CN110454178A CN201910838131.XA CN201910838131A CN110454178A CN 110454178 A CN110454178 A CN 110454178A CN 201910838131 A CN201910838131 A CN 201910838131A CN 110454178 A CN110454178 A CN 110454178A
Authority
CN
China
Prior art keywords
counter
force
half structure
lower half
diagonal rib
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910838131.XA
Other languages
Chinese (zh)
Other versions
CN110454178B (en
Inventor
宋书显
陈艺升
程涛
段建庄
张洋
苏志愿
龙治希
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Co Ltd CRTG
China Railway Tunnel Stock Co Ltd
Original Assignee
China Railway Tunnel Group Co Ltd CRTG
China Railway Tunnel Stock Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Co Ltd CRTG, China Railway Tunnel Stock Co Ltd filed Critical China Railway Tunnel Group Co Ltd CRTG
Priority to CN201910838131.XA priority Critical patent/CN110454178B/en
Publication of CN110454178A publication Critical patent/CN110454178A/en
Application granted granted Critical
Publication of CN110454178B publication Critical patent/CN110454178B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

It originates in a kind of large-diameter shield auger with counter-force structure production method, including tunnel inner wall setting can bending the first connector and the first diagonal rib supporting element, bending can bending the first connector, enter large-diameter shield machine in shield auger after originating location, straightening can bending the first connector, to counter-force lower half structure after the rear of originating location is built in shield auger;To setting above counter-force lower half structure there is counter-force face and the rear of the first support diagonal rib to support diagonal rib to be fixedly connected with the first diagonal rib supporting element to counter-force upper half structure, first rear.It originates in a kind of large-diameter shield auger with counter-force structure, including the backward counter-force lower half structure and backward counter-force upper half structure being fixedly connected for tunnel inner wall, and the second diagonal rib supporting element for connecting the backward counter-force lower half structure and backward counter-force upper half structure.It can satisfy in large-diameter shield auger and originates needs, can save the time for originating operation.

Description

It is originated in large-diameter shield auger with counter-force structure production method and counter-force structure
Technical field
The present invention relates to tunnel shield driving technical fields, and in particular to originates in a kind of large-diameter shield auger and uses counter-force Structure production method and counter-force structure.
Background technique
During tunnel shield launching, counter-force support frame plays very important effect.Shield launching environment can at present To be summarised as three kinds: vertical shaft originates, station originates and originates with tunnel.Vertical shaft and station originate it is relatively conventional, since it is installed Space is big, and benchmark steel loop can be used and be equipped with the components such as the biggish rectangular frame of volume, and it is preferable that such originates stability, provides anti- Power is larger.And originate in tunnel and usually limited by headroom, conventional counterforce device volume is larger, and assembling and demolishing process cannot lead to It crosses ground lifting machine to be cooperated, not only expends a large amount of manpowers, but also to tear the time open also longer for peace.Therefore, it is encountering in tunnel When originating case, reaction frame need to suitably be reequiped, tear efficiency open to improve counterforce structure stability and peace.
The Chinese patent literature CN204327103U for being disclosed on May 13rd, 2015 describes one kind to be begun for tunneling shield The reaction frame of hair, including the horizontally-supported and multiple fashioned iron bearing diagonal of benchmark steel loop, steel pipe bearing diagonal, steel pipe, in benchmark steel loop Outer rim scattering device has the fashioned iron fixing piece of more with the pre-embedded steel slab welding in Tunnel Second Lining;Steel pipe bearing diagonal, steel pipe Horizontally-supported and multiple fashioned iron bearing diagonals are welded on the benchmark steel loop one side opposite towards shield machine, the horizontally-supported welding of steel pipe In the lower part of benchmark steel loop, and it is vertical with the plane where benchmark steel loop, and steel pipe bearing diagonal is welded on the middle part of benchmark steel loop, and Inclined with the plane where benchmark steel loop, multiple fashioned iron bearing diagonals are distributed along the ring body of benchmark steel loop.The technical side Case should not simultaneously be using the counterforce device to originate in large-diameter shield auger, reason: it is big in diameter shield machine digging section, Reaction force is strong, and the tie point of benchmark steel loop and Tunnel Second Lining is fashioned iron fixing piece and steel pipe bearing diagonal, can with by Reaction force is limited.
Summary of the invention
The technical problem to be solved by the present invention is to how provide a kind of basis originated in realization large-diameter shield auger It is upper to save the shield launching reaction frame for originating operation time, for this purpose, the present invention provides a kind of large-diameter shield auger It inside originates and is originated in counter-force structure production method, a kind of large-diameter shield auger with counter-force structure.
In order to solve the above technical problems, the present invention adopts the following technical scheme:
It designs and originates in a kind of large-diameter shield auger with counter-force structure production method, comprising the following steps:
At the rear for corresponding to originating location in shield auger, in the lower half of tunnel inner wall, fixed setting protrudes from tunnel inner wall Can bending the first connector, tunnel inner wall the upper half fixed setting be exposed to tunnel inner wall the first diagonal rib support Part, bending can bending the first connector the part for protruding from tunnel inner wall so that large-diameter shield machine and auxiliary facility energy Enough enter originating location in shield auger;
Enter in shield auger after originating location after large-diameter shield machine and auxiliary facility, straightening can bending the first connector, The rear of originating location, which is built, in shield auger corresponds to the rear to counter-force lower half structure, institute of large-diameter shield machine lower half State can the first connector of bending be fixedly connected with the backward counter-force lower half structure;
After described to after being arranged above counter-force lower half structure to counter-force upper half structure, the backward counter-force upper half structure With counter-force face and the first support diagonal rib, the first support diagonal rib is fixedly connected with the first diagonal rib supporting element.
It preferably, further include being constructed using after the connection of the second connector to counter-force upper half structure and backward counter-force lower half Object, second connector include the second support diagonal rib, the upper end of the second support diagonal rib and the backward counter-force upper half structure Divine force that created the universe support connection, the lower end of the second support diagonal rib and the backward counter-force lower half structure support connect.
Further, the backward counter-force upper half structure the thickness of tunnel axial direction be less than it is described after to counter-force lower half structure The upper end of the thickness of the divine force that created the universe, the second support diagonal rib is fixed on the rear wall of the backward counter-force upper half structure, and second The lower end of support diagonal rib is fixed on the backward counter-force lower half structure and protrudes from the backward counter-force upper half structure part On roof.
Further, it is equipped with after described on the top surface of counter-force lower half structure for supporting diagonal rib with described second The second diagonal rib supporting element being fixedly connected, the second diagonal rib supporting element with it is described can the first connector of bending be fixedly connected.
Preferably, be equipped with lining cutting in the tunnel, it is described can the first connector of bending, the first diagonal rib supporting element correspondence Part is embedded in the lining cutting;The backward counter-force lower half structure includes concrete body, straightening can bending Before a connection piece, form the surface of the lining cutting inner wall being correspondingly connected with the backward counter-force lower half structure coarse Face.
Preferably, the backward counter-force lower half structure, backward counter-force upper half structure all have axially extending in tunnel Arc groove, and the backward counter-force lower half structure, backward counter-force upper half structure are enclosed circular cross section.
Preferably, the first diagonal rib supporting element includes being used to form the steel plate of supporting surface and for being inserted into the tunnel The holdfast of wall, the holdfast are connect with the Interal fixation;It is described can the first connector of bending include reinforcing bar.
Preferably, the tunnel has u-shaped cross-section, and the top surface of the backward counter-force lower half structure is arranged described At the haunch and vault tie point of u-shaped cross-section.
It is originated in a kind of large-diameter shield auger with counter-force structure, it is backward anti-including being fixedly connected for tunnel inner wall Power lower half structure, the backward counter-force upper half structure being fixedly connected for tunnel inner wall, and it is described backward anti-for connecting Second diagonal rib supporting element of power lower half structure and backward counter-force upper half structure.
Preferably, the reversed counter-force lower half structure includes reinforced concrete construction object, the backward counter-force lower half structure The divine force that created the universe by can the first connector of bending be fixedly connected with the tunnel inner wall, be also fixedly connected on the tunnel inner wall First diagonal rib supporting element, the backward counter-force upper half structure have counter-force face and the first support diagonal rib, and first support is oblique Rib is fixedly connected with the first diagonal rib supporting element.
Compared with prior art, the beneficial effects of the present invention are:
(1) backward counter-force lower half structure is fixedly connected with tunnel inner wall, is able to bear bigger reaction force, and stress is steady It is fixed, deform small, safety coefficient is high, can satisfy in large-diameter shield auger and originates needs.Due to large-diameter shield machine and mating Trailer enters in shield auger to be needed to assemble after originating location, and backward counter-force lower half structure, backward counter-force upper half structure, The fabrication and installation of bearing diagonal part can be completed during this period, can save the time for originating operation.
(2) when backward counter-force lower half structure, backward counter-force upper half structure are enclosed circular cross section, it can be participated in Pressure maintaining sealing during being originated in large-diameter shield auger, and originate in large-diameter shield auger and do not needed with counter-force structure It removes.
Detailed description of the invention
Fig. 1 is built-in in tunnel with counter-force structure production method using originating in a kind of large-diameter shield auger of the present invention Structural schematic diagram after making secondary lining.
Fig. 2 is to originate with counter-force structure production method using in a kind of large-diameter shield auger of the present invention in secondary lining It is interior to build the structural schematic diagram originated in large-diameter shield auger with counter-force structure.
Fig. 3 is longitudinal cross-section diagram of Fig. 2.
In figure, 11- tunnel encloses soil, 12- secondary lining, 13- shield launching guide table, 131- shield machine track, and 21- can roll over The first curved connector, to counter-force lower half structure, 23- the second diagonal rib supporting element, 31- the first diagonal rib supporting element, 32- after 22- Backward counter-force upper half structure, 321- top plate, 322- floor, 4- the second diagonal rib supporting element, 41- top plate, 42- ribbed pipe, 5- are straight greatly Diameter shield machine.
Specific embodiment
Illustrate a specific embodiment of the invention with reference to the accompanying drawings and examples, but following embodiment is used only in detail It describes the bright present invention in detail, does not limit the scope of the invention in any way.
Embodiment 1: it is originated in a kind of large-diameter shield auger with counter-force structure, referring to Fig. 1-3, including in tunnel Backward counter-force lower half structure 22 that wall (that is to say that tunnel encloses soil 11 or Wall Rock of Tunnel) is fixedly connected is fixed for tunnel inner wall The backward counter-force upper half structure 32 of connection, as needed, originating in large-diameter shield auger can also be wrapped with counter-force structure Include for after connecting to the second diagonal rib supporting element 42 of counter-force lower half structure 22 and backward counter-force upper half structure 32.
Preferably, reversed counter-force lower half structure 22 includes reinforced concrete construction object, backward counter-force lower half structure 22 By can the first connector 21 of bending be fixedly connected with tunnel inner wall, the first diagonal rib branch is also fixedly connected on tunnel inner wall Support member 31, backward counter-force upper half structure 32 have counter-force face and the first support diagonal rib 322, the first support diagonal rib 322 and first Diagonal rib supporting element 31 is fixedly connected.
Embodiment 2: originating in large-diameter shield auger described in a kind of embodiment 1 with counter-force structure production method, In the present embodiment, tunnel inner wall is formed by Wall Rock of Tunnel, referring to Fig. 1-3, comprising the following steps:
At the rear for corresponding to originating location in shield auger, in the lower half of tunnel inner wall, fixed setting protrudes from tunnel inner wall Can bending the first connector 21, can the first connector 21 of bending can choose reinforcing bar, it is solid in the upper half of tunnel inner wall Fixed setting is exposed to the first diagonal rib supporting element 31 of tunnel inner wall, and the first diagonal rib supporting element 31 can choose steel plate, in steel plate It is welded with the holdfast for being inserted into tunnel inner wall on one side, the mode of fixed setting is usually to drill on tunnel inner wall, can be rolled over The first curved connector 21 or holdfast are inserted into corresponding drilling, and then the materials such as casting concrete, binder into drilling, make Can bending the first connector 21 or holdfast be fixedly connected with tunnel inner wall, for the first diagonal rib supporting element 31, to holdfast and tunnel After hole inner wall is fixedly connected, it is also necessary to after so that the surface of steel plate is fitted in tunnel inner wall, steel plate and holdfast are welded and fixed.
Bending can bending the first connector 21 the part for protruding from tunnel inner wall, so as to large-diameter shield machine 5 and match Set facility is able to enter originating location in shield auger, in general, need by can the first connector 21 of bending be folded into fitting The degree of tunnel inner wall, but the degree of other shapes or needs can also be bent into;
Enter in shield auger after originating location after large-diameter shield machine 5 and auxiliary facility, straightening can bending the first connector 21, the rear of originating location, which is built, in shield auger corresponds to the rear to counter-force lower half construction of 5 lower half of large-diameter shield machine Object 22, can the first connector 21 of bending be fixedly connected with backward counter-force lower half structure 22;
Rear to, to counter-force upper half structure 32, backward counter-force upper half structure 32 has after being arranged above counter-force lower half structure 22 There are counter-force face and the first support diagonal rib 322, the first support diagonal rib 322 is fixedly connected with the first diagonal rib supporting element 31.
Preferably, backward counter-force upper half structure 32 includes fan-shaped ring flat-plate and the first support diagonal rib 322, and fan-shaped ring flat-plate can be with Be structure as a whole, fan-shaped ring flat-plate can be provided entirely in after to the top of counter-force lower half structure 22, can also partially be arranged in The top of backward counter-force lower half structure 22, for example, fan-shaped ring flat-plate lower part fit in after to before counter-force lower half structure 22 Side, in this way, the active force that the lower part of fan-shaped ring flat-plate is subject to can be transmitted to after on counter-force lower half structure 22.Fan-shaped ring flat-plate Plurality of steel plates can also be used, these steel plates are distributed setting on anchor ring, and every block of steel plate passes through the first support diagonal rib 322 and first Diagonal rib supporting element 31 is fixedly connected.Fan-shaped ring flat-plate can choose steel plate, and the first diagonal rib supporting element 31 can choose steel plate, in this way, Diagonal rib 322 and fan-shaped ring flat-plate can be supported to be fixed together the first diagonal rib supporting element 31, first by the way of welding.
Preferably, tunnel has u-shaped cross-section, and the top surface of backward counter-force lower half structure 22 is arranged in u-shaped cross-section Haunch and vault tie point at.
Embodiment 3: it is originated in a kind of large-diameter shield auger with counter-force structure production method, as to embodiment 2 It is further improved, further includes after being connected using the second connector 4 to counter-force upper half structure 32 and backward counter-force lower half structure 22, the second connector 4 includes the second support diagonal rib 42, and second supports the upper end of diagonal rib 42 and backward counter-force upper half structure 32 Support connection, the lower end of the second support diagonal rib 42 and the support of backward counter-force lower half structure 22 connect.Support connection can by with Under type is realized: being achieved a fixed connection using non-dismountable modes such as welding, is realized and fixed using removablies such as limiting sections Connection realizes support connection by fitting abutment, due to being supported using the second support diagonal rib 42, so the second support diagonal rib 42 with backward counter-force lower half structure 22, backward counter-force upper half structure 32 supporting point there can be no make support fail cunning It is dynamic.
Further, backward counter-force upper half structure 32 is after the thickness of tunnel axial direction is less than to counter-force lower half structure 22 Thickness, second support diagonal rib 42 upper end be fixed on after on the rear wall of counter-force upper half structure 32, second support diagonal rib 42 lower end protruded from after being fixed on to counter-force lower half structure 22 after on the roof of 32 part of counter-force upper half structure.
Further, when after construction to counter-force lower half structure 22, in the rear top surface to counter-force lower half structure 22 On be embedded with for second the second diagonal rib supporting element 23 for being fixedly connected of support diagonal rib 42.As needed, the second diagonal rib supports Part 23 with can bending the first connector 21 binding, welding etc. modes achieve a fixed connection;Second diagonal rib supporting element 23 can also be with With in concrete structure body structure reinforcing bars binding, welding etc. modes achieve a fixed connection.Second diagonal rib supporting element 23 can select Steel plate is selected, at this moment holdfast can also be set in the side of steel plate, holdfast can be embedded in concrete structure body.
Embodiment 4: originating in large-diameter shield auger described in a kind of embodiment 1 with counter-force structure production method, In the present embodiment, tunnel inner wall is to enclose soil by tunnel to be formed, here, it is necessary to lining cutting is built in tunnel, lining cutting is also just right It should be in tunnel inner wall, referring to Fig. 1-3, comprising the following steps:
In tunnel when lining for building (generally secondary lining), at the rear for corresponding to originating location in shield auger, serving as a contrast The lower half of block is pre-buried protrude from lining cutting surface can bending the first connector 21, can the first connector 21 of bending can select Reinforcing bar is selected, pre-buried setting is exposed to the first diagonal rib supporting element 31 on lining cutting surface, the first diagonal rib supporting element in the upper half of lining cutting 31 can choose steel plate, in the holdfast of steel plate being welded on one side for being embedded to lining cutting, after lining cutting initial set, can bending first Connector 21 and holdfast are just fixed together with lining cutting.
Bending can bending the first connector 21 the part for protruding from tunnel inner wall, so as to large-diameter shield machine 5 and match Set facility is able to enter originating location in shield auger, in general, need by can the first connector 21 of bending be folded into fitting The degree of tunnel inner wall, but the degree of other shapes or needs can also be bent into;
Enter in shield auger after originating location after large-diameter shield machine 5 and auxiliary facility, straightening can bending the first connector 21.The rear of originating location, which is built, in shield auger corresponds to the rear to counter-force lower half construction of 5 lower half of large-diameter shield machine Object 22, backward counter-force lower half structure 22 can be the concrete body for pouring and being formed, the structural steel in concrete structure body Muscle can with can the modes such as the first connector 21 binding of bending, welding be fixedly connected, can bending the first connector 21 with after It is fixedly connected to counter-force lower half structure 22;Preferably, straightening can before the first connector 21 of bending, preferably make lining cutting with The surface that backward counter-force lower half structure 22 is correspondingly connected with forms rough surface, is formed for example, by using common dabbing method coarse Face.
It is rear to after being arranged above counter-force lower half structure 22 to counter-force upper half structure 32, backward counter-force upper half structure 32 have counter-force face and the first support diagonal rib 322, and the first support diagonal rib 322 is fixedly connected with the first diagonal rib supporting element 31.
Preferably, backward counter-force lower half structure 22, backward counter-force upper half structure 32 all have axially extending in tunnel Arc groove, and backward counter-force lower half structure 22, backward counter-force upper half structure 32 are enclosed circular cross section.
Embodiment 5: it is originated in a kind of large-diameter shield auger with counter-force structure production method, as to embodiment 4 It is further improved, further includes after being connected using the second connector 4 to counter-force upper half structure 32 and backward counter-force lower half structure 22, the second connector 4 includes the second support diagonal rib 42, and second supports the upper end of diagonal rib 42 and backward counter-force upper half structure 32 Support connection, the lower end of the second support diagonal rib 42 and the support of backward counter-force lower half structure 22 connect.Support connection can by with Under type is realized: being achieved a fixed connection using non-dismountable modes such as welding, is realized and fixed using removablies such as limiting sections Connection realizes support connection by fitting abutment, due to being supported using the second support diagonal rib 42, so the second support diagonal rib 42 with backward counter-force lower half structure 22, backward counter-force upper half structure 32 supporting point there can be no make support fail cunning It is dynamic.
Further, backward counter-force upper half structure 32 is after the thickness of tunnel axial direction is less than to counter-force lower half structure 22 Thickness, second support diagonal rib 42 upper end be fixed on after on the rear wall of counter-force upper half structure 32, second support diagonal rib 42 lower end protruded from after being fixed on to counter-force lower half structure 22 after on the roof of 32 part of counter-force upper half structure.
Further, when after construction to counter-force lower half structure 22, in the rear top surface to counter-force lower half structure 22 On be embedded with for second the second diagonal rib supporting element 23 for being fixedly connected of support diagonal rib 42.As needed, the second diagonal rib supports Part 23 with can bending the first connector 21 binding, welding etc. modes achieve a fixed connection;Second diagonal rib supporting element 23 can also be with With in concrete structure body structure reinforcing bars binding, welding etc. modes achieve a fixed connection.Second diagonal rib supporting element 23 can select Steel plate is selected, at this moment holdfast can also be set in the side of steel plate, holdfast can be embedded in concrete structure body.
In embodiment 4 and embodiment 5, mixed used in concrete material used in lining cutting and backward counter-force lower half structure 22 Solidifying earth material is preferably identical.
In embodiment 1-5, referring to fig. 2, backward counter-force lower half structure 22 and backward counter-force upper half structure 32 it is interior Circle needs to be less than the outer diameter of large-diameter shield machine 5, and the axis of such counter-force hydraulic cylinder could be perpendicular to the machine of large-diameter shield machine Tail surface, and the both ends of counter-force hydraulic cylinder compress the tail face of counter-force structure and large-diameter shield machine respectively.
The present invention is described in detail above in conjunction with drawings and examples, still, those of skill in the art Member is it is understood that without departing from the purpose of the present invention, can also carry out each design parameter in above-described embodiment Change, forms multiple specific embodiments, is common variation range of the invention, is no longer described in detail one by one herein.

Claims (10)

1. being originated in a kind of large-diameter shield auger with counter-force structure production method, which comprises the following steps:
At the rear for corresponding to originating location in shield auger, in the lower half of tunnel inner wall, fixed setting protrudes from tunnel inner wall Can bending the first connector, tunnel inner wall the upper half fixed setting be exposed to tunnel inner wall the first diagonal rib support Part, bending can bending the first connector the part for protruding from tunnel inner wall so that large-diameter shield machine and auxiliary facility energy Enough enter originating location in shield auger;
Enter in shield auger after originating location after large-diameter shield machine and auxiliary facility, straightening can bending the first connector, The rear of originating location, which is built, in shield auger corresponds to the rear to counter-force lower half structure, institute of large-diameter shield machine lower half State can the first connector of bending be fixedly connected with the backward counter-force lower half structure;
After described to after being arranged above counter-force lower half structure to counter-force upper half structure, the backward counter-force upper half structure With counter-force face and the first support diagonal rib, the first support diagonal rib is fixedly connected with the first diagonal rib supporting element.
2. being originated in large-diameter shield auger as described in claim 1 with counter-force structure production method, which is characterized in that also Including after using the second connector to connect to counter-force upper half structure and backward counter-force lower half structure, the second connector packet Including the second support diagonal rib, the upper end of the second support diagonal rib and the backward counter-force upper half structure support connect, and described the The lower end of two support diagonal ribs and the backward counter-force lower half structure support connect.
3. being originated in large-diameter shield auger as claimed in claim 2 with counter-force structure production method, which is characterized in that institute After stating to counter-force upper half structure tunnel axial direction thickness be less than it is described after to counter-force lower half structure thickness, described second The upper end of support diagonal rib is fixed on the rear wall of the backward counter-force upper half structure, and the lower end of the second support diagonal rib is fixed on The backward counter-force lower half structure protrudes from the roof of the backward counter-force upper half structure part.
4. being originated in large-diameter shield auger as claimed in claim 3 with counter-force structure production method, which is characterized in that In The top surface of the backward counter-force lower half structure is equipped with the second diagonal rib branch for being fixedly connected with the second support diagonal rib Support member, the second diagonal rib supporting element with it is described can the first connector of bending be fixedly connected.
5. being originated in large-diameter shield auger as described in claim 1 with counter-force structure production method, which is characterized in that institute State and be equipped with lining cutting in tunnel, it is described can the first connector of bending, the corresponding part of the first diagonal rib supporting element be embedded in the lining In block;The backward counter-force lower half structure includes concrete body, can make institute before the first connector of bending in straightening The surface being correspondingly connected with the backward counter-force lower half structure for stating lining cutting inner wall forms rough surface.
6. being originated in large-diameter shield auger as described in claim 1 with counter-force structure production method, which is characterized in that institute All have the arc groove axially extending in tunnel to counter-force lower half structure, backward counter-force upper half structure after stating, and it is described after Circular cross section is enclosed to counter-force lower half structure, backward counter-force upper half structure.
7. being originated in large-diameter shield auger as described in claim 1 with counter-force structure production method, which is characterized in that institute Stating the first diagonal rib supporting element includes the steel plate for being used to form supporting surface and the holdfast for being inserted into the tunnel inner wall, the holdfast It is connect with the Interal fixation;It is described can the first connector of bending include reinforcing bar.
8. being originated in large-diameter shield auger as described in claim 1 with counter-force structure production method, which is characterized in that institute Tunnel is stated with u-shaped cross-section, the top surface of the backward counter-force lower half structure be arranged in the haunch of the u-shaped cross-section with At vault tie point.
9. being originated in a kind of large-diameter shield auger with counter-force structure, which is characterized in that including for the fixed company of tunnel inner wall The backward counter-force lower half structure connect, the backward counter-force upper half structure being fixedly connected for tunnel inner wall, and for connecting Second diagonal rib supporting element of the backward counter-force lower half structure and backward counter-force upper half structure.
10. being originated in large-diameter shield auger as described in claim 1 with counter-force structure, which is characterized in that described reversed Counter-force lower half structure includes reinforced concrete construction object, the backward counter-force lower half structure by can bending first connection Part is fixedly connected with the tunnel inner wall, and the first diagonal rib supporting element is also fixedly connected on the tunnel inner wall, described backward Counter-force upper half structure has counter-force face and the first support diagonal rib, and the first support diagonal rib and the first diagonal rib supporting element are solid Fixed connection.
CN201910838131.XA 2019-09-05 2019-09-05 Method for manufacturing reaction structure for starting in large-diameter shield tunneling machine tunnel and reaction structure Active CN110454178B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910838131.XA CN110454178B (en) 2019-09-05 2019-09-05 Method for manufacturing reaction structure for starting in large-diameter shield tunneling machine tunnel and reaction structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910838131.XA CN110454178B (en) 2019-09-05 2019-09-05 Method for manufacturing reaction structure for starting in large-diameter shield tunneling machine tunnel and reaction structure

Publications (2)

Publication Number Publication Date
CN110454178A true CN110454178A (en) 2019-11-15
CN110454178B CN110454178B (en) 2021-08-31

Family

ID=68490978

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910838131.XA Active CN110454178B (en) 2019-09-05 2019-09-05 Method for manufacturing reaction structure for starting in large-diameter shield tunneling machine tunnel and reaction structure

Country Status (1)

Country Link
CN (1) CN110454178B (en)

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006028922A (en) * 2004-07-16 2006-02-02 Okumura Corp Tunnel boring machine
JP2008081959A (en) * 2006-09-26 2008-04-10 Shimizu Corp Shield machine
CN103711495A (en) * 2013-12-25 2014-04-09 中铁十三局集团有限公司 Support-free and partial-segment-free shield launching method for subsurface excavated tunnel
CN203822315U (en) * 2014-04-23 2014-09-10 中铁十五局集团有限公司 Shield starting reaction frame
CN104500081A (en) * 2014-12-29 2015-04-08 上海市基础工程集团有限公司 Steel back support in subway tunnel construction
CN104533433A (en) * 2014-12-25 2015-04-22 中铁十七局集团第六工程有限公司 Starting method of small-radius curve tunnel
JP2015098676A (en) * 2013-11-18 2015-05-28 大成建設株式会社 Construction method of shield tunnel
CN108049880A (en) * 2018-01-30 2018-05-18 中铁二十二局集团第工程有限公司 The shield machine originated in shield method tunnel construction using small curve radius
CN207513606U (en) * 2017-12-01 2018-06-19 粤水电轨道交通建设有限公司 A kind of counterforce device for shield launching
CN108222953A (en) * 2018-01-09 2018-06-29 中铁四局集团第四工程有限公司 Construction method for U-shaped open shield tunneling machine to pass through nonstandard section of pipe gallery
CN108442933A (en) * 2018-03-02 2018-08-24 中铁十二局集团有限公司 Shield launching pedestal and shield launching method
CN208010351U (en) * 2018-01-29 2018-10-26 南昌大学 Improved shield launching reaction frame
CN108756904A (en) * 2018-06-12 2018-11-06 中铁隧道局集团有限公司 Shield machine integrally originates construction method
CN208203273U (en) * 2018-05-24 2018-12-07 中铁工程装备集团技术服务有限公司 Multifunctional shield machine originating station
CN109026034A (en) * 2018-09-10 2018-12-18 中山大学 Circumferential direction digs shield mechanism and circumferential direction digs method
CN208816130U (en) * 2018-10-15 2019-05-03 中国铁建重工集团有限公司 A kind of initiator device for development machine
CN209195415U (en) * 2018-12-13 2019-08-02 中铁十一局集团城市轨道工程有限公司 Shield launching counterforce device

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006028922A (en) * 2004-07-16 2006-02-02 Okumura Corp Tunnel boring machine
JP2008081959A (en) * 2006-09-26 2008-04-10 Shimizu Corp Shield machine
JP2015098676A (en) * 2013-11-18 2015-05-28 大成建設株式会社 Construction method of shield tunnel
CN103711495A (en) * 2013-12-25 2014-04-09 中铁十三局集团有限公司 Support-free and partial-segment-free shield launching method for subsurface excavated tunnel
CN203822315U (en) * 2014-04-23 2014-09-10 中铁十五局集团有限公司 Shield starting reaction frame
CN104533433A (en) * 2014-12-25 2015-04-22 中铁十七局集团第六工程有限公司 Starting method of small-radius curve tunnel
CN104500081A (en) * 2014-12-29 2015-04-08 上海市基础工程集团有限公司 Steel back support in subway tunnel construction
CN207513606U (en) * 2017-12-01 2018-06-19 粤水电轨道交通建设有限公司 A kind of counterforce device for shield launching
CN108222953A (en) * 2018-01-09 2018-06-29 中铁四局集团第四工程有限公司 Construction method for U-shaped open shield tunneling machine to pass through nonstandard section of pipe gallery
CN208010351U (en) * 2018-01-29 2018-10-26 南昌大学 Improved shield launching reaction frame
CN108049880A (en) * 2018-01-30 2018-05-18 中铁二十二局集团第工程有限公司 The shield machine originated in shield method tunnel construction using small curve radius
CN108442933A (en) * 2018-03-02 2018-08-24 中铁十二局集团有限公司 Shield launching pedestal and shield launching method
CN208203273U (en) * 2018-05-24 2018-12-07 中铁工程装备集团技术服务有限公司 Multifunctional shield machine originating station
CN108756904A (en) * 2018-06-12 2018-11-06 中铁隧道局集团有限公司 Shield machine integrally originates construction method
CN109026034A (en) * 2018-09-10 2018-12-18 中山大学 Circumferential direction digs shield mechanism and circumferential direction digs method
CN208816130U (en) * 2018-10-15 2019-05-03 中国铁建重工集团有限公司 A kind of initiator device for development machine
CN209195415U (en) * 2018-12-13 2019-08-02 中铁十一局集团城市轨道工程有限公司 Shield launching counterforce device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
彭红益等: "肋板式后背在桥涵顶进中的应用", 《山西建筑》 *
未丙岩: ""盾构机反力架结构设计与运用"", 《中国高新技术企业》 *

Also Published As

Publication number Publication date
CN110454178B (en) 2021-08-31

Similar Documents

Publication Publication Date Title
CN106968257B (en) Concrete-fabricated profile steel mixed supporting system for ultra-large deep foundation pit and construction method thereof
CN108412128A (en) A kind of connection structure of steel core concrete column
CN208717916U (en) One kind is from anticreep bracing members segmented head device
CN208966352U (en) A kind of supporting construction in weak rocks matter region tunnel
JP2010090608A (en) Method for constructing underground space and structure of the underground space
CN210738590U (en) Underpinning structure of tunnel lower-penetrating pile foundation
KR101750908B1 (en) System of the shotcrete lining reinforced the adhesion/tension by wire mesh and assembly structure thereof and method setting up the wire mesh to the steel rib for tunnel
CN110454178A (en) It is originated in large-diameter shield auger with counter-force structure production method and counter-force structure
EP3303711A1 (en) Method for constructing a foundation for a tower structure, and onshore tower structure
CN201347558Y (en) Ring-shaped bracing structure system of deep and large foundation pit
CN210530874U (en) Plate type grid steel frame for tunnel preliminary bracing
JP2011241637A (en) Widening structure of shield tunnel and construction method thereof
CN208073482U (en) A kind of reception of shield type rectangular top pipe steel bushing device and constructing structure
CN110185486A (en) A kind of permanent protrusion-dispelling air door wall of concrete filled steel tube and its construction method
KR100534079B1 (en) Construction method of strut
CN209539375U (en) The temporary support system of Tunnel steelframe
CN102535473A (en) Connection method of pipe curtain and underground structure
CN107023019B (en) Concrete-assembled steel mixed enclosing purlin in foundation pit supporting structure and construction method thereof
CN202031617U (en) Backing (supporting) plate device for hub-type anchor rod
CN216841713U (en) Tunnel large deformation steel pipe concrete primary support structure
CN218374089U (en) Connecting structure of micro pile and existing foundation
CN219011269U (en) Recyclable connecting piece for fixing soil nailing wall supporting reinforcing ribs
CN113202516B (en) Frame structure and manufacturing method thereof
CN212583714U (en) Tunnel steel frame connecting structure
CN212337366U (en) Corrugated plate tunnel primary support structure and tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant