CN110468875A - City integrated piping lane - Google Patents
City integrated piping lane Download PDFInfo
- Publication number
- CN110468875A CN110468875A CN201910715871.4A CN201910715871A CN110468875A CN 110468875 A CN110468875 A CN 110468875A CN 201910715871 A CN201910715871 A CN 201910715871A CN 110468875 A CN110468875 A CN 110468875A
- Authority
- CN
- China
- Prior art keywords
- compartment
- cool
- ground
- equipment
- pavement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009423 ventilation Methods 0.000 claims abstract description 86
- 230000004308 accommodation Effects 0.000 claims abstract description 49
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 17
- 238000012423 maintenance Methods 0.000 claims description 3
- 238000005516 engineering process Methods 0.000 abstract description 6
- 230000004048 modification Effects 0.000 description 5
- 238000012986 modification Methods 0.000 description 5
- 230000000694 effects Effects 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000007789 gas Substances 0.000 description 2
- 238000010438 heat treatment Methods 0.000 description 2
- 238000001556 precipitation Methods 0.000 description 2
- 238000004078 waterproofing Methods 0.000 description 2
- 241000883990 Flabellum Species 0.000 description 1
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 1
- 240000002853 Nelumbo nucifera Species 0.000 description 1
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 1
- 238000005273 aeration Methods 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000009194 climbing Effects 0.000 description 1
- 239000000567 combustion gas Substances 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 125000004122 cyclic group Chemical group 0.000 description 1
- 230000008020 evaporation Effects 0.000 description 1
- 238000001704 evaporation Methods 0.000 description 1
- 239000002737 fuel gas Substances 0.000 description 1
- 208000015181 infectious disease Diseases 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000009428 plumbing Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000003566 sealing material Substances 0.000 description 1
- 230000001757 vomitory effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/10—Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F1/00—Methods, systems, or installations for draining-off sewage or storm water
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/04—Pipes or fittings specially adapted to sewers
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F7/00—Ventilation
- F24F7/007—Ventilation with forced flow
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Hydrology & Water Resources (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Ventilation (AREA)
Abstract
The embodiment of the present application provides a kind of city integrated piping lane, comprising: for accommodating the accommodation chamber of utilities pipeline, is formed in the lower section on pavement;Equipment compartment is formed in the lower section on pavement and is located above the accommodation chamber;The bottom wall of the equipment compartment is equipped with the equipment compartment ventilation opening being connected to the accommodation chamber;Cool compartment is formed in the lower section on pavement and is located at the top of the equipment compartment;The side wall of the cool compartment is equipped with the cool compartment ventilation opening for being connected to the equipment compartment, and the bottom end of the cool compartment ventilation opening is higher than the side wall bottom end of cool compartment, is equipped with discharge structure in the cool compartment;The cool compartment is also connected to the ground ventilation mouth being arranged on the ground of pavement;Grille cover plate, lid are located at the ground ventilation mouth;The top surface of the grille cover plate is flushed with pavement ground.City integrated piping lane provided by the embodiments of the present application is able to solve the problem of ventilation pavilion protrudes from ground and is not easy placement in the related technology.
Description
Technical field
This application involves city integrated piping lane technology more particularly to a kind of city integrated piping lanes.
Background technique
City integrated piping lane is a kind of for accommodating the structures of the above municipal engineering pipeline of two classes, is to ensure city operations
Important infrastructure.Pipe gallery is generally arranged at Urban Underground, underground build a tunnel space, by electric power, communication,
The utilities pipelines such as combustion gas, heat supply, plumbing are arranged in tunnel space.The tunnel space be additionally provided with special personnel's entrance,
Hoisting port and ventilation opening, each utilities pipeline are entered in tunnel space by hoisting port, and operator is entered by personnel's entrance
Repair and maintenance operation is carried out in tunnel space, while personnel's entrance is also used as emergency escape confession operator's emergency escape.
The state that ventilation opening is used to that tunnel space to be made to be in ventilation, is able to carry out gas exchanges between external elements.
Fig. 1 is that the knot in the greenbelt between driveway and pavement is arranged in the ventilation opening of city piping lane in the related technology
Structure schematic diagram.As shown in Figure 1, currently, the ventilation pavilion for protruding from ground is provided at the top of the piping lane of most cities, in ventilation pavilion
Top or side wall open up ventilation opening.Ventilation pavilion is usually all disposed in the greenbelt of road, but the layout of greenbelt and ruler
The very little placement that will affect ventilation pavilion just will affect the normal use of city piping lane if ventilation pavilion placement is bad.
Summary of the invention
A kind of city integrated piping lane is provided in the embodiment of the present application, is able to solve ventilation pavilion in the related technology and is protruded from ground
Face and be not easy placement the problem of.
The embodiment of the present application provides a kind of city integrated piping lane, comprising:
For accommodating the accommodation chamber of utilities pipeline, it is formed in the lower section on pavement;
Equipment compartment is formed in the lower section on pavement and is located above the accommodation chamber;The bottom wall of the equipment compartment be equipped with
The equipment compartment ventilation opening of the accommodation chamber connection;
Cool compartment is formed in the lower section on pavement and is located at the top of the equipment compartment;The side wall of the cool compartment is equipped with
Cool compartment ventilation opening for being connected to the equipment compartment, the bottom end of the cool compartment ventilation opening are higher than the side wall bottom of cool compartment
End, the cool compartment is interior to be equipped with discharge structure;The cool compartment is also connected to the ground ventilation mouth being arranged on the ground of pavement;
Grille cover plate, lid are located at the ground ventilation mouth;The top surface of the grille cover plate is flushed with pavement ground.
Technical solution provided by the embodiments of the present application, using include successively arrange from bottom to up accommodation chamber, equipment compartment and
The lower section on pavement, accommodation chamber and equipment compartment is arranged in by being arranged in equipment in the city integrated piping lane of cool compartment three-decker
Equipment compartment ventilation opening in bay floor keeps ventilation, and it is logical that equipment compartment and cool compartment pass through the cool compartment being arranged on cool compartment side wall
Air port keeps ventilation, and cool compartment passes through the bottom surface ventilation opening being arranged on the ground of pavement and external environment keeps divulging information, so that
Three-decker keeps divulging information with external environment;Moreover, grille cover plate, the top surface of grille cover plate are arranged also at ground ventilation mouth
It is flushed with pavement ground, does not influence the normal use on pavement, and entire city integrated piping lane is entirely located in pavement
Lower section also improves the aesthetics in city.In addition, the height of cool compartment ventilation opening bottom end is higher than the side wall bottom end of cool compartment, and
Discharge structure is set in the bottom wall of cool compartment, enters back into equipment compartment, reaches to avoid the water for entering cool compartment by grille cover plate
To preferable waterproof effect, to carry out waterproofing protection to the equipment in equipment compartment and accommodation chamber, safety is improved.
Detailed description of the invention
The drawings described herein are used to provide a further understanding of the present application, constitutes part of this application, this Shen
Illustrative embodiments and their description please are not constituted an undue limitation on the present application for explaining the application.In the accompanying drawings:
Fig. 1 is that the structural schematic diagram between driveway and pavement is arranged in the ventilation opening of city piping lane in the related technology;
Fig. 2 is the side that the vertical road direction section below pavement is arranged in city piping lane provided by the embodiments of the present application
View;
Fig. 3 is the side that the parallel road direction section below pavement is arranged in city piping lane provided by the embodiments of the present application
View;
Fig. 4 is the top view of piping lane top layer in city provided by the embodiments of the present application;
Fig. 5 is the top view of mechanical floor in city piping lane provided by the embodiments of the present application.
Appended drawing reference:
01- ventilation pavilion;02- driveway;The pavement 03-;04- greenbelt;The city integrated piping lane of 05-;06- ventilation opening;07-
Subdrainage pipeline;
10- accommodation chamber;11- accommodation chamber escaping exit;12- accommodation chamber ladder;
20- equipment compartment;21- equipment compartment ventilation opening;22- blower;23- equipment compartment ladder;24- water-blocking bank;25- equipment compartment row
Water hole;26- equipment compartment drainpipe;
30- cool compartment;31- cool compartment side wall;32- cool compartment ventilation opening;33- waterproof blinds;34- floor drain;
40- grille cover plate;
50- top blind flange;
60- escaping exit cover board.
Specific embodiment
In order to which technical solution in the embodiment of the present application and advantage is more clearly understood, below in conjunction with attached drawing to the application
Exemplary embodiment be described in more detail, it is clear that described embodiment be only the application a part implement
Example, rather than the exhaustion of all embodiments.It should be noted that in the absence of conflict, embodiment and reality in the application
The feature applied in example can be combined with each other.
Embodiment one
The present embodiment provides a kind of city integrated piping lanes, and the lower section on pavement is arranged in, is not on the one hand influencing pedestrian just
Often walking, on the other hand has preferable waterproof and drain function, in another aspect, facilitating the setting of aeration structure, no longer by city
The influence of city's greenbelt also advantageously improves the aesthetics in city.
