CN110426977A - A kind of engineering monitoring data-acquisition system and method - Google Patents

A kind of engineering monitoring data-acquisition system and method Download PDF

Info

Publication number
CN110426977A
CN110426977A CN201910736604.5A CN201910736604A CN110426977A CN 110426977 A CN110426977 A CN 110426977A CN 201910736604 A CN201910736604 A CN 201910736604A CN 110426977 A CN110426977 A CN 110426977A
Authority
CN
China
Prior art keywords
monitoring
monitoring data
cloud server
dimensional code
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910736604.5A
Other languages
Chinese (zh)
Inventor
王浩
刘雷
覃卫民
张国华
田湖南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Institute of Rock and Soil Mechanics of CAS
Original Assignee
Wuhan Institute of Rock and Soil Mechanics of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Institute of Rock and Soil Mechanics of CAS filed Critical Wuhan Institute of Rock and Soil Mechanics of CAS
Priority to CN201910736604.5A priority Critical patent/CN110426977A/en
Publication of CN110426977A publication Critical patent/CN110426977A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • G05B19/0423Input/output
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/23Pc programming
    • G05B2219/23051Remote control, enter program remote, detachable programmer

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

The present invention relates to a kind of engineering monitoring data-acquisition system and method, which includes monitoring instrument and monitoring point, data gateway, Cloud Server and user terminal;One end of the data gateway is electrically connected with monitoring instrument, and the other end connects the Cloud Server;The monitoring point sign board is equipped with two dimensional code, and the two dimensional code carries the url address information of Cloud Server.Two dimensional code is arranged in the present invention on the sign board of monitoring point in advance, and two dimensional code carries the url address information of Cloud Server, and user terminal can obtain monitoring data by the two dimensional code on the sign board of scanning recognition monitoring point in Cloud Server.Needed to connect on the spot compared with monitoring of software obtains monitoring data with prior art monitoring personnel, the present invention can quickly, easily obtain monitoring data, improve work efficiency, be conducive to quickly judge engineering safety situation.

Description

A kind of engineering monitoring data-acquisition system and method
Technical field
The present invention relates to engineering monitoring technical field more particularly to a kind of engineering monitoring data-acquisition systems and method.
Background technique
Civil engineering monitoring refers in construction of structures work progress, using monitoring instrument to construction of structures or institute's preservation The technological means that is monitored of the indexs such as ess-strain, displacement, the water level of key position on periphery Rock And Soil stratum.Using prison It surveys instrument to be monitored key position items Con trolling index, issues alarm, when monitor value is close to controlling value for guaranteeing to apply The safety of work, it can also be used to check whether work progress is reasonable.
The acquisition of monitoring data at present, which requires greatly to connect monitoring of software on the spot, is read out record, and working efficiency is lower, For example, (being answered using key position index of a large amount of monitoring instrument to the periphery Rock And Soil stratum of construction of structures or institute's preservation Stress-strain, displacement, water level) it is monitored, big measuring appratus is distributed in building site, is remembered by the reading that monitoring of software is monitored data Record, process is cumbersome, brings great inconvenience to engineering monitoring.
Summary of the invention
The present invention for the technical problems in the prior art, provides a kind of engineering monitoring data capture method, solves Monitoring data reading record process is many and diverse, the lower problem of efficiency, realizes quick, easily acquisition monitoring instrument acquisition monitoring Data.
The technical scheme to solve the above technical problems is that
In a first aspect, the present invention provides a kind of engineering monitoring data-acquisition system, including monitoring point, data gateway, cloud clothes Business device and user terminal;The monitoring point is equipped with monitoring instrument and monitoring point sign board, one end of the data gateway and monitoring Instrument electrical connection, the other end connect the Cloud Server;The monitoring point sign board is equipped with two dimensional code, and the two dimensional code carries The url address information of Cloud Server;
The monitoring instrument, for acquiring monitoring data;
The data gateway for extracting the monitoring data of the monitoring instrument acquisition, and the monitoring data is sent To Cloud Server;
The Cloud Server includes database, the monitoring data that gateway is sent for receiving data and storage;
The user terminal obtains in Cloud Server for the two dimensional code on monitoring point sign board described in scanning recognition The monitoring data.
The beneficial effects of the present invention are: the monitoring data that monitoring instrument acquires are sent to cloud by data gateway by the present invention Server, Cloud Server store monitoring data in the database, and two dimensional code is arranged on the sign board of monitoring point in advance in the present invention, Two dimensional code carries the url address information of Cloud Server, and user terminal is by the two dimensional code on the sign board of scanning recognition monitoring point, i.e., Monitoring data can be obtained in Cloud Server.It needs to connect monitoring of software on the spot with prior art monitoring personnel and reads record monitoring Data are compared, and the present invention can quickly, easily obtain the monitoring data of monitoring instrument acquisition, are improved work efficiency.
Further, the Cloud Server further includes data processing module, for obtaining the monitoring data stored in database, And it is based on the monitoring data formation curve figure.
Further, the Cloud Server further includes data disaply moudle, for showing the monitoring data and curve graph In the html page of Cloud Server.
Further, the two dimensional code carries the corresponding url address information of the html page;
Correspondingly, the user terminal is specifically used for, two dimensional code described in scanning recognition is obtained into the html page and is supervised Measured data and curve graph.
Further, the user terminal includes the mobile phone and tablet computer with two-dimensional code authentication function.
Further, the data gateway connects the Cloud Server by Ethernet.
Second aspect, the present invention provide a kind of engineering monitoring data capture method, comprising:
S1 acquires monitoring data by monitoring instrument;
S2, data gateway extracts the monitoring data of the monitoring instrument acquisition, and the monitoring data are sent to cloud clothes It is stored in business device;
S3, is pre-printed two dimensional code on the sign board of monitoring point, and the two dimensional code carries the address the url letter of Cloud Server Breath;
S4, the two dimensional code on monitoring point sign board described in user terminal scanning recognition, obtains the prison in Cloud Server Measured data.
Further, upon step s 2, the method also includes:
Cloud Server is based on the monitoring data formation curve figure, and the monitoring data and curve graph are shown and are taken in cloud The html page of business device.
Further, described two dimensional code is pre-printed on the sign board of monitoring point to specifically include in step S3:
Two dimensional code is generated according to the corresponding url address information of html page, and the two dimensional code is printed on the monitoring Instrument.
Further, the S4 is specifically included: two dimensional code described in user terminal scanning recognition, into the HTML page of Cloud Server Face obtains the monitoring data and curve graph.
Beneficial effect using above-mentioned further scheme is: Cloud Server is based on monitoring data formation curve figure, monitors people Member can enter the html page of Cloud Server, obtain monitoring data and curve graph by mobile phone scanning recognition two dimensional code, and existing There is technology to compare, the present invention is capable of the situation of change of more intuitive feedback monitoring data, is conducive to quickly judge engineering safety Situation.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of engineering monitoring data-acquisition system provided in an embodiment of the present invention;
Fig. 2 is engineering monitoring data capture method flow diagram provided in an embodiment of the present invention.
In attached drawing, parts list represented by the reference numerals are as follows:
1, monitoring point, 2, data gateway, 3, Cloud Server, 4, user terminal, 5, two dimensional code, 6, database, 7, at data Manage module, 8, data disaply moudle, 9, monitoring instrument.
Specific embodiment
The principle and features of the present invention will be described below with reference to the accompanying drawings, and the given examples are served only to explain the present invention, and It is non-to be used to limit the scope of the invention.
Fig. 1 is the structural schematic diagram of engineering monitoring data-acquisition system provided in an embodiment of the present invention;As shown in Figure 1, should System includes monitoring point 1, data gateway 2, Cloud Server 3 and user terminal 4;The monitoring point 1 is equipped with monitoring instrument 9 and monitoring Point sign board, one end of the data gateway 2 are electrically connected with monitoring instrument 9, and the other end connects the Cloud Server 3;The prison Measuring point sign board is equipped with two dimensional code 5, and the two dimensional code 5 carries the url address information of Cloud Server 3;
It is understood that the deployment site in monitoring point is provided with monitoring point sign board in the present embodiment, two dimensional code can To be arranged on monitoring point or monitoring point sign board, it is not specifically limited herein.
In the present embodiment, corresponding two dimensional code 5 is printed on monitoring point 1 in advance, two dimensional code 5 passes through QR code coding staff Formula coding generates, and carries the url address information of Cloud Server 3.Wherein, two dimensional code (2-dimensional bar code) is to use Certain specific geometric figure is according to certain rules in the chequered with black and white graphic recording data symbols of plane (on two-dimensional directional) distribution Number information;Dexterously made using " 0 " of computer-internal logical foundations, the concept of " 1 " bit stream is constituted in code compilation Text numerical information is indicated with several geometrical bodies corresponding with binary system, passes through image input device or optoelectronic scanning Equipment automatically identifying and reading is to realize automatic processing of information.It has some general character of barcode technology: every kind of code system has its specific word Symbol collection;Each character occupies certain width, has certain verifying function etc..Also have simultaneously automatic to the information that do not go together Identification function and the processing rotationally-varying point of figure.URL (Uniform Resource Locator) is with the abstract form of character string To describe the address of a resource on the world wide web (www.One url unique identification, one web resource is by corresponding url It can get the resource.Url is uniform resource locator, the position and access method to the resource that can be obtained from internet A kind of succinct expression is the address of standard resource on internet.Each file on internet has a unique url, The information that it includes points out how the position of file and browser should handle it.
The monitoring instrument 9, for acquiring monitoring data;
Wherein, the quantity of monitoring instrument can be one or more.When the quantity of monitoring instrument is multiple, monitoring instrument Type may be it is a variety of, each monitoring instrument acquires corresponding monitoring data, is not specifically limited herein.
The data gateway 2, the monitoring data acquired for extracting the monitoring instrument 9, and the monitoring data are sent out It send to Cloud Server 3;
Specifically, data gateway 2 is connect with monitoring instrument 9 by fieldbus, it is integrated with web issuing function, by having Line or wireless interface are directly accessed Internet.In the present embodiment, data gateway 2 extracts the monitoring number that monitoring instrument 9 acquires According to, and monitoring data are sent to Cloud Server 3.
The Cloud Server 3 includes database 6, the monitoring data that gateway 2 is sent for receiving data and storage;
The user terminal 4, the two dimensional code 5 on monitoring point sign board described in scanning recognition, is obtained in Cloud Server 3 Take the monitoring data.
It should be noted that during engineering monitoring, there is a large amount of monitoring instrument to construction of structures or institute's preservation The key position index on periphery Rock And Soil stratum is monitored, such as the monitoring data such as ess-strain, displacement and water level, traditional Monitoring data acquisition methods, need monitoring personnel to read at the scene using monitoring of software, and process is cumbersome, working efficiency compared with It is low, great inconvenience is brought to engineering monitoring.And engineering monitoring data-acquisition system provided in an embodiment of the present invention, data gateway The monitoring data of monitoring instrument acquisition are sent to Cloud Server 3 by 2, and monitoring data are stored in database 6 by Cloud Server 3, Two dimensional code 5 is set on the sign board of monitoring point in advance, and two dimensional code 5 carries the url address information of Cloud Server 3.Work as monitoring personnel It should be understood that when monitoring data, it, can be in cloud by having the 4 scanning recognition two dimensional code 5 of user terminal of two-dimensional code authentication function Monitoring data are obtained in server 3.Compared with traditional monitoring data acquisition methods, the present invention, which realizes, quickly, easily to be obtained The monitoring data of monitoring instrument acquisition, improve work efficiency.
Engineering monitoring data-acquisition system provided in an embodiment of the present invention, the prison for being acquired monitoring instrument by data gateway Measured data is sent to Cloud Server, and monitoring data are stored in database 6 by Cloud Server, and the present invention indicates in monitoring point in advance Two dimensional code is set on board, and two dimensional code carries the url address information of Cloud Server, and user terminal is indicated by scanning recognition monitoring point Two dimensional code on board can obtain monitoring data in Cloud Server.It needs to connect monitoring on the spot with prior art monitoring personnel Software reads record monitoring data and compares, and the present invention can quickly, easily obtain the monitoring data of monitoring instrument acquisition, improves Working efficiency.
Content based on the above embodiment, as a kind of alternative embodiment, the Cloud Server 3 further includes data processing mould Block 7 for obtaining the monitoring data stored in database 6, and is based on the monitoring data formation curve figure.
Specifically, the Historical Monitoring data of the acquisition of monitoring instrument 9, data processing are stored in the database 6 of Cloud Server 3 Module 7 obtains the monitoring data stored in database 6, and automates formation curve figure based on monitoring data, so that monitoring personnel By checking that curve graph can intuitively obtain the situation of change of monitoring data.
Content based on the above embodiment, as a kind of alternative embodiment, the Cloud Server 3 further includes that data show mould Block 8, for the monitoring data and curve graph to be shown to the html page in Cloud Server 3.
Content based on the above embodiment, as a kind of alternative embodiment, the two dimensional code 5 carries the html page pair The url address information answered;
Correspondingly, the user terminal 4 is specifically used for, two dimensional code 5 described in scanning recognition are obtained into the html page Monitoring data and curve graph.
It is understood that the two dimensional code 5 of monitoring point 1 is according to the corresponding address the url letter of html page in the present embodiment Breath generates, and will be printed on corresponding monitoring point 1.When monitoring personnel needs to obtain monitoring data, by with two dimension The 4 scanning recognition two dimensional code of user terminal of code identification function, can by the corresponding url address information of parsing html page, into Enter the html page of Cloud Server 3, obtains monitoring data and curve graph.
Engineering monitoring data-acquisition system provided in an embodiment of the present invention, Cloud Server are based on monitoring data formation curve Figure, monitoring personnel can be entered the html page of Cloud Server, be obtained by the two dimensional code on the sign board of scanning recognition monitoring point Monitoring data and curve graph, compared with prior art, the present invention can more easily obtain monitoring data, and pass through curve graph Get information about the situation of change of monitoring data.
Content based on the above embodiment, as a kind of alternative embodiment, the user terminal 4 includes that there is two dimensional code to know The mobile phone and tablet computer of other function.In the present embodiment, when monitoring personnel needs to obtain monitoring data, by with two dimensional code Two dimensional code on mobile phone and plate cat scanner the identification monitoring point sign board of identification function, can enter the HTML of Cloud Server The page obtains monitoring data.
Content based on the above embodiment, as a kind of alternative embodiment, the data gateway 2 connects institute by Ethernet State Cloud Server.
Content based on the above embodiment, as a kind of alternative embodiment, Fig. 2 is engineering provided in an embodiment of the present invention prison Measured data acquisition methods flow diagram, as shown in Fig. 2, this method comprises:
S1 acquires monitoring data by monitoring instrument;
Wherein, the quantity of monitoring instrument can be one or more.When the quantity of monitoring instrument is multiple, each monitoring Instrument acquires corresponding monitoring data, is not specifically limited herein.
S2, data gateway extracts the monitoring data of the monitoring instrument acquisition, and the monitoring data are sent to cloud clothes It is stored in business device;
Specifically, referring to Figures 1 and 2, data gateway is connect with monitoring instrument by fieldbus, it is integrated with web publication Function is directly accessed Internet by wired or wireless interface.In the present embodiment, data gateway extracts monitoring instrument acquisition Monitoring data, and monitoring data are sent to Cloud Server.
S3, is pre-printed two dimensional code on the sign board of monitoring point, and the two dimensional code carries the address the url letter of Cloud Server Breath;
S4, the two dimensional code on monitoring point sign board described in user terminal scanning recognition, obtains the prison in Cloud Server Measured data.
It should be noted that during engineering monitoring, there is a large amount of monitoring instrument to construction of structures or institute's preservation The key position index on periphery Rock And Soil stratum is monitored, such as the monitoring data such as ess-strain, displacement and water level, traditional Monitoring data acquisition methods, need monitoring personnel to read at the scene using monitoring of software, and process is cumbersome, working efficiency compared with It is low, great inconvenience is brought to engineering monitoring.And engineering monitoring data-acquisition system provided in an embodiment of the present invention, data gateway The monitoring data that monitoring instrument acquires are sent to Cloud Server, Cloud Server stores monitoring data in the database, in advance Two dimensional code is set on the sign board of monitoring point, and two dimensional code carries the url address information of Cloud Server.As monitoring personnel it should be understood that When monitoring data, by having the user terminal scanning recognition two dimensional code of two-dimensional code authentication function, it can be obtained in Cloud Server Take monitoring data.Compared with traditional monitoring data acquisition methods, the present invention, which realizes, quickly, easily obtains monitoring instrument acquisition Monitoring data, improve work efficiency.
Engineering monitoring data capture method provided in an embodiment of the present invention, the prison for being acquired monitoring instrument by data gateway Measured data is sent to Cloud Server, and Cloud Server stores monitoring data in the database, and the present invention indicates in monitoring point in advance Two dimensional code is set on board, and two dimensional code carries the url address information of Cloud Server, and user terminal is indicated by scanning recognition monitoring point The two dimensional code of board can obtain monitoring data in Cloud Server.It is soft to need to connect monitoring on the spot with prior art monitoring personnel Part reads record monitoring data and compares, and the present invention can quickly, easily obtain the monitoring data of monitoring instrument acquisition, improves Working efficiency.
Content based on the above embodiment, as a kind of alternative embodiment, upon step s 2, the method also includes:
Cloud Server is based on the monitoring data formation curve figure, and the monitoring data and curve graph are shown and are taken in cloud The html page of business device.
Content based on the above embodiment, it is described on the sign board of monitoring point in step S3 as a kind of alternative embodiment Two dimensional code is pre-printed to specifically include:
Two dimensional code is generated according to the corresponding url address information of html page, and the two dimensional code is printed on the monitoring Instrument.
Specifically, the two dimensional code on the sign board of monitoring point is to be generated according to the corresponding url address information of html page, and incite somebody to action It is printed on corresponding monitoring point sign board.When monitoring personnel needs to obtain monitoring data, by being identified with two dimensional code The user terminal scanning recognition two dimensional code of function, can be by the corresponding url address information of parsing html page, into cloud service The html page of device obtains monitoring data and curve graph.
Content based on the above embodiment, as a kind of alternative embodiment, above-mentioned steps S4 is specifically included: user terminal is swept The identification two dimensional code is retouched, the html page into Cloud Server obtains the monitoring data and curve graph.
Engineering monitoring data capture method provided in an embodiment of the present invention, Cloud Server are based on monitoring data formation curve Figure, monitoring personnel can enter the html page of Cloud Server, obtain monitoring data and song by mobile phone scanning recognition two dimensional code Line chart, compared with prior art, the present invention can more easily obtain monitoring data, and get information about prison by curve graph The situation of change of measured data.
It should be noted that in the description of the embodiment of the present invention, the terms "include", "comprise" or its any other change Body is intended to non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wrapped Those elements are included, but also including other elements that are not explicitly listed, or further includes for this process, method, article Or the element that equipment is intrinsic.Term " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be fixed connect It connects, may be a detachable connection, or be integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be direct phase Even, the connection inside two elements can also be can be indirectly connected through an intermediary.For the ordinary skill people of this field For member, above-mentioned term can be understood in concrete meaning of the invention as the case may be.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of engineering monitoring data-acquisition system, which is characterized in that including monitoring point, data gateway, Cloud Server and user Terminal;The monitoring point is equipped with monitoring instrument and monitoring point sign board, and one end of the data gateway is electrically connected with monitoring instrument, The other end connects the Cloud Server;The monitoring point sign board is equipped with two dimensional code, and the two dimensional code carries Cloud Server Url address information;
The monitoring instrument, for acquiring monitoring data;
The monitoring data for extracting the monitoring data of the monitoring instrument acquisition, and are sent to cloud by the data gateway Server;
The Cloud Server includes database, the monitoring data that gateway is sent for receiving data and storage;
The user terminal, for the two dimensional code on monitoring point sign board described in scanning recognition, in Cloud Server described in acquisition Monitoring data.
2. engineering monitoring data-acquisition system according to claim 1, which is characterized in that the Cloud Server further includes number According to processing module, for obtaining the monitoring data stored in database, and it is based on the monitoring data formation curve figure.
3. engineering monitoring data-acquisition system according to claim 2, which is characterized in that the Cloud Server further includes number According to display module, for the monitoring data and curve graph to be shown to the html page in Cloud Server.
4. engineering monitoring data-acquisition system according to claim 3, which is characterized in that described in the two dimensional code carries The corresponding url address information of html page;
Correspondingly, the user terminal is specifically used for, two dimensional code described in scanning recognition obtains monitoring number into the html page According to and curve graph.
5. engineering monitoring data-acquisition system according to claim 1, which is characterized in that the user terminal includes having The mobile phone and tablet computer of two-dimensional code authentication function.
6. engineering monitoring data-acquisition system according to claim 1, which is characterized in that the data gateway passes through ether Net connects the Cloud Server.
7. a kind of engineering monitoring data capture method characterized by comprising
S1 acquires monitoring data by monitoring instrument;
S2, data gateway extract the monitoring data of the monitoring instrument acquisition, and the monitoring data are sent to Cloud Server Middle storage;
S3, is pre-printed two dimensional code on the sign board of monitoring point, and the two dimensional code carries the url address information of Cloud Server;
S4, the two dimensional code on monitoring point sign board described in user terminal scanning recognition, obtains the monitoring number in Cloud Server According to.
8. engineering monitoring data capture method according to claim 7, which is characterized in that upon step s 2, the side Method further include:
Cloud Server is based on the monitoring data formation curve figure, and the monitoring data and curve graph are shown in Cloud Server Html page.
9. engineering monitoring data capture method according to claim 8, which is characterized in that described to monitor in step S3 Two dimensional code is pre-printed on point sign board to specifically include:
Two dimensional code is generated according to the corresponding url address information of html page, and the two dimensional code is printed on the monitoring point.
10. engineering monitoring data capture method according to claim 9, which is characterized in that the S4 is specifically included:
Two dimensional code described in user terminal scanning recognition, the html page into Cloud Server obtain the monitoring data and curve Figure.
CN201910736604.5A 2019-08-09 2019-08-09 A kind of engineering monitoring data-acquisition system and method Pending CN110426977A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910736604.5A CN110426977A (en) 2019-08-09 2019-08-09 A kind of engineering monitoring data-acquisition system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910736604.5A CN110426977A (en) 2019-08-09 2019-08-09 A kind of engineering monitoring data-acquisition system and method

Publications (1)

Publication Number Publication Date
CN110426977A true CN110426977A (en) 2019-11-08

Family

ID=68413830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910736604.5A Pending CN110426977A (en) 2019-08-09 2019-08-09 A kind of engineering monitoring data-acquisition system and method

Country Status (1)

Country Link
CN (1) CN110426977A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110952828A (en) * 2019-12-05 2020-04-03 国家电网有限公司 Pole tower grounding down lead anchor bar
CN111683412A (en) * 2020-05-29 2020-09-18 广州微体科技有限公司 Device code scanning networking method, computer readable storage medium and electronic device

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101900532A (en) * 2009-05-06 2010-12-01 中山大学 Perturbation-fiber bragg grating coupling method-based technology for monitoring stability of rock-soil body
CN104660794A (en) * 2013-11-22 2015-05-27 中兴通讯股份有限公司 Mobile terminal and parameter processing method thereof
US20150213197A1 (en) * 2014-01-27 2015-07-30 RDFISolutions, LLC Event Based Tracking, Health Management, and Patient and Treatment Monitoring System
CN204557952U (en) * 2015-04-23 2015-08-12 中国环境监测总站 A kind of sign board being used as permanent soil environment monitoring point position
CN105554163A (en) * 2016-02-01 2016-05-04 武汉楚云端信息科技有限责任公司 Remote monitoring system based on cloud computing and remote monitoring method
CN105978978A (en) * 2016-05-16 2016-09-28 太湖流域管理局水文局(信息中心) System for achieving real-time exchange of outdoor monitoring data of hydrological environment
CN108195423A (en) * 2017-12-26 2018-06-22 上海岩土工程勘察设计研究院有限公司 A kind of data integrated system and method for engineering monitoring
CN109612519A (en) * 2018-07-30 2019-04-12 中铁七局集团西安铁路工程有限公司 One kind being based on 4G network cloud server machinery monitoring device
CN109708688A (en) * 2017-09-12 2019-05-03 建设综合勘察研究设计院有限公司 A kind of monitoring of history culture building safety and early warning system and method
CN109947024A (en) * 2019-03-29 2019-06-28 中铁隧道局集团有限公司 A kind of rail traffic data monitoring method based on mobile terminal

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101900532A (en) * 2009-05-06 2010-12-01 中山大学 Perturbation-fiber bragg grating coupling method-based technology for monitoring stability of rock-soil body
CN104660794A (en) * 2013-11-22 2015-05-27 中兴通讯股份有限公司 Mobile terminal and parameter processing method thereof
US20150213197A1 (en) * 2014-01-27 2015-07-30 RDFISolutions, LLC Event Based Tracking, Health Management, and Patient and Treatment Monitoring System
CN204557952U (en) * 2015-04-23 2015-08-12 中国环境监测总站 A kind of sign board being used as permanent soil environment monitoring point position
CN105554163A (en) * 2016-02-01 2016-05-04 武汉楚云端信息科技有限责任公司 Remote monitoring system based on cloud computing and remote monitoring method
CN105978978A (en) * 2016-05-16 2016-09-28 太湖流域管理局水文局(信息中心) System for achieving real-time exchange of outdoor monitoring data of hydrological environment
CN109708688A (en) * 2017-09-12 2019-05-03 建设综合勘察研究设计院有限公司 A kind of monitoring of history culture building safety and early warning system and method
CN108195423A (en) * 2017-12-26 2018-06-22 上海岩土工程勘察设计研究院有限公司 A kind of data integrated system and method for engineering monitoring
CN109612519A (en) * 2018-07-30 2019-04-12 中铁七局集团西安铁路工程有限公司 One kind being based on 4G network cloud server machinery monitoring device
CN109947024A (en) * 2019-03-29 2019-06-28 中铁隧道局集团有限公司 A kind of rail traffic data monitoring method based on mobile terminal

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
涂文良: "浅析地铁深基坑紧邻高层建筑施工控制技术", 《2018世界交通运输大会论文集》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110952828A (en) * 2019-12-05 2020-04-03 国家电网有限公司 Pole tower grounding down lead anchor bar
CN111683412A (en) * 2020-05-29 2020-09-18 广州微体科技有限公司 Device code scanning networking method, computer readable storage medium and electronic device

Similar Documents

Publication Publication Date Title
CN105825556A (en) Intelligent inspection system
CN105378700A (en) Capture and association of measurement data
CN102005065A (en) Handheld inspection device of maintenance and operation system for equipment and method thereof
CN205581925U (en) Anti -fake bar code label of nested type, anti -fake bar code tag information collector and anti -fake verification system
CN105654219A (en) Two-dimensional-code-based intelligent instrument life-cycle management system
CN103631902B (en) A kind of electric field checking device and method
CN110689148A (en) Metering equipment fault detection method based on AR technology
CN106874974A (en) A kind of Work tool Mobile solution implementation method based on technology of Internet of things
CN110426977A (en) A kind of engineering monitoring data-acquisition system and method
CN105574698A (en) Intelligent storage management system based on big data
CN107194823A (en) A kind of mobile terminal agricultural monitoring method for early warning and system
KR101095849B1 (en) Method and appaeatus for managing irrigation and drainage at rural area using mobile station
CN103020773B (en) Elevator intelligent laboratory information management system based on RFID
CN206541333U (en) A kind of decoration project work progress management system based on technology of Internet of things
CN205176919U (en) Power plant removes operation management system
CN102651063A (en) Method for warehousing information of electronic device
CN203149604U (en) Hand transcriber system for intelligent inspection of industrial equipment
CN109901972A (en) A kind of monitoring journal obtaining method, device, equipment and medium based on BMC
CN113743547A (en) Asset supervision method and platform based on RFID (radio frequency identification) tag and storage medium
CN106004716B (en) A kind of intelligent logistic car networked system
CN104281974A (en) Mobile operation unified identifying, recognizing and information obtaining method and system
CN104992136B (en) Identify the method and device of bar code
CN110866712A (en) Intelligent component logistics positioning method and system based on BIM (building information modeling) plug-in
CN100437740C (en) Associating website clicks with links on a web page
CN114567374A (en) Method for checking operating conditions of a facility point, and associated device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191108