CN110423860A - A kind of scrap steel preheating furnace - Google Patents

A kind of scrap steel preheating furnace Download PDF

Info

Publication number
CN110423860A
CN110423860A CN201910826304.6A CN201910826304A CN110423860A CN 110423860 A CN110423860 A CN 110423860A CN 201910826304 A CN201910826304 A CN 201910826304A CN 110423860 A CN110423860 A CN 110423860A
Authority
CN
China
Prior art keywords
steel
hopper
scrap
flue gas
tipburn
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910826304.6A
Other languages
Chinese (zh)
Other versions
CN110423860B (en
Inventor
唐献红
奎炼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Zhengyicheng Amperex Technology Ltd
Original Assignee
Suzhou Zhengyicheng Amperex Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Zhengyicheng Amperex Technology Ltd filed Critical Suzhou Zhengyicheng Amperex Technology Ltd
Priority to CN201910826304.6A priority Critical patent/CN110423860B/en
Publication of CN110423860A publication Critical patent/CN110423860A/en
Application granted granted Critical
Publication of CN110423860B publication Critical patent/CN110423860B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/56Manufacture of steel by other methods
    • C21C5/562Manufacture of steel by other methods starting from scrap
    • C21C5/565Preheating of scrap

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Furnace Details (AREA)
  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

The invention discloses a kind of scrap steel preheating furnaces, comprising: supporting steel frame is sequentially formed with feeding station, heating station and discharging station thereon;Strung alongside is at the top of the supporting steel frame for loading multiple steel scrap hoppers of steel scrap;It is arranged in below the supporting steel frame for providing the smoke circulating device of high-temperature flue gas from bottom to the steel scrap hopper;Hopper driving device for driving the steel scrap hopper mobile to the discharging station from the feeding station;And for from top to the tipburn device of the steel scrap hopper open fire heat supply.The scrap steel preheating furnace can carry out heat supply from top and bottom to steel scrap hopper respectively, have the advantages that heat supply is uniform.

Description

A kind of scrap steel preheating furnace
Technical field
The present invention relates to industrial furnace technology field more particularly to scrap steel preheating furnaces.
Background technique
Industrial furnace is that in the industrial production, the heat converted using fuel combustion or electric energy is heated material or workpiece Thermal Equipment.Steel scrap refers to the ferrous waste (such as trimming, cutting head) for not becoming product in steel plant's production process and makes Steel material in the equipment scrapped after, component.Steel scrap needs to be preheated before recycling, and scrap steel preheating can play energy conservation Double action with steel-making production capacity is improved, gradually causes the attention of each steel mill in recent years.Existing scrap steel preheating furnace is usually High-temperature flue gas device is set below steel scrap hopper to realize lower part high-temp combustion heat supply, existing defect are as follows: steel scrap hopper Top be not provided with heating plant, so as to cause steel scrap hopper lower part steel scrap heat supply preferably and the steel scrap heat supply on top is poor, Haves the defects that uneven heating.Therefore, it is necessary to study a kind of scrap steel preheating furnaces.
Summary of the invention
Shortcoming present in view of the above technology, the present invention provides a kind of uniform scrap steel preheating furnaces of heat supply.
The technical solution adopted by the present invention to solve the technical problems is: a kind of scrap steel preheating furnace, comprising: supporting steel frame, It is sequentially formed with feeding station, heating station and discharging station thereon;Strung alongside is at the top of the supporting steel frame for loading Multiple steel scrap hoppers of steel scrap;It is arranged below the supporting steel frame for providing high-temperature flue gas from bottom to the steel scrap hopper Smoke circulating device;Hopper driving for driving the steel scrap hopper mobile to the discharging station from the feeding station Device;And for from top to the tipburn device of the steel scrap hopper open fire heat supply.
Preferably, the top opening of the steel scrap hopper, bottom form several through-holes being passed through for hot fume.
Preferably, the supporting steel frame includes a main steel frame, the side steelframe that the opposite two sides of the main steel frame are arranged in, In, spacing Q is preset between the main steel frame and the side steelframe.
Preferably, the hopper driving device includes a pair of of hopper mobile unit, and the hopper mobile unit includes a water The translation beam of flat setting, one be located at below the translation beam and the lift beam parallel with the translation beam, be rotatably arranged on it is described Be used to support on lift beam multiple wheel groups of the translation beam, be fixed at be used to support in civil engineering the wheel group it is multiple tiltedly Rail chair, piston rod and the lift beam are pivotally connected to drive the wheel group to be slided on the inclined rail seat to realize the translation beam The hydraulic cylinder of elevating movement, the Translation cylinder that drives the translation beam to move horizontally, wherein be equipped on the inclined rail seat and institute The ramp that wheel group is matched and is obliquely installed is stated, the bottom of the translation beam is equipped with the track matched with the wheel group, institute It states and is additionally provided with centering sliding rail on the opposite both ends of translation beam, be additionally provided in the civil engineering and matched with the centering sliding rail Centering wheel unit, when the translation beam is lifted upwards, the top of the translation beam passes through the spacing Q and the steel scrap The bottom of bucket offsets to realize the lifting of the steel scrap hopper.
Preferably, the smoke circulating device includes: a pair of two sides below the steel scrap hopper and is built-in with accumulation of heat The heat storage tank of room;It is connected to the circulation line of heat storage tank described in side, heat storage tank and the steel scrap hopper described in the other side, it is described to follow Endless tube road is divided into high-temperature flue gas pipeline and low-temperature flue gas pipeline;And multiple reversal valves on the circulation line are set;Its In, be additionally provided on the circulation line for by by the regenerative chamber of side heat storage tank cooling after low-temperature flue gas pressurization send to The regenerative chamber of other side heat storage tank is heated to being sent again after the condition of high temperature to the air-introduced machine of the steel scrap hopper, the air-introduced machine setting On the low-temperature flue gas pipeline, heat supply burner is provided on the heat storage tank.
Preferably, the tipburn device includes tipburn bracket above the steel scrap hopper, is mounted on the tipburn Multiple top burners on bracket and for driving the tipburn bracket to do the tipburn carriage drive of upper and lower direction elevating movement Portion, wherein the top burner is located at the surface of the steel scrap hopper, length of the top burner along the tipburn bracket Directional spreding.
Preferably, it is additionally provided on the tipburn bracket for providing the gas piping and use of coal gas to the top burner In the first air pipeline to top burner offer air, wherein the bottom of the top burner forms one towards institute The flame port of steel scrap hopper is stated, a coal gas interface being connected to the gas piping is formed on the side wall of the top burner The first air interface being connected to one with first air pipeline.
Preferably, the two sides of the flame port of the top burner are provided with engine firewall, and the engine firewall is located at the top The bottom of portion's burner.
Preferably, the top burner is blast furnace gas burner nozzle, is additionally provided with ever-burning flame burner in the top burner.
Preferably, bellows are additionally provided between the bottom and the smoke circulating device of the steel scrap hopper.
Compared with prior art, the present invention the beneficial effect is that: scrap steel preheating furnace provided by the invention, smoke circulating device energy Enough to provide high-temperature flue gas from bottom to steel scrap hopper, tipburn device provides open fire from top to steel scrap hopper, has heat supply uniform The advantages of;
Air-introduced machine is located on low-temperature flue gas pipeline, effectively extends the service life of air-introduced machine, to extend flue gas recirculation The service life of device avoids frequent maintenance, effectively reduces use cost;
Smoke circulating device includes a pair of heat storage tank for being built-in with regenerative chamber, can be realized circulation heating, effectively reduces energy Consumption;
Hopper driving device has the advantages that movement is steady reliable;
Two sides are provided with tipburn carriage drive portion below tipburn bracket, which can drive top burner to do The elevating movement of upper and lower direction, when steel scrap hopper be in lifting operation when, top burner by the tipburn carriage drive portion also to Upper lifting has the advantages that structure is simple, easy to use so that top burner be avoided to collide with steel scrap hopper.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the side-looking direction of scrap steel preheating furnace of the present invention;
Fig. 2 is supporting steel frame and positional diagram of the hopper driving device on overlook direction Z of the invention;
Fig. 3 is the structural schematic diagram of supporting steel frame of the invention;
Fig. 4 is the structural schematic diagram of hopper driving device of the invention on main view direction M;
Fig. 5 is the structural schematic diagram of hopper driving device of the invention on overlook direction Z;
Fig. 6 is the structural schematic diagram of inclined rail seat of the invention;
Fig. 7 is the structural schematic diagram of translation beam of the invention;
Fig. 8 is the positional relationship of supporting steel frame of the invention, steel scrap hopper, smoke circulating device and bellows on main view direction M Schematic diagram;
Fig. 9 is the structural schematic diagram of tipburn device of the invention on overlook direction Z;
Figure 10 is the schematic diagram of the section structure in the direction N-N in Fig. 9;
Figure 11 is the structural schematic diagram of top burner of the invention;
Figure 12 is the structural schematic diagram of smoke circulating device of the invention on overlook direction Z;
Figure 13 is one of the connection schematic diagram of smoke circulating device of the invention;
Figure 14 is the two of the connection schematic diagram of smoke circulating device of the invention;
Figure 15 is the structural schematic diagram in tipburn carriage drive portion of the invention.
In figure: 10, supporting steel frame;11, main steel frame;12, side steelframe;20, steel scrap hopper;30, hopper driving device;31, Translation beam;311, track;312, centering sliding rail;32, Translation cylinder;33, lift beam;34, wheel group;35, inclined rail seat;351, ramp; 352, limited block;36, hydraulic cylinder;37, centering wheel unit;40, smoke circulating device;41, heat storage tank;42, circulation line;43, Heat supply burner;50, tipburn device;51, tipburn bracket;511, gas piping;512, the first air pipeline;513, propane pipeline; 514, the second air pipeline;52, top burner;521, flame port;522, coal gas interface;523, the first air interface;524, Propane interface;525, the second air interface;53, tipburn carriage drive portion;531, Electrohydraulic push rod;532, swing arm unit;533, even Connect frame;54, engine firewall;60, air-introduced machine;61, the first high-temperature flue gas pipeline;611, the first high-temperature flue gas reversal valve;62, second High-temperature flue gas pipeline;621, the second high-temperature flue gas reversal valve;63, the first low-temperature flue gas pipeline;631, the first low-temperature flue gas commutates Valve;64, the second low-temperature flue gas pipeline;641, the second low-temperature flue gas reversal valve;65, third low-temperature flue gas pipeline;651, third is low Warm fume reversing valve;66, the 4th low-temperature flue gas pipeline;661, the 4th low-temperature flue gas reversal valve;70, civil engineering;80, bellows.
Specific embodiment
Present invention will be described in further detail below with reference to the accompanying drawings, to enable those skilled in the art referring to specification text Word can be implemented accordingly.
As shown in Fig. 1 to Figure 15, the present invention provides a kind of scrap steel preheating furnaces, comprising: supporting steel frame 10, thereon successively shape At having feeding station, heating station and discharging station, as shown in Figure 2 and Figure 4, the quantity of the feeding station is set as 1, work Position A is the feeding station, and the quantity of the heating station is set as 6, and the quantity of the heating station is according to actual use Depending on situation, station B~G is the heating station, and the quantity of the discharging station is set as 1, and station H is discharging station; Strung alongside is at the top of the supporting steel frame 10 for loading multiple steel scrap hoppers 20 of steel scrap;It is arranged in the supporting steel frame 10 Lower section is used to provide multiple smoke circulating devices 40 of high-temperature flue gas from bottom to the steel scrap hopper 20, such as Fig. 2 and Figure 12 institute Showing, it is preferred that the smoke circulating device 40 is arranged in a one-to-one correspondence with the heating station, certainly, the smoke circulating device 40 non-can also be arranged in a one-to-one correspondence with the heating station, and a smoke circulating device 40 can be to multiple heating Station heat supply;Hopper driving device for driving the steel scrap hopper 20 mobile to the discharging station from the feeding station 30;And for from top to the tipburn device 50 of the 20 open fire heat supply of steel scrap hopper.
As an embodiment of this programme, as shown in Figure 1, the top opening of the steel scrap hopper 20, bottom form confession Several through-hole (not shown) that hot fume is passed through.
As an embodiment of this programme, as shown in figures 1 and 3, the supporting steel frame 10 includes a main steel frame 11, setting Side steelframe 12 in the opposite two sides of the main steel frame 11, wherein between being preset between the main steel frame 11 and the side steelframe 12 Away from Q, the main steel frame 11 and the side steelframe 12 are respectively fixedly disposed in civil engineering 70.
As an embodiment of this programme, as shown in Fig. 3 to Fig. 7, the hopper driving device 30 includes that a pair of of hopper moves Moving cell, the hopper mobile unit include a horizontally disposed translation beam 31, one be located at 31 lower section of the translation beam and with institute It states the parallel lift beam 33 of translation beam 31, be rotatably arranged on the multiple wheels for being used to support the translation beam 31 on the lift beam 33 Group 34 is fixed at multiple inclined rail seats 35 that the wheel group 34 is used to support in civil engineering 70, piston rod and the lift beam 33 Pivot joint is to drive the wheel group 34 to be slided on the inclined rail seat 35 to realize the hydraulic of the elevating movement of the translation beam 31 Cylinder 36, the Translation cylinder 32 for driving the translation beam 31 to move horizontally, wherein be equipped on the inclined rail seat 35 and the wheel group 34 The ramp 351 for matching and being obliquely installed, the bottom of the translation beam 31 are equipped with the track matched with the wheel group 34 311, centering sliding rail 312 is additionally provided on the opposite both ends of the translation beam 31, be additionally provided in the civil engineering 70 with it is described The centering wheel unit 37 that centering sliding rail 312 matches, when 31 lifting upwards of translation beam, the top of the translation beam 31 is worn The bottom for crossing the spacing Q and the steel scrap hopper 20 offsets to realize the lifting of the steel scrap hopper 20;In the present solution, such as Shown in Fig. 6, the top end face of the inclined rail seat 35 tilts the ramp 351 so that the translation beam 31 is in the wheel group for one 34 and the hydraulic cylinder 36 under the action of the clinoplain that moves up and down, be additionally provided with one at the end portion of the ramp 351 Prevent the wheel group 34 from skidding off the limited block 352 of the ramp 351, the limited block 352 is detachably arranged at the inclined rail seat On 35.
As an embodiment of this programme, as shown in figs. 1 and 12, the smoke circulating device 40 includes: that a pair is located at The 20 lower section two sides of steel scrap hopper and the heat storage tank 41 for being built-in with regenerative chamber;It is connected to heat storage tank 41, other side institute described in side The circulation line 42 of heat storage tank 41 and the steel scrap hopper 20 is stated, the circulation line 42 divides for high-temperature flue gas pipeline and low temperature cigarette Feed channel, the high-temperature flue gas pipeline are the pipeline for conveying high-temperature flue gas, and the low-temperature flue gas pipeline is transporting low temperature flue gas Pipeline;And multiple reversal valves on the circulation line 42 are set;Wherein, as shown in Figure 13 and Figure 14, the circulation pipe It is additionally provided on road 42 for sending the low-temperature flue gas pressurization after the cooling of the regenerative chamber of side heat storage tank to other side accumulation of heat The regenerative chamber of case is heated to sending again after the condition of high temperature to the air-introduced machine 60 of the steel scrap hopper 20, and the air-introduced machine 60 is arranged in institute It states on low-temperature flue gas pipeline, is provided with heat supply burner 43 on the heat storage tank 41;The middle part of the heat storage tank 41 is formed with described Regenerative chamber, the top of the heat storage tank are the combustion chamber being connected to the regenerative chamber, the lower part of the heat storage tank 41 be with it is described Regenerative chamber is connected to the surge chamber siphoned away for caching cryogenic gas for the air-introduced machine 60.In the present solution, for convenience, Side heat storage tank is known as the first heat storage tank, other side heat storage tank is known as the second heat storage tank, the heat supply on first heat storage tank Burner is known as the first heat supply burner, the heat supply burner on the heat storage tank of the other side is known as the second heat supply burner, first heat storage tank Interior regenerative chamber is known as the first regenerative chamber, the regenerative chamber in second heat storage tank is known as the second regenerative chamber;When in such as Figure 13 When shown working condition, at this point, the first heat supply burner is in combustion state, first regenerative chamber is in heat storage state, The second heat supply burner is flameout state, and second regenerative chamber is in heat release state, is generated by the first heat supply burner High-temperature flue gas by first regenerative chamber cooling after be in low-temperature flue gas, this is because in heat storage state it is described first store Hot cell can absorb heat quickly to which high-temperature flue gas is changed into low-temperature flue gas, and the air-introduced machine 60 will be stored by described first The low-temperature flue gas pressurization of hot cell cooling is sent to high-temperature flue gas is heated in second regenerative chamber, and second regenerative chamber can add Hot low-temperature flue gas be because are as follows: second regenerative chamber is in heat release state, can quick release heat for heating low-temperature flue gas So that low-temperature flue gas is changed into high-temperature flue gas, the air-introduced machine 60 again send high-temperature flue gas to the steel scrap hopper 20;When being in When working condition as shown in figure 14, at this point, the first heat supply burner is in flameout state, first regenerative chamber is in heat release State, the second heat supply burner are in combustion state, and second regenerative chamber is in heat storage state, are burnt by second heat supply The high-temperature flue gas that mouth generates is in low-temperature flue gas after second regenerative chamber cooling, this is because described in heat storage state Second regenerative chamber can absorb heat quickly to which high-temperature flue gas is changed into low-temperature flue gas, and the air-introduced machine 60 will be by described The low-temperature flue gas pressurization of second regenerative chamber cooling is sent to being heated to high-temperature flue gas, first regenerative chamber in first regenerative chamber Can heat low-temperature flue gas be because are as follows: first regenerative chamber is in heat release state, can quick release heat for heat it is low Warm flue gas is so that low-temperature flue gas is changed into high-temperature flue gas, in the present solution, the work of first regenerative chamber and second regenerative chamber It is opposite to make state.As shown in Figure 13 and Figure 14, the reversal valve includes one first high-temperature flue gas reversal valve 611, one second high temperature Fume reversing valve 621, one first low-temperature flue gas reversal valve 631, one second low-temperature flue gas reversal valve 641, a third low-temperature flue gas Reversal valve 651 and one the 4th low-temperature flue gas reversal valve 661;The circulation line 42 is provided with first high-temperature flue gas including one First high-temperature flue gas pipeline 61, one of reversal valve 611 is provided with the second high-temperature flue gas of the second high-temperature flue gas reversal valve 621 The first low-temperature flue gas pipeline 63, one that pipeline 62, one is provided with the first low-temperature flue gas reversal valve 631 is provided with described second Second low-temperature flue gas pipeline 64, one of low-temperature flue gas reversal valve 641 is provided with the third of the third low-temperature flue gas reversal valve 651 Low-temperature flue gas pipeline 65, one is provided with the 4th low-temperature flue gas pipeline 66 of the 4th low-temperature flue gas reversal valve 661;Wherein, institute The one end for stating the first high-temperature flue gas pipeline 61 is connected to the combustion chamber of first heat storage tank, the other end and is connected to the steel scrap Bucket 20, the one end of the second high-temperature flue gas pipeline 62 are connected to the combustion chamber of second heat storage tank, the other end connection institute State steel scrap hopper 20, the one end of the first low-temperature flue gas pipeline 63 is connected to the air inlet of the air-introduced machine 60, the other end Portion is connected to the surge chamber of first heat storage tank, one end and the air-introduced machine 60 of the second low-temperature flue gas pipeline 64 Air inlet connection, the other end are connected to the surge chamber of second heat storage tank, one end of the third low-temperature flue gas pipeline 65 Portion is connected to the air outlet of the air-introduced machine 60, the other end is connected to the surge chamber of first heat storage tank, and the described 4th is low The one end of warm flue 66 is connected to the air outlet of the air-introduced machine 60, the buffering of the other end and second heat storage tank Room connection;In the present solution, the air-introduced machine 60 is arranged on low-temperature flue gas pipeline, it can effectively extend the air-introduced machine 60 Service life avoids frequently overhauling to extend the service life of smoke circulating device 40, effectively saved use at This, while also effectively reducing the energy consumption.
As an embodiment of this programme, as shown in Fig. 1 and Fig. 9, the tipburn device 50 includes being located at the steel scrap The tipburn bracket 51 of 20 top of bucket is mounted on multiple top burners 52 on the tipburn bracket 51 for providing open fire and is used for The tipburn bracket 51 is driven to do the tipburn carriage drive portion 53 of upper and lower direction elevating movement, wherein the top burner 52 In the surface of the steel scrap hopper 20, the top burner 52 is distributed along the length direction of the tipburn bracket 51;This programme In, as shown in figure 9, the quantity of the tipburn device 50 is set as 3, it is separately positioned on heating station C, E and G station On, the quantity of the tipburn device 50 is depending on actual use situation.
As an embodiment of this programme, as shown in Figure 10 and Figure 11, be additionally provided on the tipburn bracket 51 for The top burner 52 provides the gas piping 511 of coal gas and for providing the first air hose of air to the top burner 52 Road 512, wherein the bottom of the top burner 52 forms one towards the flame port 521 of the steel scrap hopper 20, the spray Fire end mouth 521 provides open fire from the top of the steel scrap hopper 20 to the steel scrap hopper 20, which can promote described useless The after-flame of combustible component and improve flue-gas temperature in flue gas in steel hopper 20, formed on the side wall of the top burner 52 one with The first air interface that the coal gas interface 522 and one that the gas piping 511 is connected to are connected to first air pipeline 512 523。
As an embodiment of this programme, as shown in Figure 10, the two sides of the flame port 521 of the top burner 52 are arranged There is engine firewall 54, the engine firewall 54 is located at the bottom of the top burner 52, and the engine firewall 54 can be avoided the flame The flame that port 521 sprays has an impact the tipburn bracket 51.
As an embodiment of this programme, the top burner 52 is blast furnace gas burner nozzle, has flame stabilization, spout speed Spend fast advantage;Ever-burning flame burner (not shown), as shown in Figure 10 and Figure 11, the top are additionally provided in the top burner 52 The propane interface 524 and one for being passed through propane and air to the ever-burning flame burner is also formed on the shell of portion's burner 52 Second air interface 525 is additionally provided on the tipburn bracket 51 for providing the third of propane gas to the propane interface 524 Alkane pipeline 513 and for second air interface 525 provide air the second air pipeline 514, wherein the propane pipe Road 513 is connected to the propane interface 524, and second air pipeline 514 is connected to second air interface 525;We In case, the purpose that the ever-burning flame burner is arranged is: the propane flame of ever-burning flame burner is smaller and is burning always, gas burner It is easy to extinguish, and propane flame is more stable reliable, exists after gas burner is flame-out there are also propane flame, therefore, gas fire Flame can be ignited again.
As an embodiment of this programme, as shown in figure 15, tipburn carriage drive portion 53 includes being rotatably arranged on steel Electrohydraulic push rod 531 on frame is fixedly connected positioned at 51 lower section of tipburn bracket and with the tipburn bracket 51 and is used to support institute It states the connection framework 533 of tipburn bracket 51, the straight reciprocating motion of 531 piston rod of Electrohydraulic push rod is converted into the connection Swing arm unit 532 of the frame 533 in the upward elevating movement of upper and lower, wherein the Electrohydraulic push rod 531 and the connection frame Frame 533 is located at the opposite two sides of the swing arm unit 532, and the swing arm unit 532 includes being arranged on the steelframe Synchronizing shaft, the first swing arm and the second swing arm for being fastened on the synchronizing shaft, the work of first swing arm and the Electrohydraulic push rod 531 Stopper rod pivot joint, second swing arm and the connection framework 533 are pivotally connected, when the piston rod movement of the Electrohydraulic push rod 531, institute It states piston rod and drives the synchronizing shaft to rotate by first swing arm, the synchronizing shaft drives second swing arm upper and lower again It swings, to drive the movement above and below of connection framework 533.
As an embodiment of this programme, as shown in figure 8, the bottom of the steel scrap hopper 20 and the smoke circulating device Bellows 80 are additionally provided between 40, the bellows 80 enable to flue gas to uniformly enter in the steel scrap hopper 20.
Although the embodiments of the present invention have been disclosed as above, but it is not limited in listed fortune in specification and embodiments With it can be fully applied to various fields suitable for the present invention, for those skilled in the art, can be easily real Now other modification, therefore without departing from the general concept defined in the claims and the equivalent scope, the present invention is not limited to Specific details and legend shown and described herein.

Claims (10)

1. a kind of scrap steel preheating furnace characterized by comprising
Supporting steel frame (10) is sequentially formed with feeding station, heating station and discharging station thereon;
Strung alongside is at the top of the supporting steel frame (10) for loading multiple steel scrap hoppers (20) of steel scrap;
It is arranged below the supporting steel frame (10) for providing the flue gas of high-temperature flue gas from bottom to the steel scrap hopper (20) Circulator (40);
Hopper driving device for driving the steel scrap hopper (20) mobile to the discharging station from the feeding station (30);And
For from top to the tipburn device (50) of steel scrap hopper (20) the open fire heat supply.
2. scrap steel preheating furnace as described in claim 1, which is characterized in that the top opening of the steel scrap hopper (20), bottom Form several through-holes being passed through for hot fume.
3. scrap steel preheating furnace as described in claim 1, which is characterized in that the supporting steel frame (10) includes a main steel frame (11), the side steelframe (12) in the opposite two sides of the main steel frame (11) is set, wherein the main steel frame (11) and the side steelframe (12) spacing Q is preset between.
4. scrap steel preheating furnace as claimed in claim 3, which is characterized in that the hopper driving device (30) includes a pair of of hopper Mobile unit, the hopper mobile unit include a horizontally disposed translation beam (31), one below the translation beam (31) And it the lift beam (33) parallel with the translation beam (31), is rotatably arranged on the lift beam (33) and is used to support the translation Multiple wheel groups (34) of beam (31) are fixed at multiple inclined rail seats that the wheel group (34) is used to support on civil engineering (70) (35), piston rod and the lift beam (33) are pivotally connected to drive the wheel group (34) to be slided on the inclined rail seat (35) to real The hydraulic cylinder (36) of the elevating movement of the existing translation beam (31), the Translation cylinder for driving the translation beam (31) to move horizontally (32), wherein the ramp (351) for matching and being obliquely installed with the wheel group (34), institute are installed on the inclined rail seat (35) The bottom for stating translation beam (31) is equipped with the track (311) matched with the wheel group (34), the translation beam (31) it is opposite It is additionally provided with centering sliding rail (312) on both ends, is additionally provided on the civil engineering (70) and is matched with the centering sliding rail (312) Centering wheel unit (37), when the translation beam (31) is lifted upwards, the top of the translation beam (31) passes through the spacing Q It is offseted with the bottom of the steel scrap hopper (20) to realize the lifting of the steel scrap hopper (20).
5. scrap steel preheating furnace as described in claim 1, which is characterized in that the smoke circulating device (40) includes:
A pair is located at steel scrap hopper (20) the lower section two sides and is built-in with the heat storage tank (41) of regenerative chamber;
It is connected to the circulation line of heat storage tank (41) described in side, heat storage tank (41) and the steel scrap hopper (20) described in the other side (42), the circulation line (42) is divided into high-temperature flue gas pipeline and low-temperature flue gas pipeline;And
Multiple reversal valves on the circulation line (42) are set;
Wherein, be additionally provided on the circulation line (42) for by by the regenerative chamber of side heat storage tank cooling after low temperature cigarette Gas pressurization send the regenerative chamber to other side heat storage tank to be heated to being sent again after the condition of high temperature to the air-introduced machine of the steel scrap hopper (20) (60), the air-introduced machine (60) is arranged on the low-temperature flue gas pipeline, is provided with heat supply burner on the heat storage tank (41) (43).
6. scrap steel preheating furnace as described in claim 1, which is characterized in that the tipburn device (50) includes being located at the steel scrap Tipburn bracket (51) above hopper (20), the multiple top burners (52) being mounted on the tipburn bracket (51) and for driving The tipburn bracket (51) is set to do the tipburn carriage drive portion (53) of upper and lower direction elevating movement, wherein the top burner (52) it is located at the surface of the steel scrap hopper (20), length direction of the top burner (52) along the tipburn bracket (51) Distribution.
7. scrap steel preheating furnace as claimed in claim 6, which is characterized in that be additionally provided on the tipburn bracket (51) for The top burner (52) provides the gas piping (511) of coal gas and for providing the first of air to the top burner (52) Air pipeline (512), wherein the bottom of the top burner (52) forms a spitfire end towards the steel scrap hopper (20) Mouthful (521) form a coal gas interface being connected to the gas piping (511) on the side wall of the top burner (52) (522) and first air interface (523) that is connected to first air pipeline (512).
8. scrap steel preheating furnace as claimed in claim 7, which is characterized in that the flame port (521) of the top burner (52) Two sides be provided with engine firewall (54), the engine firewall (54) is located at the bottom of the top burner (52).
9. scrap steel preheating furnace as claimed in claim 6, which is characterized in that the top burner (52) is blast furnace gas burner nozzle, Ever-burning flame burner is additionally provided in the top burner (52).
10. scrap steel preheating furnace as described in claim 1, which is characterized in that the bottom of the steel scrap hopper (20) and the cigarette Bellows (80) are additionally provided between gas circulator (40).
CN201910826304.6A 2019-09-03 2019-09-03 Scrap steel preheating furnace Active CN110423860B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910826304.6A CN110423860B (en) 2019-09-03 2019-09-03 Scrap steel preheating furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910826304.6A CN110423860B (en) 2019-09-03 2019-09-03 Scrap steel preheating furnace

Publications (2)

Publication Number Publication Date
CN110423860A true CN110423860A (en) 2019-11-08
CN110423860B CN110423860B (en) 2024-01-05

Family

ID=68418611

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910826304.6A Active CN110423860B (en) 2019-09-03 2019-09-03 Scrap steel preheating furnace

Country Status (1)

Country Link
CN (1) CN110423860B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111560491A (en) * 2020-06-15 2020-08-21 沈阳科维润工程技术有限公司 Integrated tilting waste steel preheating device
CN115572791A (en) * 2022-10-19 2023-01-06 安徽闽建环保设备有限公司 Intelligent bucket type scrap steel heating system

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02309190A (en) * 1989-05-24 1990-12-25 Daido Steel Co Ltd Scrap preheating device
WO2011091685A1 (en) * 2010-02-01 2011-08-04 中冶赛迪工程技术股份有限公司 Preheating and conveying equipment for steel scrap
CN103058536A (en) * 2012-11-26 2013-04-24 石家庄新华能源环保科技股份有限公司 Heat-accumulation dividing-wall heating rotary kiln device
CN104807341A (en) * 2015-05-20 2015-07-29 中冶赛迪工程技术股份有限公司 System and technology for purifying electric furnace flue gas and simultaneously utilizing waste heat
CN107267709A (en) * 2017-07-31 2017-10-20 安徽盛博冶金环保科技有限公司 A kind of use converter gas all can heat the heater and heating means of steel scrap
WO2017206595A1 (en) * 2016-05-30 2017-12-07 中冶赛迪工程技术股份有限公司 Feeder device utilized in electric arc furnace, and flue gas and temperature control method
CN108168320A (en) * 2018-01-29 2018-06-15 大峘集团有限公司 A kind of symmetrical double furnace chambers scrap steel preheating melting appartus and steel scrap melt method
CN207741460U (en) * 2017-12-29 2018-08-17 大连新瑞晨环保科技有限公司 A kind of efficient alloy baking device
CN108754120A (en) * 2018-08-27 2018-11-06 苏州正益诚新能源科技有限公司 A kind of pre- hot actuating device of steel billet of step-by-step movement scrap steel preheating stove
CN210420022U (en) * 2019-09-03 2020-04-28 苏州正益诚新能源科技有限公司 Scrap steel preheating furnace

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02309190A (en) * 1989-05-24 1990-12-25 Daido Steel Co Ltd Scrap preheating device
WO2011091685A1 (en) * 2010-02-01 2011-08-04 中冶赛迪工程技术股份有限公司 Preheating and conveying equipment for steel scrap
CN103058536A (en) * 2012-11-26 2013-04-24 石家庄新华能源环保科技股份有限公司 Heat-accumulation dividing-wall heating rotary kiln device
CN104807341A (en) * 2015-05-20 2015-07-29 中冶赛迪工程技术股份有限公司 System and technology for purifying electric furnace flue gas and simultaneously utilizing waste heat
WO2017206595A1 (en) * 2016-05-30 2017-12-07 中冶赛迪工程技术股份有限公司 Feeder device utilized in electric arc furnace, and flue gas and temperature control method
CN107267709A (en) * 2017-07-31 2017-10-20 安徽盛博冶金环保科技有限公司 A kind of use converter gas all can heat the heater and heating means of steel scrap
CN207741460U (en) * 2017-12-29 2018-08-17 大连新瑞晨环保科技有限公司 A kind of efficient alloy baking device
CN108168320A (en) * 2018-01-29 2018-06-15 大峘集团有限公司 A kind of symmetrical double furnace chambers scrap steel preheating melting appartus and steel scrap melt method
CN108754120A (en) * 2018-08-27 2018-11-06 苏州正益诚新能源科技有限公司 A kind of pre- hot actuating device of steel billet of step-by-step movement scrap steel preheating stove
CN210420022U (en) * 2019-09-03 2020-04-28 苏州正益诚新能源科技有限公司 Scrap steel preheating furnace

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111560491A (en) * 2020-06-15 2020-08-21 沈阳科维润工程技术有限公司 Integrated tilting waste steel preheating device
CN115572791A (en) * 2022-10-19 2023-01-06 安徽闽建环保设备有限公司 Intelligent bucket type scrap steel heating system

Also Published As

Publication number Publication date
CN110423860B (en) 2024-01-05

Similar Documents

Publication Publication Date Title
CN102679726B (en) Natural gas heating furnace and smoke exhaust system thereof
CN102207286B (en) Low-heating-value gas burner
CN110423860A (en) A kind of scrap steel preheating furnace
CN210420022U (en) Scrap steel preheating furnace
CN104775038A (en) Novel copper finery oxy-fuel combustion system
CN205026653U (en) Compound htac combustion device
CN103302223B (en) Continuous forging furnace
CN103223456B (en) Energy-saving type forging heating furnace
CN201652331U (en) Heat-storage type combustion system of high-temperature industrial furnace
CN112393599A (en) Tangential curtain cooling type gas injection sintering machine and control method thereof
WO2017054308A1 (en) Combustible substance incineration heat utilization device with hydraulic pressure feed
CN201218504Y (en) Water-cooled heat accumulation combustor
CN2896167Y (en) Internal heating type industrial vertical kiln
CN210683838U (en) Top burning device of scrap steel preheating furnace
CN203343349U (en) Energy-saving and environment-friendly forging heating furnace
CN102966942A (en) Non-reversing flame-heat-accumulating-type combustion device
CN203629284U (en) Novel internal combustion type tunnel kiln
CN201992643U (en) Novel heat accumulation type burner
CN202254789U (en) Annealing kiln for marble production
CN2429741Y (en) Movable soot blowing and dust collecting vehicle
CN219649019U (en) Barrel build-up welding heating device
CN215491032U (en) Heating furnace
CN205860779U (en) A kind of apparatus for baking for stove liner
CN203216262U (en) System for combusting hot decoking oil gas by annular furnace
CN205537145U (en) Stifled eye device is opened to carbide stove

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant