CN110469106A - A kind of high rise elevator well jacking formwork system and its construction method - Google Patents

A kind of high rise elevator well jacking formwork system and its construction method Download PDF

Info

Publication number
CN110469106A
CN110469106A CN201910866212.0A CN201910866212A CN110469106A CN 110469106 A CN110469106 A CN 110469106A CN 201910866212 A CN201910866212 A CN 201910866212A CN 110469106 A CN110469106 A CN 110469106A
Authority
CN
China
Prior art keywords
supporting mechanism
template
hydraulic
jacking
high rise
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910866212.0A
Other languages
Chinese (zh)
Inventor
魏百峰
赵涛
李�根
武文心
罗琦
葸克业
王永科
辛志磊
马宏锋
李亮兵
展学洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GANSU 7TH CONSTRUCTION GROUP CO Ltd
Original Assignee
GANSU 7TH CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GANSU 7TH CONSTRUCTION GROUP CO Ltd filed Critical GANSU 7TH CONSTRUCTION GROUP CO Ltd
Priority to CN201910866212.0A priority Critical patent/CN110469106A/en
Publication of CN110469106A publication Critical patent/CN110469106A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/22Sliding forms raised continuously or step-by-step and being in contact with the poured concrete during raising and which are not anchored in the hardened concrete; Arrangements of lifting means therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/22Sliding forms raised continuously or step-by-step and being in contact with the poured concrete during raising and which are not anchored in the hardened concrete; Arrangements of lifting means therefor
    • E04G11/24Construction of lifting jacks or climbing rods for sliding forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/24Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
    • E04G3/246Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons following the inside contour of a building
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

The present invention discloses a kind of high rise elevator well jacking formwork system and its construction method, including bottom supporting mechanism, vertical jacking hydraulic device, upper supporting mechanism, template supporting device and control system, pass through vertically jacking hydraulic device connection between bottom supporting mechanism and upper supporting mechanism, vertical jacking hydraulic device is for jacking upper supporting mechanism and promoting bottom supporting mechanism, template supporting device is arranged in the top of upper supporting mechanism, template is detachably arranged in template supporting device periphery, vertical jacking hydraulic device, upper supporting mechanism and bottom supporting mechanism are electrically connected with control system.The high rise elevator well jacking formwork system and its construction method, without individually removing when template installation, dismounting, it can integrally be promoted with the hydraulic pressure lift decorum, reach the mechanization of high-rise building elevator shaft internal shear force wall, intelligent construction, improved its safety and reliability.

Description

A kind of high rise elevator well jacking formwork system and its construction method
Technical field
The present invention relates to high rise elevator well technical field, more particularly to a kind of high rise elevator well jacking formwork system and its Construction method.
Background technique
Existing construction of elevator shaft in high-rise building mainly uses steel pipe scaffold to make as bearing, plank sheathing or steel form For template system.As the height of building successively carries out setting up for construction scaffolding.There are scaffolds to set up repeatedly, operational risk Greatly, labour cost is higher, operating difficulties, mechanization degree low-risk is high, falling object from high altitude and high-altitude strike height, template weight are big etc. A series of disadvantages.
Summary of the invention
The object of the present invention is to provide a kind of high rise elevator well jacking formwork system and its construction methods, above-mentioned existing to solve The problem of with the presence of technology, template are convenient to assemble and disassemble, quick, it can be achieved that safe, efficient construction concept, has reached skyscraper electricity The internal shear force wall mechanization of stair shaft road, intelligent construction, improve its safety and reliability.
To achieve the above object, the present invention provides following schemes: the present invention provides a kind of high rise elevator well jacking formwork System, including bottom supporting mechanism, vertically jack hydraulic device, upper supporting mechanism, template supporting device and control system, institute It states between bottom supporting mechanism and upper supporting mechanism through vertically jacking hydraulic device connection, the vertical jacking hydraulic device For jacking the upper supporting mechanism and promoting the bottom supporting mechanism, described in the top setting of the upper supporting mechanism Template supporting device, template are detachably arranged in the template supporting device periphery, the vertical jacking hydraulic device, top Supporting mechanism and bottom supporting mechanism are electrically connected with the control system.
Further, the bottom supporting mechanism includes bottom beam, chassis, crossbeam and bracket beam, and the bottom beam is mounted on institute The both ends of chassis are stated, the bracket beam is placed in the bottom beam, and hydraulic stem one end and the bracket beam of hydraulic system pass through Bolt is fixedly connected, and the hydraulic cylinder of hydraulic system is fixedly connected with the bottom beam bolt;The chassis is mounted on the crossbeam Fixing groove in, organic frame is installed at the top of the crossbeam, and the bottom and the bottom of the vertical jacking hydraulic device support Mechanism is fixedly connected.
Further, the outside of the hydraulic system is equipped with small oil tank cover board, and the oil pipe of the hydraulic system exports position In on the small oil tank cover board and towards the cross rail inner.
Further, the upper supporting mechanism includes upper beam, restocking, crossbeam and bracket beam, and the upper beam is mounted on institute The both ends of restocking are stated, the bracket beam is placed in the upper beam, and hydraulic stem one end and the bracket beam of hydraulic system pass through Bolt is fixedly connected, and the hydraulic cylinder of hydraulic system is fixedly connected with the upper beam bolt;The restocking is mounted on the crossbeam Fixing groove in, organic frame, the top of the vertical jacking hydraulic device and the upper support are installed in the top of the crossbeam Mechanism is fixedly connected.
Further, the outside of the hydraulic system is equipped with small oil tank cover board, and the oil pipe of the hydraulic system exports position In on the small oil tank cover board and towards the cross rail inner.
Further, lower guide holder and upper is respectively welded in the rack of the bottom supporting mechanism and upper supporting mechanism Guide holder, corresponding on two guide holders to offer pilot hole, guiding axis is threaded through the pilot hole opened up on two guide holders Interior, the bottom of the guiding axis connect with the lower guide holder and is integral.
Further, the template supporting device, the template are fixed on the upper guide holder of the upper supporting mechanism Supporting arrangement includes four columns being centrosymmetrically arranged, and is welded with the I-shaped built in intersecting parallels at the top of four columns The crosspoint of steel, each I-steel is fixed by anchor ear, and the end of each I-steel is equipped with template sliding suspension hook, and the template is sliding Dynamic suspension hook is for hanging tight template.
Further, operating platform is provided between four columns, the surrounding setting protection of the operating platform is turned over Plate.
The present invention also provides a kind of construction methods of high rise elevator well jacking formwork system, applied to above-mentioned high rise elevator Well jacking formwork is put, comprising the following steps:
1) first layer elevator main structure is poured first, and bearing of two square holes as bracket beam is reserved on metope Hole;
2) bottom supporting mechanism is assembled, bottom beam, chassis, bracket beam and the crossbeam in the supporting mechanism of bottom assemble solid It is fixed;
3) the vertical jacking hydraulic device of installation is bolted at the top of assembled bottom supporting mechanism;
4) upper supporting mechanism is assembled, assembled upper supporting mechanism is mounted on to the top of vertical jacking hydraulic device Portion;
5) guiding axis is installed, guide holder is respectively welded in upper supporting mechanism and bottom supporting mechanism, it then will guiding Axis is mounted between two guide holders, and the bottom of guiding axis and lower part guide holder are connected as an entirety;
6) template supporting device is mounted in upper supporting mechanism by installation template supporting arrangement, then lifts template again;
7) motor and route are installed, the motor of hydraulic system is installed, adds hydraulic oil, and connection line;It is carried out after installation Debugging, makes vertically to jack hydraulic device in place, and progress template is fixed after debugging is qualified reinforces;
8) after pouring this layer concrete, by form removable, using sliding suspension hook then template is shunk into top to contract Four bracket beams of supporting mechanism start vertical jacking hydraulic device and jack upper supporting mechanism to next layer, and jacking is in place After stretch out bracket beam;Then four bracket beams for shrinking bottom supporting mechanism start vertical jacking hydraulic device, bottom are supported Bracket beam stretches out after integrally promoting one layer in mechanism;Template is slid in and out using sliding suspension hook, construction location is slided into, by template Supporting and fixing carries out main body construction;
9) circulation step 8) until after completion whole building escalator main body construction, it is removed.
The present invention achieves following technical effect compared with the existing technology:
1, template uses integrated form Novel aluminum alloy gang form, and formwork system is structure lightened, and formwork edge joint is few, lightweight High-strength, the impression quality height of concrete is, it can be achieved that recycle.
2, it by using hydraulic CONTROLLED INTEGRAL LIFT TECHNOLOGY, promotes high rise elevator well jacking formwork system integrally, solves biography System scaffold, which is taken, tears the problems such as complicated, template installation is inconvenient, rubbish should not be removed in hoistway open, improves civilized construction image.
3, the professional protective device of the mating installation of high rise elevator well jacking formwork system and safety device, realize bracket beam up and down It is self-locking mutually, guarantee the stability of high rise elevator well jacking formwork system.
4, high rise elevator well jacking formwork system uses hydraulic intelligent operation control system, can effectively realize that hydraulic system is complete It automatically controls, realizes hydraulic system synchronism, improve the reliability transmitted at a distance, guarantee concrete quality and safe mass.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings Obtain other attached drawings.
Fig. 1 is that high rise elevator well promotes formwork system overall structure diagram;
Fig. 2 is that elevator main body pours figure;
Fig. 3 is the structural schematic diagram one of bottom supporting mechanism;
Fig. 4 is the structural schematic diagram two of bottom supporting mechanism;
Fig. 5 is hydraulic system set-up mode schematic diagram;
Fig. 6 is that schematic diagram is arranged in the position of bottom supporting mechanism, vertical jacking hydraulic device and upper supporting mechanism;
Fig. 7 is guiding axis schematic view of the mounting position;
Fig. 8 is template supporting device schematic view of the mounting position;
Fig. 9 is template supporting device structure composition figure;
Figure 10 is the cross-sectional view of the state one of high rise elevator well jacking formwork system;
Figure 11 is the axonometric drawing of the state two of high rise elevator well jacking formwork system;
Figure 12 is the cross-sectional view of the state two of high rise elevator well jacking formwork system;
Wherein, 1 bottom supporting mechanism;11 bottom beams;12 chassis;13 bracket beams;14 crossbeams;15 small oil tank cover boards;16 connections Flange;17 hydraulic stems;18 hydraulic cylinders;19 racks;2 vertical jacking hydraulic devices;3 upper supporting mechanisms;4 pattern board supportings dress It sets;41 columns;42 operating platforms;43 I-steel;44 templates slide suspension hook;45 anchor ears;46 protection turnover panels;5 templates;6 guiding axis; 7 bearing holes.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
The object of the present invention is to provide a kind of high rise elevator well jacking formwork system and its construction methods, above-mentioned existing to solve The problem of with the presence of technology, template are convenient to assemble and disassemble, quick, it can be achieved that safe, efficient construction concept, has reached skyscraper electricity The internal shear force wall mechanization of stair shaft road, intelligent construction, improve its safety and reliability.
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing and specific real Applying mode, the present invention is described in further detail.
As shown in figs. 1-12, the present invention provides a kind of high rise elevator well jacking formwork system, including bottom supporting mechanism 1, Vertical jacking hydraulic device 2, upper supporting mechanism 3, template supporting device 4 and control system, bottom supporting mechanism 1 and top branch Connected between support mechanism 3 by vertically jacking hydraulic device 2, it is vertical jack hydraulic device 2 for jack upper supporting mechanism 3 and Bottom supporting mechanism 1 is promoted, template 5 is detachably arranged in 4 periphery of template supporting device, vertical to jack hydraulic device 2, top Supporting mechanism 3 and bottom supporting mechanism 1 are electrically connected with control system.
Bottom supporting mechanism 1 includes bottom beam 11, chassis 12, crossbeam 14 and bracket beam 13, and bottom beam 11 is mounted on chassis 12 Both ends, bracket beam 13 are placed in bottom beam 11, and 17 one end of hydraulic stem and the bracket beam 13 of hydraulic system are bolted to connection, The hydraulic cylinder 18 of hydraulic system is fixedly connected with 11 bolt of bottom beam;Chassis 12 is mounted in the fixing groove of crossbeam 14, crossbeam 14 Top organic frame 19 is installed, the vertical bottom for jacking hydraulic device 2 is fixedly connected with bottom supporting mechanism 1;When hydraulic stem 17 When driving bracket beam 13 overhanging, bracket beam 13 is stuck in the bearing hole 7 of elevator main body, realizes determining for bottom supporting mechanism 1 Position, upper supporting mechanism 3 are identical as the working principle of bottom supporting mechanism 1.The outside of hydraulic system is equipped with small oil tank cover board 15, the oil pipe outlet of hydraulic system is located on small oil tank cover board 15 and towards 14 inside of crossbeam.Upper supporting mechanism 3 and bottom branch The structure composition of support mechanism 1 is consistent.
It is respectively welded lower guide holder and upper guide holder in the rack 19 of bottom supporting mechanism 1 and upper supporting mechanism 3, two Corresponding on a guide holder to offer pilot hole, guiding axis 6 is threaded through in the pilot hole opened up on two guide holders, guiding axis 6 bottom connect with lower guide holder and is integral.
Template supporting device 4 is fixed on the upper guide holder of upper supporting mechanism 3, template supporting device 4 includes in four The column 41 that the heart is arranged symmetrically, the top of four columns 41 are welded with the I-steel 43 built in intersecting parallels, each I-steel 43 Crosspoint is fixed by anchor ear 45, and the end of each I-steel 43 is equipped with template sliding suspension hook 44, and template is slided suspension hook 44 and used In hanging tight template 5.Operating platform 42, the surrounding setting protection turnover panel 46 of operating platform 42 are provided between four columns 41.
The working principle of the high rise elevator well jacking formwork system are as follows: by by hydraulic lifting system, intelligence control system, Template system, protective device are flexibly connected as an entirety.High rise elevator well jacking formwork system with building construction by Layer climbs, and after pattern board supporting layer concrete pours, form removal 5 shrinks 4, top bracket beam 13, shunk Bi Hou starts vertical jacking cylinder, and next layer is arrived in jacking, after jacking in place, stretches out bracket beam 13;Then, the ox of lower part 4 is shunk Leg beam 13 after contraction, starts vertical jacking cylinder, and lower part is integrally promoted to one layer, is promoted and stretches out bracket beam 13 afterwards in place, Again supporting template.It is operated, after completing whole building elevator main body construction, is removed repeatedly.
Further, the construction method of the high rise elevator well jacking formwork system is as follows:
1) first layer elevator main structure is poured first, the square hole of 2 300X300 is reserved on metope, as ox The bearing hole 7 of leg beam 13, spacing is 400mm between hole.
2) bottom supporting mechanism is assembled
Firstly, bottom beam 11 is mounted on 12 both ends of chassis, two holes on bottom beam 11 respectively with 12 end of chassis two A hole is corresponding, usesPin shaft is attached;Then, bracket beam 13 is placed in bottom beam 11, is used The bolt of M30x80mm and the hydraulic stem 17 of hydraulic system connect, using the bolt of M30x80mm by the hydraulic cylinder of hydraulic system 18 are attached with bottom beam 11;Secondly, small oil tank cover board 15 is mounted on outside hydraulic system, as protective device, small oil tank Oil pipe outlet on cover board 15 is towards 14 inside of crossbeam;Again, chassis 12 is mounted on 14 width of crossbeam is chassis in 180mm slot Two holes among 12 are corresponding with two connecting holes of crossbeam 14 respectively, usePin shaft by bottom beam 11, Chassis 12, small oil tank cover board 15 link together;Finally, four linkage sections of rack 19 are used the bolt point of M16x100mm It is not connected with the linkage section on chassis 12, forms a complete bottom supporting mechanism.
3) the vertical jacking hydraulic device 2 of installation
Installation three-level vertically jacks hydraulic device, is erected bottom supporting mechanism with three-level using the bolt of 6 M16x30mm It is connected to jacking hydraulic device bottom, is provided with connecting flange 16 in the middle part of the crossbeam 14 of bottom supporting mechanism 1, vertically jacks hydraulic The bottom of device 2 is fixedly connected with connecting flange 16.
4) it assembles, top supporting device is installed
Firstly, upper beam is mounted on 12 both ends of chassis, two holes on upper beam, two holes with 12 end of chassis respectively It is corresponding, it usesPin shaft is attached;Then, bracket beam 13 is placed in upper beam, uses M30x80mm Bolt and the hydraulic stem 17 of hydraulic system connect, using the bolt of M30x80mm by the hydraulic cylinder 18 and bottom beam of hydraulic system 11 are attached;Secondly, small oil tank cover board 15 is mounted on outside hydraulic system, as protective device, on small oil tank cover board 15 Oil pipe outlet towards the inside of crossbeam 14;Again, chassis 12 is mounted on 14 width of crossbeam is in 180mm slot, among chassis 12 Two holes are corresponding with two connecting holes of crossbeam 14 respectively, usePin shaft is by bottom beam 11, chassis 12, small Oil cylinder cover board 15 links together;Finally, by four linkage sections of rack 19 using M16x100mm bolt respectively with chassis 12 On linkage section be connected, formed a complete upper support mechanism.Using the bolt of 6 M16x30mm by upper support mechanism Hydraulic device top is vertically jacked with three-level to connect.
5) guiding axis 6 is installed
Firstly, two guide holders are respectively welded on the supporting device of upper and lower part;Then, guiding axis 6 is mounted on up and down In guide holder, 6 lower part of guiding axis and lower part guide holder are connected as an entirety using M16x200mm bolt by bottom.
6) installation template supporting arrangement
Using the bolt of 16 M16x30mm, by 4 columns 41 of template supporting device 4 respectively and in upper support mechanism Reserved 4 connecting plates connection.
7) installation template 5
It is fixed using the one end such as electric block or bottle gouard moved by hands, wirerope and the suspension hook on aluminum alloy mould plate 5, it is another End is attached using the bolt of M16x30mm with the sliding suspension hook on 5 supporting structure of template.
8) motor and route are installed
Hydraulic system motor is installed, 46# hydraulic oil, and connection line are added.
9) it debugs
It is debugged after installing for the first time, makes hydraulic device in place, progress template 5 is fixed after debugging is qualified reinforces.
10) this layer concrete is poured, first removes template 5, template 5 is inwardly contracted to optimum bit using sliding suspension hook It sets;Then, 4, top bracket beam 13 is shunk, after contraction, starts vertical jacking cylinder, next layer is arrived in jacking, and jacking is in place Afterwards, bracket beam 13 is stretched out;Secondly, shrink shrink the bracket beam 13 of lower part 4, after contraction, start vertical jacking cylinder, will under Portion integrally promotes one layer, is promoted and stretches out bracket beam 13 afterwards in place, slides in and out template 5 using sliding suspension hook, slides into construction 5 supporting and fixing of template is carried out main body construction by position.
11) step 10) is repeated, is operated repeatedly, after completing whole building escalator main body construction, is torn open It removes.
High rise elevator well jacking formwork system and its construction method proposed by the present invention, by by hydraulic lifting system, intelligence It can control system, template system, protective device and be flexibly connected as an entirety.Without individually removing when template installation, dismounting, It can integrally be promoted with the hydraulic pressure lift decorum.High rise elevator well jacking formwork system is successively climbed with the construction of building, is climbed Stability is strong during rising, and template 5 is convenient to assemble and disassemble, quick, it can be achieved that safe, efficient construction concept, has reached skyscraper The mechanization of elevator shaft internal shear force wall, intelligent construction, improve its safety and reliability.
Specific examples are applied in the present invention, and principle and implementation of the present invention are described, above embodiments Illustrate to be merely used to help understand method and its core concept of the invention;At the same time, for those skilled in the art, according to According to thought of the invention, there will be changes in the specific implementation manner and application range.In conclusion the content of the present specification It should not be construed as limiting the invention.

Claims (9)

1. a kind of high rise elevator well jacking formwork system, it is characterised in that: including bottom supporting mechanism, vertically jack hydraulic dress It sets, upper supporting mechanism, template supporting device and control system, passes through between the bottom supporting mechanism and upper supporting mechanism Vertical jacking hydraulic device connection, the vertical jacking hydraulic device is for jacking the upper supporting mechanism and promoting the bottom The template supporting device is arranged in portion's supporting mechanism, the top of the upper supporting mechanism, and template is detachably arranged in described Template supporting device periphery, the vertical jacking hydraulic device, upper supporting mechanism and bottom supporting mechanism with the control System electrically connects.
2. high rise elevator well jacking formwork system according to claim 1, it is characterised in that: the bottom supporting mechanism packet Bottom beam, chassis, crossbeam and bracket beam are included, the bottom beam is mounted on the both ends of the chassis, and the bracket beam is placed in the bottom In beam, hydraulic stem one end and the bracket beam of hydraulic system are bolted to connection, the hydraulic cylinder of hydraulic system and institute Bottom beam bolt is stated to be fixedly connected;The chassis is mounted in the fixing groove of the crossbeam, and organic frame is installed at the top of the crossbeam, The bottom of the vertical jacking hydraulic device is fixedly connected with the bottom supporting mechanism.
3. high rise elevator well jacking formwork system according to claim 2, it is characterised in that: the outside of the hydraulic system Small oil tank cover board is installed, the oil pipe outlet of the hydraulic system is located on the small oil tank cover board and towards in the crossbeam Side.
4. high rise elevator well jacking formwork system according to claim 1, it is characterised in that: the upper supporting mechanism packet Upper beam, restocking, crossbeam and bracket beam are included, the upper beam is mounted on the both ends of the restocking, and the bracket beam is placed on described In beam, hydraulic stem one end and the bracket beam of hydraulic system are bolted to connection, the hydraulic cylinder of hydraulic system and institute Beam bolt is stated to be fixedly connected;The restocking is mounted in the fixing groove of the crossbeam, and organic frame is installed at the top of the crossbeam, The top of the vertical jacking hydraulic device is fixedly connected with the upper supporting mechanism.
5. high rise elevator well jacking formwork system according to claim 4, it is characterised in that: the outside of the hydraulic system Small oil tank cover board is installed, the oil pipe outlet of the hydraulic system is located on the small oil tank cover board and towards in the crossbeam Side.
6. high rise elevator well jacking formwork system according to claim 1, it is characterised in that: the bottom supporting mechanism and Lower guide holder and upper guide holder are respectively welded in the rack of upper supporting mechanism, corresponding offer is led on two guide holders Xiang Kong, guiding axis are threaded through in the pilot hole opened up on two guide holders, and the bottom of the guiding axis and the lower guide holder connect It connects and is integral.
7. high rise elevator well jacking formwork system according to claim 6, it is characterised in that: the upper supporting mechanism The template supporting device is fixed on upper guide holder, the template supporting device includes four columns being centrosymmetrically arranged, The I-steel built in intersecting parallels is welded at the top of four columns, the crosspoint of each I-steel is fixed by anchor ear, and The end of each I-steel is equipped with template sliding suspension hook, and the template sliding suspension hook is for hanging tight template.
8. high rise elevator well jacking formwork system according to claim 7, it is characterised in that: a structure of an essay for four columns Equipped with operating platform, the surrounding setting protection turnover panel of the operating platform.
9. a kind of construction method of high rise elevator well jacking formwork system is applied to height of any of claims 1-8 Layer elevator jacking formwork is put, which comprises the following steps:
1) first layer elevator main structure is poured first, and support holes of two square holes as bracket beam are reserved on metope Hole;
2) bottom supporting mechanism is assembled, bottom beam, chassis, bracket beam and the crossbeam in the supporting mechanism of bottom are subjected to assembling fixation;
3) the vertical jacking hydraulic device of installation is bolted at the top of assembled bottom supporting mechanism;
4) upper supporting mechanism is assembled, assembled upper supporting mechanism is mounted on to the top of vertical jacking hydraulic device;
5) guiding axis is installed, guide holder is respectively welded in upper supporting mechanism and bottom supporting mechanism, then pacifies guiding axis An entirety is connected as between two guide holders, and by the bottom of guiding axis and lower part guide holder;
6) template supporting device is mounted in upper supporting mechanism by installation template supporting arrangement, then lifts template again;
7) motor and route are installed, the motor of hydraulic system is installed, adds hydraulic oil, and connection line;It is debugged after installation, Make vertically to jack hydraulic device in place, the fixed reinforcement of template is carried out after debugging is qualified;
8) after pouring this layer concrete, by form removable, using sliding suspension hook then template is shunk into upper support to contract Four bracket beams of mechanism start vertical jacking hydraulic device and jack upper supporting mechanism to next layer, jack and extend back in place Bracket beam out;Then four bracket beams for shrinking bottom supporting mechanism start vertical jacking hydraulic device, by bottom supporting mechanism Bracket beam is stretched out after whole one layer of promotion;Template is slid in and out using sliding suspension hook, construction location is slided into, by pattern board supporting It is fixed, carry out main body construction;
9) circulation step 8) until after completion whole building escalator main body construction, it is removed.
CN201910866212.0A 2019-09-09 2019-09-09 A kind of high rise elevator well jacking formwork system and its construction method Pending CN110469106A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910866212.0A CN110469106A (en) 2019-09-09 2019-09-09 A kind of high rise elevator well jacking formwork system and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910866212.0A CN110469106A (en) 2019-09-09 2019-09-09 A kind of high rise elevator well jacking formwork system and its construction method

Publications (1)

Publication Number Publication Date
CN110469106A true CN110469106A (en) 2019-11-19

Family

ID=68514072

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910866212.0A Pending CN110469106A (en) 2019-09-09 2019-09-09 A kind of high rise elevator well jacking formwork system and its construction method

Country Status (1)

Country Link
CN (1) CN110469106A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984555A (en) * 2019-11-25 2020-04-10 北京杏林伟业电梯工程有限公司 Scaffold for elevator well
CN113027167A (en) * 2021-03-19 2021-06-25 中建八局天津建设工程有限公司 Environment-friendly demolition method for high-rise building
US20210245997A1 (en) * 2020-02-12 2021-08-12 Kone Corporation Movable machine room, elevator arrangement and method for constructing elevator
CN113565311A (en) * 2021-08-09 2021-10-29 中建三局集团有限公司 Detachable steel structure scaffold for elevator shaft
CN113738065A (en) * 2021-09-09 2021-12-03 江苏省方正电梯有限公司 Integrated steel structure assembly type modularized elevator shaft
CN114412164A (en) * 2022-03-14 2022-04-29 安徽中嘉环保建材科技有限公司 Building composite aluminum template
CN114673344A (en) * 2022-04-22 2022-06-28 中化学路桥建设有限公司 Self-lifting construction method and construction device for internal mold of elevator shaft of building
CN115613841A (en) * 2022-10-24 2023-01-17 中国一冶集团有限公司 Socket joint formula derrick operation protector that can climb

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201635390U (en) * 2009-04-10 2010-11-17 刘东轩 Automatic formwork supporting machine for high-rise building elevator shaft construction
CN102661039A (en) * 2012-05-11 2012-09-12 上海建工集团股份有限公司 Drum frame supporting power built-in integrated jacking steel platform formwork system and construction method
CN102704676A (en) * 2012-05-30 2012-10-03 徐州徐液液压科技有限公司 Jacking formwork mechanism
CN204781338U (en) * 2015-05-29 2015-11-18 武汉凡肯智能装备有限公司 A but, novel pin -connected panel supporting box roof beam that is used for intelligent hydraulic pressure jacking die carrier
CN210636796U (en) * 2019-09-09 2020-05-29 甘肃第七建设集团股份有限公司 High-rise elevator shaft jacking formwork system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201635390U (en) * 2009-04-10 2010-11-17 刘东轩 Automatic formwork supporting machine for high-rise building elevator shaft construction
CN102661039A (en) * 2012-05-11 2012-09-12 上海建工集团股份有限公司 Drum frame supporting power built-in integrated jacking steel platform formwork system and construction method
CN102704676A (en) * 2012-05-30 2012-10-03 徐州徐液液压科技有限公司 Jacking formwork mechanism
CN204781338U (en) * 2015-05-29 2015-11-18 武汉凡肯智能装备有限公司 A but, novel pin -connected panel supporting box roof beam that is used for intelligent hydraulic pressure jacking die carrier
CN210636796U (en) * 2019-09-09 2020-05-29 甘肃第七建设集团股份有限公司 High-rise elevator shaft jacking formwork system

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984555A (en) * 2019-11-25 2020-04-10 北京杏林伟业电梯工程有限公司 Scaffold for elevator well
US20210245997A1 (en) * 2020-02-12 2021-08-12 Kone Corporation Movable machine room, elevator arrangement and method for constructing elevator
US11731857B2 (en) * 2020-02-12 2023-08-22 Kone Corporation Movable machine room, elevator arrangement and method for constructing elevator
CN113027167A (en) * 2021-03-19 2021-06-25 中建八局天津建设工程有限公司 Environment-friendly demolition method for high-rise building
CN113565311A (en) * 2021-08-09 2021-10-29 中建三局集团有限公司 Detachable steel structure scaffold for elevator shaft
CN113565311B (en) * 2021-08-09 2022-08-02 中建三局集团有限公司 Detachable steel structure scaffold for elevator shaft
CN113738065A (en) * 2021-09-09 2021-12-03 江苏省方正电梯有限公司 Integrated steel structure assembly type modularized elevator shaft
CN114412164A (en) * 2022-03-14 2022-04-29 安徽中嘉环保建材科技有限公司 Building composite aluminum template
CN114673344A (en) * 2022-04-22 2022-06-28 中化学路桥建设有限公司 Self-lifting construction method and construction device for internal mold of elevator shaft of building
CN114673344B (en) * 2022-04-22 2022-12-02 中化学建设集团有限公司 Self-lifting construction method and construction device for internal mold of elevator shaft of building
CN115613841A (en) * 2022-10-24 2023-01-17 中国一冶集团有限公司 Socket joint formula derrick operation protector that can climb

Similar Documents

Publication Publication Date Title
CN110469106A (en) A kind of high rise elevator well jacking formwork system and its construction method
CN102661039B (en) Drum frame supporting power built-in integrated jacking steel platform formwork system and construction method
CN205171378U (en) Assembling lifting type construction platform for pier column construction
US20220213705A1 (en) Method for entire removal of space truss and assistive support mechanism
CN103758341A (en) Steel column drum rack support type hydraulic lifting overall steel platform cross truss layer construction method
CN108331336A (en) The integrated lifting steel plateform system and its construction method of floor synchronous construction
CN106592826A (en) Construction method for cylindrical frame supporting type hydraulic-climbing integral steel platform formwork shear steel plate layer
CN101191382A (en) Steel pillar supporting type integral self-lifting steel platform scaffold template system and constructing method thereof
CN109594479A (en) A kind of parallel overpass center anticollision barrier of double width while construct mould bases and method
CN204644884U (en) High pier over-form construction reinforced bar installs mobile stock
CN109184190A (en) It climbs and carries integrated beam type hydraulic climbing platform and its installation method
CN105839543A (en) Construction process for self-lifting outer frame turnover formwork of bridge high pier
CN210636796U (en) High-rise elevator shaft jacking formwork system
CN104775363B (en) The spelling method of upper king-post strut reinforcing bar sections
CN106869479A (en) Bailey bracket sliding formwork system construction method
CN102767282A (en) Assembly-type high-formwork construction method for cantilever of oversized special-shaped conversion layer
CN209482678U (en) Integrally hoisting steel platform for irregular wall construction
CN111519545A (en) Pier and capping beam integrated construction platform and construction method thereof
CN111335172A (en) Movable pier column cross beam prestress tensioning hanging frame construction platform and construction method
CN110886225A (en) Construction method of cable tower stay cable installation system
CN1048066C (en) Method and apparatus for integrally self-lifting scaffold
CN209923780U (en) Suspended support of segment prefabricated bent cap
CN214656383U (en) Line is alternately low headroom and is pieced together wide cast-in-place case roof beam support
CN212247877U (en) Main tower inner formword and maintenance platform integrated device
CN208870379U (en) The integrated lifting steel plateform system of floor synchronous construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination