with plural detachable cutting elements independently detachable

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Civil Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a reaming and recovering device for pile foundation casing follow-up construction, which comprises: the short steel casing can be sleeved and fixed on the pile foundation casing; the retaining pieces are arranged at the bottom of the side wall of the short steel protective cylinder at intervals along the circumferential direction of the short steel protective cylinder, the longitudinal sections of the retaining pieces are L-shaped, and one end of the gasket is fixedly connected to the short steel protective cylinder; and the drilling sheets are arranged in one-to-one correspondence with the blocking sheets respectively, are positioned between the short steel protective cylinder and the blocking sheets in opposite directions, and are rotatably connected to the blocking sheets. According to the reaming device for the pile foundation casing follow-up construction, the drill bit is arranged so that the reaming aperture of the pile foundation casing is larger than the inner diameter of the pile foundation casing, and the existence of the gap between the pile foundation casing and the soil body enables the frictional resistance between the pile foundation casing and the soil body to be effectively reduced when the pile foundation casing is pulled out upwards at a later stage, so that the pile foundation casing is convenient to pull out.

Description

Reaming and recovering device for pile foundation casing follow-up construction
Technical Field
The invention relates to the technical field of pile foundation construction, in particular to a reaming and recovering device for pile foundation casing follow-up construction.
Background
The pile foundation casing follow-up method is a technical method which can ensure smooth construction of a pile foundation and avoid quality accidents such as shrinkage, pile breakage and the like, and is often applied to pile foundation construction under weak geology.
It is not necessary for the end-bearing pile to retain the pile casing.
However, after the construction is completed by adopting the traditional pile foundation casing following method, the inserted pile foundation casing is difficult to be directly pulled out basically due to the double friction resistance of soil and concrete, and if the pile foundation casing cannot be recycled, a large amount of resources can be wasted.
Disclosure of Invention
To above-mentioned problem, now provide a pile foundation protects a reaming and recovery unit for section of thick bamboo follow-up method construction, aim at effectively realizing the recycle of pile foundation construction and later stage pile foundation protects a section of thick bamboo.
The specific technical scheme is as follows:
the invention provides a reaming device for pile casing follow-up construction, which is characterized by comprising the following components:
the short steel casing can be sleeved and fixed on the pile foundation casing;
the baffle plates are arranged at the bottom of the side wall of the short steel protective cylinder at intervals along the circumferential direction of the short steel protective cylinder, the longitudinal section of each baffle plate is L-shaped, and one end of each baffle plate is fixedly connected to the short steel protective cylinder; and
the drill plates are arranged in one-to-one correspondence with the blocking pieces respectively, the drill plates are oppositely positioned between the short steel protective cylinder and the blocking pieces, and the drill plates are rotatably connected to the blocking pieces.
Foretell pile foundation protects a tub reaming device for follow-up method construction still has such characteristic, and reaming device still includes a plurality of fixed pins, and the fixed pin sets up with the drill plate one-to-one respectively, and the fixed pin includes:
the fixed rod can be arranged on the drill bit in a penetrating way; and
two fixation nuts that are located the dead lever both ends, fixation nut screwed connection is on the dead lever, and the dead lever passes through fixation nut centre gripping on the separation blade.
The reaming device for the pile foundation casing follow-up construction method further has the characteristics that the drill bit is provided with the through holes, and the fixing rod penetrates through the through holes to be arranged on the drill bit.
The reaming device for the pile foundation casing follow-up construction further has the characteristic that the aperture of the penetrating hole is larger than the rod diameter of the fixing rod.
The reaming device for the construction of the pile foundation casing follow-up method also has the characteristic that the cross sections of the separation blade, the drill bit and the fixed rod are arc-shaped.
A second aspect of the present invention provides a pile casing follow-up method construction recovery apparatus, comprising:
the two ends of the fixing ring are provided with fastening buckles;
the reinforcing pieces are arranged on the fixing ring at intervals along the circumferential direction of the fixing ring; and
and the hoisting rods are arranged in one-to-one correspondence with the reinforcing sheets respectively, one ends of the hoisting rods are spirally connected to the reinforcing sheets, and hoisting holes are formed in the other ends of the hoisting rods.
The beneficial effect of above-mentioned scheme is:
according to the reaming device for the pile foundation casing follow-up construction, the drill bit is arranged so that the reaming aperture of the pile foundation casing is larger than the inner diameter of the pile foundation casing, and the existence of the gap between the pile foundation casing and the soil body enables the frictional resistance between the pile foundation casing and the soil body to be effectively reduced when the pile foundation casing is pulled out upwards at a later stage, so that the pile foundation casing is convenient to pull out.
Drawings
Fig. 1 is a schematic structural diagram of a hole enlarging device for pile foundation casing follow-up construction provided in an embodiment of the present invention;
fig. 2 is a schematic structural view of a baffle plate provided in an embodiment of the present invention;
FIG. 3 is a schematic structural diagram of a drill bit provided in an embodiment of the present invention;
FIG. 4 is a schematic structural view of a retaining pin provided in an embodiment of the present invention;
fig. 5 is a schematic use diagram of a reaming device for pile casing follow-up construction provided in an embodiment of the present invention.
Fig. 6 is a schematic structural diagram of a recovery device for pile casing follow-up construction according to an embodiment of the present invention.
In the drawings: 1. a short steel casing; 2. a baffle plate; 3. drilling a sheet; 4. a fixing pin; 5. fixing the rod; 6. fixing a nut; 7. perforating holes; 8. a fixing ring; 9. fastening a buckle; 10. a reinforcing sheet; 11. hoisting the rod; 12. hoisting holes; 13. pile foundation casing; 14. and (4) holes.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It should be noted that the embodiments and features of the embodiments may be combined with each other without conflict. The invention is further described with reference to the following drawings and specific examples, which are not intended to be limiting.
As shown in fig. 1 to 4, a hole enlarging device for pile casing follow-up construction provided in an embodiment of the present invention includes: the short steel pile casing 1 can be sleeved and fixed at the bottom of the side wall of the pile foundation pile casing 13 in a spot welding manner; a plurality of baffle pieces 2 are arranged at the bottom of the side wall of the short steel protective cylinder 1 at intervals along the circumferential direction of the short steel protective cylinder 1, the longitudinal section of each baffle piece 2 is L-shaped, and one end of each baffle piece is fixed on the short steel protective cylinder 1 in a spot welding manner; and a plurality of drill bits 3, drill bit 3 respectively with separation blade 2 one-to-one setting, drill bit 3 is located short steel and protects between section of thick bamboo 1 and the separation blade 2 relatively, and drill bit 3 rotates and connects on separation blade 2.
As shown in fig. 1 to 5, in the present invention, before inserting the pile casing 13, the drill plate 3 needs to be rotated outward so that one side of the drill plate facing the pile casing 13 can lean against the other end of the blocking plate 2 (before inserting, the pile casing 13 can be vertically lifted so that the drill plate 3 in the hole enlarging device maintains the above state under the soil supporting effect), and then the pile casing 13 is driven into the soil layer by using the vibration hammer, because the drill plate 3 extends outward and the soil resistance effect is achieved, when the pile casing 13 is driven into the soil layer by using the vibration hammer, the drill plate 3 can maintain the above state and be inserted and driven at the periphery of the pile casing 13 to form the annular hole 14 (the outer diameter of the hole 14 is the actual hole edge formed by inserting and driving). After pile foundation pile casing 13 is inserted and beaten and is submerged in the geology, the user can be fixed in this pile foundation pile casing 13 with another pile foundation pile casing 13 spot welding on and continue to insert and beat can.
The rotary design of the drill bit 3 in the invention enables the drill bit to rotate and be in a vertical state under the action of self gravity in the subsequent recovery process of the pile foundation casing 13, so as to reduce the frictional resistance with soil.
The existence of the circular hole 14 in the invention ensures that the pile foundation casing 13 only bears the frictional resistance of the initial setting concrete in the pile foundation casing 13 in the subsequent process of lifting and recovering the pile foundation casing 13. Compared with the use of the pile foundation casing 13 with the conventional design, the pile foundation casing can reduce or even avoid the resistance generated by the secondary contact with the soil body on the periphery of the hole 14 formed by inserting and punching, thereby being quicker and more convenient to recover.
The blocking piece 2 with the L-shaped longitudinal section can also keep the drill bit 3 in the above state during the inserting and beating.
Specifically, the reaming device further comprises a plurality of fixing pins 4, the fixing pins 4 are respectively arranged in one-to-one correspondence with the drill bits 3, and the fixing pins 4 comprise: the fixing rod 5 is arranged on the drill bit 3 in a penetrating manner; the fixing rod 5 is arranged on the drill bit 3 in a penetrating mode through a penetrating hole 7 in the drill bit 3, the drill bit 3 can be arranged between the short steel protective cylinder 1 and the blocking piece 2 after penetrating, the fixing nut 6 is screwed to enable the fixing nut 6 to be attached and clamped on the blocking piece 2, and then the drill bit 3 can be connected to the blocking piece 2.
In the invention, the cross sections of the baffle plate 2, the drill plate 3 and the fixing rod 5 can be optimized to be arc-shaped so as to facilitate the joint installation of related parts.
The invention also provides a recovery device for the construction of the pile foundation casing follow-up method, which is used for realizing the recovery and utilization of the pile foundation casing after reaming, and specifically, as shown in fig. 6, the recovery device for the construction of the pile foundation casing follow-up method provided by the invention comprises: the fixing ring 8 is provided with fastening buckles 9 at two ends of the fixing ring 8, and the fixing ring 8 can be fastened to form a circular ring shape through the fastening buckles 9; the reinforcing pieces 10 can be attached to the pile foundation casing, and the reinforcing pieces 10 are arranged on the fixing ring 8 at intervals along the circumferential direction of the fixing ring 8; and a plurality of hoisting rods 11, hoisting rods 11 respectively with strengthen piece 10 one-to-one setting, hoisting rods 11's one end spiral pass strengthen piece 10 after again spiral connection on pile foundation protects a section of thick bamboo 13, be equipped with hole for hoist 12 on its other end. In the invention, when the pile foundation casing 13 is recovered, only the fixing ring 8 needs to be fixed on the pile foundation casing 13 by using the fastening buckle 8, the reinforcing sheet 10 can be attached to the pile foundation casing 13 (in the invention, the reinforcing sheet 10 can also be spot-welded on the pile foundation casing 13 to enhance the structural strength), the hoisting rod 11 penetrates through the reinforcing sheet 10 and is spirally connected to the pile foundation casing 13, finally, the hoisting steel rope penetrates into the hoisting hole 12 to hoist and hoist the pile foundation casing 12, and the hoisted pile foundation casing 12 can be recycled by electric welding and cutting. According to the invention, the reinforcing sheet 10 is arranged to reinforce the lifting point area, so that the lifting safety is ensured. The combined use of the reaming device and the recovery device can effectively realize the recovery and utilization of the pile foundation casing, so as to effectively save resources. The recovery device can be disassembled for reuse after the recovery is finished.
While the invention has been described with reference to a preferred embodiment, it will be understood by those skilled in the art that various changes in form and detail may be made therein without departing from the spirit and scope of the invention.

Claims (5)

1. The utility model provides a pile foundation protects a reaming device for section of thick bamboo follow-up method construction which characterized in that includes:
a short steel casing (1) which can be sleeved and fixed on the pile foundation casing;
the baffle plates (2) are arranged at the bottom of the side wall of the short steel casing (1) at intervals along the circumferential direction of the short steel casing (1), the longitudinal section of each baffle plate (2) is L-shaped, and one end of each baffle plate is fixedly connected to the short steel casing (1); and
a plurality of drill pieces (3), drill piece (3) respectively with separation blade (2) one-to-one sets up, drill piece (3) are located relatively short steel protects a section of thick bamboo (1) and between separation blade (2), just drill piece (3) rotate connect in on separation blade (2).
2. The reaming device for the construction of the pile foundation casing follow-up method according to claim 1, wherein the reaming device further comprises a plurality of fixing pins (4), the fixing pins (4) are respectively arranged corresponding to the drill bits (3) one by one, and the fixing pins (4) comprise:
the fixing rod (5), the said fixing rod (5) can be worn and located on the said drilling bit (3); and
two fixation nuts (6) located at two ends of the fixation rod (5), wherein the fixation nuts (6) are spirally connected to the fixation rod (5), and the fixation rod (5) is clamped on the separation blade (2) through the fixation nuts (6).
3. The reaming device for the construction of the pile foundation casing follow-up method according to claim 2, wherein a through hole (7) is formed in the drill plate (3), and the fixing rod (5) is arranged on the drill plate (3) in a penetrating mode through the through hole (7).
4. The reaming device for the construction of the pile foundation casing follow-up method according to claim 3, wherein the diameter of the through hole (7) is larger than the diameter of the fixing rod (5).
5. The reaming device for the follow-up construction of the pile casing according to any one of claims 2 to 4, wherein the cross sections of the baffle plate (2), the drill plate (3) and the fixing rod (5) are arc-shaped.
CN201910698052.3A 2019-07-31 2019-07-31 Reaming and recovering device for pile foundation casing follow-up construction Active CN110469272B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910698052.3A CN110469272B (en) 2019-07-31 2019-07-31 Reaming and recovering device for pile foundation casing follow-up construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910698052.3A CN110469272B (en) 2019-07-31 2019-07-31 Reaming and recovering device for pile foundation casing follow-up construction

Publications (2)

Publication Number Publication Date
CN110469272A CN110469272A (en) 2019-11-19
CN110469272B true CN110469272B (en) 2020-10-23

Family

ID=68509919

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910698052.3A Active CN110469272B (en) 2019-07-31 2019-07-31 Reaming and recovering device for pile foundation casing follow-up construction

Country Status (1)

Country Link
CN (1) CN110469272B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115182342B (en) * 2022-09-13 2022-11-29 山东鲁中公路建设有限公司 Pile foundation construction process and device applied to unfavorable geology

Citations (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4436167A (en) * 1981-03-30 1984-03-13 Okumura Corporation Method of excavating a pile hole and an apparatus therefor
CN2197387Y (en) * 1993-02-18 1995-05-17 张国梁 Bearing pile moulding apparatus
CN101144278A (en) * 2006-10-29 2008-03-19 叶世昌 Integrated multifunctional hole-drilling pile-filling machine
CN201261683Y (en) * 2008-07-29 2009-06-24 北京二七轨道交通装备有限责任公司 Shaft gear sling
CN101644050A (en) * 2009-09-01 2010-02-10 中交第二航务工程局有限公司 Combined steel casing and construction method of waterborne drilled pile based on same
CN201416401Y (en) * 2009-04-13 2010-03-03 李孝勇 Hydraulic dual variable-diameter shaft back-drilling diameter expander
CN101920904A (en) * 2010-05-13 2010-12-22 上海电气电站设备有限公司 Hoist tool for round piece with groove on periphery surface
CN201779102U (en) * 2010-07-07 2011-03-30 李一品 Diameter-variable anchor ear
CN102001577A (en) * 2010-11-13 2011-04-06 西安超码科技有限公司 Carbon/carbon composite material lifting appliance for high-temperature furnace
CN103206170A (en) * 2013-04-18 2013-07-17 宁波市镇海欣泰机械厂 Concrete body hole bottom reamer
CN203284056U (en) * 2013-05-28 2013-11-13 上海海陆昆仑高科技工程有限公司 Transportation lifting device
CN103485340A (en) * 2013-09-18 2014-01-01 中交二航局第四工程有限公司 Wave-web fore-shaft steel casing device and construction method thereof
CN203796175U (en) * 2014-05-09 2014-08-27 中铁十一局集团城市轨道工程有限公司 Embedment reamer for steel casings of rotary drilling bored piles
CN104179173A (en) * 2014-08-12 2014-12-03 福建工程学院 Pile pipe extrusion reamer
CN204111180U (en) * 2014-09-16 2015-01-21 济宁市金牛机械有限公司 A kind of guide wheel quenching suspender
CN104314076A (en) * 2014-10-13 2015-01-28 安徽湖滨建设集团有限公司 Recycled type prestressed anchor cable structure for soft soil foundation and construction method
CN104806169A (en) * 2014-01-29 2015-07-29 上海工程机械厂有限公司 Hole expanding drill bit
CN204714334U (en) * 2015-06-12 2015-10-21 河南永荣硅钢冲压有限公司 Lifting device
CN105275253A (en) * 2015-11-11 2016-01-27 国网河北阜城县供电公司 Equal-diameter rod erecting device and application method thereof
CN205973430U (en) * 2016-08-30 2017-02-22 中铁一局集团有限公司 Hoist is used in section hoist and mount of strength nature skeleton festival
CN106703020A (en) * 2016-12-30 2017-05-24 重庆中材参天建材有限公司 Recyclable standard steel protective barrel for super-long underwater pile foundation
CN206189408U (en) * 2016-10-20 2017-05-24 毛加才 A recovery unit is protected with long steel to pile foundation construction on water
CN206219054U (en) * 2016-11-17 2017-06-06 国网福建省电力有限公司 A kind of electrical bushing lifts hoop device
CN206289628U (en) * 2016-12-01 2017-06-30 中国建筑第八工程局有限公司 Pile foundation casing set
CN106968604A (en) * 2017-05-27 2017-07-21 河南理工大学 Reamer inside mine anchor rod hole
CN207813502U (en) * 2018-01-17 2018-09-04 中石化石油工程技术服务有限公司 A kind of soil bore enlarging device of reducing
CN108862020A (en) * 2017-05-09 2018-11-23 天津滨海光热技术研究院有限公司 A kind of thermal-collecting tube hoist tool and its application method
CN208152946U (en) * 2018-03-27 2018-11-27 中国建筑第七工程局有限公司 Cast-in-situ bored pile drilling tool
CN208327115U (en) * 2018-06-13 2019-01-04 湖北省城建设计院股份有限公司 A kind of novel fabricated pipe gallery hoisting structure

Patent Citations (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4436167A (en) * 1981-03-30 1984-03-13 Okumura Corporation Method of excavating a pile hole and an apparatus therefor
CN2197387Y (en) * 1993-02-18 1995-05-17 张国梁 Bearing pile moulding apparatus
CN101144278A (en) * 2006-10-29 2008-03-19 叶世昌 Integrated multifunctional hole-drilling pile-filling machine
CN201261683Y (en) * 2008-07-29 2009-06-24 北京二七轨道交通装备有限责任公司 Shaft gear sling
CN201416401Y (en) * 2009-04-13 2010-03-03 李孝勇 Hydraulic dual variable-diameter shaft back-drilling diameter expander
CN101644050A (en) * 2009-09-01 2010-02-10 中交第二航务工程局有限公司 Combined steel casing and construction method of waterborne drilled pile based on same
CN101920904A (en) * 2010-05-13 2010-12-22 上海电气电站设备有限公司 Hoist tool for round piece with groove on periphery surface
CN201779102U (en) * 2010-07-07 2011-03-30 李一品 Diameter-variable anchor ear
CN102001577A (en) * 2010-11-13 2011-04-06 西安超码科技有限公司 Carbon/carbon composite material lifting appliance for high-temperature furnace
CN103206170A (en) * 2013-04-18 2013-07-17 宁波市镇海欣泰机械厂 Concrete body hole bottom reamer
CN203284056U (en) * 2013-05-28 2013-11-13 上海海陆昆仑高科技工程有限公司 Transportation lifting device
CN103485340A (en) * 2013-09-18 2014-01-01 中交二航局第四工程有限公司 Wave-web fore-shaft steel casing device and construction method thereof
CN104806169A (en) * 2014-01-29 2015-07-29 上海工程机械厂有限公司 Hole expanding drill bit
CN203796175U (en) * 2014-05-09 2014-08-27 中铁十一局集团城市轨道工程有限公司 Embedment reamer for steel casings of rotary drilling bored piles
CN104179173A (en) * 2014-08-12 2014-12-03 福建工程学院 Pile pipe extrusion reamer
CN204111180U (en) * 2014-09-16 2015-01-21 济宁市金牛机械有限公司 A kind of guide wheel quenching suspender
CN104314076A (en) * 2014-10-13 2015-01-28 安徽湖滨建设集团有限公司 Recycled type prestressed anchor cable structure for soft soil foundation and construction method
CN204714334U (en) * 2015-06-12 2015-10-21 河南永荣硅钢冲压有限公司 Lifting device
CN105275253A (en) * 2015-11-11 2016-01-27 国网河北阜城县供电公司 Equal-diameter rod erecting device and application method thereof
CN205973430U (en) * 2016-08-30 2017-02-22 中铁一局集团有限公司 Hoist is used in section hoist and mount of strength nature skeleton festival
CN206189408U (en) * 2016-10-20 2017-05-24 毛加才 A recovery unit is protected with long steel to pile foundation construction on water
CN206219054U (en) * 2016-11-17 2017-06-06 国网福建省电力有限公司 A kind of electrical bushing lifts hoop device
CN206289628U (en) * 2016-12-01 2017-06-30 中国建筑第八工程局有限公司 Pile foundation casing set
CN106703020A (en) * 2016-12-30 2017-05-24 重庆中材参天建材有限公司 Recyclable standard steel protective barrel for super-long underwater pile foundation
CN108862020A (en) * 2017-05-09 2018-11-23 天津滨海光热技术研究院有限公司 A kind of thermal-collecting tube hoist tool and its application method
CN106968604A (en) * 2017-05-27 2017-07-21 河南理工大学 Reamer inside mine anchor rod hole
CN207813502U (en) * 2018-01-17 2018-09-04 中石化石油工程技术服务有限公司 A kind of soil bore enlarging device of reducing
CN208152946U (en) * 2018-03-27 2018-11-27 中国建筑第七工程局有限公司 Cast-in-situ bored pile drilling tool
CN208327115U (en) * 2018-06-13 2019-01-04 湖北省城建设计院股份有限公司 A kind of novel fabricated pipe gallery hoisting structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
深水条件下钢套箱可回收式底板施工技术研究;尹玉林等;《公路》;20190630(第6期);第89-92页 *

Also Published As

Publication number Publication date
CN110469272A (en) 2019-11-19

Similar Documents

Publication Publication Date Title
CN207974103U (en) The isolating device of cast-in-situ bored pile pile crown
CN110469272B (en) Reaming and recovering device for pile foundation casing follow-up construction
CN207072755U (en) One kind is used for underwater bearing pin and removes rocker device
CN113818828A (en) Screw principle fishing device
CN106049896A (en) Dismantling method for resisting impact load in high-altitude overhanging steel-structure-platform dismantling process
CN109989715A (en) The drill tool assembly of engineering driller
CN214738054U (en) Bored concrete pile head reinforcing bar isolating device
CN214614100U (en) Inner supporting structure
CN213978954U (en) Construction tool for quickly separating pile head of cast-in-place pile
CN105649085B (en) Cast-in-situ bored pile hole cleaning device
CN204919539U (en) Configuration optimization's manual work dig hole for stake steel protect a section of thick bamboo
CN104533280B (en) Hand water drill drilling booster
CN210946790U (en) Rotary drilling rig for rotary-expanding steel pipe pile
CN101564848B (en) Draining board shearing apparatus and underwater draining board shearing method
CN207829840U (en) A kind of spring-piece type column fisher
CN202140056U (en) Reinforcement cage type fisher with chopping-reaming bit
CN206903185U (en) Pre-buried board-like carrier setting bolt structure
CN217773030U (en) Emergency rescue glass breaking-in tool
CN2893121Y (en) Geologic drilling machine disposable bit
CN220394520U (en) Steel-plastic composite pile casing
CN213897116U (en) Auxiliary device for pile head cutting
CN211115798U (en) Novel punching bored concrete pile percussion bit
CN203922432U (en) A kind of hoisting tooling for large-scale permanent-magnetic wind driven generator
CN217602595U (en) Simple soft drill device for cleaning sediments
CN218669430U (en) Anchor rod for mining engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant