CN110468794A - A kind of novel ecological permeable dike and its construction method - Google Patents
A kind of novel ecological permeable dike and its construction method Download PDFInfo
- Publication number
- CN110468794A CN110468794A CN201910672235.8A CN201910672235A CN110468794A CN 110468794 A CN110468794 A CN 110468794A CN 201910672235 A CN201910672235 A CN 201910672235A CN 110468794 A CN110468794 A CN 110468794A
- Authority
- CN
- China
- Prior art keywords
- gravel
- enrockment
- cement sand
- ecological permeable
- dam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
- E02B7/02—Fixed barrages
- E02B7/04—Dams across valleys
- E02B7/06—Earth-fill dams; Rock-fill dams
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/18—Making embankments, e.g. dikes, dams
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0007—Production methods using a mold
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/40—Protecting water resources
- Y02A20/402—River restoration
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Revetment (AREA)
Abstract
The present invention provides a kind of novel ecological permeable dikes, it is characterized in that, including dam body, the dam body includes the cement sand and gravel layer that intermediate mound or gravel fraction is arranged in and is arranged on the outside of mound or gravel fraction, the mound or gravel fraction are filled using enrockment or gravel, and the cement sand and gravel layer is filled by permeable cement sand and gravel material.The present invention also provides a kind of construction methods of novel ecological permeable dike, which is characterized in that specifically includes the following steps: (1) builds upstream and downstream template;(2) enrockment or gravel are filled;(3) cement sand and gravel material is filled;(4) rolling and placement material.Novel ecological permeable dike of the present invention includes intermediate mound or gravel fraction and the cement sand and gravel layer being arranged on the outside of mound or gravel fraction, therefore, permeable dike of the invention is a kind of permeable dike between rock-fill dams and concrete dam, intensity is higher, securely and reliably, controllable infiltration capacity, can equally be easy to implement river corridor restoration.
Description
Technical field
The invention belongs to Water Ecological Recovery technical fields, and in particular to a kind of novel ecological permeable dike and its construction method.
Background technique
A large amount of mill weir dams that block that the province mountain area such as Zhejiang, Fujian, Jiangxi is built at present may result in section generation downstream
Subtract dehydration, causes many water environmental problems such as aquatic animals and plants extinction, soil erosion.Meanwhile rural area production and living sewage, agricultural
Pollution of area source etc. causes mountain area middle and small river water pollution serious, and blocks mill weir dam and prevent the natural flowing of river water, also exacerbates
The deterioration of water pollution trend.In order to solve this problem, currently used measure includes: and builds more steps to block mill weir dam,
It forms limited water storage section, or is blocked in small hydropower station and add dewatering orifice, pipe etc. in mill weir dam and release ecological flow.However,
The new more steps of build block mill weir dam, and cost is larger, also only solves lower reache to a certain extent and subtracts dehydration problem;It adds
Although dewatering orifice blocks mill weir and can efficiently solve and subtract dehydration problem, exist release ecological flow facility easily by river garbage or
The disadvantages of artificial blocking, destruction.In addition, above-mentioned measure is difficult to cope with mountain area middle and small river water pollution issue, it is difficult to effectively
The reparation of ground realization Ecology.
Ecological permeable dam is a kind of weir pattern occurred in recent years.The structure is used to construct Plain River Network Areas earliest preposition
Library system is the effective engineering technology being evolved from traditional dam for administering water quality pollution of area source.It is stored before ensureing dam
While water, the downstream river sluicing of dam body tunneling boring seepage flow mode can be passed through;Dam body hole can grow some green plantss,
The polluter in adsorption and permeation water flow can be decomposed, effectively to realize mountain area middle and small river Water Ecological Recovery;It builds needed for the dam
Building stones be available locally, construction cost can be greatly reduced, have good economy.Common permeable dike include earth and rockfill dam,
Stone masonry dam and concrete dam etc., wherein native stone permeable dike is built up with weathering earth material or enrockment, dam body intensity is not high, stability
It is insufficient;The stability of stone masonry dam is stronger, and engineering geology is more demanding, and artificial demand is big, and construction efficiency is low and higher cost;
Although and concrete permeable dam stability and intensity are higher, and drainage channel need to specially be arranged, and comprehensive unit price is higher.
Cement sand and gravel is by the broken of the natural grit granulation in the riverbed near dam site or mountain area, dead meal or purchase
In the building stones such as building stones, a small amount of gelling agent is added, made of water mixes and stirs.When gelling agent volume is lower than 60kg/m3When, its surface is deposited
In certain gap, biocompatibility green cement can be selected can have so that dam surface pore can grow some green plantss
Effect decomposes the polluter in adsorption and permeation water flow, to realize mountain area middle and small river Water Ecological Recovery;Sand gravel in the material
Material is available locally, and the construction cost of ecological permeable dam can be greatly reduced, and economy is good;In addition, relative to rockfill, it is strong
Du Genggao.
How cement sand and gravel technology to be combined with the design of permeable dike, it is made both to can guarantee the ecological permeable dam
Intensity controls seepage discharge, and can simplify construction, reduce cost, is current urgent problem.
Summary of the invention
The present invention provides a kind of novel ecological permeable dike and its construction method, to solve that permeable dam body is unstable, seepage flow
The problems such as amount is difficult to drainage channel difficult design in control and general concrete permeable dike working procedure with seepage paths.
In order to solve the above technical problems, the embodiment of the present invention provides a kind of novel ecological permeable dike, which is characterized in that packet
Dam body is included, the dam body includes the gelling sand that intermediate mound or gravel fraction is arranged in and is arranged on the outside of mound or gravel fraction
Gravel layer, the mound or gravel fraction are filled using enrockment or gravel, and the cement sand and gravel layer is by permeable gelling
Sand gravel material fills.
Further, the partial size of the enrockment or gravel is within the scope of 40 mm of mm ~ 100.
Further, the cement sand and gravel material is mixed and stirred by rubble, gelling agent, water, in the cement sand and gravel material
Ballast grain sizes are the mm of 5 mm~60.
Further, the height of the dam body is 1.5~2m.
Further, the enrockment or gravel use riverbed dead meal or natural grit granulation.
Preferably, the side slope of the enrockment or gravel fraction is 1:1.0 ~ 1:1.2, the outer side slope of the cement sand and gravel layer
For 1:0.8 ~ 1:1.0.
Preferably, the gelling volume of cement sand and gravel material can be 20 kg/m3~60 kg/m3, the cement sand and gravel layer
Outer surface has several gaps.
Further, the ecological permeable dam is made of one layer or more dam body.
The present invention gives a kind of construction method of novel ecological permeable dike, which is characterized in that specifically includes the following steps:
(1) it builds upstream and downstream template: designing the upstream and downstream template of the corresponding gradient by the design requirement of side slope outside ecological permeable dam,
Meanwhile the side slope template of enrockment or gravel fraction is built according to permeable dike design requirement;
(2) enrockment or gravel are filled: filling enrockment or gravel in the side slope template of enrockment or gravel fraction in dam body;
(3) it fills cement sand and gravel material: two side template of enrockment or gravel fraction is removed, in enrockment or gravel fraction and upstream and downstream
The cement sand and gravel material contour with it is filled between template;
(4) rolling and placement material: first rolling the enrockment or gravel at middle part, so that the cement sand and gravel material of two sides is complete
It is resisted against in the template of upstream and downstream, then carries out logical storehouse and roll, and flatten storehouse surface.
Further, the construction method of the novel ecological permeable dike further includes treatment process at the top of step (5), the top
Portion's treatment process includes being filled to the top of ecological permeable dam using cement sand and gravel material, rolls and flattens, improves flood season dam crest
The stability of cement sand and gravel ecological permeable dam when crossing water.
Preferably, the dam body can be divided into 1 layer or multilayer is constructed by several times, every layer of dam in multilayer gradation work progress
Body is sequentially constructed according to the step (1)-(4), last implementation steps (5).
The advantageous effects of the above technical solutions of the present invention are as follows:
1. novel ecological permeable dike of the present invention includes intermediate mound or gravel fraction and is arranged on the outside of mound or gravel fraction
Cement sand and gravel layer, therefore, permeable dike of the invention is a kind of permeable dike between rock-fill dams and concrete dam, intensity compared with
Height securely and reliably can control infiltration capacity, can equally be easy to implement river corridor restoration.
2. novel ecological permeable dike of the invention can be by itself carrying out row's infiltration, water seepage drainage effect is good, it is possible to reduce buries
If the process of drainage pipeline, simple process, easy for construction, construction efficiency is high;Project amount is reduced, saves manually, reduces
Cost.
3. the dam material of mound or gravel fraction in the present invention among dam body is available locally, economical, raw
State environmental-protecting performance.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of novel ecological permeable dike of the invention;
Fig. 2 is the construction schematic diagram of step (2) in the construction method of novel ecological permeable dike of the invention;
Fig. 3 is the construction schematic diagram of step (3) in the construction method of novel ecological permeable dike of the invention;
Fig. 4 is the construction schematic diagram of two layers of dam body in the construction method of novel ecological permeable dike of the invention.
Description of symbols: 1, template;2, enrockment or gravel fraction;3, cement sand and gravel layer;4, green plants.
Specific embodiment
To keep the technical problem to be solved in the present invention, technical solution and advantage clearer, below in conjunction with attached drawing and tool
Body embodiment is described in detail.
As shown in Figure 1, a kind of novel ecological permeable dike, including dam body, the dam body include being arranged in intermediate mound or gravel
Stone part 2 and the cement sand and gravel layer 3 being arranged on the outside of mound or gravel fraction, the mound or gravel fraction 2 use enrockment
Or gravel fills, the cement sand and gravel layer 3 is filled by permeable cement sand and gravel material.
In a further embodiment, the partial size of the enrockment or gravel is within the scope of 40 mm of mm ~ 100.
In a further embodiment, the cement sand and gravel material is mixed and stirred by rubble, gelling agent, water, the rubble
Local prototype gradation is generally taken, gelling agent volume is generally below 60kg/m3, and water-cement ratio range is 0.8 ~ 1.2;The gelling sand
Gravel material medium stone partial size is the mm of 5 mm~60.The enrockment or grain size of gravel of internal enrockment or gravel fraction should ensure that be lower than and be somebody's turn to do
The 1/3 of part minimum dimension, cement sand and gravel maximum particle diameter should ensure that lower than cement sand and gravel layer most in cement sand and gravel layer
The 1/3 of small size.
In a further embodiment, the height of the dam body is 1.5~2m.
In a further embodiment, the enrockment or gravel use riverbed dead meal or natural grit granulation.
Preferably, the side slope of the enrockment or gravel fraction 2 is 1:1.0 ~ 1:1.2, the outside of the cement sand and gravel layer 3
Slope is 1:0.8 ~ 1:1.0.
Preferably, the gelling volume of cement sand and gravel material can be the kg/m of 20 kg/m3 ~ 603, the cement sand and gravel layer 3
Outer surface have several gaps.To guarantee that dam body is permeable and improves stability, the gelling volume of cement sand and gravel material is general
It can be 20kg/m3 ~ 60kg/m3(there are many gaps in cement sand and gravel material surface).In the present embodiment, be gelled volume 20 ~
60kg/m3Cement sand and gravel, infiltration coefficient range is 10-3~10-5cm/s-1Between, height of dam degree is lower than the gelling gravel of 5m
Stone ecological dam is able to satisfy stability requirement.
Embodiment 1
The present invention gives a kind of construction method of novel ecological permeable dike, specifically includes the following steps:
(1) it builds upstream and downstream template 1: designing the upstream and downstream template of the corresponding gradient by the design requirement of side slope outside ecological permeable dam
1, meanwhile, the side slope template 1 of enrockment or gravel fraction is built according to permeable dike design requirement.
(2) enrockment or gravel are filled: filling enrockment or gravel in the side slope template 1 of enrockment or gravel fraction 2 in dam body.
(3) fill cement sand and gravel material: removing two side template 1 of enrockment or gravel fraction, enrockment or gravel fraction 2 with
The cement sand and gravel material contour with it is filled between upstream and downstream template 1.
(4) rolling and placement material: first rolling the enrockment or gravel at middle part, so that the cement sand and gravel material of two sides
It is resisted against in the template of upstream and downstream completely, then carries out logical storehouse and roll, and flatten storehouse surface.
In a further embodiment, the construction method of the novel ecological permeable dike further includes processing at the top of step (5)
Process, the top treatment process include being filled to the top of ecological permeable dam using cement sand and gravel material, roll and flatten, mention
The stability of cement sand and gravel ecological permeable dam when high flood season dam crest crosses water.
Preferably, kind is implanted with green plants 4 in several gaps of the outer surface of the cement sand and gravel layer.
Embodiment 2
Embodiment 2 with respect to embodiment 1 the difference is that, the dam body be divided into multilayer and using by the way of construction by several times into
Row;It is carried out by the way of being constructed twice in the present embodiment using 2 layers, specifically includes following procedure.
First layer work progress:
It builds upstream and downstream template 1: designing the upstream and downstream template 1 of the corresponding gradient by the design requirement of side slope outside ecological permeable dam,
Meanwhile the side slope template 1 of enrockment or gravel fraction 2 is built according to permeable dike design requirement.
Filling enrockment or gravel: enrockment or gravel are filled in the side slope template 1 of enrockment or gravel fraction 2 in dam body.
It fills cement sand and gravel material: removing two side template 1 of enrockment or gravel fraction, in enrockment or gravel fraction and above and below
It swims and fills the cement sand and gravel material contour with it between template 1.
Rolling and placement material: first rolling the enrockment or gravel at middle part, so that the cement sand and gravel material of two sides is complete
It is resisted against in upstream and downstream template 1 entirely, then carries out logical storehouse and roll, and flatten storehouse surface.
Second layer work progress:
It builds upstream and downstream template 1: designing the upstream and downstream template 1 of the corresponding gradient by the design requirement of side slope outside ecological permeable dam,
Meanwhile the side slope template 1 of enrockment or gravel fraction is built according to permeable dike design requirement.
Filling enrockment or gravel: enrockment or gravel are filled in the side slope template 1 of enrockment or gravel fraction in dam body.
Fill cement sand and gravel material: removing 2 liang of side templates 1 of enrockment or gravel fraction, enrockment or gravel fraction 2 and it is upper,
The cement sand and gravel material contour with it is filled between downstream template 1.
Rolling and placement material: first rolling the enrockment or gravel at middle part, so that the cement sand and gravel material of two sides is complete
It is resisted against in the template of upstream and downstream entirely, then carries out logical storehouse and roll, and flatten storehouse surface.
Last top treatment process includes being filled to the top of ecological permeable dam using cement sand and gravel material, is rolled and whole
It is flat, improve the stability of cement sand and gravel ecological permeable dam when flood season dam crest crosses water.
Kind is implanted with green plants 4 in several gaps of the outer surface of cement sand and gravel layer 3.
It is directed to the higher-height situation of dam body, layering can be used and construct by several times, to guarantee the stability of dam body.
Novel ecological permeable dike of the invention and its construction method, water penetration and gelling sand based on enrockment (or gravel)
The relative stability of gravel material, a kind of novel ecological permeable dike of foundation;The cement sand and gravel in the ecological permeable dam of the structure
The gelling agent of material is less, and the enrockment or gravel inside building stones and permeable dike can use riverbed dead meal, nature aggregate on the spot
The materials such as material reduce the pollution to environment;Its form of construction work is rolled using the logical storehouse similar with rock-fill dams or RCC dam,
Construction technology is simple;The safer stabilization of structure, infiltration capacity is controllable, and can guarantee that the dam can play permeable effect, without carrying out
Infiltration pipeline is built;Compared with some rock-fill concrete ecological permeable dams, no setting is required special infiltration drainage channel, reduction
The process of embedded drainage pipeline, simple process, easy for construction, construction efficiency is high;Project amount is reduced, artificial, drop is saved
Low overall cost;The hole of dam surface can grow some green plantss, for repairing river channel ecology.
The above is a preferred embodiment of the present invention, it is noted that for those skilled in the art
For, without departing from the principles of the present invention, it can also make several improvements and retouch, these improvements and modifications
It should be regarded as protection scope of the present invention.
Claims (10)
1. a kind of novel ecological permeable dike, which is characterized in that including dam body, the dam body includes being arranged in intermediate mound or gravel
Part and the cement sand and gravel layer being arranged on the outside of mound or gravel fraction, the mound or gravel fraction use enrockment or gravel
It fills, the cement sand and gravel layer is filled by permeable cement sand and gravel material.
2. a kind of novel ecological permeable dike according to claim 1, which is characterized in that the partial size of the enrockment or gravel exists
Within the scope of the mm of 40 mm ~ 100.
3. a kind of novel ecological permeable dike according to claim 1, which is characterized in that the cement sand and gravel material is by broken
Stone, gelling agent, water mix and stir, and the cement sand and gravel material medium stone partial size is the mm of 5 mm~60.
4. a kind of novel ecological permeable dike according to claim 1, which is characterized in that the height of the dam body be 1.5~
2m。
5. a kind of novel ecological permeable dike according to claim 1, which is characterized in that the enrockment or gravel use riverbed
Dead meal or natural grit granulation.
6. a kind of novel ecological permeable dike according to claim 1, which is characterized in that the side of the enrockment or gravel fraction
Slope is 1:1.0 ~ 1:1.2, and the outer side slope of the cement sand and gravel layer is 1:0.8 ~ 1:1.0.
7. a kind of novel ecological permeable dike according to claim 1, which is characterized in that the gelling volume of cement sand and gravel material
It can be 20 kg/m3~60 kg/m3, the outer surface of the cement sand and gravel layer has several gaps.
8. a kind of a kind of construction method of novel ecological permeable dike according to claim 1, which is characterized in that specifically include
Following steps:
(1) it builds upstream and downstream template: designing the upstream and downstream template of the corresponding gradient by the design requirement of side slope outside ecological permeable dam,
Meanwhile the side slope template of enrockment or gravel fraction is built according to permeable dike design requirement;
(2) enrockment or gravel are filled: filling enrockment or gravel in the side slope template of enrockment or gravel fraction in dam body;
(3) it fills cement sand and gravel material: two side template of enrockment or gravel fraction is removed, in enrockment or gravel fraction and upstream and downstream
The cement sand and gravel material contour with it is filled between template;
(4) rolling and placement material: first rolling the enrockment or gravel at middle part, so that the cement sand and gravel material of two sides is complete
It is resisted against in the template of upstream and downstream, then carries out logical storehouse and roll, and flatten storehouse surface.
9. a kind of novel ecological permeable dike according to claim 8, which is characterized in that the novel ecological permeable dike is applied
Work method further includes treatment process at the top of step (5), and the top treatment process includes to the top of ecological permeable dam using glue
Solidifying sand gravel material filling, rolls and flattens, and improves the stability of cement sand and gravel ecological permeable dam when flood season dam crest crosses water.
10. a kind of novel ecological permeable dike according to claim 8, which is characterized in that the dam body can be divided into 1 layer or more
Layer is constructed by several times, and every layer of dam body is sequentially constructed according to the step (1)-(4) in multilayer gradation work progress,
Last implementation steps (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910672235.8A CN110468794A (en) | 2019-07-24 | 2019-07-24 | A kind of novel ecological permeable dike and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910672235.8A CN110468794A (en) | 2019-07-24 | 2019-07-24 | A kind of novel ecological permeable dike and its construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110468794A true CN110468794A (en) | 2019-11-19 |
Family
ID=68508818
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910672235.8A Pending CN110468794A (en) | 2019-07-24 | 2019-07-24 | A kind of novel ecological permeable dike and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110468794A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2786922C1 (en) * | 2022-06-08 | 2022-12-26 | Федеральное государственное бюджетное образовательное учреждение высшего образования "Государственный университет морского и речного флота имени адмирала С.О. Макарова" | Method for construction of ground dam of hydropower plant |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103964770A (en) * | 2014-05-04 | 2014-08-06 | 中国水利水电科学研究院 | Preparation method for pulp-added and vibrated gelatinized sand gravels and product |
CN104652371A (en) * | 2015-01-29 | 2015-05-27 | 河海大学 | Overflow cemented rock-fill dam established based on old dam and construction method thereof |
CN108824351A (en) * | 2018-06-27 | 2018-11-16 | 河海大学 | Enhance the ecological spur dike of river surface water and groundwater exchange |
-
2019
- 2019-07-24 CN CN201910672235.8A patent/CN110468794A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103964770A (en) * | 2014-05-04 | 2014-08-06 | 中国水利水电科学研究院 | Preparation method for pulp-added and vibrated gelatinized sand gravels and product |
CN104652371A (en) * | 2015-01-29 | 2015-05-27 | 河海大学 | Overflow cemented rock-fill dam established based on old dam and construction method thereof |
CN108824351A (en) * | 2018-06-27 | 2018-11-16 | 河海大学 | Enhance the ecological spur dike of river surface water and groundwater exchange |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2786922C1 (en) * | 2022-06-08 | 2022-12-26 | Федеральное государственное бюджетное образовательное учреждение высшего образования "Государственный университет морского и речного флота имени адмирала С.О. Макарова" | Method for construction of ground dam of hydropower plant |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105970979A (en) | Ecological slope protection method based on sludge solidification soil | |
CN102733349B (en) | Method for de-silting lake and constructing lake center island | |
CN104818707B (en) | Application cotton stalk consolidation and solidification dredging silt, the method for new barged-in fill | |
CN103953008B (en) | A kind of modified mixed dam being applicable to Tailings Dam | |
CN104631380A (en) | Shore type ladder-grade two-dimensional surface flow water filtering riverbed in-situ ecological remediation method | |
WO2019214701A1 (en) | Modular soil pressure applying and molding device and soft soil foundation treatment method | |
CN106193245B (en) | A kind of paddy field underground reservoir and its construction method for sponge city | |
CN107034767A (en) | A kind of full pervious concrete pavement structure of regeneration aggregate and its construction method | |
CN113699971A (en) | Soft soil stratum in-situ curing agent preparation feeding equipment and curing process thereof | |
CN105350489B (en) | A kind of bank slope construction method of river lake ecological pollution | |
CN105019425A (en) | Construction method of drainage body and solidified layer combined foundation structure | |
CN114319455B (en) | Full-coverage sealing field, environment treatment and re-greening process for large refuse landfill | |
CN210315389U (en) | Ecological slope protection of silt solidification is filled to mould bag | |
CN209338948U (en) | A kind of water-permeable pavement structure | |
CN113818402A (en) | Reinforcing and reinforcing structure of clay core rockfill dam and construction method thereof | |
CN108442313A (en) | River levee structure integrating pollution migration blocking and ecological greening and construction method | |
CN110080160B (en) | Ecological seepage-proofing structure based on gravel-doped clay and herbaceous layer and construction method thereof | |
CN107129208A (en) | A kind of bioactivity, porous gap coarse aggregate ecological revetment matrix engineering material | |
CN102251499B (en) | Ecological permeability reducing method and ecological permeability reducing soil for river | |
CN104695455B (en) | High-flow and high-head antiscour and anti-seepage overflow cofferdam structure and construction method thereof | |
CN105839653A (en) | Construction method for reconstructing cofferdam anti-seepage system in immersed tube tunnel | |
CN110080167A (en) | Mould bag fills sludge solidification ecological slope protection construction method | |
CN102936884B (en) | Method for reducing permeability of regenerated water riverway | |
CN110468794A (en) | A kind of novel ecological permeable dike and its construction method | |
CN209798668U (en) | Ecological slope protection structure based on silt solidified soil |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20191119 |