CN110453699A CN201910783198.8A CN201910783198A CN110453699A CN 110453699 A CN110453699 A CN 110453699A CN 201910783198 A CN201910783198 A CN 201910783198A CN 110453699 A CN110453699 A CN 110453699A
Authority
CN
China
Prior art keywords
pile
rice
rectangular
steel reinforcement
reinforcement cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910783198.8A
Other languages
Chinese (zh)
Other versions
CN110453699B (en
Inventor
黄达
罗世林
吴礼舟
裴向军
王俊杰
肖衡林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei University of Technology
Original Assignee
Hebei University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei University of Technology filed Critical Hebei University of Technology
Priority to CN201910783198.8A priority Critical patent/CN110453699B/en
Publication of CN110453699A publication Critical patent/CN110453699A/en
Application granted granted Critical
Publication of CN110453699B publication Critical patent/CN110453699B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/207Securing of slopes or inclines with means incorporating sheet piles or piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Paleontology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The present invention is the draining anti-slide pile structure and its construction method of a kind of " rice " type stake core, which includes the rectangular solid pile bottom in lower part, the rectangular outer pile lining in top, stake core in top " rice " type, and three is connected into an entirety using steel reinforcement cage;The rectangular solid pile bottom in lower part penetrates sliding surface and gos deep into basement rock and inside opens up multiple drain holes;Multiple deflector holes are offered on the rectangular outer pile lining in top;Stake core in top " rice " type is set in the rectangular outer pile lining in top, and the region in the rectangular outer pile lining in top and top " rice " type between stake core is top pile body collecting space;The bottom of top pile body collecting space and the rectangular solid pile bottom in lower part top corresponding position are laid with multilayer drainage blanket;Drain hole and deflector hole are connected with corresponding top pile body collecting space;Permeable aggregate is filled in top pile body collecting space, drain hole and deflector hole;The globality and its bending resistance shear behavior of the friction pile are good, and are able to achieve real-time draining.

Description

A kind of the draining anti-slide pile structure and its construction method of " rice " type stake core
Technical field
The invention belongs to hazards control field, more particularly to a kind of " rice " type stake core draining anti-slide pile structure and apply Work method, suitable for the hydrodynamic force type reinforcing side slope technique by Hydrographic Factors such as library water and rainfalls.
Background technique
Landslide is essentially that side slope slopes are progressive, process of dynamic failure, and influence factor shows complicated and diversity The characteristics of, mainly by various synthesis such as topography and geomorphology, formation lithology, geological structure, rainfall, engineering construction disturbance, times It influences, therefore landslide control engineering is often a complicated system engineering.Currently, many to the administering method on landslide, such as: gear Cob wall, anchor pole cut slope off-load and back-pressure, friction pile etc..Wherein, friction pile has flexible arrangement, construction is simple, disturbs to landslide The advantages that small, therefore the extensive concern by engineering circles and academia.
Initially, when analysis, checking Landslide Stability, the adverse effect factor of underground water is but often ignored, it is believed that does not have The necessary water drainage of arrangement meticulously, it is even contemplated that whether there is or not water drainages is all unimportant.In fact, friction pile is improving slip mass antiskid While stability, the seepage channel of slopes internal water is decreased, to increase potential landslide danger to a certain extent Danger.That is friction pile has resistance infiltration effect to gliding mass seepage flow, has raised gliding mass water level, increases gliding mass self weight, and make The decline of the cohesive strength and internal friction angle of gliding mass and slider bed, Landslide Stability decline, sliding force increase.Based on this, slip mass is carried out Hydrophobic and slopes drainage, for ensuring that the stabilization of slip mass plays an important role, so draining friction pile meet the tendency of and It is raw.For list from shape, draining friction pile can be divided into tubular pole and square pile.The smooth outer surface of tubular pole is rounded, is especially making It is for friction pile in use, small with the frictional force of soil, have to increase project cost using the big tubular pole of outer diameter in many engineerings. Furthermore the anti-bending strength of thin-wall pipe pile is poor, and the shearing resistance, tensile property of especially pile body are poor, brings larger peace to landslide control Full hidden danger.It is such as " a kind of application No. is 201220581962.7 " a kind of draining friction piles " and application No. is 201610832857.9 Upper side slope drains friction pile " have the shortcomings that anti-bending strength is poor.And compare relative to tubular pole performance, square pile has outer surface Product is big and at square, this means that square pile can obtain bigger bearing capacity than tubular pole under the conditions of same geology.Furthermore square pile Theoretical calculation shearing resistance can be 2~3 times of same tubular pole, while also having construction breakage rate low, shock resistance is strong, can be easy The fast connector of non-solder is developed, all-weather construction can be truly realized, construction can be quick.Therefore numerous squares drain antiskid Stake patent emerges one after another.But some patents pursue drainage effect simply and ignore its anti-bending strength.Such as application No. is 201510252389.3 " a kind of draining friction piles and its construction method for automatically adjusting water level ", in order to reach automatic adjustment water The purpose of position is provided with rectangle hollow pile body, its anti-bending strength is caused to be had a greatly reduced quality.In addition, application No. is 201810078596.5 " hollow draining anchor draws friction pile and its construction method ", the system is by friction pile, anchor drawing device, seepage well and pumping system group At structure is extremely complex, and construction procedure is up to 33 steps, very cumbersome.
Summary of the invention
In view of the deficiencies of the prior art, the invention proposes the draining anti-slide pile structures and construction party of a kind of " rice " type stake core Method, the friction pile cross section are square, using steel reinforcement cage by the rectangular solid pile bottom in lower part, the rectangular outer pile lining in top and top " rice " The connection of stake core is integral in type, substantially increases the globality and its bending resistance shear behavior of friction pile.It is filled using permeable aggregate Top pile body collecting space, deflector hole and drain hole realize the function of draining.Furthermore the use of geomembrane and drainage blanket Perfection overcomes the risk of its draining failure in friction pile use process.Furthermore the draining friction pile both can with cast in situs, Can be prefabricated, working procedure is simple, flexible operation.
To solve the above problems, The technical solution adopted by the invention is as follows:
A kind of draining anti-slide pile structure of " rice " type stake core, which is characterized in that the structure include the rectangular solid pile bottom in lower part, Stake core, top pile body collecting space, permeable aggregate and drainage blanket in the rectangular outer pile lining in top, top " rice " type;The lower part Rectangular solid pile bottom penetrates sliding surface and gos deep into the rectangular solid pile bottom of basement rock and lower part offering multiple drain holes;The top side Multiple deflector holes are offered on the outer pile lining of shape;
Stake core in setting top " rice " type in the rectangular outer pile lining in top, in the rectangular outer pile lining in top and top " rice " type Region between stake core is top pile body collecting space;
The bottom of the top pile body collecting space and the rectangular solid pile bottom in lower part top corresponding position are laid with multilayer draining Bed course;
The drain hole and deflector hole are connected with corresponding top pile body collecting space;On top, pile body catchments sky Between, in drain hole and deflector hole fill permeable aggregate;
Stake core in the rectangular solid pile bottom in lower part, the rectangular outer pile lining in top, top " rice " type is connected into one using steel reinforcement cage A entirety, and stake core one-piece casting in the rectangular solid pile bottom in lower part, the rectangular outer pile lining in top and top " rice " type.
The section configuration of the drain hole opened up in the rectangular solid pile bottom in lower part can be round or rectangular;Drain hole Effect be in real time will be collected to top pile body collecting space water discharge slopes;
The thickness d of the rectangular outer pile lining in top is about the 1/6 of pile body section length l;And uniformly distributed there is deflector hole.
The wall thickness of stake core is set as the 2/3 of the rectangular outer pile wall thickness in top in top " rice " type.
The section configuration of the top pile body collecting space is triangle, and is filled with permeable aggregate.
The permeable aggregate is also filled in drain hole and deflector hole;Its permeable aggregate can be rubble or permeable stone Equal strength is moderate and has the material of water permeability.
The steel reinforcement cage includes " rice " shape steel reinforcement cage and rectangular steel reinforcement cage, and " rice " shape steel reinforcement cage is located at stake in top " rice " type In-core, rectangular steel reinforcement cage are located in the rectangular outer pile lining in top, and " rice " shape steel reinforcement cage and rectangular steel reinforcement cage are downward through to lower part In rectangular solid pile bottom, " rice " shape steel reinforcement cage welds integral with rectangular steel reinforcement cage.To improve the antiskid and flexing resistance of pile body Energy.
The drainage blanket is located at the top at the rectangular solid pile bottom in bottom and lower part of top pile body collecting space, and it has There is the function of filtering;
The geomembrane is wrapped on the outside of pile body, prevents impurity or fine particle in slopes from flowing by deflector hole To reduce drainage performance in the pile body collecting space of top.
The present invention also protects a kind of construction method of the draining anti-slide pile structure of " rice " type stake core, it is characterised in that: described Construction method comprises the concrete steps that:
S1 site inspection and indoor design: the engineering geological condition of site inspection massif, region hydrogeology condition capture The position of potential sliding surface (band), determines friction pile size, stake holes depth and burial place;
The precast reinforced cage of S2: " rice " shape steel reinforcement cage (5) and rectangular steel reinforcement cage (11) are made by the way of welding, finally General " rice " shape steel reinforcement cage (5) is fitted into welding in rectangular steel reinforcement cage (11) and forms steel reinforcement cage entirety;
S3 makes template: making rectangular exterior sheathing and triangle inner template according to square pile dimensioned;
S4 preparation of construction: positioning is measured to inbuilt position needed for friction pile according to indoor design result, by reinforcing bar Cage, cement material, template and drilling device are transported to construction site;
S5 pile hole construction: require to excavate stake holes to projected depth, according to geology item according to the stake position of design and stake holes size Part carries out retaining wall processing to stake holes;
S6 pours the rectangular solid pile bottom in lower part: the steel reinforcement cage made entirety and rectangular exterior sheathing is lifted into stake holes, The rectangular solid pile bottom in lower part is poured to design height and reserved drain hole;
S7 pours stake core in the rectangular outer pile lining in top and top " rice " type: triangle inner template lifted to design position, One-piece casting forms stake core in the rectangular outer pile lining in top and top " rice " type, and reserves deflector hole in the rectangular outer pile lining in top;
The filling of S8 aggregate: form removal after the completion of above-mentioned all steps fills permeable aggregate into drain hole, is then laid with And then permeable aggregate is filled in top pile body collecting space and deflector hole by drainage blanket;
S9 is backfilling and compacted: geomembrane being wrapped on the outside of pile body, then backfills the space between pile body and stake holes, and ram Cover one layer of clay in fact and in stake top.
Compared with prior art, the beneficial effects of the present invention are:
1) anti-slide pile structure of the present invention use square pile body format, square pile using the same geology of its bearing capacity ratio under the conditions of Big more of tubular pole, therefore engineering consumptive material can be saved and accelerate rate of constructing;
2) anti-slide pile structure of the present invention is inherited using the barrette of " rice " type stake core and has developed original concrete square pile and applied The low feature of work breakage rate improves the impact resistance of stake so that pile body is more uniformly stressed;" rice " type stake core form simultaneously Structure is full symmetric, easy for construction.
3) use rice shape steel reinforcement cage and rectangular steel reinforcement cage by the rectangular solid pile bottom in lower part, the rectangular outer pile lining in top and top Stake core is closely joined together in " rice " type, substantially increases the shearing resistance and anti-bending strength of pile body;Top pile body collecting space is led Discharge orifice and drain hole are used cooperatively, and can be carried out real-time draining, and perfection meets the drainage requirement of friction pile.
4) pile body structure of the invention patent is simple, both can cast in situs, also can be prefabricated.Construction method is mature, process letter Single, construction quality is easy to get control.
Detailed description of the invention
In order to keep the purpose, technical scheme and beneficial effects of the invention patent clearer, the present invention provides following attached drawing It is illustrated:
Fig. 1 is a kind of perspective view operation schematic diagram of the draining friction pile of " rice " type stake core of the present invention;
Fig. 2 is a kind of A-A top view of the draining friction pile of " rice " type stake core of the present invention;
Fig. 3 is a kind of B-B cross-section diagram of the draining friction pile of " rice " type stake core of the present invention;
In figure: 1, the rectangular solid pile bottom in lower part, 2, the rectangular outer pile lining in top, 3, stake core in top " rice " type, 4, top stake Body collecting space, 5, " rice " shape steel reinforcement cage, 6, permeable aggregate, 7, drainage blanket, 8, drain hole, 9, deflector hole, 10, geotechnique's filter Film, 11, rectangular steel reinforcement cage, 12, basement rock, 13, sliding surface, 14, clay layer.
Specific embodiment
Below with reference to embodiment, the invention will be further described, but should not be construed the above-mentioned subject area of the present invention only It is limited to following embodiments.Without departing from the idea case in the present invention described above, according to ordinary skill knowledge and used With means, various replacements and change are made, should all include within the scope of the present invention.
Embodiment 1
Present embodiment discloses a kind of draining anti-slide pile structures of " rice " type stake core, as illustrated in fig. 1 and 2, including lower part side Shape solid pile bottom 1, the rectangular outer pile lining 2 in top, stake core 3, top pile body collecting space 4, " rice " shape steel reinforcement cage in top " rice " type 5, permeable aggregate 6, drainage blanket 7, geomembrane 10 and rectangular steel reinforcement cage 11.The rectangular solid pile bottom 1 in lower part penetrates sliding surface 13 and go deep into the rectangular solid pile bottom of 12 certain depth of basement rock and the lower part offering multiple drain holes 8;The top is rectangular outer Multiple deflector holes 9 are offered on pile lining 2;The drain hole 8 and deflector hole 9 are connected with corresponding top pile body collecting space 4 It is logical;The permeable aggregate 6 is filled in top pile body collecting space 4, drain hole 8 and deflector hole 9.The top pile body catchments sky Between 4 rectangular 1 top of solid pile bottom in bottom and lower part be laid with multilayer drainage blanket 7;Using steel reinforcement cage 5 the rectangular solid pile in lower part Bottom 1, the rectangular outer pile lining 2 in top, stake core 3 connects into an entirety in top " rice " type, while being made by the method for one-piece casting In the rectangular outer pile lining in top and top " rice " type stake core connect with the rectangular solid pile bottom in lower part it is integral.
The permeable aggregate type specification filled in top pile body collecting space 4, drain hole 8 and deflector hole 9 can be identical, It can be adjusted according to actual needs.The particular number of drain hole 8 and deflector hole 9 will be determined according to actual requirement, comprehensive The demand of draining with bending resistance and shearing resistance will be considered simultaneously by closing the size for considering stake, geological conditions.
As shown in Figures 2 and 3, the section configuration of the drain hole 8 opened up in the rectangular solid pile bottom 1 in lower part can be it is round or Person is rectangular, and drain hole can be connected by connecting conduit with blind hole or water guide hole;The effect of drain hole 8 is will to be collected in real time Slopes are discharged in the water of top pile body collecting space 4;
As shown in Figure 1, the thickness d of the rectangular outer pile lining 2 in top is about the 1/6 of pile body section length l;And it uniformly distributed leads Discharge orifice 9;The wall thickness of stake core will generally be set as the 2/3 of the rectangular outer pile wall thickness in top in top " rice " type.Lower part is rectangular solid The depth that basement rock is goed deep at stake bottom 1 is usually 1.5m~3m, and the height that basement rock is exposed at the rectangular solid pile bottom 1 in lower part is that insertion basement rock is deep The 1/3~1/2 of degree.The height of the rectangular outer pile lining in top is determined according to the thickness of gliding mass.
As shown in Figure 1, one end of deflector hole 9 is connected to corresponding top pile body collecting space 4, effect is in real time will Water in slopes converges into top pile body collecting space 4;
As depicted in figs. 1 and 2, the section configuration of top pile body collecting space 4 is triangle, and is filled with permeable aggregate 6;
As shown in figs. 1 and 3, permeable aggregate 6 is also filled in drain hole 8 and deflector hole 9;Its permeable aggregate 6 can be broken Stone or permeable stone equal strength it is moderate and with water permeability material;
As shown in Figure 1, Figure 2 and Figure 3, stake core 3 is located inside the rectangular outer pile lining 2 in top in top " rice " type, section shape Shape is " rice " font;
As shown in Figure 1, Figure 2 and Figure 3, described " rice " the shape steel reinforcement cage 5 is located in top " rice " type in stake core 3, and passes through downwards It wears to the rectangular solid pile bottom in lower part, the rectangular steel reinforcement cage 11 is located in the rectangular outer pile lining in top, and downward through to lower part In rectangular solid pile bottom, by " rice " shape steel reinforcement cage 5 and rectangular steel reinforcement cage 11 be welded to each other by stake core 3 in top " rice " type, under The rectangular solid pile bottom in portion, the rectangular outer pile lining 2 in top are linked to be entirety, to improve the antiskid and anti-bending strength of pile body;
As shown in Figure 1, drainage blanket 7 is located at the upper of the rectangular solid pile bottom 1 in bottom and lower part of top pile body collecting space 4 Portion, and it has the function of filtering;The area of drainage blanket is corresponding with the area of top pile body collecting space consistent, drainage blanket Laying area be less than stake section, can guarantee the rectangular outer pile lining 2 in top, the rectangular solid pile bottom 1 in lower part, stake core in top " rice " type 3 threes can pour in an entirety, improve the globality of anti-slide pile structure.
As shown in figures 1 and 3, geomembrane 10 is wrapped on the outside of entire pile body, prevents the impurity or tiny in slopes Particle is flowed into top pile body collecting space 4 by deflector hole 9 to reduce drainage performance.
Embodiment 2
The construction method of the draining anti-slide pile structure of the present embodiment one kind " rice " type stake core, comprising the following steps:
S1 site inspection and indoor design: the engineering geological condition of site inspection massif, region hydrogeology condition capture The position of potential sliding surface (band), determines friction pile size, stake holes depth and burial place;
The precast reinforced cage of S2: making rectangular steel reinforcement cage 11, makes " rice " shape steel reinforcement cage 5 using the method for welding, finally will " rice " shape steel reinforcement cage 5 is fitted into welding in rectangular steel reinforcement cage 11 and forms steel reinforcement cage entirety;
S3 makes template: making rectangular exterior sheathing and triangle inner template according to square pile dimensioned;
S4 preparation of construction: it is fixed to be measured according to the indoor design result of step S1 to inbuilt position needed for friction pile Position, is transported to construction site for steel reinforcement cage, cement material, template and drilling device etc.;
S5 pile hole construction: require to excavate stake holes to projected depth, according to geology item according to the stake position of design and stake holes size Part carries out retaining wall processing to stake holes;
S6 pours the rectangular solid pile bottom 1 in lower part: the steel reinforcement cage made entirety and rectangular exterior sheathing is lifted into stake holes, The rectangular solid pile bottom 1 in lower part is poured to design height and reserved drain hole 8;
S7 pours stake core 3 in the rectangular outer pile lining 2 in top and top " rice " type: triangle inner template is lifted to design position It sets, one-piece casting forms stake core 3 in the rectangular outer pile lining 2 in top and top " rice " type, and reserves water conservancy diversion in the rectangular outer pile lining 2 in top Hole 9;
The filling of S8 aggregate: form removal after the completion of above-mentioned all steps fills permeable aggregate 6 into drain hole 8, then spreads If drainage blanket 7, drainage blanket position just corresponds to the position of top pile body collecting space 4, and can cover top pile body The area of collecting space 4, drainage blanket are made of seepy material, and permeable aggregate 6 is and then filled to top pile body and is catchmented sky Between 4 and deflector hole 9 in;
S9 is backfilling and compacted: geomembrane 10 is wrapped on the outside of pile body, the space between pile body and stake holes is then backfilled, and Compacting.
Embodiment 3
The construction method of the draining anti-slide pile structure of the present embodiment one kind " rice " type stake core, comprising the following steps:
S1. indoor analyzing calculation: the engineering geological condition of site inspection massif, region hydrogeology condition capture potential Sliding surface (band) position, determine friction pile size, stake holes depth and burial place;
S2. it digs stake holes: excavating stake holes, and carry out retaining wall processing, stake holes radius should be bigger than the stake diameter of anti-slide pile structure;
S3. according to the design requirement of embodiment 1 it is prefabricated in drain hole and top pile body collecting space it is populated The draining friction pile of " rice " type stake core of water aggregate;
S4. the draining friction pile of prefabricated " rice " type stake core is lifted by crane, align piles position adjusts the draining antiskid of pre- " rice " type stake core Then the draining friction pile of prefabricated " rice " type stake core is put into stake holes to designed elevation by the verticality of stake;
S5. permeable aggregate 6 is filled into deflector hole 9, and geomembrane 10 is wrapped on the outside of pile body;
S6. the space between pile body and stake holes is backfilled, and is tamped, then is laid with one layer of clay layer 14 in stake top, can be prevented Slope table runoff flows backward inside pile body.
The application structure has both two functions of draining and antiskid, is highly resistant to oblique slope deforming, especially to the raising hydrology Landslide Stability under the influence of factor has an extraordinary effect, and its construction is quickly and conveniently, can be used for dewatering needs Slopes, such as reservoir stability.
The present invention does not address place and is suitable for the prior art.

Claims (9)

1. a kind of draining anti-slide pile structure of " rice " type stake core, which is characterized in that the structure includes the rectangular solid pile bottom in lower part (1), the rectangular outer pile lining (2) in top, stake core (3), top pile body collecting space (4), permeable aggregate (6) and row in top " rice " type Water subfill (7);The rectangular solid pile bottom (1) in lower part penetrates sliding surface (13) and gos deep into the rectangular solid pile bottom of basement rock (12) and lower part (1) multiple drain holes (8) are offered in;Multiple deflector holes (9) are offered on the rectangular outer pile lining (2) in top;
Stake core (3), the rectangular outer pile lining (2) in top and top in top " rice " type are set in the rectangular outer pile lining (2) in top Region in " rice " type between stake core (3) is top pile body collecting space;
Rectangular solid pile bottom (1) the top corresponding position in bottom and lower part of the top pile body collecting space (4) is laid with multilayer row Water subfill (7);
The drain hole (8) and deflector hole (9) are connected with corresponding top pile body collecting space (4);In top pile body collection Permeable aggregate (6) are filled in hydrospace (4), drain hole (8) and deflector hole (9);
Stake core (3) in the rectangular solid pile bottom (1) in lower part, the rectangular outer pile lining (2) in top, top " rice " type is connected using steel reinforcement cage At an entirety, and in the rectangular solid pile bottom (1) in lower part, the rectangular outer pile lining (2) in top and top " rice " type, stake core (3) is integrally poured It builds.
2. draining anti-slide pile structure according to claim 1, it is characterised in that: in the rectangular solid pile bottom (1) in lower part The section configuration of the drain hole (8) opened up is round or rectangular.
3. draining anti-slide pile structure according to claim 1, it is characterised in that: the thickness of the rectangular outer pile lining (2) in top Spend 1/6 that d is pile body section length l;And uniformly distributed deflector hole (9) on the rectangular outer pile lining (2) in top.
4. draining anti-slide pile structure according to claim 1, it is characterised in that: the wall thickness setting of stake core in top " rice " type It is the 2/3 of the rectangular outer pile wall thickness in top.
5. draining anti-slide pile structure according to claim 1, it is characterised in that: the top pile body collecting space (4) Section configuration is triangle.
6. draining anti-slide pile structure according to claim 1, it is characterised in that: permeable aggregate (6) is rubble or permeable Stone.
7. draining anti-slide pile structure according to claim 1, it is characterised in that: the steel reinforcement cage includes " rice " shape steel reinforcement cage (5) it is located in top " rice " type in stake core (3) with rectangular steel reinforcement cage (10), " rice " shape steel reinforcement cage (5), rectangular steel reinforcement cage (10) position In the rectangular outer pile lining (2) in top, and " rice " shape steel reinforcement cage (5) and rectangular steel reinforcement cage (10) are downward through rectangular solid to lower part In stake bottom, " rice " shape steel reinforcement cage (5) welds integral with rectangular steel reinforcement cage (10).
8. draining anti-slide pile structure according to claim 1, it is characterised in that: in the outside of the rectangular outer pile lining (2) in top Including geomembrane (10).
9. a kind of construction method of the draining anti-slide pile structure of any " rice " type stake core of claim 1-8, feature exist In: the construction method comprises the concrete steps that:
S1 site inspection and indoor design: the engineering geological condition of site inspection massif, region hydrogeology condition capture potential Sliding surface (band) position, determine friction pile size, stake holes depth and burial place;
The precast reinforced cage of S2: making " rice " shape steel reinforcement cage (5) and rectangular steel reinforcement cage (11) by the way of welding, finally incites somebody to action " rice " Shape steel reinforcement cage (5) is fitted into welding in rectangular steel reinforcement cage (11) and forms steel reinforcement cage entirety;
S3 makes template: making rectangular exterior sheathing and triangle inner template according to square pile dimensioned;
S4 preparation of construction: positioning is measured to inbuilt position needed for friction pile according to indoor design result, by steel reinforcement cage, water Mud material, template and drilling device are transported to construction site;
S5 pile hole construction: require to excavate stake holes to projected depth, according to geological conditions pair according to the stake position of design and stake holes size Stake holes carries out retaining wall processing;
S6 pours the rectangular solid pile bottom (1) in lower part: the steel reinforcement cage made entirety and rectangular exterior sheathing being lifted into stake holes, poured The rectangular solid pile bottom (1) in lower part is built to design height and reserves drain hole (8);
S7 pours stake core (3) in the rectangular outer pile lining (2) in top and top " rice " type: triangle inner template is lifted to design position It sets, one-piece casting forms stake core (3) in the rectangular outer pile lining (2) in top and top " rice " type, and pre- in the rectangular outer pile lining (2) in top Stay deflector hole (9);
The filling of S8 aggregate: form removal after the completion of above-mentioned all steps fills permeable aggregate (6) into drain hole (8), then spreads If permeable aggregate (6) is and then filled in top pile body collecting space (4) and deflector hole (9) by drainage blanket (7);
S9 is backfilling and compacted: geomembrane (10) being wrapped on the outside of pile body, then backfills the space between pile body and stake holes, and ram Cover one layer of clay (14) in fact and in stake top.
CN201910783198.8A 2019-08-23 2019-08-23 Drainage slide-resistant pile structure of 'rice' -shaped pile core and construction method thereof Active CN110453699B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910783198.8A CN110453699B (en) 2019-08-23 2019-08-23 Drainage slide-resistant pile structure of 'rice' -shaped pile core and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910783198.8A CN110453699B (en) 2019-08-23 2019-08-23 Drainage slide-resistant pile structure of 'rice' -shaped pile core and construction method thereof

Publications (2)

Publication Number Publication Date
CN110453699A true CN110453699A (en) 2019-11-15
CN110453699B CN110453699B (en) 2020-10-09

Family

ID=68488808

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910783198.8A Active CN110453699B (en) 2019-08-23 2019-08-23 Drainage slide-resistant pile structure of 'rice' -shaped pile core and construction method thereof

Country Status (1)

Country Link
CN (1) CN110453699B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111622240A (en) * 2020-06-02 2020-09-04 四川大学 Trapezoidal toe-added drainage slide-resistant pile and construction method thereof
CN112761171A (en) * 2021-01-05 2021-05-07 安徽理工大学 Anti-slide pile inserter
CN113931202A (en) * 2021-09-27 2022-01-14 中铁第四勘察设计院集团有限公司 Anti-skid drainage system containing hydrophilic minerals for large landslide and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105064238A (en) * 2015-07-21 2015-11-18 喻良军 High-strength road pile
CN106759390A (en) * 2016-11-14 2017-05-31 重庆大学 A kind of rubble non-uniform pile composite construction and its construction method with draining and AsA -GSH cycle
CN106759274A (en) * 2016-12-31 2017-05-31 重庆大学 A kind of semi-hollow stake and its construction method with draining AsA -GSH cycle
CN110016922A (en) * 2019-05-14 2019-07-16 河北工业大学 A kind of novel integral draining anti-slide pile structure and its construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105064238A (en) * 2015-07-21 2015-11-18 喻良军 High-strength road pile
CN106759390A (en) * 2016-11-14 2017-05-31 重庆大学 A kind of rubble non-uniform pile composite construction and its construction method with draining and AsA -GSH cycle
CN106759274A (en) * 2016-12-31 2017-05-31 重庆大学 A kind of semi-hollow stake and its construction method with draining AsA -GSH cycle
CN110016922A (en) * 2019-05-14 2019-07-16 河北工业大学 A kind of novel integral draining anti-slide pile structure and its construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111622240A (en) * 2020-06-02 2020-09-04 四川大学 Trapezoidal toe-added drainage slide-resistant pile and construction method thereof
CN111622240B (en) * 2020-06-02 2021-12-07 四川大学 Trapezoidal toe-added drainage slide-resistant pile and construction method thereof
CN112761171A (en) * 2021-01-05 2021-05-07 安徽理工大学 Anti-slide pile inserter
CN113931202A (en) * 2021-09-27 2022-01-14 中铁第四勘察设计院集团有限公司 Anti-skid drainage system containing hydrophilic minerals for large landslide and construction method

Also Published As

Publication number Publication date
CN110453699B (en) 2020-10-09

Similar Documents

Publication Publication Date Title
CN102041845B (en) United draining system for effectively lowering seepage lines in fill dam of tailing reservoir
CN110453699A (en) A kind of the draining anti-slide pile structure and its construction method of " rice " type stake core
CN110016922A (en) A kind of novel integral draining anti-slide pile structure and its construction method
CN110080254A (en) Draining friction pile-water guide culvert structure and construction method for oblique slope reinforcement
CN104895093B (en) A kind of half coercion underground continuous wall and its construction method
CN111622240B (en) Trapezoidal toe-added drainage slide-resistant pile and construction method thereof
CN107829441A (en) It is a kind of do not influence surrounding enviroment draw hole caisson structure and its construction method
CN109537579A (en) The construction method of cast-in-situ bored pile
CN110424428A (en) The construction method of the comprehensive Yield rainfall relation system of deep basal pit
CN110805049B (en) Construction method of mountain slope ultra-thickness spray anchor permanent supporting structure
CN110528540B (en) Drainage slide-resistant pile structure with embedded pile columns and construction method thereof
CN117107747A (en) Tubular pile body, broken stone drainage tubular pile and construction method of broken stone drainage tubular pile
CN106759264A (en) One kind grouting pipe network and its construction method
CN109024657B (en) Construction method of super high-rise core tube deep pit edge tower crane foundation under complex conditions
CN103114605B (en) Anti-seepage drainage layer structure and construction method
CN110453698B (en) Square drainage slide-resistant pile structure internally connected with semicircular pile ring and construction method thereof
CN209603127U (en) Eliminate the bored concrete pile of breathing soil layer frictional force
CN212223899U (en) Strong permeable stratum bottom sealing concrete separate-bin pouring structure
CN111441367B (en) Strong water-permeable stratum bottom-sealing concrete sub-warehouse pouring structure and construction method
CN205329674U (en) Underground continuous wall structure under fluid bowl or channelling geological conditions
CN108221948A (en) A kind of method for processing foundation
CN209538198U (en) Abnormity draining friction pile
CN110453697A (en) A kind of anti-slide pile structure and its construction method with multizone united drainage function
CN219386394U (en) Miniature steel pipe bored concrete pile barricade
KR100666102B1 (en) Vertical type basement drainage system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant