CN110430283A - A kind of service push method and relevant device of Transmission Expansion Planning in Electric - Google Patents

A kind of service push method and relevant device of Transmission Expansion Planning in Electric Download PDF

Info

Publication number
CN110430283A
CN110430283A CN201910769442.5A CN201910769442A CN110430283A CN 110430283 A CN110430283 A CN 110430283A CN 201910769442 A CN201910769442 A CN 201910769442A CN 110430283 A CN110430283 A CN 110430283A
Authority
CN
China
Prior art keywords
access device
user access
information
activity
services
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910769442.5A
Other languages
Chinese (zh)
Inventor
周炳华
崔金栋
姚海燕
王德君
吴金荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yuhang Branch Of Hangzhou Electric Power Design Institute Co Ltd
Northeast Electric Power University
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
Yuhang Branch Of Hangzhou Electric Power Design Institute Co Ltd
Northeast Dianli University
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yuhang Branch Of Hangzhou Electric Power Design Institute Co Ltd, Northeast Dianli University, Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical Yuhang Branch Of Hangzhou Electric Power Design Institute Co Ltd
Priority to CN201910769442.5A priority Critical patent/CN110430283A/en
Publication of CN110430283A publication Critical patent/CN110430283A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/50Network services
    • H04L67/55Push-based network services

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

This application discloses a kind of service push method of Transmission Expansion Planning in Electric, device, electronic equipment and computer readable storage medium, the service push method of the Transmission Expansion Planning in Electric includes: to generate electricity consumption planning information on services for operation of power networks state;Inquiry pre-establishes and the user access device information bank of real-time update maintenance;The network connection state of each user access device Yu Grid Central server is stored in user access device information bank;Determine that network connection state is the user access device target cluster having connected;Information on services is planned to user access device object set pocket transmission electricity consumption.The application is by recording the network connection state of each user access device Yu Grid Central server, the service push of Transmission Expansion Planning in Electric is carried out using the user access device in connected status as user access device target cluster, the work total amount and duration consumption of service push are effectively reduced, and effectively increases the specific aim and validity of service pushing efficiency and service push.

Description

A kind of service push method and relevant device of Transmission Expansion Planning in Electric
Technical field
This application involves field of communication technology, in particular to a kind of service push method of Transmission Expansion Planning in Electric, device, electronics Equipment and computer readable storage medium.
Background technique
Power transmission network is connected to power supply and load, and programmed decision-making is basic work particularly important in electric system.
In modern power network, reproducible new energy has obtained the application of certain scale, is all with conventional energy resource one Grid generation.Generally, conventional energy resource refers to the technically comparative maturity and such as coal, petroleum, natural gas and large and medium-sized water power The energy utilized on a large scale, and new energy typically refer to solar energy, wind energy, modern biotechnology mass-energy, geothermal energy, ocean energy and The not yet extensive energy for utilizing, actively researching and developing such as Hydrogen Energy.Therefore, also directly affect can for the programmed decision-making of power transmission network The consumption of the renewable sources of energy.
Transmission Expansion Planning in Electric related service information generated can specifically push to user client, so that user learns and adds To utilize.In the prior art, related service message is all to push to each user client one by one.Therefore, an activity clothes The popularization of business message may generate the message push amount of at least hundreds of thousands, need ten easily using existing message push mode Completion could be pushed within several hours, cause push take long time, pushing efficiency it is low, it is difficult to adapt to the step of present event promotion Cut down, at the same push during with for usage degree can not match, client is difficult to realize effectively cope in batches.
It has been that those skilled in the art need to pay close attention in consideration of it, providing a kind of scheme for solving above-mentioned technical problem 's.
Summary of the invention
The service push method for being designed to provide a kind of Transmission Expansion Planning in Electric, device, electronic equipment and the calculating of the application Machine readable storage medium storing program for executing to effectively improve service pushing efficiency, to reduce push duration, and effectively improves being directed to for service push Property and validity.
In order to solve the above technical problems, in a first aspect, this application discloses a kind of service push method of Transmission Expansion Planning in Electric, Include:
Electricity consumption, which is generated, for operation of power networks state plans information on services;
Inquiry pre-establishes and the user access device information bank of real-time update maintenance;The user access device information bank In be stored with the network connection state of each user access device Yu Grid Central server;
Determine that the network connection state is the user access device target cluster having connected;
Information on services is planned to electricity consumption described in the user access device object set pocket transmission.
Optionally, further includes:
Inquiry pre-establishes and the activity participation information library of real-time update maintenance;The activity participation information is stored in library The activity of each user access device participates in time record;
The activity of determination participates in time and the immediate target user's access equipment of current time;
The electricity consumption, which is sent, to target user's access equipment plans information on services.
Optionally, activity participation information library is safeguarded by following steps real-time update:
It receives the activity that user access device is sent and participates in request;Request, which is participated in, according to the activity updates the activity ginseng With information bank;
Alternatively, participating in inviting to user access device transmission activity;According to the activity invitation response update received Activity participation information library.
It is optionally, described to send the electricity consumption planning information on services to target user's access equipment, comprising:
The electricity consumption planning information on services and preferential message are sent to target user's access equipment.
Optionally, the electricity consumption planning information on services includes wrong net peak load shifting message.
Second aspect, this application discloses a kind of service driving means of Transmission Expansion Planning in Electric, comprising:
Generation module plans information on services for generating electricity consumption for operation of power networks state;
Update module, for pre-establishing simultaneously real-time update maintenance user access device information bank;User's access is set The network connection state of each user access device Yu Grid Central server is stored in standby information bank;
Enquiry module, for inquiring the user access device information bank;Determine that the network connection state is to have connected User access device target cluster;
Sending module, for planning information on services to electricity consumption described in the user access device object set pocket transmission.
Optionally, the update module is also used to: pre-establishing simultaneously real-time update maintenance activity participation information library;The work The activity that each user access device is stored in dynamic participation information library participates in time record;
The enquiry module is also used to: inquiring activity participation information library;The activity of determination participates in time and current time Immediate target user's access equipment;
The sending module is also used to: Xiang Suoshu target user's access equipment sends the electricity consumption and plans information on services.
Optionally, the sending module is specifically used for: Xiang Suoshu target user's access equipment sends the electricity consumption planning clothes Information of being engaged in and preferential message.
The third aspect, disclosed herein as well is a kind of electronic equipment, comprising:
Memory, for storing computer program;
Processor realizes that the service of any Transmission Expansion Planning in Electric as described above is pushed away for executing the computer program The step of delivery method.
Fourth aspect, disclosed herein as well is a kind of computer readable storage medium, the computer readable storage medium In be stored with computer program, to realize any power transmission network as described above when the computer program is executed by processor The step of service push method of planning.
The service push method of Transmission Expansion Planning in Electric provided herein includes: to generate electricity consumption rule for operation of power networks state Draw information on services;Inquiry pre-establishes and the user access device information bank of real-time update maintenance;The user access device letter The network connection state of each user access device Yu Grid Central server is stored in breath library;Determine the network connection shape State is the user access device target cluster having connected;It plans and takes to electricity consumption described in the user access device object set pocket transmission Business information.
As it can be seen that the application records each user access device and Grid Central server using user access device information bank Network connection state, and will in network connected status user access device as user access device target cluster and The service push of Transmission Expansion Planning in Electric is carried out, to effectively reduce the work total amount and duration consumption of service push, and is effectively mentioned The high specific aim and validity of service pushing efficiency and service push.The service of Transmission Expansion Planning in Electric provided herein pushes away Sending device, electronic equipment and computer readable storage medium equally has above-mentioned beneficial effect.
Detailed description of the invention
In order to illustrate more clearly of the technical solution in the prior art and the embodiment of the present application, below will to the prior art and Attached drawing to be used is needed to make brief introduction in the embodiment of the present application description.Certainly, in relation to the attached drawing of the embodiment of the present application below A part of the embodiment in only the application of description is not paying creativeness to those skilled in the art Under the premise of labour, other attached drawings can also be obtained according to the attached drawing of offer, other accompanying drawings obtained also belong to the application Protection scope.
Fig. 1 is a kind of flow chart of the service push method of Transmission Expansion Planning in Electric disclosed in the embodiment of the present application;
Fig. 2 is a kind of structural block diagram of the service driving means of Transmission Expansion Planning in Electric disclosed in the embodiment of the present application;
Fig. 3 is the structural block diagram of a kind of electronic equipment disclosed in the embodiment of the present application.
Specific embodiment
The core of the application is to provide service push method, device, electronic equipment and the calculating of a kind of Transmission Expansion Planning in Electric Machine readable storage medium storing program for executing to effectively improve service pushing efficiency, to reduce push duration, and effectively improves being directed to for service push Property and validity.
In order to which technical solutions in the embodiments of the present application is more clearly and completely described, below in conjunction with this Shen Please attached drawing in embodiment, technical solutions in the embodiments of the present application is introduced.Obviously, described embodiment is only Some embodiments of the present application, instead of all the embodiments.Based on the embodiment in the application, those of ordinary skill in the art Every other embodiment obtained without making creative work, shall fall in the protection scope of this application.
Currently, Transmission Expansion Planning in Electric related service information generated can specifically push to user client, so that user obtains It knows and is used.In the prior art, related service message is all to push to each user client one by one.Therefore, one The popularization of activity service message may generate the message push amount of at least hundreds of thousands, easily using existing message push mode Need could push completion within more than ten hour, cause push take long time, pushing efficiency it is low, it is difficult to adapt to present event promotion Paces, while push during with for usage degree can not match, client is difficult to realize effectively cope in batches.In view of This, this application provides a kind of service push methods of Transmission Expansion Planning in Electric, can effectively solve the above problems.
Shown in Figure 1, the embodiment of the present application discloses a kind of service push method of Transmission Expansion Planning in Electric, specifically includes that
S11: electricity consumption is generated for operation of power networks state and plans information on services.
It should be noted that the service push method of Transmission Expansion Planning in Electric provided herein can be applied particularly in power grid Central server.For current operation of power networks state, corresponding electricity consumption planning information on services is produced.
Electricity consumption planning information on services can specifically be generated based on certain planning strategy.For example, in Electric Power Network Planning instantly, drum It encourages peak load shifting and wrong net electricity consumption is exactly the Critical policies of kind of network optimization.It can be effective by peak load shifting or wrong net electricity consumption Reduction and balancing power network load, the problems such as current power is nervous is effectively relieved.
S12: inquiry pre-establishes and the user access device information bank of real-time update maintenance;User access device information bank In be stored with the network connection state of each user access device Yu Grid Central server.
Specifically, in the service push method of Transmission Expansion Planning in Electric provided by the embodiment of the present application, one can be pre-established User access device information bank has specifically included each wherein having recorded the access behavior of the user access device of each user The network connection state of user access device and Grid Central server.Further, may be used also in user access device information bank To record network login time, accessed node, the access IP and device type etc. of each user access device.
Relevant information in user access device information bank is specifically what real-time update was safeguarded.When some user access device After being connected to Grid Central server, its network connection state can be set as having connected;And when the user access device disconnects After network connection with Grid Central server, it can set not connected for its network connection state.Pass through inquiry user's access Facility information library can obtain the network connection state of each user access device instantly.
S13: determine that network connection state is the user access device target cluster having connected.
Specifically, for validity and specific aim that the service of improving pushes, the provided service push of the embodiment of the present application Network connection state is specifically the user access device that has connected as the main object of service push by method.Therefore, it can incite somebody to action All user access devices in connected status are determined as user access device target cluster.
S14: information on services is planned to user access device object set pocket transmission electricity consumption.
The service push method of Transmission Expansion Planning in Electric provided by the embodiment of the present application includes: to generate for operation of power networks state Information on services is planned in electricity consumption;Inquiry pre-establishes and the user access device information bank of real-time update maintenance;User access device The network connection state of each user access device Yu Grid Central server is stored in information bank;Determine network connection state For the user access device target cluster having connected;Information on services is planned to user access device object set pocket transmission electricity consumption.
As it can be seen that the application records each user access device and Grid Central server using user access device information bank Network connection state, and will in network connected status user access device as user access device target cluster and The service push of Transmission Expansion Planning in Electric is carried out, to effectively reduce the work total amount and duration consumption of service push, and is effectively mentioned The high specific aim and validity of service pushing efficiency and service push.
On the basis of the above, in the service push method of Transmission Expansion Planning in Electric provided by the embodiment of the present application, make For a kind of specific embodiment, further includes:
Inquiry pre-establishes and the activity participation information library of real-time update maintenance;It is stored in activity participation information library each The activity of user access device participates in time record;
The activity of determination participates in time and the immediate target user's access equipment of current time;
Electricity consumption, which is sent, to target user's access equipment plans information on services.
Specifically, in the service push method of Transmission Expansion Planning in Electric provided by the embodiment of the present application, one can also be pre-established A activity participation information library information bank, wherein the activity for having recorded the user access device of each user participates in situation, it is specific to wrap The all previous activity for including each user access device participates in the time.It certainly, further, can also be by each user access device Activity participate in the time corresponding position in user access device information bank be also recorded simultaneously.
Similarly, the relevant information in activity participation information library is also what real-time update was safeguarded.When some user access is set When some activity of standby participation, it can be updated the present system time of Grid Central server as the corresponding activity participation time In activity participation information library.
By inquiry activity participation information library, when can obtain the activity participation of each user access device the last time Between.As a result, in the service push method of Transmission Expansion Planning in Electric provided by the embodiment of the present application, also the last time is participated in movable User access device is determined as target user's access equipment, and also carries out service push to it.
The embodiment of the present application is movable by the user access device having connected simultaneously to network and the last participation User access device sends service PUSH message, can also improve user's participation activity while improving pushing efficiency and validity Enthusiasm.
Further, as a kind of specific embodiment, activity participation information library specifically can be real-time by following steps Updating maintenance:
It receives the activity that user access device is sent and participates in request;It is participated in requesting more New activity participation information according to activity Library;
Alternatively, participating in inviting to user access device transmission activity;Response more New activity is invited according to the activity received Participation information library.
On the basis of the above, in the service push method of Transmission Expansion Planning in Electric provided by the embodiment of the present application, make For a kind of specific embodiment, electricity consumption is sent to target user's access equipment and plans information on services, comprising:
Electricity consumption planning information on services and preferential message are sent to target user's access equipment.
On the basis of the above, in the service push method of Transmission Expansion Planning in Electric provided by the embodiment of the present application, make For a kind of specific embodiment, electricity consumption plans that information on services includes wrong net peak load shifting message.
Specifically, as before, wrong net electricity consumption and peak load shifting are instantly common, effective electricity consumption planning behaves.Pass through this Shen Please Transmission Expansion Planning in Electric provided by embodiment service push method, the enthusiasm of user's mistake net peak load shifting can be effectively improved, Effectively the operation of power transmission network is optimized.
Shown in Figure 2, the embodiment of the present application discloses a kind of service driving means of Transmission Expansion Planning in Electric, specifically includes that
Generation module 21 plans information on services for generating electricity consumption for operation of power networks state;
Update module 22, for pre-establishing simultaneously real-time update maintenance user access device information bank;User access device The network connection state of each user access device Yu Grid Central server is stored in information bank;
Enquiry module 23, for inquiring user access device information bank;Determine that network connection state is the user having connected Access equipment target cluster;
Sending module 24, for planning information on services to user access device object set pocket transmission electricity consumption.
As it can be seen that the application records each user access device and Grid Central server using user access device information bank Network connection state, and will in network connected status user access device as user access device target cluster and The service push of Transmission Expansion Planning in Electric is carried out, to effectively reduce the work total amount and duration consumption of service push, and is effectively mentioned The high specific aim and validity of service pushing efficiency and service push.
On the basis of the above, in the service driving means of Transmission Expansion Planning in Electric provided by the embodiment of the present application, make For a kind of specific embodiment,
Update module 22 is also used to: pre-establishing simultaneously real-time update maintenance activity participation information library;Activity participation information library In be stored with each user access device activity participate in the time record;
Enquiry module 23 is also used to: inquiry activity participation information library;The activity of determination participates in the time and current time is closest Target user's access equipment;
Sending module 24 is also used to: being sent electricity consumption to target user's access equipment and is planned information on services.
On the basis of the above, in the service driving means of Transmission Expansion Planning in Electric provided by the embodiment of the present application, make For a kind of specific embodiment, update module 22 is specifically used for:
It receives the activity that user access device is sent and participates in request;It is participated in requesting more New activity participation information according to activity Library;
Alternatively, participating in inviting to user access device transmission activity;Response more New activity is invited according to the activity received Participation information library.
On the basis of the above, in the service driving means of Transmission Expansion Planning in Electric provided by the embodiment of the present application, make For a kind of specific embodiment, sending module 24 is specifically used for:
Electricity consumption planning information on services and preferential message are sent to target user's access equipment.
On the basis of the above, in the service driving means of Transmission Expansion Planning in Electric provided by the embodiment of the present application, make For a kind of specific embodiment, electricity consumption plans that information on services includes wrong net peak load shifting message.
The particular content of service driving means about above-mentioned Transmission Expansion Planning in Electric, can refer to previously with regard to Transmission Expansion Planning in Electric Being discussed in detail for service push method, just repeats no more here.
Shown in Figure 3, the embodiment of the present application discloses a kind of electronic equipment, comprising:
Memory 31, for storing computer program;
Processor 32 realizes the service of any Transmission Expansion Planning in Electric as described above for executing the computer program The step of method for pushing.
Further, the embodiment of the present application also discloses a kind of computer readable storage medium, described computer-readable to deposit Computer program is stored in storage media, it is as described above any to realize when the computer program is executed by processor The step of service push method of Transmission Expansion Planning in Electric.
About the particular content of above-mentioned electronic equipment and computer readable storage medium, can refer to previously with regard to transmission of electricity network planning Being discussed in detail for the service push method drawn, just repeats no more here.
Each embodiment is described in a progressive manner in the application, the highlights of each of the examples are with other realities The difference of example is applied, the same or similar parts in each embodiment may refer to each other.For equipment disclosed in embodiment Speech, since it is corresponded to the methods disclosed in the examples, so being described relatively simple, related place is referring to method part illustration .
It should be noted that in present specification, the relational terms of such as " first " and " second " etc are used merely to One entity or operation and another entity or operate is distinguished, without necessarily requiring or implying these entities or There are any actual relationship or orders between person's operation.In addition, the terms "include", "comprise" or its any other Variant is intended to non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only It including those elements, but also including other elements that are not explicitly listed, or further include for this process, method, object Product or the intrinsic element of equipment.In the absence of more restrictions, the element limited by sentence "including a ...", It is not precluded in the process, method, article or apparatus that includes the element that there is also other identical elements.
Technical solution provided herein is described in detail above.Specific case used herein is to this Shen Principle and embodiment please is expounded, the present processes that the above embodiments are only used to help understand and its Core concept.It should be pointed out that for those skilled in the art, in the premise for not departing from the application principle Under, can also to the application, some improvement and modification can also be carried out, these improvement and modification are also fallen into the protection scope of the application.

Claims (10)

1. a kind of service push method of Transmission Expansion Planning in Electric characterized by comprising
Electricity consumption, which is generated, for operation of power networks state plans information on services;
Inquiry pre-establishes and the user access device information bank of real-time update maintenance;It is deposited in the user access device information bank Contain the network connection state of each user access device Yu Grid Central server;
Determine that the network connection state is the user access device target cluster having connected;
Information on services is planned to electricity consumption described in the user access device object set pocket transmission.
2. the service push method of Transmission Expansion Planning in Electric according to claim 1, which is characterized in that further include:
Inquiry pre-establishes and the activity participation information library of real-time update maintenance;It is stored in activity participation information library each The activity of user access device participates in time record;
The activity of determination participates in time and the immediate target user's access equipment of current time;
The electricity consumption, which is sent, to target user's access equipment plans information on services.
3. the service push method of Transmission Expansion Planning in Electric according to claim 2, which is characterized in that the activity participation information It is safeguarded by following steps real-time update in library:
It receives the activity that user access device is sent and participates in request;The request update activity, which is participated in, according to the activity participates in letter Cease library;
Alternatively, participating in inviting to user access device transmission activity;Response is invited to update the activity according to the activity received Participation information library.
4. the service push method of Transmission Expansion Planning in Electric according to claim 2, which is characterized in that described to be used to the target Family access equipment sends the electricity consumption and plans information on services, comprising:
The electricity consumption planning information on services and preferential message are sent to target user's access equipment.
5. the service push method of Transmission Expansion Planning in Electric according to any one of claims 1 to 4, which is characterized in that the use Electricity planning information on services includes wrong net peak load shifting message.
6. a kind of service driving means of Transmission Expansion Planning in Electric characterized by comprising
Generation module plans information on services for generating electricity consumption for operation of power networks state;
Update module, for pre-establishing simultaneously real-time update maintenance user access device information bank;The user access device letter The network connection state of each user access device Yu Grid Central server is stored in breath library;
Enquiry module, for inquiring the user access device information bank;Determine that the network connection state is the use having connected Family access equipment target cluster;
Sending module, for planning information on services to electricity consumption described in the user access device object set pocket transmission.
7. the service driving means of Transmission Expansion Planning in Electric according to claim 6, which is characterized in that
The update module is also used to: pre-establishing simultaneously real-time update maintenance activity participation information library;The activity participation information The activity that each user access device is stored in library participates in time record;
The enquiry module is also used to: inquiring activity participation information library;Determine that the activity participation time most connects with current time Close target user's access equipment;
The sending module is also used to: Xiang Suoshu target user's access equipment sends the electricity consumption and plans information on services.
8. the service driving means of Transmission Expansion Planning in Electric according to claim 7, which is characterized in that the sending module is specific For:
The electricity consumption planning information on services and preferential message are sent to target user's access equipment.
9. a kind of electronic equipment characterized by comprising
Memory, for storing computer program;
Processor, for executing the computer program to realize such as Transmission Expansion Planning in Electric described in any one of claim 1 to 5 The step of service push method.
10. a kind of computer readable storage medium, which is characterized in that be stored with computer in the computer readable storage medium Program, to realize such as Transmission Expansion Planning in Electric described in any one of claim 1 to 5 when the computer program is executed by processor Service push method the step of.
CN201910769442.5A 2019-08-20 2019-08-20 A kind of service push method and relevant device of Transmission Expansion Planning in Electric Pending CN110430283A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910769442.5A CN110430283A (en) 2019-08-20 2019-08-20 A kind of service push method and relevant device of Transmission Expansion Planning in Electric

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910769442.5A CN110430283A (en) 2019-08-20 2019-08-20 A kind of service push method and relevant device of Transmission Expansion Planning in Electric

Publications (1)

Publication Number Publication Date
CN110430283A true CN110430283A (en) 2019-11-08

Family

ID=68417088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910769442.5A Pending CN110430283A (en) 2019-08-20 2019-08-20 A kind of service push method and relevant device of Transmission Expansion Planning in Electric

Country Status (1)

Country Link
CN (1) CN110430283A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115913787A (en) * 2023-02-16 2023-04-04 国网浙江省电力有限公司 File encryption and decryption transmission method suitable for electric power data

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102074078A (en) * 2011-01-25 2011-05-25 卢泳 Electric energy meter intelligent display control device and control method thereof
CN102610078A (en) * 2012-02-24 2012-07-25 东北大学 Communication implementation method of intelligent power consumption system
CN103023150A (en) * 2012-12-18 2013-04-03 广州南方电力集团科技发展有限公司 Remote control device and method for staggering power grid peaks
CN103500360A (en) * 2013-05-29 2014-01-08 湖南大学 Industrial enterprise orderly power utility optimization method
CN105004061A (en) * 2015-07-20 2015-10-28 国网天津市电力公司 Electric water heater peak shifting parameter adjusting control system and load management method thereof
CN105827706A (en) * 2016-03-24 2016-08-03 努比亚技术有限公司 Information push device and method
CN108509583A (en) * 2018-03-29 2018-09-07 广东欧珀移动通信有限公司 A kind of information-pushing method, server and computer readable storage medium
CN108737535A (en) * 2018-05-14 2018-11-02 平安科技(深圳)有限公司 A kind of information push method, storage medium and server
CN108810056A (en) * 2017-05-04 2018-11-13 腾讯科技(北京)有限公司 Information-pushing method and device
CN110059177A (en) * 2019-04-24 2019-07-26 南京传唱软件科技有限公司 A kind of activity recommendation method and device based on user's portrait

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102074078A (en) * 2011-01-25 2011-05-25 卢泳 Electric energy meter intelligent display control device and control method thereof
CN102610078A (en) * 2012-02-24 2012-07-25 东北大学 Communication implementation method of intelligent power consumption system
CN103023150A (en) * 2012-12-18 2013-04-03 广州南方电力集团科技发展有限公司 Remote control device and method for staggering power grid peaks
CN103500360A (en) * 2013-05-29 2014-01-08 湖南大学 Industrial enterprise orderly power utility optimization method
CN105004061A (en) * 2015-07-20 2015-10-28 国网天津市电力公司 Electric water heater peak shifting parameter adjusting control system and load management method thereof
CN105827706A (en) * 2016-03-24 2016-08-03 努比亚技术有限公司 Information push device and method
CN108810056A (en) * 2017-05-04 2018-11-13 腾讯科技(北京)有限公司 Information-pushing method and device
CN108509583A (en) * 2018-03-29 2018-09-07 广东欧珀移动通信有限公司 A kind of information-pushing method, server and computer readable storage medium
CN108737535A (en) * 2018-05-14 2018-11-02 平安科技(深圳)有限公司 A kind of information push method, storage medium and server
CN110059177A (en) * 2019-04-24 2019-07-26 南京传唱软件科技有限公司 A kind of activity recommendation method and device based on user's portrait

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王波,胡子珩,邹志勇,王玮: ""深圳地区错峰用电管理***"", 《电力需求侧管理》 *
王莹: ""基于移动互联网的终端消息推送方案研究"", 《荷泽学院学报》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115913787A (en) * 2023-02-16 2023-04-04 国网浙江省电力有限公司 File encryption and decryption transmission method suitable for electric power data

Similar Documents

Publication Publication Date Title
Han et al. Day‐ahead electric vehicle aggregator bidding strategy using stochastic programming in an uncertain reserve market
Wang et al. Privacy-preserving energy scheduling in microgrid systems
Zhang et al. Life cycle planning of battery energy storage system in off‐grid wind–solar–diesel microgrid
CN108206547B (en) Method for optimizing capacity of each unit of wind-hydrogen coupled power generation system
Kim et al. Optimal scheduling for maintenance period of generating units using a hybrid scatter‐genetic algorithm
CN112907082B (en) Block chain consensus algorithm evaluation optimization method
Guo et al. Optimal design of battery energy storage system for a wind–diesel off‐grid power system in a remote Canadian community
US20210217110A1 (en) Smart power generation and targeting
Devlin et al. System flexibility provision using short term grid scale storage
Kong et al. Greenplanning: Optimal energy source selection and capacity planning for green datacenters
Sheng et al. Capacity configuration optimisation for stand‐alone micro‐grid based on an improved binary bat algorithm
Parashar et al. Modified elephant herding optimisation for economic generation co‐ordination of DERs and BESS in grid connected micro‐grid
Wang Risk assessment of stochastic spinning reserve of a wind‐integrated multi‐state generating system based on a cross‐entropy method
Du et al. Preliminary analysis of long‐term storage requirement in enabling high renewable energy penetration: A case of East Asia
Lin et al. Optimal ESS allocation in distribution network using accelerated generalised Benders decomposition
Liu Energy station and distribution network collaborative planning of integrated energy system based on operation optimization and demand response
CN111582850A (en) Electricity charge recharging method and device based on mobile phone bank
Liu et al. Chance‐constrained scheduling model of grid‐connected microgrid based on probabilistic and robust optimisation
Zhang et al. Risk‐based stochastic day‐ahead operation for data centre virtual power plants
CN110430283A (en) A kind of service push method and relevant device of Transmission Expansion Planning in Electric
Prasanta Gupta et al. Stochastic scheduling of battery energy storage system for large‐scale wind power penetration
Chakir et al. Managing a hybrid energy smart grid with a renewable energy source
Liu et al. Distributionally robust co‐optimization of the demand‐side resources and soft open points allocation for the high penetration of renewable energy
Zhang et al. Scheduling wind‐battery energy storage hybrid systems in time‐of‐use pricing schemes
Dialynas et al. Modelling and evaluation of microgrids reliability and operational performance and its impact on service quality

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhou Binghua

Inventor after: Yao Haiyan

Inventor after: Wang Dejun

Inventor after: Cui Jindong

Inventor after: Wu Jinrong

Inventor before: Zhou Binghua

Inventor before: Cui Jindong

Inventor before: Yao Haiyan

Inventor before: Wang Dejun

Inventor before: Wu Jinrong

CB03 Change of inventor or designer information
RJ01 Rejection of invention patent application after publication

Application publication date: 20191108

RJ01 Rejection of invention patent application after publication