Fig. 2 is the side that the vertical road direction section below pavement is arranged in city piping lane provided by the embodiments of the present application
View, Fig. 3 are the side view that the parallel road direction section below pavement is arranged in city piping lane provided by the embodiments of the present application
Figure, Fig. 4 are the top view of piping lane top layer in city provided by the embodiments of the present application, and Fig. 5 is city provided by the embodiments of the present application pipe
The top view of mechanical floor in corridor.Fig. 2 is the view of Section A-A in Fig. 4, and Fig. 3 is the view of section B-B in Fig. 4.Fig. 5 is by Fig. 4
The top view that middle cool compartment 30 removes.
As shown in Figures 2 to 4, city integrated piping lane provided in this embodiment includes three-decker, is sequentially consisted of:
Accommodation chamber 10, equipment compartment 20 and cool compartment 30, three-decker are both formed in the lower section on pavement 03.On the ground on pavement 03
Ground ventilation mouth is opened up, so that three-decker and external environment keep divulging information.Ground ventilation mouth is located at using the lid of grille cover plate 40
Place, the top surface of grille cover plate 40 are flushed with pavement ground, and grille cover plate 40 has certain intensity, pavement can be supported to carry
Lotus, making it not influences the normal use on pavement, and also ensures and keep ventilation inside city integrated piping lane.
Specifically, accommodation chamber 10 is located at bottom, for accommodating utilities pipeline, such as: water pipe, fuel gas pipeline, heating tube
The equipment such as road, the communications cable, electric power cable.
Equipment compartment 20 is located at the top of accommodation chamber 10, and the bottom wall of equipment compartment 20 is equipped with equipment compartment ventilation opening 21, equipment compartment 20
Ventilation is realized by equipment compartment ventilation opening 21 between accommodation chamber 10.
Cool compartment 30 is located at the top of equipment compartment 20.Cool compartment 30 has the cool compartment side wall 31 that vertically direction extends,
It is provided with cool compartment ventilation opening 32 on the cool compartment side wall 31, passes through cool compartment ventilation opening 32 between cool compartment 30 and equipment compartment 20
Keep ventilation.
The lid of grille cover plate 40 is located at ground ventilation mouth, positioned at the top of cool compartment 30.Grille cover plate 40 is equipped with hole, with
Cool compartment 30 is set to keep divulging information by grille cover plate 40 and external environment.
In addition, bottom end is higher than cool compartment side wall 31 for the cool compartment ventilation opening 32 being arranged on cool compartment side wall 31
Bottom end, then the water entered in cool compartment 30 from the hole of grille cover plate 40 can be vented cabin side wall 31 and block, without from logical
Wind cabin ventilation opening 32 enters in equipment compartment 20.Further, it is equipped with discharge structure in cool compartment 30, will go into cool compartment 30
Interior water is discharged in subdrainage pipeline, is entered in equipment compartment 20 and then to the equipment in equipment compartment 20 after avoiding water from increasing
Generate destroying infection.
Technical solution provided in this embodiment, using accommodation chamber, equipment compartment and ventilation including successively arranging from bottom to up
The lower section on pavement, accommodation chamber and equipment compartment is arranged in by being arranged at equipment compartment bottom in the city integrated piping lane of cabin three-decker
Equipment compartment ventilation opening on wall keeps ventilation, and equipment compartment and cool compartment pass through the cool compartment ventilation opening being arranged on cool compartment side wall
Ventilation is kept, cool compartment passes through the bottom surface ventilation opening being arranged on the ground of pavement and external environment keeps divulging information, so that three layers
Structure keeps divulging information with external environment;Moreover, grille cover plate, the top surface of grille cover plate and people are arranged also at ground ventilation mouth
Trade ground flushes, and does not influence the normal use on pavement, and entire city integrated piping lane is entirely located in the lower section on pavement,
Also improve the aesthetics in city.In addition, the height of cool compartment ventilation opening bottom end is higher than the side wall bottom end of cool compartment, and divulging information
Discharge structure is arranged in the bottom wall in cabin, enters back into equipment compartment to avoid the water for entering cool compartment by grille cover plate, reaches preferable
Waterproof effect improves safety to carry out waterproofing protection to the equipment in equipment compartment and accommodation chamber.
