- CN110426542A CN110426542A CN201910717871.8A CN201910717871A CN110426542A CN 110426542 A CN110426542 A CN 110426542A CN 201910717871 A CN201910717871 A CN 201910717871A CN 110426542 A CN110426542 A CN 110426542A
- Authority
- CN
- China
- Prior art keywords
- cabinet body
- electricity consumption
- cabinet
- monitoring device
- consumption monitoring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000005611 electricity Effects 0.000 title claims abstract description 55
- 238000012806 monitoring device Methods 0.000 title claims abstract description 31
- 238000009434 installation Methods 0.000 claims abstract description 19
- 230000000007 visual effect Effects 0.000 claims description 9
- 238000012544 monitoring process Methods 0.000 claims description 7
- 230000017525 heat dissipation Effects 0.000 claims description 5
- 210000002421 cell wall Anatomy 0.000 claims description 3
- 230000001360 synchronised effect Effects 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 3
- 230000032683 aging Effects 0.000 description 2
- 238000004378 air conditioning Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- NIXOWILDQLNWCW-UHFFFAOYSA-N acrylic acid group Chemical group C(C=C)(=O)O NIXOWILDQLNWCW-UHFFFAOYSA-N 0.000 description 1
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 230000004069 differentiation Effects 0.000 description 1
- 239000011521 glass Substances 0.000 description 1
- 230000005923 long-lasting effect Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 239000003381 stabilizer Substances 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
- 239000012780 transparent material Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R1/00—Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
- G01R1/02—General constructional details
- G01R1/04—Housings; Supporting members; Arrangements of terminals
- G01R1/0408—Test fixtures or contact fields; Connectors or connecting adaptors; Test clips; Test sockets
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R1/00—Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
- G01R1/02—General constructional details
- G01R1/04—Housings; Supporting members; Arrangements of terminals
- G01R1/0408—Test fixtures or contact fields; Connectors or connecting adaptors; Test clips; Test sockets
- G01R1/0416—Connectors, terminals
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R11/00—Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
- G01R11/02—Constructional details
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R11/00—Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
- G01R11/02—Constructional details
- G01R11/04—Housings; Supporting racks; Arrangements of terminals
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R11/00—Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
- G01R11/02—Constructional details
- G01R11/25—Arrangements for indicating or signalling faults
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R22/00—Arrangements for measuring time integral of electric power or current, e.g. electricity meters
- G01R22/06—Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
- G01R22/061—Details of electronic electricity meters
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R22/00—Arrangements for measuring time integral of electric power or current, e.g. electricity meters
- G01R22/06—Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
- G01R22/061—Details of electronic electricity meters
- G01R22/065—Details of electronic electricity meters related to mechanical aspects
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R22/00—Arrangements for measuring time integral of electric power or current, e.g. electricity meters
- G01R22/06—Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
- G01R22/061—Details of electronic electricity meters
- G01R22/068—Arrangements for indicating or signaling faults
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Patch Boards (AREA)
Abstract
The present invention relates to a kind of electricity consumption monitoring devices comprising: Installation cabinet, the Installation cabinet include the cabinet body being mutually rotatablely connected and cabinet door, and the bottom of the cabinet body is equipped with movable pulley;Insert row is switched, the switch insert row is set on the cabinet body, and the switch insert row includes at least two jacks, and the jack is for the plug grafting with power device;Fixing seat, the fixing seat are set on the inner wall of the cabinet body;And three-phase kilowatt-hour meter, the three-phase kilowatt-hour meter is set in the cabinet body and is electrically connected with the switch insert row, and the three-phase kilowatt-hour meter is also used to connect with external power supply.By installing movable pulley in the bottom of cabinet body, thus has stronger maneuverability, it can be according to the flexible mobile handoff of need of work to different job sites, use electric installation and switch insert row grafting, it is monitored and measures with the real-time electricity consumption situation to power device, realize in the unit time to the synchronous purpose for carrying out electricity consumption metering of different power devices.
Description
Technical field
The present invention relates to electric quantity metering equipment technical fields, more particularly to a kind of electricity consumption monitoring device.
Background technique
With the development of the social economy, people's lives level is also continuously improved, mark the most significant is various each
The household electricity equipment of sample more and more appears in us at one's side.In order to understand the use of each household electricity equipment under different conditions
Charge condition, to prevent electricity consumption is excessive from causing circuit overload is on fire to wait danger, it is therefore desirable to measuring equipment be used
Ensure Electrical Safety.
However, traditional Electro-metering mode is between end of incoming cables and transformer or between transformer and load end
Three-phase intelligent ammeter is installed to record the real-time electricity consumption of user, but since three-phase intelligent ammeter in this kind of metering method can not be right
The electricity consumption of the different power devices of different location carries out flexible, real time on-line monitoring and metering, leads to service performance and is applicable in
There are biggish limitations for range.
Summary of the invention
Based on this, it is necessary to provide a kind of electricity consumption monitoring device, it is intended to which different location can not be directed to by solving the prior art
Different power devices electricity consumption realize effectively detection, lead to the problem big using limitation.
Its technical solution is as follows:
A kind of electricity consumption monitoring device comprising:
Installation cabinet, the Installation cabinet include the cabinet body being mutually rotatablely connected and cabinet door, and the bottom of the cabinet body is equipped with shifting
Driving wheel;
Insert row is switched, the switch insert row is set on the cabinet body, and the switch insert row includes at least two jacks, institute
Jack is stated for the plug grafting with power device;
Fixing seat, the fixing seat are set on the inner wall of the cabinet body;And
Three-phase kilowatt-hour meter, the three-phase kilowatt-hour meter are set in the cabinet body and are electrically connected with the switch insert row, and described three
Phase ammeter is also used to connect with external power supply.
Above-mentioned electricity consumption monitoring device and is pacified respectively on the cabinet in use, by installing movable pulley in the bottom of cabinet body
Three-phase kilowatt-hour meter and switch insert row are filled, and is electrically connected three-phase kilowatt-hour meter and switch insert row, three-phase kilowatt-hour meter connects with external power supply simultaneously
It connects well, thus has stronger maneuverability using electric quantity monitoring equipment by movable pulley, can flexibly be moved according to need of work
It is dynamic to switch to different job sites, using electric installation and switch insert row grafting, with the real-time electricity consumption situation to power device
It is monitored and measures.Further, since being provided at least two jacks on switch insert row, it is thus possible to while not at least two
Same power device connects simultaneously, realizes in the unit time to the synchronous purpose for carrying out electricity consumption metering of different power devices.On
The scheme of stating can greatly promote the scope of application and service performance of electricity consumption monitoring device.
The technical solution of the application is further described below:
The cabinet body is rotatably set on the cabinet body by gear assembly in one of the embodiments, the tooth
Wheel assembly includes the first gear being set on the cabinet body and the second gear that is set in the cabinet door, first tooth
Wheel is engaged with the second gear, and the cabinet door and the cabinet body is enabled to open and close cooperation;The three-phase kilowatt-hour meter is set to institute
It states on the inner wall of cabinet body, the cabinet door is equipped with visual windows, and the visual windows are opposite with the three-phase kilowatt-hour meter.
The switch insert row is two in one of the embodiments, and the two sides of the width direction of the cabinet body are distinguished
It is concaved with mounting groove, the cell wall of the mounting groove is provided with latch catch, and the switch insert row is set to correspondingly
It is snapped connection in the mounting groove and with the latch catch, the mounting groove offered line close to the side wall of the movable pulley
Notch.
Two lateral surfaces of the width direction of the cabinet body are provided with shield, the protection in one of the embodiments,
It covers above the notch of the mounting groove.
The cabinet body is equipped with sliding rail in one of the embodiments, and the shield is equipped with sliding slot, and the sliding rail clamps
In in the sliding slot, enabling the shield mobile relative to the mounting groove.
Handle lock is provided on the inner sidewall of the cabinet door in one of the embodiments, on the lateral wall of the cabinet door
It is provided with knob, the knob is connect by trundle with the handle lock.
The rear wall of the cabinet body offers spaced heat dissipation grid and outlet hole in one of the embodiments,.
The electricity consumption monitoring device further includes connecting terminal in one of the embodiments, the connecting terminal setting
In on the rear wall of the cabinet body and between the three-phase kilowatt-hour meter and the switch extension socket.
The electricity consumption monitoring device further includes the first operating status lamp, the second operation shape in one of the embodiments,
State lamp and third operating status lamp, the first operating status lamp, the second operating status lamp and the third run shape
State lamp is electrically connected with the connecting terminal respectively.
The electricity consumption monitoring device further includes drawing handle in one of the embodiments, and the drawing handle is set to the cabinet
On the outside of the roof of body.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of electricity consumption monitoring device described in one embodiment of the invention;
Fig. 2 is the positive structure diagram of Fig. 1.
Description of symbols:
10, Installation cabinet, 11, cabinet body, 12, cabinet door, 13, gear assembly, 14, visual windows, 15, heat dissipation grid, 16, outlet
Hole, 20, movable pulley, 30, switch insert row, 40, three-phase kilowatt-hour meter, 50, mounting groove, 60, shield, 70, handle lock, 80, terminals
Son, the 90, first operating status lamp, the 100, second operating status lamp, 110, third operating status lamp, 120, drawing handle.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention more comprehensible, below in conjunction with attached drawing and specific embodiment party
Formula, the present invention is further described in detail.It should be understood that the specific embodiments described herein are only to solve
The present invention is released, and the scope of protection of the present invention is not limited.
It should be noted that when element is referred to as " being fixedly arranged on ", " being set to " or " install in " another element, it can be with
Directly on the other element or there may also be elements placed in the middle.When an element is considered as " connection " another yuan
Part, it can be directly to another element or may be simultaneously present centering elements;One element and another element
The concrete mode being fixedly connected can be achieved by the prior art, and details are not described herein, it is preferred to use the fixation side of threaded connection
Formula.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention
The normally understood meaning of technical staff is identical.Term as used herein in the specification of the present invention is intended merely to description tool
The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term " and or " used herein includes one or more
Any and all combinations of relevant listed item.
Heretofore described " first ", " second " do not represent specific quantity and sequence, are only used for the differentiation of title.
As shown in Figure 1, for one embodiment of the application show electricity consumption monitoring device, for different electricity consumption places not
Electricity consumption monitoring and metering are carried out with power device, such as a skyscraper, numerous air-conditionings, electricity are installed
Depending on, headlamp etc., when there are influence factors such as ageing equipment, electric current transmission unstabilitys, for avoid electricity consumption be more than rated capacity (i.e.
Carry), then it needs to carry out electricity consumption monitoring and metering respectively to each air-conditioning, TV, headlamp, it is hidden utmostly to eliminate electricity consumption
Suffer from, lifting means use reliability.
Specifically, electricity consumption monitoring device includes: Installation cabinet 10, switch insert row 30 and three-phase kilowatt-hour meter 40.The Installation cabinet
Including the cabinet body 11 being mutually rotatablely connected and cabinet door 12, the bottom of the cabinet body 11 is equipped with movable pulley 20, and movable pulley 20 is preferred
For universal wheel, thus assign the stronger locomotivity of equipment.In addition, the bottom of cabinet body 11 is also equipped with positioning stabilizer blade, for setting
It is standby to be fixed on work-yard.The switch insert row 30 is set on the cabinet body 11, and the switch insert row 30 includes at least
Two jacks, the jack is for the plug grafting with power device;The three-phase kilowatt-hour meter 40 is set in the cabinet body 11 simultaneously
It is electrically connected with the switch insert row 30, and the three-phase kilowatt-hour meter 40 is also used to connect with external power supply.
Above-mentioned electricity consumption monitoring device is in use, by installing movable pulley 20 in the bottom of cabinet body 11, and on cabinet body 11
Installation three-phase kilowatt-hour meter 40 and switch insert row 30 respectively, and it is electrically connected three-phase kilowatt-hour meter 40 and switch insert row 30, three-phase kilowatt-hour meter 40
It is connect simultaneously with external power supply well, thus has stronger maneuverability using electric quantity monitoring equipment by movable pulley 20, it can
According to the flexible mobile handoff of need of work to different job sites, using electric installation and switch 30 grafting of insert row, to electricity consumption
The real-time electricity consumption situation of device is monitored and measures.Further, since at least two jacks are provided on switch insert row 30, because
And can be connected simultaneously from least two different power devices simultaneously, it realizes in the unit time to the same stepping of different power devices
The purpose of row electricity consumption metering.Above scheme can greatly promote the scope of application and service performance of electricity consumption monitoring device.
Please continue to refer to Fig. 1 and Fig. 2, in an embodiment, the cabinet door 12 is rotatably set to institute by gear assembly 13
It states on cabinet body 11, the gear assembly includes the first gear being set on the cabinet body 11 and is set in the cabinet door 12
Second gear, the first gear engages with the second gear, so that the cabinet door 12 and the cabinet body 11 opening and closing cooperate.
It should be understood that first gear and second gear are bevel gear.
Wherein, cabinet body 11 and cabinet door 12 constitute the Installation cabinet 10 of trapezoidal cube structure, can increase the capacity of Installation cabinet 10,
Each electronic component is set to keep installation electric clearance;It is preferred that being made of stainless steel material, to improve service life.Cabinet door 12 passes through
Upper and lower two gear assemblies 13 are installed on the leading flank of cabinet body 11, and staff is facilitated to open or close operation.The three-phase electricity
Table 40 is set on the inner wall of the cabinet body 11, and the cabinet door 12 is equipped with visual windows 14, the visual windows 14 and described three
Phase ammeter 40 is opposite.By the way that visual windows 14 are arranged, so that equipment is also able to observe that on three-phase kilowatt-hour meter 40 when working normally
Numerical value takes into account work convenience and safety.The size of visual windows 14 should be equal or slightly larger than three-phase kilowatt-hour meter 40
Size, so as to show ammeter completely to effectively record required data.
It is provided with handle lock 70 on the inner sidewall of the cabinet door 12, is provided with knob on the lateral wall of the cabinet door 12, institute
Knob is stated to connect by trundle with the handle lock.Wherein, trundle is installed through preset installation through-hole in cabinet door 12
It is interior, and both ends exceed 12 thickness both side surface of cabinet door respectively.Handle lock 70 is placed in the position of the center-right side of cabinet door 12, work
When, rotation work personnel can synchronize driving handle lock 70 in external turning knob and rotate, it will be able to which locking opens Installation cabinet
10, to keep equipment use more safe and reliable.It should be understood that handle lock 70 can be using any mature skill in the prior art
The lockset of art.
For further lifting means service performance, the switch insert row 30 is two, the width direction of the cabinet body 11
Two sides are recessed with mounting groove 50 respectively inwards, and the switch insert row 30 is set to correspondingly in the mounting groove 50, institute
The side wall that mounting groove 50 is stated close to the movable pulley 20 offers crossed beam trunking mouth.Mounting groove 50 can will switch the firm peace of insert row 30
Dress is fixed, and the outlet of switch insert row 30 can be passed through out of crossed beam trunking mouth, and mounting groove 50 is avoided to interfere with switch insert row 30.
Preferably, it is convenient to mount and dismount to make to switch insert row 30, the cell wall of mounting groove 50 is equipped with latch catch, enables to switch insert row 30
It is enough buckled and is fixed by elastic force;When taking-up, it is only necessary to which slightly firmly lifting occurs, can be whole out of mounting groove 50 by switch insert row 30
Body takes out.Further, it is also equipped with positive stop hook on mounting groove 50, the positive stop hook is by torsional spring and shaft is rotatable is fixed on
Crossed beam trunking mouth side, positive stop hook can cover crossed beam trunking mouth, and the outlet for switching insert row 30 is fixed, to further prevent switch to insert
It comes in carrying or transportational process and falls.
Please continue to refer to Fig. 1 and Fig. 2, in addition, for the security protection ability of lifting means, the width direction of the cabinet body 11
Two lateral surfaces are provided with shield 60, and the shield 60 covers above the notch of the mounting groove 50.Shield 60 can
Play dust-proof, waterproof ability, avoid causing in foreign matter access switch insert row 30 electronic component damage and can not normal use.
Further, the cabinet body 11 is equipped with sliding rail, and the shield 60 is equipped with sliding slot, and the sliding rail is installed in described
In sliding slot, enable the shield 60 mobile relative to the mounting groove 50.When needing to enter power device, it is only necessary to sliding
Dynamic shield 60, which makes it away from card pass insert row, can expose jack, and grafting is facilitated to operate.The outside wall surface of shield 60 is equipped with interval
The recess portion and protrusion of setting, recess portion and the continuous arrangement of protrusion form non-slip texture, to skid when preventing operation shield 60.
Shield 60 is preferably made of transparent material, such as glass, acrylic etc., and staff can be facilitated to observe switch
The working condition of socket, excludes hidden danger in time.
In addition, the electricity consumption monitoring device further includes connecting terminal 80, the connecting terminal 80 is set to the cabinet body
On 11 rear wall and between the three-phase kilowatt-hour meter 40 and the switch extension socket.Connecting terminal 80 can be to cabinet body 11 inside
Route carry out regular storage, facilitate staff to carry out operation and maintenance to device, avoid electric wire is rambling from being scattered.
Please continue to refer to Fig. 1 and Fig. 2, further, the rear wall of the cabinet body 11 offers spaced heat dissipation
Grid 15 and outlet hole 16.The outlet that outlet hole 16 is used to make to switch insert row 30 is stretched out outside cabinet body 11 in order to external power supply company
It connects.Preferably, outlet hole 16 is located at installation pedestal and (is fixedly arranged on by screw on the inner wall of cabinet body 11, is inserted for fixed switch
Row is 30) connecting terminal 80 between, so that switching the appearance of insert row 30 closer to three-phase kilowatt-hour meter 40, to reduce out line length.
In real work, equipment is very likely placed in hot environment, interior when equipment can be made to work by opening up heat dissipation grid 15
Portion generate amount of heat be effectively discharged in environment or long lasting for work when, avoid route or electronic device from being chronically at
Accelerated ageing in hot environment and influence service life.
Please continue to refer to figure Fig. 2, the electricity consumption monitoring device further includes the first operating status lamp 90, the second operating status
Lamp 100 and third operating status lamp 110, the first operating status lamp 90, the second operating status lamp 100 and described
Three operating status lamps 110 are electrically connected with the connecting terminal 80 respectively.In this way, different operating status lamps can real-time display set
Standby operating condition then shows equipment normal ON external power supply when the first operating status lamp 90 is lighted, and equipment obtains electricity
Energy;When the second operating status lamp 100 is lighted, then show that power device normally connects equipment and carries out electricity consumption monitoring and meter
Amount;When third operating status lamp 110 is lighted, then show that line short or load too high problem occurs in tested power device.
It should be understood that the first operating status lamp 90 is lighted with amber light, the second operating status lamp 100 is with green light point
Bright, third operating status lamp 110 is lighted with red colored lamp.
Please continue to refer to Fig. 1, the electricity consumption monitoring device further includes drawing 120, and the drawing is set to the cabinet 120
On the outside of the roof of body 11.It is drawn by setting 120, facilitates staff to lift equipment, translates etc. and operate.
Each technical characteristic of embodiment described above can be combined arbitrarily, for simplicity of description, not to above-mentioned reality
It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, all should be considered as described in this specification.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously
It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art
It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention
Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.
Claims (10)
1. a kind of electricity consumption monitoring device characterized by comprising
Installation cabinet, the Installation cabinet include the cabinet body being mutually rotatablely connected and cabinet door, and the bottom of the cabinet body is equipped with movable pulley;
Insert row is switched, the switch insert row is set on the cabinet body, and the switch insert row includes at least two jacks, described to insert
Hole is for the plug grafting with power device;
Fixing seat, the fixing seat are set on the inner wall of the cabinet body;And
Three-phase kilowatt-hour meter, the three-phase kilowatt-hour meter is set in the cabinet body and is electrically connected with the switch insert row, and the three-phase electricity
Table is also used to connect with external power supply.
2. electricity consumption monitoring device according to claim 1, which is characterized in that the cabinet body can be rotated by gear assembly
It is set on the cabinet body, the gear assembly includes the first gear being set on the cabinet body and is set to the cabinet door
On second gear, the first gear engages with the second gear, the cabinet door opened and closed with the cabinet body and is matched
It closes;The three-phase kilowatt-hour meter is set on the inner wall of the cabinet body, the cabinet door be equipped with visual windows, the visual windows with it is described
Three-phase kilowatt-hour meter is opposite.
3. electricity consumption monitoring device according to claim 1, which is characterized in that the switch insert row is two, the cabinet
The two sides of the width direction of body are recessed with mounting groove respectively inwards, and the cell wall of the mounting groove is provided with latch catch, described
Switch insert row is set in the mounting groove correspondingly and snaps connection with the latch catch, and the mounting groove is close to institute
The side wall for stating movable pulley offers crossed beam trunking mouth.
4. electricity consumption monitoring device according to claim 3, which is characterized in that two outsides of the width direction of the cabinet body
Face is provided with shield, and the shield covers above the notch of the mounting groove.
5. electricity consumption monitoring device according to claim 4, which is characterized in that the cabinet body is equipped with sliding rail, described anti-
Shield is equipped with sliding slot, and the sliding rail is installed in the sliding slot, enables the shield mobile relative to the mounting groove.
6. electricity consumption monitoring device according to claim 1, which is characterized in that be provided with hand on the inner sidewall of the cabinet door
Locking, knob is provided on the lateral wall of the cabinet door, the knob is connect by trundle with the handle lock.
7. electricity consumption monitoring device according to claim 1, which is characterized in that the rear wall of the cabinet body offers interval
The heat dissipation grid and outlet hole of setting.
8. electricity consumption monitoring device according to any one of claims 1 to 7, which is characterized in that the electricity consumption monitoring is set
Standby further includes connecting terminal, the connecting terminal be set on the rear wall of the cabinet body and be located at the three-phase kilowatt-hour meter with it is described
Between switch extension socket.
9. electricity consumption monitoring device according to claim 8, which is characterized in that the electricity consumption monitoring device further includes
One operating status lamp, the second operating status lamp and third operating status lamp, the first operating status lamp, the second operation shape
State lamp and the third operating status lamp are electrically connected with the connecting terminal respectively.
10. electricity consumption monitoring device according to claim 9, which is characterized in that the electricity consumption monitoring device further includes
Handle is drawn, it is described to draw the roof outside for being set to the cabinet body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910717871.8A CN110426542A (en) | 2019-08-05 | 2019-08-05 | Electricity consumption monitoring device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910717871.8A CN110426542A (en) | 2019-08-05 | 2019-08-05 | Electricity consumption monitoring device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110426542A true CN110426542A (en) | 2019-11-08 |
Family
ID=68412613
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910717871.8A Pending CN110426542A (en) | 2019-08-05 | 2019-08-05 | Electricity consumption monitoring device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110426542A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113327175A (en) * | 2021-04-29 | 2021-08-31 | 青岛海尔科技有限公司 | Method and device for determining total power consumption, storage medium and electronic device |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20100001706U (en) * | 2008-08-07 | 2010-02-18 | 김용완 | Gauge box of a method of non-interruption of electric power |
CN205091376U (en) * | 2015-11-06 | 2016-03-16 | 国网山东省电力公司菏泽供电公司 | Movable type electric power metering box |
CN108428296A (en) * | 2018-05-16 | 2018-08-21 | 许昌亿源电气有限公司 | A kind of mobile vacuum band isolation on-load switch type prepaid high voltage metering box |
CN207966074U (en) * | 2018-01-26 | 2018-10-12 | 周口平高智能电气有限公司 | A kind of outdoor high-voltage integral type prepayment metering device |
CN208937631U (en) * | 2018-10-10 | 2019-06-04 | 国网安徽省电力有限公司阜阳供电公司 | A kind of low-voltage electric energy metering case easy to remove |
CN211263560U (en) * | 2019-08-05 | 2020-08-14 | 广州供电局有限公司 | Power consumption monitoring equipment |
-
2019
- 2019-08-05 CN CN201910717871.8A patent/CN110426542A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20100001706U (en) * | 2008-08-07 | 2010-02-18 | 김용완 | Gauge box of a method of non-interruption of electric power |
CN205091376U (en) * | 2015-11-06 | 2016-03-16 | 国网山东省电力公司菏泽供电公司 | Movable type electric power metering box |
CN207966074U (en) * | 2018-01-26 | 2018-10-12 | 周口平高智能电气有限公司 | A kind of outdoor high-voltage integral type prepayment metering device |
CN108428296A (en) * | 2018-05-16 | 2018-08-21 | 许昌亿源电气有限公司 | A kind of mobile vacuum band isolation on-load switch type prepaid high voltage metering box |
CN208937631U (en) * | 2018-10-10 | 2019-06-04 | 国网安徽省电力有限公司阜阳供电公司 | A kind of low-voltage electric energy metering case easy to remove |
CN211263560U (en) * | 2019-08-05 | 2020-08-14 | 广州供电局有限公司 | Power consumption monitoring equipment |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113327175A (en) * | 2021-04-29 | 2021-08-31 | 青岛海尔科技有限公司 | Method and device for determining total power consumption, storage medium and electronic device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103326291A (en) | Interlocking device for bus duct plug box | |
CN110426542A (en) | Electricity consumption monitoring device | |
CN211263560U (en) | Power consumption monitoring equipment | |
CN110601039B (en) | Mining flameproof and intrinsically safe dual-power dual-loop lighting comprehensive protection device | |
CN211263639U (en) | Electricity consumption metering display equipment | |
CN110456195A (en) | Electro-metering shows equipment | |
CN208444748U (en) | A kind of panel switches for AC low voltage power switch box | |
CN210111461U (en) | Intelligent all-insulated AC screen | |
CN104701920A (en) | Portable DC power supply | |
CN211905471U (en) | High-voltage electric energy meter capable of being replaced in electrified mode and connecting structure thereof | |
CN103872599B (en) | Multifunctional mobile maintenance power box | |
CN203813241U (en) | Movable type multifunctional maintenance power supply box | |
CN203589814U (en) | Portable direct current power source | |
CN215600775U (en) | Electrical switch cabinet with safety interlocking function | |
CN111162466A (en) | Modular convenient block terminal that overhauls | |
CN217115950U (en) | Multi-loop electromagnetic starter device | |
CN220553812U (en) | Automatic discharging device of capacitor box | |
CN212366533U (en) | Lighting distribution box | |
CN210347757U (en) | High-voltage live display device | |
CN209821286U (en) | Capacitance and inductance tester | |
CN214473524U (en) | Intelligent transformer test junction box | |
CN217720486U (en) | Full-voltage safety power utilization intelligent equipment | |
CN213423323U (en) | Hand-held DC resistance tester | |
CN218070564U (en) | Isolated formula winding displacement device of high-low voltage switchgear | |
CN211605744U (en) | Alternating-current high-low voltage complete switch equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20201021 Address after: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No. Applicant after: Guangzhou Power Supply Bureau of Guangdong Power Grid Co.,Ltd. Address before: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No. Applicant before: GUANGZHOU POWER SUPPLY Co.,Ltd. |
|
TA01 | Transfer of patent application right |