CN110469126A - Binding trolley and its binding construction method for concrete reinforcement - Google Patents

Binding trolley and its binding construction method for concrete reinforcement Download PDF

Info

Publication number
CN110469126A
CN110469126A CN201910847916.3A CN201910847916A CN110469126A CN 110469126 A CN110469126 A CN 110469126A CN 201910847916 A CN201910847916 A CN 201910847916A CN 110469126 A CN110469126 A CN 110469126A
Authority
CN
China
Prior art keywords
binding
trolley
reinforcement
concrete
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910847916.3A
Other languages
Chinese (zh)
Other versions
CN110469126B (en
Inventor
范旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Corp
Original Assignee
China 19th Metallurgical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 19th Metallurgical Corp filed Critical China 19th Metallurgical Corp
Priority to CN201910847916.3A priority Critical patent/CN110469126B/en
Publication of CN110469126A publication Critical patent/CN110469126A/en
Application granted granted Critical
Publication of CN110469126B publication Critical patent/CN110469126B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of binding trolleys and its binding construction method for concrete reinforcement, belong to construction equipment auxiliary process equipment Design manufacturing technology field.A kind of reinforcing bar binding strong operability is provided, constructing operation is conveniently used for the binding trolley and its binding construction method of concrete reinforcement.The binding trolley includes bogie frame, reinforcing bar binding platform and installation drive system, and the reinforcing bar binding platform is supported on the bogie frame by the way that the installation drive system is movable.The process includes binding trolley according to the concrete beam reinforcing of suitable length assembled in the length of beams of concrete at the construction field (site) falsework system, binding trolley post debugging hoist engine in place simultaneously arranges hydraulic leg between falsework system and binding trolley, beam reinforcement cages are bound on load-bearing rod iron, the framework of steel reinforcement sling is placed on beam bottom mother plate by operation hoist engine, and hydraulic leg is packed up after framework of steel reinforcement is in place and trolley segmentation is removed several processes.

Description

Binding trolley and its binding construction method for concrete reinforcement
Technical field
The present invention relates to a kind of binding trolleys to belong to and build more particularly, to a kind of binding trolley for concrete reinforcement Build construction equipment auxiliary process equipment Design manufacturing technology field.Steel is carried out using the binding trolley the invention further relates to a kind of The binding construction method of muscle binding.
Background technique
In recent years, country carries forward vigorously house and civilian infrastructure construction, mainly includes high residential building, multilayer business Building, workshop, town road etc. provide the facility of infrastructure service for resident living and social production.
Necessarily design has a large amount of beam bodies in armored concrete high residential building, multilayer commercial building.Master as building structure Supporting member is wanted, the construction quality of reinforced beam is most important safely to the structure for ensuring building.
In large span building construction, the sectional dimension of beams of concrete is big, span is long, carries out reinforcing bar binding at the construction field (site) It is extremely difficult, it needs to set up interim steel pipe support structure and is supported.Many steel pipe supports are set up and are not advised not by checking computations Model, steel pipe support deformation is excessive, there is generation in the case where toppling over more, causes security risk.Simultaneously as framework of steel reinforcement quality weight, The beam reinforcement cages bound on steel pipe support are mobile in place to operating difficulties on beam bottom mother plate, increase the recruitment used time.
In order to solve problem above, engineering construction field engineers devise many auxiliary devices, such as: CN 109025315A patent of invention discloses the auxiliary device and its construction method of a kind of beam steel bar colligation.Beam steel includes beam top Main reinforcement, two row's muscle of beam top, beam stirrup, beam lower part main reinforcement, two row's muscle of beam lower part, beam waist muscle;Template, beam are equipped with below beam steel The auxiliary device of reinforcing bar binding includes two circular vertical bars and the skeleton that a circular transverse bar is formed, the vertical bar It is fixed together with transverse bar, there is the groove of dense arrangement, the bottom difference of two vertical bars in two vertical bars There are movable pulley and small cross bar, small cross bar is placed in the groove of vertical cross bar, size and different reinforcement location of the position according to beam It being adjusted, all transverse steels are both placed on small cross bar, and the weight of all beam steels is reached in vertical bar by small cross bar, It is reached in template by vertical bar by movable pulley again.But the structure anti-overturning can be poor, the beam reinforcement cages bound are mobile In place to difficult on beam bottom mother plate.
Problem above is very universal in the realm of building construction, but industry fails to give fine solution at present.Therefore, it studies A kind of binding trolley and its binding construction method for concrete reinforcement is for improving large span, big section concrete beam reinforcing The operability of binding, safety save the recruitment used time with realistic meaning and practical value.
Summary of the invention
The technical problems to be solved by the present invention are: provide a kind of reinforcing bar binding strong operability, constructing operation conveniently with In the binding trolley of concrete reinforcement, the present invention also provides a kind of binding constructions that reinforcing bar binding is carried out using the binding trolley Method.
Used technical solution is to solve above-mentioned technical problem: a kind of binding trolley for concrete reinforcement, institute The binding trolley stated includes that bogie frame, reinforcing bar binding platform and installation drive system, the reinforcing bar binding platform pass through described Installation drive system movable be supported on the bogie frame.
Further, the reinforcing bar binding platform is horizontal by the installation drive system along its length More supporting beams being arranged on the bogie frame.
The preferred mode of the above solution is that the installation drive system includes more cranes, each crane is along long The top for being arranged in the bogie frame that degree direction is adapted with corresponding reinforcing bar binding platform position respectively.
Further, the supporting beam is made of channel steel, I-steel or load-bearing rod iron, the crane is elevator Machine.
The preferred mode of the above solution is that the bogie frame includes multiple groups supporting table car frame, each group supporting table car The connection of frame sequence along its length is the bogie frame, equal by hoist engine on the supporting table car frame described in each group At least it is disposed with a supporting beam.