For the above-mentioned discharge structure being arranged in cool compartment 30, can be realized using kinds of schemes.The present embodiment mentions
For a kind of implementation: at cool compartment ventilation opening 32 be arranged waterproof blinds 33, when waterproof blinds 33 be in open or it is half-open
When state, it can be realized ventilation and the water that can block a part splashing pass through cool compartment ventilation opening 32 into equipment compartment 20
It is interior;When precipitation is larger, waterproof blinds can be completely closed, water can be stopped to enter across cool compartment ventilation opening 32 completely and set
In standby cabin 20.Waterproof blinds can be the structure manually adjusted, or the structure controlled by controller and actuator.
In the biggish rain and snow weather of precipitation, controller controls actuator movement, and driving waterproof blinds 33 is closed;In non-rain and snow weather
In, controller controls actuator movement, and driving waterproof blinds 33 is in the state opened.
In the case that inflow is less in cool compartment 30, after a period of time, moisture natural evaporation.In cool compartment 30
In the biggish situation of inflow, cool compartment drainage hole (not shown), and and underground can be opened up in the bottom wall of cool compartment 30
Discharge pipe line connection, the water in cool compartment 30 is drained into subdrainage pipeline 07.It is provided with ground in cool compartment drainage hole
Leakage 34, can enter in subdrainage pipeline 07 to avoid sundries.It should be noted that the floor drain 34 in Fig. 2 and Fig. 3 is only intended to
Indicate the position of floor drain 34 or cool compartment drainage hole, actually cool compartment drainage hole is arranged on the bottom wall of cool compartment 30, ground
Leakage 34 is located in cool compartment drainage hole.
Above-mentioned accommodation chamber 10 can realize ventilation by equipment compartment ventilation opening 21 with before equipment compartment 20.In order to improve air stream
Ventilation equipment are arranged in logical speed in equipment compartment 20, and ventilation equipment have air inlet and air outlet, and air inlet is logical towards equipment compartment
Air port, the direction of air outlet frontage and airiness cabin ventilation opening.Ventilation equipment are the equipment that air can be promoted orderly to circulate, and can be adopted
It is made of a variety of principles.In the present embodiment, ventilation equipment are used as using blower 22, blower 22 is fixed on equipment compartment ventilation opening 21
Top.The air inlet of blower 22 is in bottom, towards equipment compartment ventilation opening 21, the side in the air outlet frontage and airiness cabin 30 of blower 22
To especially towards cool compartment ventilation opening 32.Flabellum in blower 22 promotes the air in accommodation chamber 10 from equipment compartment when rotating
Ventilation opening 21 enters blower 22, and is discharged from air outlet, then be expelled to outside by equipment compartment ventilation opening 32 and ground ventilation mouth
In environment.
For the part that cool compartment 30 is connect with ground, the present embodiment provides a kind of concrete implementation modes:
Set cool compartment 30 to the cyclic structure of closure, such as: annular shape, block form, oval ring-type etc..This implementation
In example by taking block form as an example, cool compartment 30 has the interior ring-side wall that horizontal cross-section is rectangle and the outer ring that horizontal cross-section is rectangle
Side wall, interior ring-side wall, outer ring side wall and bottom wall surround the cool compartment 30 of square frame-shaped.Cool compartment ventilation opening 32 is arranged in interior ring-side wall
On, the intermediate region that interior ring-side wall surrounds is connected to the equipment compartment 20 of lower section.
Grille cover plate 40 is closed hoop cover board, specially square frame-shaped cover board, and lid is located at the upper of the cool compartment 30 of square frame-shaped
Side.In addition, being located above above-mentioned interior ring-side wall using the lid of top blind flange 50, enclosed in the intermediate region set positioned at grille cover plate 40.
Top blind flange 50 is the entity cover board of rectangle, thereon without hole.The top surface of top blind flange 50 is flushed with pavement ground, and is pushed up
Portion's cover board 50 has certain intensity, can support top object, bear the load on pavement, does not influence normally making for pavement
With.
In the attached drawing of the present embodiment, the quantity of blower 22 is two, and the air outlet of each blower 22 is enclosed towards interior ring-side wall
If region so that from blower 22 be discharged gas directly pass through cool compartment ventilation opening 32 enter cool compartment 30.
As shown in figure 4, grille cover plate 40 is disposed around the periphery of top blind flange 50, the lower section of grille cover plate 40 is cool compartment
30.Grille cover plate 40 and top blind flange 50 can be set on pavement, avoid blind way.Pedestrian can step down in top blind flange 50
Pass through.
Personnel entry points, personnel outlet, emergency exits and urgent escape device are additionally provided in city integrated piping lane.People
Member's entrance and personnel outlet can be according to conventional arrangements in the place for facilitating personnel to enter and leave.The present embodiment to emergency exits and
Equipment is described in detail:
It is equipped with accommodation chamber escaping exit 11 in the roof of accommodation chamber 10, and accommodation chamber is set in the lower section of accommodation chamber escaping exit 11
Ladder 12.The top of accommodation chamber ladder 12 extends to accommodation chamber escaping exit 11, and bottom end extends downward into the bottom wall of accommodation chamber 10, or
The distance between the bottom end of person's accommodation chamber ladder 12 and 10 bottom wall of accommodation chamber are less than 1 meter, with allow the operator to can be along
Accommodation chamber ladder 12 is climb to equipment compartment 20.
It is additionally provided with ground escaping exit on pavement ground, is located on the escaping exit of ground using the lid of escaping exit cover board 60.Equipment
Cabin 20 upward one is equipped with equipment compartment ladder 23, the top of equipment compartment ladder 23 through to ground escaping exit, the lower section of ground escaping exit
End extends to ground escaping exit, and bottom end extends to the bottom wall of equipment compartment 20 or the bottom end of equipment compartment ladder 23 and equipment compartment bottom
The distance between wall is less than 1 meter, to allow the operator to climb by equipment compartment ladder 23, until climbing from ground escaping exit
Ground out.The distance between equipment compartment ladder 23 and accommodation chamber escaping exit 11 are small as far as possible, with when emergency occurs, operator
Member passes sequentially through accommodation chamber ladder 12 with the shortest time and equipment compartment ladder 11 is escaped.
The top surface of above-mentioned escaping exit cover board 60 is flushed with pavement ground;Alternatively, escaping exit cover board 60 can also be slightly high
Out ground a bit, for observably informing that weight is not shelved on escaping exit cover board 60 by pedestrian.And by escaping exit cover board 60
Edge is set as inclined-plane, so as to stumble between escaping exit cover board 60 and pavement ground without apparent step to avoid by pedestrian
.
Above-mentioned accommodation chamber ladder 12 and equipment compartment ladder 23 can be independent ladder, and vertical or oblique stand is fixed on side wall
On.Alternatively, multiple pole-climbings successively arranged in the vertical direction can also be arranged on side wall, each pole-climbing is horizontal-extending
Tubular structure, pole-climbing is hand steered for operator or foot is stepped on.
Further, it is also necessary to waterproof construction be set in equipment compartment 20, the water entered in equipment compartment 20 is drained into ground
In lower discharge pipe line 07.Specifically, the water-blocking bank 24 of the bottom wall setting closed hoop in equipment compartment 20, water-blocking bank 24 are located at ventilation
The lower section of the interior ring-side wall in cabin 30 is enclosed so as to all concentrate on water-blocking bank 24 from the water that cool compartment ventilation opening 32 enters in equipment compartment 20
If region in, without flowing to outside water-blocking bank 24.The size of water-blocking bank 24 can be greater than the size of interior ring-side wall, expand
The range of collection.
It is enclosed in water-blocking bank 24 and is equipped with equipment compartment drainage hole 25 in the region set, equipment compartment drainage hole 25 is drained by equipment compartment
Pipe 26 is connected with subsoil drain, and water-blocking bank 24 is enclosed to the water discharge set in region.In equipment compartment drainage hole 25 settablely
Leakage, for stopping other sundries to enter in drainpipe.It is enclosed in the region set in water-blocking bank 24, the position of equipment compartment drainage hole 25 is
Minimum, to enable water to flow to equipment compartment drainage hole 25.
The quantity of above-mentioned accommodation chamber 10 can be multiple, the settable hatch door of the side wall of accommodation chamber 10, pass in and out for operator.
Simultaneously accommodation chamber ladder 12 is arranged in lower section in the settable accommodation chamber escaping exit 11 of the roof of accommodation chamber 10.Settable city in accommodation chamber 10
City's pipeline, such as: burning line has certain risk, needs to be separately positioned in an accommodation chamber 10, and the receiving
Refractory heat-insulating structure can be laid in cabin 10.Requirement of the power pipeline to waterproof is relatively high, it is also desirable to be separately positioned at a receiving
In cabin 10.Heating pipeline and water supply line can be placed in the same accommodation chamber 10.
Based on the above technical solution, top blind flange locking device can also be used, being used for will in normal condition
Top blind flange 50 is locked on the ground of pavement, and the locking to top blind flange 50 is released in the state of maintenance.Top blind flange
50 can only be opened within, and can not open from ground.When needing to overhaul blower 22, top blind flange 50 can be beaten
It opens.Alternatively, top blind flange locking device uses smart lock, it is connected with electric terminal by wireless network, only electric terminal
User could unlock top blind flange locking device, from external opening top blind flange 50, and it is other per capita cannot be from external opening top
Portion's cover board 50 realizes antitheft function.
Using escaping exit cover board locking device, for escaping exit cover board 60 to be locked in pavement ground in normal condition
On, and locking of the releasing to escaping exit cover board 60 in the state of emergency.Escaping exit cover board 60 can only be opened within, on ground
On can not open.Alternatively, escaping exit cover board locking device can also use smart lock, pass through wireless network and electric terminal phase
Even, only the user of electric terminal just can control the unlock of escape cover plate locking device, escaping exit cover board to be opened in outside,
And other people can not realize antitheft function from external opening escaping exit cover board.
Ground escaping exit can only be used as escape route, can also be used as the normal Vomitory of operator.Work as ground
When escaping exit is only used as escape route, need that entrance is arranged elsewhere.
Setting sealing material is needed to avoid in gap between above-mentioned each cover board and ground to improve the effect of sealing waterproof
Gap of the water between cover board and ground enters in piping lane.
In the description of the present application, it is to be understood that term " center ", " longitudinal direction ", " transverse direction ", " length ", " width ",
The instructions such as " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside"
Orientation or positional relationship is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of description the application and simplification is retouched
It states, rather than the device or element of indication or suggestion meaning must have a particular orientation, be constructed and operated in a specific orientation,
Therefore it should not be understood as the limitation to the application.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance
Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or
Implicitly include one or more of the features.In the description of the present application, the meaning of " plurality " is at least two, such as two
It is a, three etc., unless otherwise specifically defined.
In this application unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " fixation " etc.
Term shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;It can be mechanical connect
It connects, is also possible to be electrically connected or can communicate with each other;It can be directly connected, can also indirectly connected through an intermediary, it can
To be the interaction relationship of connection or two elements inside two elements.For the ordinary skill in the art,
The concrete meaning of above-mentioned term in this application can be understood as the case may be.
Although the preferred embodiment of the application has been described, it is created once a person skilled in the art knows basic
Property concept, then additional changes and modifications may be made to these embodiments.So it includes excellent that the following claims are intended to be interpreted as
It selects embodiment and falls into all change and modification of the application range.
Obviously, those skilled in the art can carry out various modification and variations without departing from the essence of the application to the application
Mind and range.In this way, if these modifications and variations of the application belong to the range of the claim of this application and its equivalent technologies
Within, then the application is also intended to include these modifications and variations.
Claims (10)
1. a kind of city integrated piping lane characterized by comprising
For accommodating the accommodation chamber of utilities pipeline, it is formed in the lower section on pavement;
Equipment compartment is formed in the lower section on pavement and is located above the accommodation chamber;The bottom wall of the equipment compartment be equipped with it is described
The equipment compartment ventilation opening of accommodation chamber connection;
Cool compartment is formed in the lower section on pavement and is located at the top of the equipment compartment;The side wall of the cool compartment is equipped with and is used for
The cool compartment ventilation opening being connected to the equipment compartment, the bottom end of the cool compartment ventilation opening are higher than the side wall bottom end of cool compartment, institute
It states and is equipped with discharge structure in cool compartment;The cool compartment is also connected to the ground ventilation mouth being arranged on the ground of pavement;
Grille cover plate, lid are located at the ground ventilation mouth;The top surface of the grille cover plate is flushed with pavement ground.
2. city integrated piping lane according to claim 1, which is characterized in that the discharge structure includes:
Waterproof blinds is arranged in the cool compartment ventilation opening;
The bottom surface of the cool compartment is arranged in cool compartment drainage hole, for being connected with subdrainage pipeline.
3. city integrated piping lane according to claim 2, which is characterized in that the cool compartment is closed hoop structure, institute
Cool compartment ventilation opening is stated to be arranged on the interior ring-side wall of the cool compartment;The grille cover plate is closed hoop cover board, and lid is located at
Above the cool compartment;The city integrated piping lane further include:
Top blind flange, lid are located at ring-side wall in the cool compartment and enclose the space above set;The top surface of the top blind flange and people's row
Road ground flushes.
4. city integrated piping lane according to claim 3, which is characterized in that the horizontal cross-section of the cool compartment is square frame-shaped
Shape, the grille cover plate are block form, and the top blind flange is rectangle.
5. city integrated piping lane according to claim 1-4, which is characterized in that the roof of the accommodation chamber is arranged
There is accommodation chamber escaping exit, is provided with accommodation chamber ladder below the accommodation chamber escaping exit;
The pavement ground is additionally provided with ground escaping exit and lid is located at the escaping exit cover board of the ground escaping exit, describedly
There is equipment compartment ladder below the escaping exit of face, the equipment compartment ladder extends to the bottom of the equipment compartment from the ground escaping exit
Wall;The escaping exit cover board is flushed with pavement ground.
6. city integrated piping lane according to claim 1-4, which is characterized in that further include:
Ventilation equipment are arranged in the equipment compartment;The air inlet of the ventilation equipment is described towards the equipment compartment ventilation opening
The air outlet of ventilation equipment is towards the direction of the cool compartment ventilation opening.
7. city integrated piping lane according to claim 4, which is characterized in that the bottom wall of the equipment compartment is equipped with the gear of annular
Water bank, the water-blocking bank are located at the lower section of the interior ring-side wall of the cool compartment;
The water-blocking bank, which encloses, is additionally provided with equipment compartment drainage hole in the region set, pass through equipment compartment drainpipe and subdrainage pipeline phase
Even.
8. city integrated piping lane according to claim 4, which is characterized in that further include:
Top blind flange locking device, for the top blind flange to be locked in pavement ground, Yi Ji in normal condition
The locking to the top blind flange is released when maintenance state.
9. city integrated piping lane according to claim 5, which is characterized in that further include:
Escaping exit cover board locking device, for the escaping exit cover board to be locked in pavement ground in normal condition, with
And locking of the releasing to the escaping exit cover board in the state of emergency.
10. city integrated piping lane according to claim 2, which is characterized in that further include:
Controller is opened for controlling the waterproof blinds middle closure in rain and snow, and in non-rain and snow weather.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910715871.4A CN110468875B (en) | 2019-08-05 | 2019-08-05 | Urban comprehensive pipe rack |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910715871.4A CN110468875B (en) | 2019-08-05 | 2019-08-05 | Urban comprehensive pipe rack |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110468875A true CN110468875A (en) | 2019-11-19 |
CN110468875B CN110468875B (en) | 2024-07-16 |
Family
ID=68509940
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910715871.4A Active CN110468875B (en) | 2019-08-05 | 2019-08-05 | Urban comprehensive pipe rack |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110468875B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111441383A (en) * | 2020-04-10 | 2020-07-24 | 济南市市政工程设计研究院(集团)有限责任公司 | Liftable utility tunnel vent structure and utility tunnel |
CN111549820A (en) * | 2020-05-27 | 2020-08-18 | 未来都市(苏州工业园区)规划建筑设计事务所有限公司 | Underground comprehensive pipe gallery system |
CN112064672A (en) * | 2020-08-05 | 2020-12-11 | 周昆 | Zipper type municipal pipeline trench convenient to overhaul and maintain and using method thereof |
CN112781154A (en) * | 2021-01-12 | 2021-05-11 | 上海市政交通设计研究院有限公司 | Utility tunnel's vent structure |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105971009A (en) * | 2016-06-21 | 2016-09-28 | 沈阳建筑大学 | Five-layer circular urban underground complex |
CN106013225A (en) * | 2016-06-21 | 2016-10-12 | 沈阳建筑大学 | Six-layer circular traffic, comprehensive pipe rack and sponge urban underground complex |
CN106013215A (en) * | 2016-06-21 | 2016-10-12 | 沈阳建筑大学 | Three-layer rectangle-like urban underground complex |
CN206308708U (en) * | 2016-12-27 | 2017-07-07 | 中冶京诚工程技术有限公司 | City utility tunnel ventilating shaft |
CN106939618A (en) * | 2017-04-27 | 2017-07-11 | 中国市政工程西北设计研究院有限公司 | A kind of underground pipe gallery ground ventilation mouthful and blower fan hoisting port and escaping exit |
CN107938705A (en) * | 2017-12-22 | 2018-04-20 | 中冶京诚工程技术有限公司 | Be provided with vent and mouthful node structure's of fleing double-deck utility tunnel |
CN108425380A (en) * | 2018-05-11 | 2018-08-21 | 北京市市政工程设计研究总院有限公司 | A kind of underground pipe gallery combustion gas cabin integration wind pavilion |
CN207760872U (en) * | 2017-11-23 | 2018-08-24 | 中冶京诚工程技术有限公司 | Double-layer comprehensive pipe gallery |
CN210827564U (en) * | 2019-08-05 | 2020-06-23 | 中铁第五勘察设计院集团有限公司 | City utility tunnel |
-
2019
- 2019-08-05 CN CN201910715871.4A patent/CN110468875B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105971009A (en) * | 2016-06-21 | 2016-09-28 | 沈阳建筑大学 | Five-layer circular urban underground complex |
CN106013225A (en) * | 2016-06-21 | 2016-10-12 | 沈阳建筑大学 | Six-layer circular traffic, comprehensive pipe rack and sponge urban underground complex |
CN106013215A (en) * | 2016-06-21 | 2016-10-12 | 沈阳建筑大学 | Three-layer rectangle-like urban underground complex |
CN206308708U (en) * | 2016-12-27 | 2017-07-07 | 中冶京诚工程技术有限公司 | City utility tunnel ventilating shaft |
CN106939618A (en) * | 2017-04-27 | 2017-07-11 | 中国市政工程西北设计研究院有限公司 | A kind of underground pipe gallery ground ventilation mouthful and blower fan hoisting port and escaping exit |
CN207760872U (en) * | 2017-11-23 | 2018-08-24 | 中冶京诚工程技术有限公司 | Double-layer comprehensive pipe gallery |
CN107938705A (en) * | 2017-12-22 | 2018-04-20 | 中冶京诚工程技术有限公司 | Be provided with vent and mouthful node structure's of fleing double-deck utility tunnel |
CN108425380A (en) * | 2018-05-11 | 2018-08-21 | 北京市市政工程设计研究总院有限公司 | A kind of underground pipe gallery combustion gas cabin integration wind pavilion |
CN210827564U (en) * | 2019-08-05 | 2020-06-23 | 中铁第五勘察设计院集团有限公司 | City utility tunnel |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111441383A (en) * | 2020-04-10 | 2020-07-24 | 济南市市政工程设计研究院(集团)有限责任公司 | Liftable utility tunnel vent structure and utility tunnel |
CN111549820A (en) * | 2020-05-27 | 2020-08-18 | 未来都市(苏州工业园区)规划建筑设计事务所有限公司 | Underground comprehensive pipe gallery system |
CN112064672A (en) * | 2020-08-05 | 2020-12-11 | 周昆 | Zipper type municipal pipeline trench convenient to overhaul and maintain and using method thereof |
CN112781154A (en) * | 2021-01-12 | 2021-05-11 | 上海市政交通设计研究院有限公司 | Utility tunnel's vent structure |
Also Published As
Publication number | Publication date |
---|---|
CN110468875B (en) | 2024-07-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110468875A (en) | City integrated piping lane | |
CN107059919B (en) | A kind of underground pipe gallery | |
CN205296224U (en) | Air intake, hoist and mount mouthful and mouthful combined layout's utility tunnel node structure of fleing | |
CN106285074A (en) | A kind of design specification of Logistics Park | |
KR101008354B1 (en) | Structure of fountain | |
CN101182781B (en) | Breathing place used for synthesis pipe canal | |
CN105804222A (en) | Storage pond under landscape water body | |
CN109056982A (en) | A kind of section dirty overflow well of confluence of rainwater and sewage irrigation canals and ditches | |
CN110295624A (en) | Crossroad underground pedestrian walk and pipe gallery build structure and its construction method jointly | |
CN210827564U (en) | City utility tunnel | |
CN211368777U (en) | Utility tunnel | |
CN217400906U (en) | Multifunctional flat guide | |
CN108708504B (en) | Roof smoke-discharging skylight and buried structure thereof | |
CN208884626U (en) | Singly build hypogee fire water box | |
CN209468821U (en) | A kind of basement fire cistern structure and building | |
CN204370766U (en) | A kind of view ventilating shaft and building | |
CN107059918A (en) | Get down the highway to Double Multi-Arch, pipe gallery and sponge City complex | |
CN211257072U (en) | Utility tunnel ventilation unit, utility tunnel and utility tunnel system | |
CN205475661U (en) | Regulation pond under landscape water body | |
CN208870158U (en) | A kind of section dirty overflow well of confluence of rainwater and sewage irrigation canals and ditches | |
CN107142958B (en) | Double shield pattern synthesis piping lane node wells | |
CN110173019A (en) | It is a kind of to overlap inlet water lifting pumps room of forming a team | |
CN206956928U (en) | Subway station extra exit device of electric sliding door | |
CN106759780B (en) | A kind of prevention of station in oilfield accident sewage and control system | |
CN106468106A (en) | A kind of grottoes hotel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |