CN110424992A - The method in the lane Inclined Full-mechanized Mining Face Guo Jiu - Google Patents

The method in the lane Inclined Full-mechanized Mining Face Guo Jiu Download PDF

Info

Publication number
CN110424992A
CN110424992A CN201910729579.8A CN201910729579A CN110424992A CN 110424992 A CN110424992 A CN 110424992A CN 201910729579 A CN201910729579 A CN 201910729579A CN 110424992 A CN110424992 A CN 110424992A
Authority
CN
China
Prior art keywords
lane
coal
jiu
rail
grillage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910729579.8A
Other languages
Chinese (zh)
Inventor
张江云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CMJT HUARONG ENERGY Co Ltd
Original Assignee
CMJT HUARONG ENERGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CMJT HUARONG ENERGY Co Ltd filed Critical CMJT HUARONG ENERGY Co Ltd
Priority to CN201910729579.8A priority Critical patent/CN110424992A/en
Publication of CN110424992A publication Critical patent/CN110424992A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D19/00Provisional protective covers for working space
    • E21D19/02Provisional protective covers for working space for use in longwall working
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/0004Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor along the working face

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The present invention relates to coal mining fields, disclose a kind of method in the lane Inclined Full-mechanized Mining Face Guo Jiu.The present invention is using anchor cable cooperation rail as substrate, top is connect by semicircle yoke grillage on it, it is laid with integral false top, prevent wall caving leakage top range further expansion during the lane Guo Jiu, the top top coal that the grillage set up simultaneously is contacted with set cap is in same level, it is ensured that bracket smooth transition, working face realize continuous safety and high efficiency, the face moving stopping surface time is greatly decreased, improves resource recovery rate.

Description

The method in the lane Inclined Full-mechanized Mining Face Guo Jiu
Technical field
The present invention relates to coal mining fields, the especially a kind of method in the lane Inclined Full-mechanized Mining Face Guo Jiu.
Background technique
In coal mining, due to having more old lane, Inclined Full-mechanized Mining Face within the scope of working face extraction Old lane is frequently encountered during exploitation, during the lane Guo Jiu, is easy to happen wall caving, inbreak influences back to cause safety problem The normal procedure adopted.
By taking certain coal mine 3215-241 working face as an example, 3215-241 working face is located at certain the horizontal exploiting field the mine+700m, exploitation Between absolute altitude+1167m~+1180m;Long 280m~360m is moved towards, average out to 300m tilts long 77m~114m, average out to 102m, it is 27~67 ° of seam inclination, 39 ° average;Coal seam average thickness 5.24m, 20.8 ten thousand tons of working face reserves.The coal seam is more loose It is soft, easy slice caving, inbreak;B11 anticline is crossed during working face extraction, since anticline and synclinal shaft pressure compare concentration, top plate is split Gap is relatively developed, and the larger above situation of gas bearing capacity has larger impact to back production, sees Fig. 1 roadway workface layout drawing.
At air return lane is away from 3021S crossdrift 100m, old lane (the horizontal northern wing main haulage roadway of+900m) away from air return lane it is flat away from 7.2m;It hangs down to bottom plate away from 5.8m, working face mining height≤2.5m away from force piece top beam shortest distance 3.3m in old lane;Old lane is arrived The position of the force piece top beam shortest distance is located at air return lane down 3-10 away from air return lane 5.5m, old lane coverage 9.1m Within the scope of frame, it is detailed in Fig. 2 roadway workface position profile.
3215-241 working face has normal fault f2415-1 through entire working face, fault parameter: tendency 297 °, inclination angle ∠ 23 °, drop H=1.2m, normal fault are located at before air return lane A9# point 5m before 8m, transportation roadway A31# point, strike length 18~21m, right Back production has larger impact.Working face has B11 anticlinal axis, and since anticline axle portion pressure is relatively concentrated, roof fracture is relatively developed, and gas Content is larger (being shown in Table 3-3 geological structure situation table).
1 geological structure situation table of table
For 3215-241 working face, 3215-241 face roof direction be the horizontal northern wing main haulage roadway of+900m (+ At the horizontal northern two loading siding mouths of 900m to the horizontal northern wing main haulage roadway crossdrift 6# point of+900m, old lane), this section of main haulage roadway part The coal seam 15-2,4# is disclosed, old lane bottom plate is, using the traditional lane Guo Jiu mode, to be somebody's turn to do in 3215-241 Coal Face Passing Through in the middle part of coal seam Wall caving leakage useful event easily occurs when old lane.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of lanes Inclined Full-mechanized Mining Face Guo Jiu of safety and stability Method.
The method in the lane Inclined Full-mechanized Mining Face Guo Jiu disclosed by the invention, includes the following steps:
Before working face discloses old lane, multiple rows of anchor cable lock top is set in Jiu Xiang, the rail in old lane is dismantled, rail is set up In anchor cable bottom, multiple rows of anchor cable respectively corresponds setting rail and forms anchor net, connects top with semicircle yoke grillage on the net in anchor, is laid to Whole false top;
It along inclined direction helps successively to be laid on rail to bracket from coal using half round timber after rail is fixed, and with iron wire handle Half round timber is fixed on rail, connect half round timber with rail integral;
Crib building operation can be carried out after laying half round timber, grillage uses half round timber crib building from top to bottom;
After grillage is set up, the top top coal for contacting the grillage set up with set cap is in same level, it is ensured that branch Frame smooth transition;
After the completion of shield top work, back production is normally promoted.
Preferably, before working face discloses old lane, the supporting and gas situation in tunnel are first checked;It was found that tunnel gas density It greatly or transfinites, it is necessary to which the ventilation operation in old lane is reinforced in processing in time.
Preferably, the fixed form of rail is as follows: determine anchor cable strike separation, recycle fiery root of weld according to live anchor cable away from Anchor cable eye is blown from rail, then installs rail, using lockset fixed rail.
Preferably, when setting up grillage, half round timber is set up in " well " font.
Preferably, the grillage half round timber four corners of erection are fixed using pawl fourth or iron wire, prevent from moving frame wood in the process Pile collapses;
The grillage of erection must be tight with timber wedge wedge, and grillage and top plate is made to connect reality.
Preferably, true dip back production is pressed during working face extraction, and is promoted comprehensively.
Preferably, during working face extraction, back production, the control of working face entirety mining height are carried out by the seat earth that old lane discloses Within 2.5m;Strict control cutting coal machine coal cutting depth, every knife advance rate are not more than 0.63m;Working face when cutting upper section bracket, Coal shearer speed controls within 1.5m/min, mitigates vibration of the coal mining machine roller to coal wall.
Preferably, it after coalcutter coal cutting, stretches out extensible canopy in time and face guard carries out shield top, wall supporting, supporting newly exposes Top coal and the coal side come, reduces the time of empty side, empty top to the greatest extent, prevents wall caving, roof fall before frame.
Preferably, the case where projecting to working face according to old lane reinforces shield top to double-level-metal net is laid in coverage Coal operation.
Preferably, the top plate of this section is maintained at a plane, adhered to coal cutting one by working face during the coal cutting of the lane Guo Jiu A timely sliding advance of support of bracket reduces empty top exposure duration, while this section of force piece setting load is in 8~12MPa.
The beneficial effects of the present invention are: the present invention passes through semicircle yoke using anchor cable cooperation rail as substrate on it Grillage connects top, is laid with integral false top, it is therefore prevented that wall caving leakage top range further expansion during the lane Guo Jiu, while the grillage set up The top top coal contacted with set cap is in same level, it is ensured that bracket smooth transition, it is high that working face realizes continuous safety Effect exploitation, is greatly decreased the face moving stopping surface time, improves resource recovery rate.
Detailed description of the invention
Fig. 1 is the roadway workface layout drawing of the embodiment of the present invention;
Fig. 2 is 2-2 ' position profile in Fig. 1;
Fig. 3 is the schematic diagram on false top;
Fig. 4 is A-A ' cross-sectional view in Fig. 3;
Fig. 5 is B-B ' cross-sectional view in Fig. 3.
Appended drawing reference: anchor cable 1, rail 2, half round timber 3, lockset 4.
Specific embodiment
Below by taking the coal mine 3215-241 working face introduced in background technique as an example, the present invention is described in detail, In The lane the present embodiment Zhong Jiu is the horizontal northern wing main haulage roadway of+900m, and it is horizontal to+900m to be located at the horizontal northern two loading siding mouths of+900m At northern wing main haulage roadway crossdrift 6# point.
Working face, which uses, moves towards longwell retrusive, comprehensive mechanized coal mining method exploitation.Three machine corollary equipments are as follows: ZF5000/ 15/30 type four post support shield type low caving coal hydraulic support, coalcutter are the coal mining of III type electrical haulage of MG300/720-AWD Machine, SGZ730/200 type drag conveyor.
The method in the lane Inclined Full-mechanized Mining Face Guo Jiu includes the following steps:
Because a large amount of gas may be contained in old lane, before working face discloses old lane, supporting and the gas in tunnel are first checked Situation;It was found that tunnel gas density is big or transfinites, it is necessary to which the ventilation operation in old lane is reinforced in processing in time.
Before working face discloses old lane, multiple rows of lock of anchor cable 1 top is set in Jiu Xiang, the rail 2 in old lane is dismantled, by rail 2 It is set up in 1 bottom of anchor cable, multiple rows of anchor cable 1 respectively corresponds setting rail 2 and forms anchor net, and multiple rows of anchor cable 1 forms anchor net, online in anchor Top is connect with 3 frame grillage of half round timber, is laid with integral false top, it is therefore prevented that wall caving leakage top range further expansion during the lane Guo Jiu.Such as Shown in Fig. 3, in the north+900m, wing main haulage roadway sets 3 row φ 17.8mm anchor cables 1 lock top and sets up the 15kg/m removed from Jiu Xiang and gives up Old rail 2 not only facilitates connection using waste and old rail 2, and can with effectively save cost, yoke grillage using Φ >=16cm, Long 2-3m half round timber 3.
It can be connected using modes such as bolt, binding, locks between rail 2 and anchor cable 1, in embodiment as shown in Figure 5, The fixed form of rail 2 is as follows: determining 1 strike separation of anchor cable, fiery root of weld is recycled to blow according to the distance of live anchor cable 1 in rail 2 Anchor cable eye, then rail 2 is installed, using 4 fixed rail 2 of lockset.In embodiment as shown in Figures 1 to 3, the adjacent anchor cable of same row 1 space D 1 is 1.5m, and the space D 2 of bar shaped connector is 1.2m.
It along inclined direction helps successively to be laid on rail 2 to bracket from coal using half round timber 3 after rail 2 is fixed, and uses iron Bundle of lines half round timber 3 is fixed on rail 2, connect half round timber 3 with rail 2 integral;Half round timber 3 is high-quality using Φ >=16cm's Half round timber 3, iron wire then use 8# iron wire.
Crib building operation can be carried out after laying half round timber 3, grillage uses length for 2.0~3.0m, Φ >= Crib building, grillage generally use wooden structures and set up the half round timber 3 of 16cm from top to bottom, with regard to concrete preferred structure It says, in embodiment as shown in Figure 4, the grillage includes half round timber 3, and the half round timber 3 sets up into " well " font structure unit, The half round timber 3 of adjacent " well " font structure unit intersects connection." well " font structure unit can guarantee two in length and breadth The intensity in direction, and the half round timber 3 of each " well " font structure unit intersect connection can be by each " well " font structure list Member connects into the stable network system, to improve its globality and stability.The both ends of " well " font structure are preferably divided It is not erected on two adjacent rails 2, therefore, the length of half round timber 3 needs the spacing greater than rail 2, the grillage half of erection 3 four corners of round log are fixed using pawl fourth or iron wire, prevent grillage during moving frame from collapsing;The grillage of erection must use timber wedge Wedge is tight, and grillage and top plate is made to connect reality.
After grillage is set up, stretch-draw jack fastening lockset 4 can be used, and contact the grillage set up with set cap Top top coal is in same level, it is ensured that bracket smooth transition;
After the completion of shield top work, back production is normally promoted.
True dip back production is pressed during working face extraction, and is promoted comprehensively, and forbids arbitrarily to adjust side.
During working face extraction, back production is carried out by the seat earth that old lane discloses, in the present embodiment, i.e., along 15-4# coal Layer bottom plate back production, working face entirety mining height control within 2.5m;Strict control cutting coal machine coal cutting depth, every knife advance rate are little In 0.63m;When cutting upper section bracket, coal shearer speed controls within 1.5m/min working face, mitigates coal mining machine roller to coal The vibration of wall.
After coalcutter coal cutting, stretches out extensible canopy in time and face guard carries out shield top, wall supporting.The top coal that supporting is newly exposed And coal side, it reduces the time of empty side, empty top to the greatest extent, prevents wall caving, roof fall before frame.
When working face moves frame operation, it is too many to drop column, reduces top coal loosening to the greatest extent;Must not lifting column back and forth, prevent Cause crushing voerhead coal;20 frame bracket of top forbids Sub-Level Caving operation.
Working face is during back production, the case where projecting to working face according to the horizontal northern wing main haulage roadway of scene+900m, to shadow It rings and carries out being laid with double-level-metal net in range, reinforce shield top coal operation.
Working face must reinforce feed flow management work, reinforce hydraulic support maintenance, and bracket is forbidden to have leakage to alter the appearance of liquid situation, Coalcutter driver accomplishes to cut off the water, and reduces water and washes away to coal wall.
Working face is maintained at a plane during the coal cutting of the lane Guo Jiu, by the top plate of this section, adheres to one bracket of coal cutting Timely sliding advance of support reduces empty top exposure duration, while this section of force piece setting load is in 10MPa or so.Control working face Mining height method, while guaranteeing support setting load 10MPa or so, top plate will not be destroyed, while can play the work of supporting roof again With having accumulated experience achievement for the excessively different geological structures of fully mechanized coal face under complex geological condition.

Claims (10)

1. the method in the lane Inclined Full-mechanized Mining Face Guo Jiu, which comprises the steps of:
Before working face discloses old lane, multiple rows of anchor cable lock top is set in Jiu Xiang, the rail in old lane is dismantled, rail is set up in anchor Rope bottom, multiple rows of anchor cable respectively correspond setting rail and form anchor net, connect top with semicircle yoke grillage on the net in anchor, are laid with integral Vacation top;
It along inclined direction helps successively to be laid on rail to bracket from coal using half round timber after rail is fixed, and with iron wire semicircle Wood is fixed on rail, connect half round timber with rail integral;
Crib building operation can be carried out after laying half round timber, grillage uses half round timber crib building from top to bottom;
After grillage is set up, the top top coal for contacting the grillage set up with set cap is in same level, it is ensured that bracket is flat Steady transition;
After the completion of shield top work, back production is normally promoted.
2. the method in the lane Inclined Full-mechanized Mining Face Guo Jiu as described in claim 1, it is characterised in that: working face discloses old lane Before, the supporting and gas situation in tunnel are first checked;It was found that tunnel gas density is big or transfinites, it is necessary to which processing in time is reinforced old The ventilation operation in lane.
3. the method in the lane Inclined Full-mechanized Mining Face Guo Jiu as described in claim 1, it is characterised in that: the fixed form of rail It is as follows: to determine anchor cable strike separation, recycle fiery root of weld to blow anchor cable eye in rail according to the distance of live anchor cable, then install iron Rail, using lockset fixed rail.
4. the method in the lane Inclined Full-mechanized Mining Face Guo Jiu as described in claim 1, it is characterised in that: when setting up grillage, Half round timber is set up in " well " font.
5. the method in the lane Inclined Full-mechanized Mining Face Guo Jiu as described in claim 1 or 4, it is characterised in that: the grillage of erection Half round timber four corners are fixed using pawl fourth or iron wire, prevent grillage during moving frame from collapsing;
The grillage of erection must be tight with timber wedge wedge, and grillage and top plate is made to connect reality.
6. the method in the lane Inclined Full-mechanized Mining Face Guo Jiu as described in claim 1, it is characterised in that: during working face extraction By true dip back production, and promote comprehensively.
7. the method in the lane Inclined Full-mechanized Mining Face Guo Jiu as described in claim 1, it is characterised in that: the working face extraction phase Between, back production is carried out by the seat earth that old lane discloses, working face entirety mining height controls within 2.5m;Strict control coal cutting machine cut Coal depth, every knife advance rate are not more than 0.63m;Working face when cutting upper section bracket, coal shearer speed control 1.5m/min with It is interior, mitigate vibration of the coal mining machine roller to coal wall.
8. the method in the lane Inclined Full-mechanized Mining Face Guo Jiu as described in claim 1, it is characterised in that: after coalcutter coal cutting, Stretch out extensible canopy and face guard in time and carry out shield top, wall supporting, top coal and the coal side that supporting is newly exposed, reduce to the greatest extent empty side, The time on sky top, prevent wall caving, roof fall before frame.
9. the method in the lane Inclined Full-mechanized Mining Face Guo Jiu as described in claim 1, it is characterised in that: projected to according to old lane The case where working face, reinforces shield top coal operation to double-level-metal net is laid in coverage.
10. the method in the lane Inclined Full-mechanized Mining Face Guo Jiu as described in claim 1, it is characterised in that: working face is excessively old During the coal cutting of lane, the top plate of this section is maintained at a plane, adheres to one timely sliding advance of support of bracket of coal cutting reducing empty top Exposure duration, while this section of force piece setting load is in 8~12MPa.
CN201910729579.8A 2019-08-08 2019-08-08 The method in the lane Inclined Full-mechanized Mining Face Guo Jiu Pending CN110424992A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910729579.8A CN110424992A (en) 2019-08-08 2019-08-08 The method in the lane Inclined Full-mechanized Mining Face Guo Jiu

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910729579.8A CN110424992A (en) 2019-08-08 2019-08-08 The method in the lane Inclined Full-mechanized Mining Face Guo Jiu

Publications (1)

Publication Number Publication Date
CN110424992A true CN110424992A (en) 2019-11-08

Family

ID=68415033

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910729579.8A Pending CN110424992A (en) 2019-08-08 2019-08-08 The method in the lane Inclined Full-mechanized Mining Face Guo Jiu

Country Status (1)

Country Link
CN (1) CN110424992A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110792463A (en) * 2019-11-11 2020-02-14 大同煤矿集团有限责任公司 Reinforcing method for machine path leakage top of working surface under complex conditions

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107542467A (en) * 2017-08-28 2018-01-05 龙口矿业集团有限公司 A kind of complex condition tilts the method that old working is crossed in normally closed back production
CN107869350A (en) * 2017-10-25 2018-04-03 山东科技大学 A kind of new drop rushes colliery bolting with wire mesh method
CN108005654A (en) * 2017-11-27 2018-05-08 淮南矿业(集团)有限责任公司 Face upward and adopt large-mining-height working surface and cross old working construction technology
CN108150206A (en) * 2017-11-16 2018-06-12 大同煤矿集团有限责任公司 A kind of method by fully-mechanized mining working crossheading caving place
CN108316941A (en) * 2017-12-20 2018-07-24 贵州大学 A kind of breaking surrounding rock and soft-rock tunnel U-shaped steel cover canopy method for protecting support

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107542467A (en) * 2017-08-28 2018-01-05 龙口矿业集团有限公司 A kind of complex condition tilts the method that old working is crossed in normally closed back production
CN107869350A (en) * 2017-10-25 2018-04-03 山东科技大学 A kind of new drop rushes colliery bolting with wire mesh method
CN108150206A (en) * 2017-11-16 2018-06-12 大同煤矿集团有限责任公司 A kind of method by fully-mechanized mining working crossheading caving place
CN108005654A (en) * 2017-11-27 2018-05-08 淮南矿业(集团)有限责任公司 Face upward and adopt large-mining-height working surface and cross old working construction technology
CN108316941A (en) * 2017-12-20 2018-07-24 贵州大学 A kind of breaking surrounding rock and soft-rock tunnel U-shaped steel cover canopy method for protecting support

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
闫鸿斌: "《梦萦故里--追忆旧时的青山泉》", 31 July 2016, 中国矿业大学出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110792463A (en) * 2019-11-11 2020-02-14 大同煤矿集团有限责任公司 Reinforcing method for machine path leakage top of working surface under complex conditions

Similar Documents

Publication Publication Date Title
CN104234749B (en) A kind of fully-mechanized mining working big cross section return channel surrounding rock control method
CN104632220B (en) Mining method with adjustable and controllable structure size of gentle dip medium-thickness ore body strip column reconstructed stope
CN109763861B (en) Roof fall processing method for fault fracture zone in incision
CN102777182B (en) Rapid end extracting method of large mining height working face
CN108868833A (en) A method of it carries out cutting gob side entry retaining in the relieving roadway of top in U-shaped steel supported laneway
CN102587913A (en) Steeply inclined seam dip oblique strike longwall comprehensive mechanical coal mining method
CN108005654B (en) Construction process for overhead mining large-mining-height working face old roadway passing
CN104533419B (en) Method for partial recovery of residual coal from wide coal pillar
CN104061001A (en) Gob-side entry retaining mining support process method
CN108843354A (en) A kind of inclined super high seam lane top asymmetric anchor stalk method for protecting support of gob side entry driving
CN110529144A (en) A kind of hybrid advanced support method of light section stope drift active workings
CN104453996A (en) Upward layered wall type bag filling mining method
CN107387083A (en) A kind of medium-thickness seam gob side entry retaining roadside support body construction method supported using spoil
CN101498216A (en) Thick coal seam large height workface step coal wall coal mining method
CN110985083B (en) Stoping roadway stack type support supporting system and method
CN104895592A (en) Fully-mechanized coal mining and caving face support retracement supporting method
CN105909284A (en) Sloughing prevention and control method for large mining height coal wall
CN110424992A (en) The method in the lane Inclined Full-mechanized Mining Face Guo Jiu
CN104763456B (en) Coal mining tunnel is incorporated as lane or make the return trip empty area's supporting support and the method withdrawing hydraulic support
CN110118085A (en) A kind of compound advanced secondary tunneling method in two lane of top working face of large mining depth high working face
CN107859532A (en) It is a kind of to run through closely the discarded shaft of vertical well processing method of coal seam stope up and down
CN106523010A (en) Steeply-inclined coal seam working face and coal mining method
CN102425428A (en) Method for controlling extreme broken roof in roadway head
CN205445623U (en) Along empty facility of strutting of mineing coal seam closely in lane that protects
CN105370307B (en) Coal working face crosses freeboard section support process

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191108