CN110469071B - Isolation interrogation room for integrated soft package construction and construction method thereof - Google Patents

Isolation interrogation room for integrated soft package construction and construction method thereof Download PDF

Info

Publication number
CN110469071B
CN110469071B CN201910717836.6A CN201910717836A CN110469071B CN 110469071 B CN110469071 B CN 110469071B CN 201910717836 A CN201910717836 A CN 201910717836A CN 110469071 B CN110469071 B CN 110469071B
Authority
CN
China
Prior art keywords
plate
soft
flame
layer
soft package
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910717836.6A
Other languages
Chinese (zh)
Other versions
CN110469071A (en
Inventor
吴斯婷
熊晟
朱蓉蓉
季旸
张福海
丁林聚
赵俭学
袁文岑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Third Construction Co Ltd of China Construction First Group Co Ltd
Original Assignee
China Construction First Group Corp Ltd
Third Construction Co Ltd of China Construction First Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, Third Construction Co Ltd of China Construction First Group Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201910717836.6A priority Critical patent/CN110469071B/en
Publication of CN110469071A publication Critical patent/CN110469071A/en
Application granted granted Critical
Publication of CN110469071B publication Critical patent/CN110469071B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • E04B9/065Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members comprising supporting beams having a folded cross-section
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0875Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements having a basic insulating layer and at least one covering layer
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0885Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements specially adapted for being adhesively fixed to the wall; Fastening means therefor; Fixing by means of plastics materials hardening after application

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Building Environments (AREA)
  • Floor Finish (AREA)

Abstract

The invention relates to the technical field of interrogation room construction and discloses an isolation interrogation room for integrated soft package construction and a construction method thereof. The invention comprises a soft package wall body, an elastic composite floor, concealed electronic interrogation equipment, a soft package toilet and soft package furniture; the soft package wall body comprises a foundation wall body, light steel keels horizontally paved on the surface of the foundation wall body, flame-retardant plates fixed on the light steel keels, sound-insulation soft package layers paved on the outer sides of the flame-retardant plates, and the flame-retardant plates are hung on the light steel keels through vertical keels; the sound insulation soft cladding is fixedly connected with the flame retardant plate through a hanging component, the hanging component comprises an S-shaped fixing piece and a Z-shaped plug-in piece which are matched with each other, and the sound insulation soft cladding comprises a back sealing plate, a sound insulation layer and soft leather wrapping the sound insulation layer; the elastic composite floor is sequentially provided with a ground foundation structure, a mortar combining layer, a leveling layer, a self-leveling layer, a buffer layer and a ground decoration layer from bottom to top. The invention has no dead angle, is an omnibearing soft package, and has good tightness and comfort level.

Description

Isolation interrogation room for integrated soft package construction and construction method thereof
Technical Field
The invention relates to the technical field of interrogation room construction, in particular to an isolation interrogation room for integrated soft package construction and a construction method thereof.
Background
In some rooms such as interrogation rooms, talk rooms and the like with special purposes or under special conditions, the inquired person needs to stay in the room for a long time and is not allowed to leave, and the interrogation rooms also have the function of isolation rooms. The room needs to be fully and safely treated, important personnel and staff for interrogation or talking are protected, sharp and protruding objects cannot appear on the ground and the wall surface in the room, all monitoring and display screens, toilet tables, toilets and other equipment facilities need to be flexibly packaged, exposed hard parts cannot appear, and the equipment cannot be easily disassembled to form aggressive parts; avoiding the dangerous behaviors of important personnel caused by emotional agitation in the process of interrogation or talking, and influencing normal interrogation and talking.
Most of the existing isolation interrogation rooms only carry out soft package construction on the wall surfaces, soft carpets are paved on the ground, furniture without obvious edges or furniture edges are selected to be wrapped, and on some common facilities, effective countermeasures are not provided, so that research, development and production of the whole matched facilities aiming at the application are not carried out in a professional manner.
Disclosure of Invention
The invention provides an isolation interrogation room for integrated soft package construction, which has no dead angle, good tightness and good living comfort, and a construction method thereof.
The technical problems to be solved are as follows: most of the existing isolation interrogation rooms only carry out soft package construction on the wall surfaces, and the ground and other supporting facilities have no special design and treatment, so that certain potential safety hazards exist.
In order to solve the technical problems, the invention adopts the following technical scheme:
the invention relates to an isolation interrogation room for integrated soft package construction, which comprises a soft package wall body, an elastic composite floor, concealed electronic interrogation equipment, a soft package toilet and soft package furniture;
the soft package wall body comprises a foundation wall body, light steel keels horizontally paved on the surface of the foundation wall body, flame-retardant plates fixed on the light steel keels, sound-insulation soft package layers paved on the outer sides of the flame-retardant plates, and the flame-retardant plates are hung on the light steel keels through vertical keels; the sound insulation soft cladding is fixedly connected with the flame retardant plate through a hanging component, the hanging component comprises an S-shaped fixing piece and a Z-shaped plug-in piece which are matched with each other, and the sound insulation soft cladding comprises a back sealing plate, a sound insulation layer and soft leather wrapping the sound insulation layer;
the elastic composite floor sequentially comprises a ground foundation structure, a leveling layer, a self-leveling layer, a buffer layer and a ground decoration layer from bottom to top;
the upper part of the soft package wall body is inwards sunken to form a mounting groove for accommodating electronic interrogation equipment, the peripheral edge of the mounting groove is provided with a reinforcing frame, and the reinforcing frame and the light steel joist are positioned in the same vertical plane and fixedly connected with the light steel joist; the flame retardant plate is attached to the surface of the reinforcing frame and is in sealing connection with the flame retardant plates on the soft-package wall body around, and a heat radiation opening is formed in the flame retardant plate positioned in the middle of the reinforcing frame; the electronic interrogation equipment is fixed on the foundation wall body through the mounting hanging frame, one end of the mounting hanging frame is fixedly connected with the electronic interrogation equipment, and the other end of the mounting hanging frame penetrates through the heat dissipation opening to be fixedly connected with the foundation wall body; the outer vertical surface of the electronic interrogation device is not more than the outer vertical surface of the soft package wall body;
the soft-package bathroom comprises a bathroom wall, a bathroom floor, an embedded spray head, a soft-package closestool and a soft-package toilet table, wherein the bathroom wall comprises a basic wall body, and a waterproof layer, a cement board, a PVC board and a waterproof facing are sequentially paved on the surface of the basic wall body.
The invention relates to an isolation interrogation room for integrated soft package construction, which is further characterized in that the light steel joist is formed by sequentially splicing a plurality of joist standard knots, the cross section of each joist standard knot is in a trapezoid shape with gradually enlarged openings, each keel standard knot is formed by enclosing two symmetrically arranged inclined plates and a web plate connected with the inclined plates, the web plate is fixed on the wall surface of a foundation wall body through expansion bolts, the two ends of each inclined plate are respectively provided with a group of long side edges of each spiral inclined plate which are inwards recessed to form T-shaped clamping holes, the T-shaped clamping holes are uniformly distributed at intervals along the length direction of the light steel joist, the holes are horizontally distributed in parallel, and the screw holes are fixedly connected with the adjacent joist standard knots through bolts; t-shaped clamping holes on the two inclined plates are arranged in one-to-one correspondence.
The invention discloses an isolation interrogation room for integrated soft package construction, further, the vertical keels are light thin-wall channel steel and are arranged along the vertical direction in a through length mode, the openings of the vertical keels are buckled between two adjacent T-shaped clamping holes towards the light steel keels, the edges of the two ends of each opening are vertically bent and horizontally extend inwards to form hooking parts, and one sides of the hooking parts extending into the T-shaped clamping holes are clamped and fixed.
The invention relates to an isolation interrogation room for integrated soft package construction, which is characterized in that the S-shaped fixing pieces are arranged at intervals along the horizontal direction and comprise a first limb plate, a second limb plate and a third limb plate which are parallel to each other, and a first connecting plate for connecting the first limb plate and the second limb plate and a second connecting plate for connecting the second limb plate and the third limb plate; the face of first limb board is laminated with fire-retardant board face and is set up and pass through screw fixed connection, and first limb board, second limb board enclose the notch that forms and set up downwards vertically with first connecting plate, are provided with buffer spring in the notch, buffer spring both ends respectively with the face welded fastening of first limb board and second limb board, enclose the grafting mouth that forms up vertically between second limb board, third limb board and the second connecting plate, the tip of third limb board is narrowed back and is buckled in the grafting mouth and form elasticity chucking portion.
The invention discloses an isolation interrogation room for integrated soft package construction, which is further characterized in that the Z-shaped plug-in unit comprises a first fixing plate which is fixedly connected with a plug-in port in a plugging manner, a second fixing plate which is parallel to the first fixing plate, a supporting plate which is connected with the first fixing plate and the second fixing plate, the first fixing plate is vertically inserted into the plug-in port and clamped between a second limb plate and an elastic clamping part, the lower surface of the supporting plate is in fit with the upper end surface of a third limb plate, the outer side surface of the second fixing plate and the outer side surface of the third limb plate are positioned in the same vertical plane, and the second fixing plate is fixedly connected with an acoustic insulation soft package through screws.
The isolation interrogation room for integrated soft package construction is characterized in that the back sealing plate is a flame-retardant material plate with the thickness not exceeding 9mm, the sound insulation layer is flame-retardant sponge with the thickness not less than 50mm, the sound insulation layer is fixed on the back sealing plate through bonding or nail shooting, the edge of soft package leather wraps the end part of the flame-retardant sponge and then is fixed with the back sealing plate, and the wrapping end faces of adjacent soft package leather are tightly attached.
According to the isolation interrogation room for the integrated soft package construction, further, the suspended ceiling plate is inwards sunken to form the installation cavity, the installation cavity is in sealing connection with the surrounding suspended ceiling plates through the gypsum board, the embedded spray heads are arranged in the installation cavity, the lower surfaces of the embedded spray heads are not more than the lower surfaces of the surrounding suspended ceiling plates, and the water inlets of the embedded spray heads are communicated with the water inlet pipes hidden in the suspended ceiling plates.
The isolation interrogation room for integrated soft package construction is characterized in that the elastic composite floor is arranged at the corner joint position of the soft package wall body, the leveling layer on the ground is piled up along the wall surface to be flush with the lower end face of the flame-retardant plate of the wall surface, the leveling layer, the buffer layer and the ground decoration layer are all piled up along the leveling layer of the corner and are attached to the lower end face of the flame-retardant plate, and the sound insulation soft package layer at the lowest end extends downwards to be pressed on the outer side of the ground decoration layer.
The invention relates to an isolation interrogation room for integrated soft package construction, which is characterized in that the soft package furniture comprises a finished product base plate and a flame-retardant sponge soft package surface layer, and is fixedly connected with a ground structure through a right-angle connecting piece and an expansion bolt.
The invention discloses a construction method of an isolation interrogation room for integrated soft package construction, which comprises the following steps:
step one, cleaning and flattening a base layer;
step two, positioning and paying off; paying-off positioning is carried out on the surface of the foundation wall, the upper surface of the ground foundation structure and the lower surface of the suspended ceiling respectively, and the setting positions of all the components are determined;
thirdly, constructing keels and reserved pipelines; paving a light steel keel on the surface of a foundation wall, fixing the light steel keel on the foundation wall through expansion bolts, and then clamping and fixing a vertical keel on the light steel keel;
fourthly, suspended ceiling construction; installing a ceiling keel, grooving according to the setting positions of the lamp and the embedded nozzle, reserving an installation cavity, and then arranging the lighting lamp and the embedded nozzle and sealing;
step five, paving a wall flame-retardant plate;
step six, wall soft package construction; arranging an S-shaped fixing piece on the flame-retardant plate, fixedly mounting a Z-shaped plug-in unit on the back surface of the sound-insulation soft cladding, and correspondingly inserting the Z-shaped plug-in unit into the S-shaped fixing piece to finish the fixation of the sound-insulation soft cladding;
step seven, constructing an elastic composite floor;
and step eight, electronic interrogation equipment and soft package furniture installation.
Compared with the prior art, the isolation interrogation room for integrated soft package construction and the construction method thereof have the following beneficial effects:
the wall surface and the ground of the isolation interrogation room for integrated soft package construction are integrated soft package construction, the wall surface is detachably provided with the integrated sound insulation soft package layer, the wall surface can be prefabricated in a factory, and the wall surface is hung on the flame retardant plate through the hanging component, so that the construction is simple, convenient and efficient, time-saving and labor-saving, the construction workload on site is reduced, the construction period is greatly shortened, and the construction efficiency is improved; the hitching assembly adopts the matched S-shaped fixing piece and the Z-shaped plug connector, and the buffer spring is further arranged in the S-shaped fixing piece, so that the anti-collision performance and the elasticity of the sound insulation soft cladding can be effectively increased.
The toilet matched facilities and the built-in furniture furnishings are subjected to soft package treatment, so that any hard and protruding parts are prevented from being exposed, and the personal injury opportunity caused by internal personnel is reduced; the electronic interrogation equipment, the lamps and the shower facilities in the interrogation room are all installed in a mode of not protruding to the lower surface of the wall surface or the suspended ceiling, so that any possibility of being taken down is avoided, and any sharp corner part is also avoided being exposed.
The isolation interrogation room and the construction method of the integrated soft package construction are further described below with reference to the accompanying drawings.
Drawings
FIG. 1 is a schematic view of a cross-section of a flexible wall;
FIG. 2 is a schematic view of a longitudinal section of a flexible wall;
FIG. 3 is a schematic view showing the detail of the portion A in FIG. 2;
FIG. 4 is a schematic cross-sectional view of a resilient composite floor;
FIG. 5 is a schematic view of the structure of the corner joint of the flexible wall and the resilient composite floor;
FIG. 6 is a schematic diagram of a structure at an installation node of an electronic interrogation device;
FIG. 7 is a schematic view of the construction of a corner connection node of a wall of a bathroom and a floor of the bathroom;
FIG. 8 is a schematic view of the structure at the mounting node of the embedded sprinkler;
fig. 9 is a schematic structural view of a connection node of soft furniture and the ground.
Reference numerals:
11-a foundation wall; 12-light steel keels; 121-inclined plates; 122-web; 123-T-shaped clamping holes; 13-flame retardant panel; 14-sound insulation soft cladding; 141-a back seal plate; 142-an acoustic insulation layer; 143-soft package leather; 15-vertical keels; a 2-S-shaped fixing member; 21-a first limb plate; 22-a second limb plate; 23-third limb plate; 24-a first connection plate; 25-a second connection plate; 26-a buffer spring; 27-an elastic clamping part; a 3-Z insert; 31-a first fixing plate; 32-a second fixing plate; 33-a support plate; 41-a ground infrastructure; 42-a mortar bond layer; 43-a leveling layer; 44-self leveling layer; 45-buffer layer; 46-a floor finish; 5-electronic interrogation equipment; 61-mounting slots; 62-reinforcing the frame; 63-heat dissipation port; 64-mounting a hanging frame; 71-a waterproof layer; 72-cement board; 73-PVC plate; 74-waterproof finish; 8-embedded spray head; 81-mounting cavity; 82-gypsum board; 83-ceiling tile; 9-soft package furniture; 91-right angle connector.
Detailed Description
As shown in fig. 1, the isolation interrogation room for integrated soft package construction comprises a soft package wall body, an elastic composite floor, concealed electronic interrogation equipment 5, a soft package toilet and soft package furniture 9.
As shown in fig. 1 and 2, the soft-covered wall body comprises a base wall body 11, a light steel keel 12 horizontally paved on the surface of the base wall body 11, a flame-retardant plate 13 fixed on the light steel keel 12, and a sound-insulation soft-covered layer 14 paved on the outer side of the flame-retardant plate 13; the light steel keels 12 are fixed on the foundation wall 11 through expansion bolts, are arranged up and down at intervals, and the distance between the adjacent light steel keels 12 is not more than 1.5m.
The light steel joist 12 is formed by sequentially splicing a plurality of joist standard knots, the cross section of each joist standard knot is in a trapezoid shape with gradually enlarged openings, each joist standard knot is formed by enclosing two symmetrically arranged inclined plates 121 and a web 122 connected with the inclined plates 121, the web 122 is fixed on the wall surface of the foundation wall 11 through expansion bolts, and the included angle between the inclined plates 121 and the web 122 is 100-110 degrees; two ends of the inclined plate 121 are respectively provided with a group of screw holes which are horizontally arranged in parallel and are fixedly connected with the adjacent keel standard knots through bolts; the long side edges of the inclined plates 121 are inwards recessed to form T-shaped clamping holes 123, the T-shaped clamping holes 123 are uniformly distributed at intervals along the length direction of the light steel keels 12, the minimum distance between every two adjacent T-shaped clamping holes 123 is not more than 200mm, the T-shaped clamping holes 123 on the two inclined plates 121 are arranged in one-to-one correspondence, and the closing-in edges of the T-shaped clamping holes 123 are in arc transitional connection with the edges of the inclined plates 121.
The flame-retardant plate 13 is hooked on the light steel joist 12 through a vertical keel 15, the vertical keel 15 is a light thin-wall channel steel, the vertical keel 15 is arranged along the vertical direction in a through length mode, an opening of the vertical keel 15 is buckled between two adjacent T-shaped clamping holes 123 towards the light steel joist 12, edges at two ends of the opening are vertically bent and horizontally extend inwards to form a hooking part, and one side of the hooking part extending into the T-shaped clamping holes 123 is clamped and fixed; the flame-retardant plate 13 is fixed on the vertical keel 15 through screws or bonding, and the thickness of the flame-retardant plate 13 is not less than 15mm; the vertical keels 15 are uniformly distributed on the wall surface at intervals, and the minimum distance between every two adjacent vertical keels 15 is not less than 300mm.
As shown in fig. 3, the sound insulation soft cladding 14 is fixedly connected with the flame retardant plate 13 through a hanging component, the hanging component comprises an S-shaped fixing piece 2 and a Z-shaped inserting piece 3 which are mutually matched, the S-shaped fixing piece 2 is arranged at intervals along the horizontal direction and comprises a first limb plate 21, a second limb plate 22 and a third limb plate 23 which are mutually parallel, and a first connecting plate 24 for connecting the first limb plate 21 and the second limb plate 22, a second connecting plate 25 for connecting the second limb plate 22 and the third limb plate 23, the plate surface of the first limb plate 21 is attached to the plate surface of the flame retardant plate 13 and is fixedly connected through screws, the width of the first limb plate 21 is 1.5-1.7 times of the width of the second limb plate 22, a notch formed by encircling the first limb plate 21 and the second limb plate 22 is vertically downwards arranged, a buffer spring 26 is arranged in the notch, the buffer spring 26 is a compression spring, and the two ends of the buffer spring 26 are respectively welded and fixed with the plate surfaces of the first limb plate 21 and the second limb plate 22, when the impact is received, the buffer spring 26 is compressed, the buffer spring is effectively decomposed, and the impact can be relieved, and the original impact can be quickly and the impact can be recovered after the impact is completed; the distance between the central axis of the buffer spring 26 and the first connecting plate 24 is not less than 0.8 times the width of the second limb plate 22; the insertion port formed by encircling the second limb plate 22, the third limb plate 23 and the second connecting plate 25 is vertically upwards, and the end part of the third limb plate 23 is narrowed and then bent inwards to form an elastic clamping part 27; the Z-shaped plug-in unit 3 includes a first fixing plate 31 fixed to the socket, a second fixing plate 32 parallel to the first fixing plate 31, a support plate 33 connecting the first fixing plate 31 and the second fixing plate 32, the first fixing plate 31 is vertically inserted into the socket and clamped between the second limb 22 and the elastic clamping part 27, the lower surface of the support plate 33 is attached to the upper end surface of the third limb 23, the outer side surface of the second fixing plate 32 and the outer side surface of the third limb 23 are located in the same vertical plane, and the second fixing plate 32 is fixedly connected with the sound insulation soft cladding 14 through screws.
The soft cladding 14 gives sound insulation includes back shrouding 141, puigging 142 and the soft packet leather 143 of parcel outside puigging 142, and back shrouding 141 is the fire-retardant material board that thickness is no more than 9mm, and puigging 142 is the fire-retardant sponge of thickness is no less than 50mm, fixes on back shrouding 141 through bonding or penetrating the nail, and soft packet leather 143's border parcel fire-retardant sponge tip back is fixed with back shrouding 141, and adjacent soft packet leather 143's parcel terminal surface closely laminates the setting.
As shown in fig. 4, the elastic composite floor sequentially comprises a ground foundation structure 41, a leveling layer 43, a self-leveling layer 44, a buffer layer 45 and a ground decoration layer 46 from bottom to top, wherein the thickness of the leveling layer 43 is not less than 20mm, the buffer layer 45 is pearl cotton with the thickness of not less than 8mm, and the ground decoration layer 46 is a polyvinyl chloride plate with the thickness of not less than 5mm, and in the embodiment, the PVC dance floor is used.
As shown in fig. 5, at the corner connection position of the elastic composite floor and the soft package wall, the leveling layer 43 on the ground is piled up along the wall surface to be flush with the lower end surface of the wall surface flame retardant plate 13, the leveling layer 44, the buffer layer 45 and the ground decoration layer 46 are all piled up along the leveling layer 43 on the corner and are attached to the lower end surface of the flame retardant plate 13, and the sound insulation soft package layer 14 at the lowest end extends downwards to be pressed on the outer side of the ground decoration layer 46.
As shown in fig. 6, the upper part of the soft package wall is recessed inwards to form a mounting groove 61 for accommodating the electronic interrogation device 5, the peripheral edge of the mounting groove 61 is provided with a reinforcing frame 62, and the reinforcing frame 62 and the light steel joist 12 are positioned in the same vertical plane and fixedly connected with the light steel joist 12; the flame retardant plate 13 is attached to the surface of the reinforcing frame 62 and is in sealing connection with the flame retardant plate 13 on the soft-package wall body around, and a heat dissipation opening 63 is formed in the flame retardant plate 13 positioned in the middle of the reinforcing frame 62 and is used for heat dissipation of the electronic interrogation equipment 5 such as a display and a sound and penetrating of electromechanical pipelines; the electronic interrogation device 5 is fixed on the foundation wall 11 through a mounting hanging frame 64, one end of the mounting hanging frame 64 is fixedly connected with the electronic interrogation device 5, and the other end of the mounting hanging frame 64 penetrates through a heat dissipation opening 63 to be fixedly connected with the foundation wall 11; the outer vertical surface of the electronic interrogation equipment 5 does not exceed the outer vertical surface of the soft package wall body; the electronic interrogation device 5 comprises a display screen, a broadcaster and a camera.
The indoor furred ceiling of isolation interrogation adopts the furred ceiling to decorate, because high enough does not do soft packet processing, and lighting apparatus adopts current embedding mode, installs its embedding furred ceiling structure in and arranges, and lighting apparatus's lower surface and the lower surface parallel and level setting of furred ceiling all around.
The soft-pack bathroom comprises a bathroom wall, a bathroom floor, an embedded spray head 8, a soft-pack toilet bowl and a soft-pack hand washing table, as shown in fig. 7, the bathroom wall comprises a base wall 11, a waterproof layer 71, a cement board 72, a PVC board 73 and a waterproof facing 74 are sequentially paved on the surface of the base wall 11, the waterproof layer 71 is JS waterproof paint with the thickness of not less than 1.2mm, the thickness of the cement board 72 is not less than 10mm, the cement board is fixed on the base wall 11, the thickness of the PVC board 73 is not less than 50mm, and the cement board 72 is bonded and fixed through silicone structural adhesive. The bathroom floor is similar to the elastic composite floor in structure, the difference is that a mortar combination layer 42 and a waterproof layer 71 are arranged between a ground foundation structure and a leveling layer 43, the mortar combination layer 42 is a 1:3 dry hard cement mortar layer with the thickness not less than 30mm, the bathroom floor is formed by downward connection and integral spraying of waterproof paint on a bathroom wall, the arrangement structure of the corner connection part of the bathroom wall and the bathroom floor is similar to the corner connection position of the elastic composite floor and a soft package wall, and the difference is only the arrangement of the waterproof layer 71 and the mortar combination layer 42.
Suspended ceiling 83 adopts the furred ceiling to decorate, because high enough, do not do soft packet processing, as shown in fig. 8, suspended ceiling 83 inwards caves in and forms installation cavity 81, installation cavity 81 passes through gypsum board 82 and suspended ceiling 83 sealing connection all around, gypsum board 82 is the waterproof thistle board 82 that the thickness that the bilayer set up is not less than 9.5mm, embedded shower nozzle 8 sets up in installation cavity 81, the lower surface of embedded shower nozzle 8 is not more than the lower surface setting of suspended ceiling 83 all around, the water inlet of embedded shower nozzle 8 communicates with the inlet tube of hiding in the roof.
The soft-packed closestool comprises a closestool and a soft-packed shell which is hermetically packed outside the closestool, wherein the soft-packed shell is fixed on the outer surface of the closestool through silicone structural adhesive, and the bottom of the closestool is fixedly connected with a ground foundation structure 41 of a toilet bottom plate in a sealing way.
The soft-package hand washing table comprises a hand washing table and a soft-package table top which is hermetically packaged and arranged outside the hand washing table, and the soft-package table top is fixed on the outer surface of the hand washing table through silicone structural adhesive.
The soft package furniture 9 is formed by a finished product base plate and a flame-retardant sponge soft package surface layer, as shown in fig. 9, the soft package furniture 9 is fixedly connected with a ground structure through a right-angle connecting piece 91 and an expansion bolt, so that the furniture with smaller dead weight and volume is prevented from being lifted by related personnel to hurt people, and the safety is improved.
The invention discloses a construction method of an isolation interrogation room for integrated soft package construction, which comprises the following steps:
step one, cleaning and flattening a base layer;
cleaning the floating slurry, floor ash and the like stuck on the base layer by using a chisel or a steel wire brush, and cleaning the floating soil by using a broom; rinsing with clear water does not allow residual lime.
Step two, positioning and paying off;
paying-off positioning is carried out on the surface of the foundation wall 11, and the setting positions of the light steel keels 12, the vertical keels 15 and the electronic interrogation equipment 5 concealed on the wall surface are determined;
paying off positioning is carried out on the upper surface of the ground foundation structure 41, and the setting positions of soft package furniture 9, equipment and the like in a room are determined so as to determine the positioning and the trend of pipelines;
paying-off positioning is carried out on the lower surface of the suspended ceiling, and the setting positions of the lamp and the embedded spray head 8 are determined so as to determine the arrangement and trend of the electric wires and the water pipes.
Thirdly, constructing keels and reserved pipelines;
paving a light steel keel 12 on the surface of a foundation wall 11, fixing the light steel keel 12 on the foundation wall 11 through expansion bolts, and then clamping and fixing a vertical keel 15 on the light steel keel 12;
meanwhile, the construction of the reserved pipelines is carried out according to the construction design requirement, the protection of finished components is paid attention to in the process of cross construction, and the electricity safety is paid attention to in the process of pipeline construction.
Fourthly, suspended ceiling construction;
installing a ceiling keel, grooving construction is carried out according to the setting positions of the lamp and the embedded spray head 8, a mounting cavity 81 is reserved, and then the lamp and the embedded spray head 8 are arranged and sealed.
Step five, paving a wall flame retardant plate 13;
flame-retardant plates 13 are paved along the wall surface, and the flame-retardant plates 13 are fixed on the vertical keels 15 through bolts or bonding.
Step six, wall soft package construction;
the S-shaped fixing piece 2 is arranged on the flame retardant plate 13, the Z-shaped plug-in unit 3 is fixedly arranged on the back surface of the sound insulation soft cladding 14, and then the Z-shaped plug-in unit 3 is correspondingly inserted into the S-shaped fixing piece 2, so that the sound insulation soft cladding 14 is fixed.
Step seven, constructing an elastic composite floor;
paving a mortar bonding layer 42 above the ground foundation structure 41, paving a waterproof layer 71 on the ground of the bathroom after curing to the standard strength, paving a mortar leveling layer 43 on the waterproof layer 71 and curing after the waterproof construction is completed; after reaching the construction strength, carrying out the construction of the self-leveling interface agent of the base layer, and forming a layer of protective film between the self-leveling material and the ground so that the self-leveling moisture cannot be absorbed by the ground too quickly to cause the self-leveling surface to crack; after the completion, the buffer layer 45 pearl cotton is paved, and finally, the ground decoration layer 46 is paved along the longer direction of the room.
The specific construction method of the self-leveling layer 44 comprises the following steps: pouring the stirred self-leveling slurry on a terrace, enabling the self-leveling slurry to flow away like water for automatic leveling, scraping the slurry with a tooth scraper, and controlling the required thickness according to the paying-off positioning of a level gauge; the ground is rolled in a single direction by using self-flowing flat air to remove air brought in during stirring, so that bubbles, pitted surfaces and interface height differences are avoided; the separation slits are arranged every 60 square meters.
The floor decoration layer 46 is laid from inside to outside along the longer direction of the room, and when the floor decoration layer 46 is glued and laid, one side of the floor decoration layer is aligned with the sprung dimension line and is pressed and compacted, so that the line connection is required to be smooth and the line is not curled.
During construction, it should be noted that mortar arcs with the radius of 20mm need to be made on the ground around the room, so that the ground decoration layer 46 is ensured to be turned up tightly, and hollowness is avoided.
Step eight, the electronic interrogation equipment 5 and the soft package furniture 9 are installed;
according to the positions of the wall, the roof and the ground where the pipeline, the opening and the embedded modeling are reserved, the electronic interrogation equipment 5 and the soft package furniture 9 are positioned and installed, and the soft package furniture 9 is fixed with the ground.
The above examples are only illustrative of the preferred embodiments of the present invention and are not intended to limit the scope of the present invention, and various modifications and improvements made by those skilled in the art to the technical solution of the present invention should fall within the scope of protection defined by the claims of the present invention without departing from the spirit of the present invention.

Claims (7)

1. Isolation interrogation room of soft package construction of integration, its characterized in that: comprises a soft-package wall body, an elastic composite floor, concealed electronic interrogation equipment (5), a soft-package toilet and soft-package furniture (9);
the soft package wall body comprises a foundation wall body (11), a light steel keel (12) horizontally paved on the surface of the foundation wall body (11), a flame-retardant plate (13) fixed on the light steel keel (12), a sound insulation soft package layer (14) paved on the outer side of the flame-retardant plate (13), and the flame-retardant plate (13) is hooked on the light steel keel (12) through a vertical keel (15); the sound insulation soft cladding (14) is fixedly connected with the flame retardant plate (13) through a hanging component, the hanging component comprises an S-shaped fixing piece (2) and a Z-shaped insert (3) which are matched with each other, and the sound insulation soft cladding (14) comprises a back sealing plate (141), a sound insulation layer (142) and soft cladding leather (143) wrapped outside the sound insulation layer (142);
the S-shaped fixing pieces (2) are arranged at intervals along the horizontal direction and comprise a first limb plate (21), a second limb plate (22) and a third limb plate (23) which are parallel to each other, and a first connecting plate (24) for connecting the first limb plate (21) with the second limb plate (22) and a second connecting plate (25) for connecting the second limb plate (22) with the third limb plate (23); the plate surface of the first limb plate (21) is attached to the plate surface of the flame-retardant plate (13) and is fixedly connected with the flame-retardant plate through screws, a notch formed by encircling the first limb plate (21), the second limb plate (22) and the first connecting plate (24) is vertically downwards, a buffer spring (26) is arranged in the notch, two ends of the buffer spring (26) are respectively welded and fixed with the plate surfaces of the first limb plate (21) and the second limb plate (22), an inserting port formed by encircling the second limb plate (22), the third limb plate (23) and the second connecting plate (25) is vertically upwards, and the end part of the third limb plate (23) is narrowed and then bent towards the inside of the inserting port to form an elastic clamping part (27);
the Z-shaped plug-in unit (3) comprises a first fixing plate (31) which is fixedly connected with the plug-in port in a plugging manner, a second fixing plate (32) which is mutually parallel to the first fixing plate (31), a supporting plate (33) which is used for connecting the first fixing plate (31) with the second fixing plate (32), the first fixing plate (31) is vertically inserted into the plug-in port and clamped between the second limb plate (22) and the elastic clamping part (27), the lower surface of the supporting plate (33) is attached to the upper end surface of the third limb plate (23), the outer side surface of the second fixing plate (32) and the outer side surface of the third limb plate (23) are positioned in the same vertical plane, and the second fixing plate (32) is fixedly connected with the sound insulation soft cladding (14) through screws;
the elastic composite floor is sequentially provided with a ground foundation structure (41), a leveling layer (43), a self-leveling layer (44), a buffer layer (45) and a ground decoration layer (46) from bottom to top;
the upper part of the soft package wall body is inwards sunken to form a mounting groove (61) for accommodating the electronic interrogation equipment (5), the peripheral edge of the mounting groove (61) is provided with a reinforcing frame (62), and the reinforcing frame (62) and the light steel joist (12) are positioned in the same vertical plane and fixedly connected with the light steel joist (12); the flame retardant plate (13) is attached to the surface of the reinforcing frame (62) and is in sealing connection with the flame retardant plate (13) on the soft-package wall body around, and a heat dissipation opening (63) is formed in the flame retardant plate (13) positioned in the middle of the reinforcing frame (62); the electronic interrogation equipment (5) is fixed on the foundation wall body (11) through a mounting hanging frame (64), one end of the mounting hanging frame (64) is fixedly connected with the electronic interrogation equipment (5), and the other end of the mounting hanging frame passes through a heat dissipation opening (63) to be fixedly connected with the foundation wall body (11); the outer vertical surface of the electronic interrogation equipment (5) is not more than the outer vertical surface of the soft package wall body;
the soft-package bathroom comprises a bathroom wall, a bathroom floor, an embedded spray head (8), a soft-package closestool and a soft-package toilet table, wherein the bathroom wall comprises a base wall (11), and a waterproof layer (71), a cement board (72), a PVC board (73) and a waterproof facing (74) which are paved on the surface of the base wall (11) in sequence; the soft package furniture (9) comprises a finished product base plate and a flame-retardant sponge soft package surface layer, and the soft package furniture (9) is fixedly connected with a ground structure through a right-angle connecting piece (91) and an expansion bolt.
2. The isolated interrogation room for integrated soft pack construction of claim 1, wherein: the light steel joist (12) is formed by sequentially splicing a plurality of joist standard knots, the cross section of each joist standard knot is in a trapezoid shape with gradually enlarged openings, each joist standard knot is formed by enclosing two symmetrically arranged inclined plates (121) and a web plate (122) connected with the inclined plates (121), the web plates (122) are fixed on the wall surface of a foundation wall body (11) through expansion bolts, two ends of each inclined plate (121) are respectively provided with a group of screw holes, the screw holes are horizontally arranged in parallel and are fixedly connected with the adjacent joist standard knots through bolts; the long side edges of the inclined plates (121) are inwards sunken to form T-shaped clamping holes (123), the T-shaped clamping holes (123) are uniformly distributed at intervals along the length direction of the light steel keels (12), and the T-shaped clamping holes (123) on the two inclined plates (121) are arranged in one-to-one correspondence.
3. The isolated interrogation room for integrated soft pack construction of claim 2, wherein: the vertical keel (15) is light thin-wall channel steel, is arranged from the top plate of the interrogation room to the floor along the vertical direction in a through length mode, the opening of the vertical keel (15) is buckled between two adjacent T-shaped clamping holes (123) towards the light steel keel (12), the edges of the two ends of the opening are vertically bent and horizontally extend inwards to form hooking parts, and the hooking parts extend into one side of the T-shaped clamping holes (123) to be clamped and fixed.
4. The isolated interrogation room for integrated soft pack construction of claim 1, wherein: the back sealing plate (141) is a flame-retardant material plate with the thickness not exceeding 9mm, the sound insulation layer (142) is flame-retardant sponge with the thickness not less than 50mm, the sound insulation layer is fixed on the back sealing plate (141) through bonding or nail shooting, the edge of the soft wrapping leather (143) wraps the end part of the flame-retardant sponge and then is fixed with the back sealing plate (141), and the wrapping end faces of the adjacent soft wrapping leather (143) are tightly attached.
5. The isolated interrogation room for integrated soft pack construction of claim 1, wherein: still include furred ceiling board (83), inwards sunken formation installation cavity (81) of furred ceiling board (83), installation cavity (81) are through gypsum board (82) and furred ceiling board (83) sealing connection all around, and embedded shower nozzle (8) set up in installation cavity (81), and the lower surface of embedded shower nozzle (8) does not exceed the lower surface setting of furred ceiling board (83) all around, and the water inlet of embedded shower nozzle (8) communicates with the inlet tube of hiding in the roof.
6. The isolated interrogation room for integrated soft pack construction of claim 1, wherein: the corner joint position of the elastic composite floor and the soft package wall body, the above-ground leveling layer (43) is piled up along the wall surface to be flush with the lower end face of the wall surface flame-retardant plate (13), the self-leveling layer (44), the buffer layer (45) and the ground decoration layer (46) are all piled up along the leveling layer (43) of the corner and are attached to the lower end face of the flame-retardant plate (13), and the sound insulation soft package layer (14) at the lowest end extends downwards to be pressed on the outer side of the ground decoration layer (46).
7. The construction method of the isolation interrogation room for integrated soft package construction of any one of claims 1 to 6, characterized by comprising the following steps: the method comprises the following steps:
step one, cleaning and flattening a base layer;
step two, positioning and paying off; paying-off positioning is carried out on the surface of the foundation wall body (11), the upper surface of the ground foundation structure (41) and the lower surface of the suspended ceiling respectively, and the setting positions of all the components are determined;
thirdly, constructing keels and reserved pipelines; paving a light steel keel (12) on the surface of a foundation wall body (11), fixing the light steel keel (12) on the foundation wall body (11) through an expansion bolt, and then clamping and fixing a vertical keel (15) on the light steel keel (12);
fourthly, suspended ceiling construction; installing a ceiling keel, grooving according to the setting positions of the lamp and the embedded spray head (8), reserving an installation cavity (81), and then arranging the lighting lamp and the embedded spray head (8), and sealing;
step five, paving a wall flame-retardant plate (13);
step six, wall soft package construction; an S-shaped fixing piece (2) is arranged on the flame-retardant plate (13), the Z-shaped plug-in unit (3) is fixedly arranged on the back surface of the sound-insulation soft cladding (14), and then the Z-shaped plug-in unit (3) is correspondingly inserted into the S-shaped fixing piece (2) to finish the fixation of the sound-insulation soft cladding (14);
step seven, constructing an elastic composite floor;
and step eight, installing electronic interrogation equipment (5) and soft package furniture (9).
CN201910717836.6A 2019-08-05 2019-08-05 Isolation interrogation room for integrated soft package construction and construction method thereof Active CN110469071B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910717836.6A CN110469071B (en) 2019-08-05 2019-08-05 Isolation interrogation room for integrated soft package construction and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910717836.6A CN110469071B (en) 2019-08-05 2019-08-05 Isolation interrogation room for integrated soft package construction and construction method thereof

Publications (2)

Publication Number Publication Date
CN110469071A CN110469071A (en) 2019-11-19
CN110469071B true CN110469071B (en) 2024-02-06

Family

ID=68510028

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910717836.6A Active CN110469071B (en) 2019-08-05 2019-08-05 Isolation interrogation room for integrated soft package construction and construction method thereof

Country Status (1)

Country Link
CN (1) CN110469071B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113212639A (en) * 2021-05-28 2021-08-06 广船国际有限公司 Passenger ship wall surface soft package structure

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103510631A (en) * 2012-06-25 2014-01-15 深圳海外装饰工程有限公司 Indoor sound insulation construction structure and construction method thereof
WO2014166407A1 (en) * 2013-04-11 2014-10-16 Leng Luhao Dry hanging wall panel structure
CN205348639U (en) * 2016-01-19 2016-06-29 张健 Colorful compound softwood
CN106013659A (en) * 2016-07-01 2016-10-12 江苏亚泰船舶工程有限公司 Construction technology of wall surface soft package structure
CN206769263U (en) * 2017-05-10 2017-12-19 陈湘 Indoor design decorative wall panels and wall
CN207513072U (en) * 2017-11-28 2018-06-19 上海康业建筑装饰工程有限公司 A kind of solid Soft Roll metope structure
CN208858083U (en) * 2018-08-13 2019-05-14 河北建工集团有限责任公司 Metope soft roll structure and receipts side component for it
CN210737971U (en) * 2019-08-05 2020-06-12 中建一局集团第三建筑有限公司 Integrated soft package construction isolation interrogation room

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018112339A1 (en) * 2016-12-15 2018-06-21 Spear Power Systems, LLC Architectural materials having integrated energy storage system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103510631A (en) * 2012-06-25 2014-01-15 深圳海外装饰工程有限公司 Indoor sound insulation construction structure and construction method thereof
WO2014166407A1 (en) * 2013-04-11 2014-10-16 Leng Luhao Dry hanging wall panel structure
CN205348639U (en) * 2016-01-19 2016-06-29 张健 Colorful compound softwood
CN106013659A (en) * 2016-07-01 2016-10-12 江苏亚泰船舶工程有限公司 Construction technology of wall surface soft package structure
CN206769263U (en) * 2017-05-10 2017-12-19 陈湘 Indoor design decorative wall panels and wall
CN207513072U (en) * 2017-11-28 2018-06-19 上海康业建筑装饰工程有限公司 A kind of solid Soft Roll metope structure
CN208858083U (en) * 2018-08-13 2019-05-14 河北建工集团有限责任公司 Metope soft roll structure and receipts side component for it
CN210737971U (en) * 2019-08-05 2020-06-12 中建一局集团第三建筑有限公司 Integrated soft package construction isolation interrogation room

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
审讯***中高精度监听设备的技术解决方案;陈强;自动化应用(第1期);第21, 22, 28页 *

Also Published As

Publication number Publication date
CN110469071A (en) 2019-11-19

Similar Documents

Publication Publication Date Title
CN103938764B (en) The rapid constructing method of indoor secondary light partition wall and this partition wall
WO2019128242A1 (en) Fabricated toilet and mounting method therefor
CN110469071B (en) Isolation interrogation room for integrated soft package construction and construction method thereof
CN202718362U (en) Waterproof base plate for toilet or shower room
JP4049564B2 (en) Fireproof partition wall and its construction method
CN104831837A (en) Indoor seamlessly-spliced secondary light partition wall system and rapid construction method of partition wall
CN201850787U (en) Clean chamber built by special modules
CN210737971U (en) Integrated soft package construction isolation interrogation room
CN204662719U (en) A kind of indoor seamless spliced secondary light partition wall system
CN109577523A (en) For spraying the template and construction method of walling body
RU121843U1 (en) PLASTIC FACING WALL PANEL AND CORNER FOR PLASTIC FACING WALL PANEL
CN112900789A (en) Built on stilts mounting structure of interior decoration
CN115182489A (en) Deformation joint curtain wall node structure is striden to tower undaria height
WO2019218177A1 (en) Construction method for house having pipe and wire separate from main structure
CN211736124U (en) Protection sound-proof structure of building wallboard
CN210563156U (en) Ceramic tile dry-hanging system
CN212836443U (en) Fixing structure for wrapping vertical pipe ceramic tile
CN214461520U (en) Assembled overlapping tenon partition wall batten
CN109449846A (en) A kind of house wiring system and assembling mode
WO2019218225A1 (en) House having water pipe and low-voltage wire separate from main structure
WO2019218208A1 (en) Suspended ceiling
CN218993146U (en) Landscape lamp device used on outdoor flower bed wall
CN221399249U (en) Urinal mounting structure
CN209457351U (en) A kind of walltile paving structure
CN207092289U (en) A kind of calcium silicate board with microporous

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200131

Address after: Room 3042, 9-17 Zhongli, yongdingmennei East Street, Dongcheng District, Beijing 100050

Applicant after: THE THIRD CONSTRUCTION CO., LTD. OF CHINA CONSTRUCTION FIRST Group

Applicant after: CHINA CONSTRUCTION FIRST Group Corp.,Ltd.

Address before: 1311, room 52, Zhongjian building, No. 100161 West Fourth Ring Road, Beijing, Fengtai District

Applicant before: CHINA CONSTRUCTION FIRST Group Corp.,Ltd.

GR01 Patent grant