Further, the bottom of the supporting table car frame described in each group is arranged with shifting roller, the support Trolley subrack 5 is mobile by the shifting roller.
The preferred mode of the above solution is that the supporting table car frame includes pedestal and sub-truss, the support Truss is packed on the pedestal, and the shifting roller is arranged on the downside of the pedestal, and the supporting beam is logical It crosses in the sub-truss that the hoist engine is arranged in above pedestal.
Further, the pedestal is made of two rectangle heavy wall square tubes, the sub-truss includes two vertical Column, one group of crossbeam and four hounds, the gate support frame being composed of two root posts and one group of crossbeam are open by its Lower end be respectively supported at two described in rectangle heavy wall square tube, hound described in four is supported on from two sides are inclined respectively Between the column and the rectangle heavy wall square tube, the shifting roller is arranged in the rectangle heavy wall square tube On downside, the hoist engine is arranged in the two sides at the top of the gate support frame.
Further, the column is made of a square tube with guide groove, the two of each load-bearing rod iron End is respectively arranged with limition orientation head, and load-bearing rod iron described in each passes through the limition orientation head at its both ends along short transverse respectively What is be reciprocally moveable is arranged in the guide groove of corresponding position.
A kind of construction method using the binding trolley binding concrete reinforcement, the process includes following step Suddenly,
A, binding trolley is assembled, assembled in falsework system at the construction field (site) to be suitble to length according to the length of beams of concrete The concrete beam reinforcing of degree binds trolley,
B, hoist engine and hydraulic leg are debugged, after binding trolley is in place, debugs hoist engine, and falsework system with tie up It pricks between trolley and arranges hydraulic leg,
C, assembling reinforcement skeleton binds beam reinforcement cages on load-bearing rod iron,
D, framework of steel reinforcement is in place, and by operation hoist engine, the framework of steel reinforcement sling is placed on beam bottom mother plate in place,
E, mobile trolley used, after framework of steel reinforcement is in place, hydraulic leg is packed up, trolley segmentation is moved to next Liang Weizhichu Complete the binding work of the reinforcing bar.
The beneficial effects of the present invention are: the application includes that bogie frame, reinforcing bar binding platform and installation are driven by being arranged a set of The binding trolley of dynamic system, and described in the reinforcing bar binding platform is supported on by the way that the installation drive system is movable Bogie frame on.In this way, can be spelled in falsework system at the construction field (site) by first when carrying out the binding of concrete reinforcement The bogie frame for being suitble to the concrete beam reinforcing binding trolley of length is filled, then by conduct under the cooperation of the installation drive system The reinforcing bar binding platform of reinforcing bar binding support supports on the bogie frame, its height is adjusted to suitable position and is fixed Bogie frame can then be tied up concrete steel tendons skeleton based on reinforcing bar binding platform, after the completion of overall binding, then be led to Cross installation drive system under the cooperation of the reinforcing bar binding platform will the qualified concrete steel tendons skeleton of binding to be lifted into position complete At the binding work of concrete steel tendons skeleton.Since the bogie frame of the application is activity arrangement, can according to need in difference Construction layer is arranged based on falsework system and bundlees reinforcing bar on the spot, and then lifting is in place, improves work progress The operability of middle reinforcing bar binding, makes constructing operation become very convenient.Pass through bogie frame branch along with the application binds trolley Support installation drive system and binding platform, it is possible to adjust system as needed, improve the resistant to tipping ability of binding trolley.
Detailed description of the invention
Fig. 1 is main view of the present invention for the binding trolley of concrete reinforcement;
Fig. 2 is the 2-2 cross-sectional view of Fig. 1;
Fig. 3 is the side view of Fig. 1;
Fig. 4 be the present invention relates to load-bearing rod iron and guide pillar slot cooperation schematic diagram.
In the figure, it is marked as bogie frame 1, reinforcing bar binding platform 2, installation drive system 3, crane 4, supporting table car frame 5, Shifting roller 6, sub-truss 8, column 9, crossbeam 10, hound 11, rectangle heavy wall square tube 12, hydraulic leg 13, is led at pedestal 7 To slot 14, limition orientation head 15.
Specific embodiment
It as shown in Figure 1, Figure 2, is a kind of reinforcing bar binding strong operability provided by the invention, constructing operation side shown in Fig. 3 and Fig. 4 Just the binding trolley for concrete reinforcement, and construction party is bound using its of the binding trolley progress reinforcing bar binding Method.The binding trolley includes bogie frame 1, reinforcing bar binding platform 2 and installation drive system 3, the reinforcing bar binding platform 2 It is supported on the bogie frame 1 by the way that the installation drive system 3 is movable.The process includes following step Suddenly,
A, binding trolley is assembled, assembled in falsework system at the construction field (site) to be suitble to length according to the length of beams of concrete The concrete beam reinforcing of degree binds trolley,
B, hoist engine and hydraulic leg are debugged, after binding trolley is in place, debugs hoist engine, and falsework system with tie up It pricks and arranges hydraulic leg 13 between trolley,
C, assembling reinforcement skeleton binds beam reinforcement cages on load-bearing rod iron,
D, framework of steel reinforcement is in place, and by operating hoist engine, the framework of steel reinforcement sling is placed on beam bottom mother plate in place.
E, mobile trolley used, after framework of steel reinforcement is in place, hydraulic leg is packed up, trolley segmentation is moved to next Liang Weizhichu Complete the binding work of the reinforcing bar.The application includes bogie frame, reinforcing bar binding platform and installation driving by being arranged a set of The binding trolley of system, and by the reinforcing bar binding platform by the installation drive system it is movable be supported on it is described On bogie frame.In this way, can be by assembled in first falsework system at the construction field (site) when carrying out the binding of concrete reinforcement It is suitble to the bogie frame of the concrete beam reinforcing binding trolley of length, then will be used as steel under the cooperation of the installation drive system The reinforcing bar binding platform of muscle binding support supports on the bogie frame, its height is adjusted to suitable position and fixes platform Vehicle frame can then be tied up concrete steel tendons skeleton based on reinforcing bar binding platform, after the completion of overall binding, then be passed through Drive system is installed, the qualified concrete steel tendons skeleton of binding is lifted into position completion under the cooperation of the reinforcing bar binding platform The binding work of concrete steel tendons skeleton.Since the bogie frame of the application is activity arrangement, it can according to need and applied in difference Work layer is arranged based on falsework system and bundlees reinforcing bar on the spot, and then lifting is in place, is improved in work progress The operability of reinforcing bar binding, makes constructing operation become very convenient.It is supported along with the application binds trolley by bogie frame Drive system and binding platform are installed, it is possible to adjust system as needed, improve the resistant to tipping ability of binding trolley.
In order to which length as needed carries out the assembling of the binding trolley, wanted with adapting to the binding of different length reinforcing bar It asks, and meets moveable requirement, bogie frame 1 described herein includes multiple groups supporting table car frame 5, and each group supports trolley The connection of the sequence along its length of subrack 5 is the bogie frame 1, is passed through on the supporting table car frame 5 described in each group The hoist engine is at least disposed with a supporting beam.And the bottom of the supporting table car frame 5 described in each group is arranged with Shifting roller 6, the supporting table car frame 5 are mobile by the shifting roller 6.Specific structure is each support Trolley subrack 5 includes pedestal 7 and sub-truss 8, and the sub-truss 8 is packed on the pedestal 7, the movement Idler wheel 6 is arranged on the downside of the pedestal 7, and the supporting beam is arranged in 7 top of pedestal by the hoist engine In sub-truss 8.At this point, not only meeting support in order to simplify the structure that the application binds trolley to greatest extent and requiring, but also conveniently In the installation of the trolley in falsework system itself and the transfer of framework of steel reinforcement after the completion of to the support and binding of reinforcing bar, The pedestal 7 is made of two rectangle heavy wall square tubes 12, and the sub-truss 8 includes 9, one groups of 10 and of crossbeam of two root posts Four hounds 11, the gate support frame being composed of two root posts 9 and one group of crossbeam 10 are distinguished by its open lower end In rectangle heavy wall square tube 12 described in being supported on two, hound 11 described in four respectively from two sides it is inclined be supported on it is described Column 9 and the rectangle heavy wall square tube 12 between, the shifting roller 6 is arranged in the rectangle heavy wall square tube 12 Downside on, the hoist engine is arranged in the two sides at the top of the gate support frame.
Further, with the bogie frame of above structure 1 be adapted and spacer bar skeleton needs, the reinforcing bar Binding platform 2 is more be horizontally arranged at along its length by the installation drive system 3 on the bogie frame 1 Supporting beam.At this point, preferred structure is that the supporting beam is made of channel steel, I-steel or load-bearing rod iron.Correspondingly, described Install drive system 3 include more cranes 4, each crane 4 along its length respectively with corresponding reinforcing bar binding platform 2 Set the adaptable top for being arranged in the bogie frame 1.At this point, it is hoist engine that preferred structure, which is the crane 4,.Together When, in order to avoid occurring in process of binding by the larger shaking of assembling reinforcement, when the supporting beam selects load-bearing rod iron, Column 9 described herein is made of a square tube with guide groove 14, is respectively set at the both ends of each load-bearing rod iron There is a limit guide head 15, load-bearing rod iron described in each passes through the limition orientation head 15 at its both ends along short transverse reciprocally respectively Mobile is arranged in the guide groove 14 of corresponding position.
Certainly, above-mentioned installation drive system is also possible to the structure being made of jack, i.e., changes hoist engine into thousand Jin top, can be it is hydraulic be also possible to mechanical, such structure installation is more flexible, and cost is lower, but efficiency is opposite Lower, safety is also more relatively poor.Likewise, the sub-truss 8 may not be by gate supporting framework at knot Structure can be the form for the rectangular configuration that at least four columns, four beams are constituted, can no longer need diagonal brace angle steel 11 at this time .The sub-truss 8 of this structure is more stable, but cost is higher, and rectangular configuration less utilizes single steel bar relatively, especially It is detrimental to stirrup and is transported in binding trolley.
In conclusion also being had using the scene binding that binding trolley provided by the present application carries out concrete reinforcement following excellent Point,
1, concrete beam reinforcing binding trolley provided by the present application is simple for production, can produce in batches, reduce construction cost;
2, trolley structure peace is torn open convenient, can be moved integrally, practical, saves the recruitment used time;
3, trolley structure reliable performance greatly improves the safety of the big section concrete beam reinforcing binding in construction site.
Embodiment one
Binding trolley provided by the present application is mainly made of 13 parts.
1.: pedestal, using Q345, the welding of 300 × 120 × 2.5mm quarter bend is made;
2.: column, using Q345,120 × 120 × 3mm square tube is made;
3.: angle cleat, Q345,50 × 50 × 5mm of ∠;
4.: hoist engine, "-" type, rated load weight 3.5t hoist engine are equipped with automatic locking device;
5.: wirerope, Q345, φ 14mm;
6.: load-bearing rod iron, Q345, φ 75mm;
7.: framework of steel reinforcement;
8.: angle steel diagonal brace, Q345,50 × 50 × 5mm of ∠;
9.: connection channel steel, Q345,300 × 120 × 5mm of section, long 300mm;
Connect bolt, Q345, φ 16mm;
Idler wheel, φ 80mm, long 260mm;
Hydraulic leg, rated load weight 4t;
End socket steel plate, Q345,2.5mm are thick.
Raw material, the component of 13 component parts are simple and easy to get, low in cost, total is simple for production, performance can It leans on, is convenient and practical.
The concrete beam reinforcing binding trolley is assemblied to form by end section and several standard knots, to meet different length The requirement of concrete beam reinforcing binding.
Entire trolley is clear by power path during beam steel bar colligation, 7. the weight transmitting of framework of steel reinforcement to 6. load-bearing steel On stick, the load that 6. load-bearing rod iron is born passes to 5. wirerope, and the load that 5. wirerope is born is passed to by 4. hoist engine 2. column, the load that 2. column is born passes throughHydraulic leg is ultimately transferred to falsework system.
The embodiment that trolley uses is main are as follows:
Step 1: trolley is assembled
According to beam length, the concrete beam reinforcing of assembled suitable length binds trolley in falsework system at the construction field (site).
Step 2: debugging hoist engine and hydraulic leg
After trolley is in place, hoist engine is debugged, hydraulic leg is put down.
Step 3: assembling reinforcement skeleton
Beam reinforcement cages are bound on load-bearing rod iron.
Step 4: framework of steel reinforcement is in place
By operating hoist engine, the framework of steel reinforcement sling is placed on beam bottom mother plate in place.
Step 5: mobile trolley used
After framework of steel reinforcement is in place, hydraulic leg is packed up, the connection channel steel between trolley different segment can be removed when necessary, it will Trolley segmentation is moved to next Liang Weizhichu.

Claims (10)

1. a kind of binding trolley for concrete reinforcement, it is characterised in that: the binding trolley includes bogie frame (1), steel Muscle binds platform (2) and installation drive system (3), and the reinforcing bar binding platform (2) passes through the installation drive system (3) It is movable to be supported on the bogie frame (1).
2. the binding trolley according to claim 1 for concrete reinforcement, it is characterised in that: the reinforcing bar binding is flat Platform (2) is more be horizontally arranged at along its length by the installation drive system (3) on the bogie frame (1) Supporting beam.
3. the binding trolley according to claim 2 for concrete reinforcement, it is characterised in that: the installation drives system System (3) includes more cranes (4), each crane (4) along its length respectively with corresponding reinforcing bar binding platform (2) position The adaptable top for being arranged in the bogie frame (1).
4. the binding trolley according to claim 3 for concrete reinforcement, it is characterised in that: the supporting beam is by slot Steel, I-steel or load-bearing rod iron are constituted, and the crane (4) is hoist engine.
5. the binding trolley according to claim 1,2,3 or 4 for concrete reinforcement, it is characterised in that: the platform Vehicle frame (1) includes multiple groups supporting table car frame (5), and the connection of each group supporting table car frame (5) sequence along its length is described Bogie frame (1), a supporting beam is at least disposed with by hoist engine on the supporting table car frame (5) described in each group.
6. the binding trolley according to claim 5 for concrete reinforcement, it is characterised in that: support described in each group The bottom of trolley subrack (5) is arranged with shifting roller (6), and the supporting table car frame (5) passes through the shifting roller (6) mobile.
7. the binding trolley according to claim 6 for concrete reinforcement, it is characterised in that: the supporting table car Frame (5) includes pedestal (7) and sub-truss (8), and the sub-truss (8) is packed on the pedestal (7), the shifting Dynamic idler wheel (6) are arranged on the downside of the pedestal (7), and the supporting beam is arranged in pedestal by the hoist engine (7) in the sub-truss (8) above.
8. the binding trolley according to claim 7 for concrete reinforcement, it is characterised in that: the pedestal (7) by Two rectangle heavy wall square tubes (12) are constituted, and the sub-truss (8) includes two root posts (9), one group of crossbeam (10) He Sigen Hound (11) passes through its open lower end point by the gate support frame that two root posts (9) and one group of crossbeam (10) are composed In rectangle heavy wall square tube (12) described in not being supported on two, hound (11) described in four is respectively from the inclined support in two sides Between the column (9) and the rectangle heavy wall square tube (12), the shifting roller (6) is arranged in the square On the downside of shape heavy wall square tube (12), the hoist engine is arranged in the two sides at the top of the gate support frame.
9. the binding trolley according to claim 8 for concrete reinforcement, it is characterised in that: the column (9) by A piece square tube with guide groove (14) is constituted, and is respectively arranged with limition orientation head (15) at the both ends of each load-bearing rod iron, The limition orientation head (15) that load-bearing rod iron described in each passes through its both ends respectively is arranged in along what short transverse was reciprocally moveable In the guide groove (14) of corresponding position.
10. a kind of binding construction method using binding trolley binding concrete reinforcement described in claim 9, it is characterised in that: The process includes the following steps,
A, binding trolley is assembled, and according to the length of beams of concrete, assembly is suitble to length in falsework system at the construction field (site) Concrete beam reinforcing binds trolley,
B, hoist engine and hydraulic leg are debugged, after binding trolley is in place, debugs hoist engine, and in falsework system and binding platform Hydraulic leg (13) are arranged between vehicle,
C, assembling reinforcement skeleton binds beam reinforcement cages on load-bearing rod iron,
D, framework of steel reinforcement is in place, and by operation hoist engine, the framework of steel reinforcement sling is placed on beam bottom mother plate in place,
E, mobile trolley used, after framework of steel reinforcement is in place, hydraulic leg is packed up, trolley segmentation is moved to next Liang Weizhichu and is completed The binding work of the reinforcing bar.
CN201910847916.3A 2019-09-09 2019-09-09 Binding trolley for concrete reinforcing steel bars and binding construction method thereof Active CN110469126B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910847916.3A CN110469126B (en) 2019-09-09 2019-09-09 Binding trolley for concrete reinforcing steel bars and binding construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910847916.3A CN110469126B (en) 2019-09-09 2019-09-09 Binding trolley for concrete reinforcing steel bars and binding construction method thereof

Publications (2)

Publication Number Publication Date
CN110469126A true CN110469126A (en) 2019-11-19
CN110469126B CN110469126B (en) 2022-01-21

Family

ID=68515281

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910847916.3A Active CN110469126B (en) 2019-09-09 2019-09-09 Binding trolley for concrete reinforcing steel bars and binding construction method thereof

Country Status (1)

Country Link
CN (1) CN110469126B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113525220A (en) * 2021-05-20 2021-10-22 广西建工集团建筑机械制造有限责任公司 Tower crane loading binding process

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203430058U (en) * 2013-05-31 2014-02-12 重庆广播电视大学 Suspension type building framework beam steel bar frame hanger
CN204980970U (en) * 2015-07-31 2016-01-20 河北宁通电子材料有限公司 Single crystal hoisting device
CN206591458U (en) * 2017-03-22 2017-10-27 武汉玖益交通设施工程有限公司 A kind of electronic the anti-of limit for height door frame of one-way lifting smashes avoiding structure
CN207435878U (en) * 2017-11-09 2018-06-01 中铁二十局集团第四工程有限公司 A kind of Liftable type steel trestle structure
CN109339458A (en) * 2018-11-19 2019-02-15 江苏南通六建建设集团有限公司 A kind of multi-functional trolley of Cast-in-situ Beam steel reinforcement cage binding installation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203430058U (en) * 2013-05-31 2014-02-12 重庆广播电视大学 Suspension type building framework beam steel bar frame hanger
CN204980970U (en) * 2015-07-31 2016-01-20 河北宁通电子材料有限公司 Single crystal hoisting device
CN206591458U (en) * 2017-03-22 2017-10-27 武汉玖益交通设施工程有限公司 A kind of electronic the anti-of limit for height door frame of one-way lifting smashes avoiding structure
CN207435878U (en) * 2017-11-09 2018-06-01 中铁二十局集团第四工程有限公司 A kind of Liftable type steel trestle structure
CN109339458A (en) * 2018-11-19 2019-02-15 江苏南通六建建设集团有限公司 A kind of multi-functional trolley of Cast-in-situ Beam steel reinforcement cage binding installation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113525220A (en) * 2021-05-20 2021-10-22 广西建工集团建筑机械制造有限责任公司 Tower crane loading binding process

Also Published As

Publication number Publication date
CN110469126B (en) 2022-01-21

Similar Documents

Publication Publication Date Title
CN102587286A (en) Simply supported-continuous construction method for bridge superstructure
CN103243654A (en) Mounting method for steel anchor beam of cable-stayed bridge and assembly jig and cable bent tower mounting platform used in method
CN105544984A (en) Large-span steel structure jig frame integrity slip construction process
CN102912736A (en) Vertical assembling construction method for trussed arch bridge
CN101555680B (en) Large-span Pi type socle beam construction process in non-rope area of cable stayed bridge
CN111038940A (en) Rail mounted is used for hoist and mount traction system of transportation
CN109837837A (en) Mounting device and method for concrete-steel Beam prefabricated bridge
CN110984637B (en) Steel structure modular installation method for steelmaking oxygen lance valve station
CN101633483B (en) Integral lifting apparatus for steel structure net rack
CN110469126A (en) Binding trolley and its binding construction method for concrete reinforcement
CN202881858U (en) Jig frame used for vertical assembly construction of truss arc bridge
CN210659321U (en) Trolley structure for binding concrete reinforcing steel bars
CN114251518B (en) Pipeline installation structure of non-laminate closed pipe well and construction method thereof
CN107143147B (en) Unit-modularized detachable type assembly moulding bed
CN107217669B (en) Pile pulling equipment and quick moving method thereof
CN201943006U (en) Main tower zone movable bracket for assisting non-variable amplitude girder erecting crane to erect steel box girders
CN214271705U (en) Bent cap reinforcing bar ligature bed-jig
CN201052950Y (en) Crane
CN201209237Y (en) Multi-mobile beam segment bracket for mould support
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib
CN110424749B (en) Rail type overhead connection device for pier body reinforcement height connection construction and height connection method thereof
CN209760050U (en) a split heads for depositing transport steel truss girder member
CN203782573U (en) Drag runway structure for erecting steel pipe arch bridge
CN207633791U (en) A kind of free-standing temporary support for curved tube component
CN216638685U (en) Hoisting equipment for construction of prefabricated box girder

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant