CN110410109A - A kind of construction of hangar tunnel lining cutting arch shifting formwork trolley and construction method - Google Patents

A kind of construction of hangar tunnel lining cutting arch shifting formwork trolley and construction method Download PDF

Info

Publication number
CN110410109A
CN110410109A CN201910775486.9A CN201910775486A CN110410109A CN 110410109 A CN110410109 A CN 110410109A CN 201910775486 A CN201910775486 A CN 201910775486A CN 110410109 A CN110410109 A CN 110410109A
Authority
CN
China
Prior art keywords
construction
hangar tunnel
flatcar
lining cutting
tunnel lining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910775486.9A
Other languages
Chinese (zh)
Inventor
姚青云
何磊祖
吴俊儒
梁增钊
黄耀清
韦权
蒋昌盛
韦大川
廖晓阳
曾云峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Navigation Construction Engineering Co ltd
Original Assignee
Guangxi Road Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Road Construction Engineering Group Co Ltd filed Critical Guangxi Road Construction Engineering Group Co Ltd
Priority to CN201910775486.9A priority Critical patent/CN110410109A/en
Publication of CN110410109A publication Critical patent/CN110410109A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to a kind of hangar tunnel lining cutting arch construction shifting formwork trolley and construction methods, hangar tunnel lining cutting arch construction shifting formwork trolley includes formwork for placing, sub-truss, moving flatcar and rail assembly, formwork for placing is fixedly connected on the working face of sub-truss, and sub-truss is installed in moving flatcar;In walking states, moving flatcar is walked along being fixedly mounted on the rail assembly on ground, and in die-filling, concreting, jack is installed between moving flatcar and ground, jack is connect by fluid pressure line with hydraulic station, and support base is arranged between moving flatcar and ground.The present invention can the template of double arch order hangar tunnel lining cutting arch carry out integral installation disassembly, whole hang shifting, duplicate template spelling and partition work can be saved, the cumbersome process for building scaffold protection can be saved significantly again, and template can also be shifted integrally to next construction section, save the process torn open refill again, larger raising construction efficiency shortens the construction period;Have the characteristics that construction safety coefficient height, rapid and convenient, standardization.

Description

A kind of construction of hangar tunnel lining cutting arch shifting formwork trolley and construction method
Technical field
The present invention relates to a kind of technical field of building construction, specially a kind of hangar tunnel lining cutting arch construction shifting formwork trolley and Construction method is suitable for hangar tunnel lining cutting arch concrete construction.
Background technique
In recent years, the highway infrastructures in China are quickly grown, a large amount of highway hot work in progress or Program Construction, high-grade public affairs Road is promoted from plains region to mountain area on a large scale.In highway construction, it can more and more encounter and deep-cut section.On these roads Duan Zhong, the region steeper to some side slope less stables, slope surface, general slope protection are extremely difficult to economic, permanent protection Effect, hangar tunnel as a kind of permanent safeguard structure, compare open trench tunnel have again construction technology it is simple, it is simple for structure, construct The advantages that short time limit, therefore the metastable half arch order hangar tunnel of structure will be appeared in more and more in Road Design. This is also to put forward new requirements to the progress of construction, how efficient, economic and safety is realized in the construction of hangar tunnel lining cutting arch, It is the new problem put in engineers and technicians.
Current half arch order hangar tunnel arch construction mostly uses hoisting machine tool to assist greatly, installs steel pipe support, template section by section, Walls concrete is poured, then removes steel pipe support, template section by section, carries out the lower paragraph of installation after template cleaning.It is this to apply Work method operating personnel's large labor intensity, construction efficiency is very low, and progress is slow.In order to meet construction speed and constructing aims It is required that often to increase template number, increases operating personnel and setting to realize, bracket, template consumption is significantly increased, greatly Width increases construction cost.And template, through repeated multiple times block-by-block installing and dismounting, template is easily-deformable, and deformation is big, plate connector It gradually deforms, occurs the hangar tunnel lining cutting arch after pouring on demoulding back wall surface uneven, seam crossing spillage generates bee Nest cavity, leads to poor appearance.And cellular cavity position is even across secondary treatment, waterproof of the hangar tunnel lining cutting arch at this position Ability and structure durability also receive very big weakening.And it is poor in steel pipe support structural integrity, bearing capacity is limited, makes Construction safety risk is high in the structure of heavy load, is not easy control.
Summary of the invention
The object of the present invention is to provide a kind of hangar tunnel lining cutting arch construction shifting formwork trolley and construction methods;Hangar tunnel is filled up The blank of lining cutting arch construction can be realized standardized construction, and construction is light, and assembling and dismounting are convenient, and it is convenient to construct, and reduce it Its mechanical use, Yi Zhouzhuan shorten construction period, reduce construction cost, and overall structure is stablized, and working security is good.
In order to realize aforementioned present invention purpose, the technical solution of use are as follows:
A kind of hangar tunnel lining cutting arch construction shifting formwork trolley, hangar tunnel includes the hangar tunnel lining cutting arch on top, hangar tunnel lining arch subordinate Side's connection hangar tunnel lining cutting stalk, hangar tunnel lining cutting stalk lower section connection hangar tunnel basis, hangar tunnel basis locate below ground level, hangar tunnel lining cutting Construction shifting formwork trolley in arch includes formwork for placing, sub-truss, moving flatcar and rail assembly, and sub-truss is different by length Channel steel or I-steel formed by welding whole, be installed on flatcar crossbeam.Formwork for placing is fixedly connected on sub-truss Working face, sub-truss is installed in moving flatcar;In walking states, moving flatcar is along the track for being fixedly mounted on ground It walks on component, in die-filling, concreting, jack is installed, jack passes through hydraulic tube between moving flatcar and ground Road is connect with hydraulic station, and support base is arranged between moving flatcar and ground.
I.e. the construction of hangar tunnel lining cutting arch with shifting formwork trolley in walking states, trolley can on rail assembly front and back free walker It walks, when going to predetermined position, trolley stops, and several jack are placed under trolley, and jack is connected with hydraulic station, opens hydraulic It stands, jack integrally jacks up trolley to predetermined altitude, then installs support base, and trolley is made to be fixed on construction height, hydraulic station Can release, for trolley weight by support seat supports, worker carries out die-filling, concrete pouring operation;When construction finishes, hydraulic station is opened It opens, jack jacks up trolley, removes support base, and then trolley is decreased until that traveling wheel falls into track by jack, removes thousand Jin top, trolley can walk on to next operating position, so on circulate.
The support base is one kind of wedge block, husky cylinder or lifting support.Because landform needs, below hangar tunnel, ground is not usually It is horizontal, therefore uses height-adjustable support base A, each support base can be individually adjusted according to the inclined angle in ground Highly, make the moving flatcar above support base that can keep horizontal posture.The sand cylinder is cylindrical shape, and steel-pipe welding is at closing Fixing end of the container as lower section pours into fine sand in the opening of fixing end bottom or side setting belt switch, container, in fine sand Upper to place the smaller movable end of outer diameter, when opening is opened, fine sand outflow, then movable end height declines.
The rail assembly includes two track, rear horizontal-associate and the preceding horizontal-associates being arranged side by side;The preceding horizontal-associate, rear horizontal-associate difference The front and back ends of track are installed on, front and back horizontal-associate makes the depth of parallelism of two rows of tracks obtain fixed control, and two rows of tracks will not occur Relative displacement and deviation improve the stability of trolley walking, guarantee the precision of hangar tunnel lining cutting arch construction.
The moving flatcar includes flatcar crossbeam, flatcar stringer and walking component;Several flatcar crossbeams and flatcar stringer are taken It connects and constitutes moving flatcar platform, traveling wheel is installed on moving flatcar mesa base.Usual crossbeam is located at the top of stringer, under stringer Side's connection traveling wheel, flatcar crossbeam is I-steel, and flatcar stringer is configured to I-steel or Two bors d's oeuveres I-steel.
Motor is installed, motor is connect by deceleration device with traveling wheel, row of the motor to traveling wheel in the moving flatcar Offer power is sailed, motor connects external power supply by conducting wire.
The sub-truss forms entirety by welding by the different channel steel of length or I-steel, is installed on moving flatcar On.
The formwork for placing includes superposed circular arc mould A and circular arc mould B, circular arc mould A and circular arc mould B positioned at lower part Hinged by door-hinge, circular arc mould A is fixedly connected with sub-truss, and circular arc mould B is connect by being vertically connected with bar with moving flatcar;Such as Shown in attached drawing, the engaging lug of upper connecting rod one end and moving flatcar is hinged, and the other end is connect with the top circular arc mould B;Lower connecting rod One end is hinged with moving flatcar, and the other end is connect with the lower part circular arc mould B, when releasing is vertically connected with the connection of bar Yu circular arc mould B, circle Arc mould B is bent inwards by door-hinge, when realizing demoulding trolley entire lowering, makes that falsework entire lowering is smooth, non-resistance, It prevents B sections of circular arc mould to rub the lining cutting side wall of hangar tunnel, causes the damage of sidewall surfaces.
The moving flatcar is connect with hangar tunnel basis and hangar tunnel lining cutting stalk by several Horizontal limiting pull rods, level limit Position pull rod is one kind of screw-thread steel, I-steel, channel steel or angle steel.The preformed hole when hangar tunnel lining cutting stalk pours, horizontal direction Screw thread is arranged in the right end of Horizontal limiting pull rod, passes through hangar tunnel lining cutting stalk, is fastened at right end screw thread with threaded fastener, horizontal Limit pull rod left end is connect with flatcar crossbeam, can weld, otic placode aperture can also be welded on flatcar crossbeam, is connected by threaded fastener It connects;In casting, pre-buried slanting Horizontal limiting pull rod, Horizontal limiting pull rod is weldingly connected with trolley on boron hole basis;Work as trolley When going to fixed position, by the anchorage effect of Horizontal limiting pull rod, prevent in die-filling, concreting, position occurs for trolley It moves;When needing to remove Horizontal limiting pull rod, then threaded fastener is removed, unload the Horizontal limiting pull rod of horizontal direction, and cut Break oblique Horizontal limiting pull rod.
Its construction method the following steps are included:
(1) processing component: the construction of hangar tunnel lining cutting arch presses drawing processing component with shifting formwork trolley, is transported to after trial assembly in processing factory Construction site;
(2) track laying: left and right track centerline is indicated in survey crew's setting-out, and the line vertical tile sleeper released along measurement is wanted Sleeper center is asked to match with surveying and locating;Sleeper carries out track installation after the completion of being laid with;Bracket walking uses double track form, often Track is laid on the sleeper of side;Laying track is carried out along sleeper center line, track is attached in the form of fish platee matches bolt; Make the preceding horizontal-associate and rear horizontal-associate of track structure using channel steel or I-steel in two rail ends;
(3) shifting formwork trolley is assembled: sub-truss carries out precast block in factory, and integral solder assembles after roping to scene, and with Flatcar crossbeam, flatcar stringer are integral by bolt or welding, are divided into a section by longitudinal every certain length, are hoisted to using crane On track;Spelling is carried out after cast template precast block at the scene, adjacent two pieces of cast templates are spliced using high-strength bolt, Every piece of cast template is welded with sub-truss;It is assisted in template installation process using crane, artificial assistance fine tuning is protected Demonstrate,prove the accuracy of template installation;In order to ensure the normal operation of rack template in concrete construction, after need to being installed to trolley It is debugged.Main commissioning content, which is embraced, includes walking, stop, the bending of circular arc mould B and trolley landing etc.;
(4) die-filling: to be moved along by motor pushing trolley, until the position identified in advance;In trolley moving process, answer It is steady to promote, pay attention to the stability of trolley, biggish thrust can not be used suddenly, prevent sub-truss from deforming;Trolley is moved to Behind position, jack is installed below each jacking supporting leg;Very heavy top/bottom part setting supporting pad support pad is smooth, avoids the occurrence of jack The case where inclination;Jack is installed and is checked without starting up to jack after any problem;The jacking speed of jack should be same Step, slowly carries out according to the top lifting height calculated in advance;Height can be finely adjusted, until reaching design height;According to calculating It determines branch points and is being arranged symmetrically support base on flatcar stringer bottom both sides, support seat structure is wedge block, husky cylinder, lifting support It is one of;Horizontal limiting pull rod is installed, support base removes jack after the installation is completed.
(5) pour: construction personnel wears safety belt and carries out stuff up a crack to cast template bottom on the construction operation platform of template Processing, stuff up a crack is complete and then carries out concreting, vibrates.
(6) demoulding: the concrete strength wait pour removes Horizontal limiting pull rod, then demoulding after reaching requirement, and dismounting is poured When injection molded plate, flatcar crossbeam bottom first is extended to jack top, then removes the support base at flatcar stringer bottom, is unclamped and circular arc mould The connecting rod of B connection, withdraws circular arc mould B, and jack bounces back synchronous entire lowering trolley, until traveling wheel falls into track, removes Jack, trolley are moved along the construction for carrying out next segment.
(7) step (4) to (6) are repeated until entire hangar tunnel pours completion.
(8) trolley is removed by the opposite process of assembling sequence, classification collects arrangement, and entrucking is transported existing to the construction of next hangar tunnel Field is recovered to equipment stacking field.
Possessed substantive distinguishing features outstanding and marked improvement are the present invention compared with the existing technology:
1, the present invention in trolley can realize overall movement, avoid conventional stent and template broken after the completion of pouring assemble again it is numerous Trivial construction, energy continuous productive process, Flow Pace is relatively fixed, and the flowing water duration is controllable;Trolley consolidation is convenient and efficient, so as to Larger raising construction speed, effectively shortens the construction period.
2, cast template and sub-truss of the present invention form a firm entirety, can bear biggish load, be suitable for More generous amount concrete pours, and safety coefficient is high, and construction safety can be effectively ensured;The hangar tunnel arch wall leveling constructed, The defects of seam crossing trace is small, will not generate cellular cavity, effectively increases the waterproof effect of hangar tunnel.
3, the present invention in the construction process, does not need truck crane or the cooperation of other large automobile, can effectively reduce other machines The use of tool, the expenditure of machinery cost have apparent reduction, substantially reduce equipment cost in construction;Various parts are easily purchased in trolley It buys, easy processing, and recyclable disassembly uses, Yi Zhouzhuan, transition after the completion of construction to new construction point or is recovered to equipment Stacking field is all the very conveniently not loss of material;During dress, demoulding, using hydraulic jack dress, tear open Mould greatly reduces labor intensity without excessive investment manpower, reduces human cost.
Detailed description of the invention
Fig. 1 is the present invention in the structural schematic diagram in dismounting mould state;
Fig. 2 is partial enlarged view at I in Fig. 1;
Fig. 3 is partial enlarged view at II in Fig. 1;
Fig. 4 is the structural schematic diagram of the present invention when walking;
Fig. 5 is schematic perspective view of the present invention in dismounting mould state;
Component names and serial number in figure are as follows:
Track 1, support base 2, traveling wheel 3, flatcar stringer 4, motor 5, supporting pad 6, jack 7, flatcar crossbeam 8, sub-truss 9, circular arc mould A 10, hangar tunnel lining cutting arch 11, door-hinge 12, circular arc mould B 13, connecting rod A 14, connecting rod B 15, hangar tunnel lining cutting Stalk 16, Horizontal limiting pull rod 17, hangar tunnel basis 18.
Specific embodiment
Embodiment 1
A kind of hangar tunnel lining cutting arch construction shifting formwork trolley, hangar tunnel includes the hangar tunnel lining cutting arch 11 on top, hangar tunnel lining cutting arch 11 lower sections connect hangar tunnel lining cutting stalk 16, and hangar tunnel basis 18 is connected below hangar tunnel lining cutting stalk 16, and hangar tunnel basis 18 is located at ground Hereinafter, hangar tunnel lining cutting arch construction shifting formwork trolley includes formwork for placing, sub-truss 9, moving flatcar and rail assembly, pour Template is fixedly connected on the working face of sub-truss, and sub-truss 9 is installed in moving flatcar;It is mobile flat in walking states Vehicle is walked along being fixedly mounted on the rail assembly on ground, in die-filling, concreting, is installed between moving flatcar and ground Jack 7, jack 7 are connect by fluid pressure line with hydraulic station, and husky cylinder support base is arranged between moving flatcar and ground 2;
The rail assembly includes two track 1, rear horizontal-associate and the preceding horizontal-associates being arranged side by side;The preceding horizontal-associate, rear horizontal-associate are pacified respectively Front and back ends loaded on track 1;
The moving flatcar includes flatcar crossbeam 8, flatcar stringer 4 and walking component;Several flatcar crossbeams 8 and flatcar stringer 4 are taken It connects and constitutes moving flatcar platform, traveling wheel 3 is installed on moving flatcar mesa base;
Motor 5 is installed, motor 5 is connect by deceleration device with traveling wheel 3 on the moving flatcar platform;
The sub-truss 9 forms entirety by welding by the different channel steel of length, is installed in moving flatcar;
The formwork for placing includes superposed circular arc mould A10 and circular arc mould B13, circular arc mould A10 and circular arc positioned at lower part Mould B13 is hinged by door-hinge 12, and circular arc mould A10 is fixedly connected with sub-truss 9, and circular arc mould B13 passes through connecting rod 14/15 and branch Truss 9 is supportted to connect;
The moving flatcar is connect with hangar tunnel basis 18 and hangar tunnel lining cutting stalk 16 by several Horizontal limiting pull rods 17, horizontal Limit pull rod 17 is screw-thread steel.
Hangar tunnel lining cutting arch construction use shifting formwork trolley, construction method the following steps are included:
(1) processing component: the construction of hangar tunnel lining cutting arch presses drawing processing component with shifting formwork trolley, is transported to after trial assembly in processing factory Construction site;
(2) track laying: left and right track centerline is indicated in setting-out, the line vertical tile sleeper released along measurement, it is desirable that in sleeper The heart matches with surveying and locating;Sleeper carries out track installation after the completion of being laid with;Trolley, which is walked, uses double track form, on every side sleeper It is laid with track;Laying track is carried out along sleeper center line;Make track structure using channel steel or I-steel in two rail ends Preceding horizontal-associate and rear horizontal-associate;
(3) shifting formwork trolley is assembled: sub-truss carries out precast block in factory, and integral solder assembles after roping to scene, and with Flatcar crossbeam, flatcar stringer are integral by bolt or welding, are divided into a section by longitudinal every certain length, are hoisted to using crane On track;Spelling is carried out after cast template precast block at the scene, adjacent two pieces of cast templates are spliced using high-strength bolt, Every piece of cast template is welded with sub-truss;
(4) die-filling: to be moved along by motor pushing trolley, until the position identified in advance;After trolley movement in place, every Jack is installed below a jacking supporting leg;Very heavy top/bottom part setting supporting pad support pad is smooth;Jack installs and checks nothing Start up to jack after any problem;Until reaching design height;Branch points are determined and at flatcar stringer bottom two according to calculating While being arranged symmetrically support base, Horizontal limiting pull rod is installed, support base removes jack after the installation is completed;
(5) it pours: stuff up a crack processing being carried out to cast template bottom on construction operation platform, stuff up a crack is complete and then carries out coagulation Soil pours, and vibrates;
(6) demoulding: the concrete strength wait pour removes Horizontal limiting pull rod after reaching requirement, and casting moulds are removed in then demoulding When plate, flatcar crossbeam bottom first is extended to jack top, then removes the support base at flatcar stringer bottom, unclamps and connects with circular arc mould B The connecting rod connect withdraws circular arc mould B, and jack, which bounces back, synchronizes entire lowering trolley, and until traveling wheel falls into track, dismounting is very heavy Top, trolley are moved along the construction for carrying out next segment;
(7) step (4) to (6) are repeated until entire hangar tunnel pours completion;
(8) the process form removal trolley opposite by assembling sequence, classification collect arrangement, and entrucking is transported existing to the construction of next hangar tunnel Field is recovered to equipment stacking field.
Embodiment 2
The difference from embodiment 1 is that: the support base 2 is wedge block;Sub-truss 9 passes through spiral shell by the different I-steel of length Bolt fastener forms entirety;Horizontal limiting pull rod 17 is I-steel.
Embodiment 3
The difference from embodiment 1 is that: the Horizontal limiting pull rod 17 is channel steel.
Embodiment 4
The difference from embodiment 1 is that: the Horizontal limiting pull rod 17 is angle steel.

Claims (9)

1. a kind of hangar tunnel lining cutting arch construction shifting formwork trolley, hangar tunnel includes the hangar tunnel lining cutting arch (11) on top, hangar tunnel lining cutting Hangar tunnel lining cutting stalk (16) are connected below arch (11), connection hangar tunnel is basic (18) below hangar tunnel lining cutting stalk (16), hangar tunnel base Plinth (18) locates below ground level, it is characterised in that: hangar tunnel lining cutting arch construction shifting formwork trolley includes formwork for placing, sub-truss (9), moving flatcar and rail assembly, formwork for placing are fixedly connected on the working face of sub-truss (9), sub-truss (9) installation In in moving flatcar;In walking states, moving flatcar edge, which is fixedly mounted on the rail assembly on ground, walks, die-filling, mixed When solidifying soil pours, jack (7) are installed between moving flatcar and ground, jack (7) is connect by fluid pressure line with hydraulic station, And support base (2) are set between moving flatcar and ground.
2. hangar tunnel lining cutting according to claim 1 arch construction shifting formwork trolley, it is characterised in that: the support base (2) For one kind of wedge block, husky cylinder or lifting support.
3. hangar tunnel lining cutting according to claim 1 arch construction shifting formwork trolley, it is characterised in that: the rail assembly packet Include two track (1), rear horizontal-associate and the preceding horizontal-associates being arranged side by side;The preceding horizontal-associate, rear horizontal-associate be respectively arranged in track (1) before, Rear end.
4. hangar tunnel lining cutting according to claim 1 arch construction shifting formwork trolley, it is characterised in that: the moving flatcar packet Include flatcar crossbeam (8), flatcar stringer (4) and walking component;Several flatcar crossbeams (8) and flatcar stringer (4) overlap joint constitute movement Flatcar platform, traveling wheel (3) are installed on moving flatcar mesa base.
5. hangar tunnel lining cutting according to claim 3 arch construction shifting formwork trolley, it is characterised in that: the moving flatcar is flat Motor (5) are installed on platform, motor (5) is connect by deceleration device with traveling wheel (3).
6. hangar tunnel lining cutting according to claim 1 arch construction shifting formwork trolley, it is characterised in that: the sub-truss (9) entirety is formed by welding by the different channel steel of length or I-steel, be installed in moving flatcar.
7. hangar tunnel lining cutting according to claim 1 arch construction shifting formwork trolley, it is characterised in that: the formwork for placing packet Include superposed circular arc mould A(10) and circular arc mould B(13 positioned at lower part), circular arc mould A(10) and circular arc mould B(13) pass through door Axis (12) hingedly, circular arc mould A(10) be fixedly connected with sub-truss, circular arc mould B(13) by connecting rod (14/15) and support purlin Frame connection.
8. hangar tunnel lining cutting according to claim 1 arch construction use shifting formwork trolley, it is characterised in that: the moving flatcar with Hangar tunnel basis (18) and hangar tunnel lining cutting stalk (16) are connected by several Horizontal limiting pull rods (17), Horizontal limiting pull rod (17) For one kind of screw-thread steel, I-steel, channel steel or angle steel.
9. hangar tunnel lining cutting according to claim 1 arch construction use shifting formwork trolley, construction method the following steps are included:
(1) processing component: the construction of hangar tunnel lining cutting arch presses drawing processing component with shifting formwork trolley, is transported to after trial assembly in processing factory Construction site;
(2) track laying: left and right track centerline is indicated in setting-out, the line vertical tile sleeper released along measurement, it is desirable that in sleeper The heart matches with surveying and locating;Sleeper carries out track installation after the completion of being laid with;Trolley, which is walked, uses double track form, on every side sleeper It is laid with track;Laying track is carried out along sleeper center line;Make track structure using channel steel or I-steel in two rail ends Preceding horizontal-associate and rear horizontal-associate;
(3) shifting formwork trolley is assembled: sub-truss carries out precast block in factory, and integral solder assembles after roping to scene, and with Flatcar crossbeam, flatcar stringer are integral by bolt or welding, are divided into a section by longitudinal every certain length, are hoisted to using crane On track;Spelling is carried out after cast template precast block at the scene, adjacent two pieces of cast templates are spliced using high-strength bolt, Every piece of cast template is welded with sub-truss;
(4) die-filling: to be moved along by motor pushing trolley, until the position identified in advance;After trolley movement in place, every Jack is installed below a jacking supporting leg;Very heavy top/bottom part setting supporting pad support pad is smooth;Jack installs and checks nothing Start up to jack after any problem;Until reaching design height;Branch points are determined and at flatcar stringer bottom two according to calculating While being arranged symmetrically support base, Horizontal limiting pull rod is installed, support base removes jack after the installation is completed;
(5) it pours: stuff up a crack processing being carried out to cast template bottom on construction operation platform, stuff up a crack is complete and then carries out coagulation Soil pours, and vibrates;
(6) demoulding: the concrete strength wait pour removes Horizontal limiting pull rod after reaching requirement, and casting moulds are removed in then demoulding When plate, flatcar crossbeam bottom first is extended to jack top, then removes the support base at flatcar stringer bottom, unclamps and connects with circular arc mould B The connecting rod connect withdraws circular arc mould B, and jack, which bounces back, synchronizes entire lowering trolley, and until traveling wheel falls into track, dismounting is very heavy Top, trolley are moved along the construction for carrying out next segment;
(7) step (4) to (6) are repeated until entire hangar tunnel pours completion;
(8) the process form removal trolley opposite by assembling sequence, classification collect arrangement, and entrucking is transported existing to the construction of next hangar tunnel Field is recovered to equipment stacking field.
CN201910775486.9A 2019-08-21 2019-08-21 A kind of construction of hangar tunnel lining cutting arch shifting formwork trolley and construction method Pending CN110410109A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910775486.9A CN110410109A (en) 2019-08-21 2019-08-21 A kind of construction of hangar tunnel lining cutting arch shifting formwork trolley and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910775486.9A CN110410109A (en) 2019-08-21 2019-08-21 A kind of construction of hangar tunnel lining cutting arch shifting formwork trolley and construction method

Publications (1)

Publication Number Publication Date
CN110410109A true CN110410109A (en) 2019-11-05

Family

ID=68368414

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910775486.9A Pending CN110410109A (en) 2019-08-21 2019-08-21 A kind of construction of hangar tunnel lining cutting arch shifting formwork trolley and construction method

Country Status (1)

Country Link
CN (1) CN110410109A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111719436A (en) * 2020-07-17 2020-09-29 温州市铁路与轨道交通投资集团有限公司 Construction system and construction method for urban railway cast-in-place box girder support in soft foundation area
CN112943301A (en) * 2021-02-05 2021-06-11 广西名嘉钢结构工程有限公司 Shed tunnel construction bearing structure
CN113914897A (en) * 2021-09-27 2022-01-11 中铁十四局集团建筑工程有限公司 Movable vault secondary lining template rack and connection cavern rack moving structure
WO2022142193A1 (en) * 2020-12-30 2022-07-07 中铁六局集团北京铁路建设有限公司 Construction method for large-span thin-wall concrete sound barrier pouring trolley
CN115450656A (en) * 2020-05-25 2022-12-09 保利长大海外工程有限公司 Lining trolley turnover method for underground space engineering

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201212150Y (en) * 2008-06-06 2009-03-25 中铁十四局集团有限公司 Big template lining trolley for subway stationg constructed by open-cut method
CN204126655U (en) * 2014-08-28 2015-01-28 中铁十二局集团第三工程有限公司 The anti-electric lining trolley of double track tunnel newly-built hangar tunnel lining construction
CN204163740U (en) * 2014-08-28 2015-02-18 中铁十二局集团第三工程有限公司 The anti-electric bow member chassis of single-track tunnel spreading hangar tunnel lining construction
CN104533456A (en) * 2014-12-15 2015-04-22 中铁上海工程局集团有限公司 Super-large section chamber reinforced concrete modelling construction method
CN210370698U (en) * 2019-08-21 2020-04-21 广西路建工程集团有限公司 Mould shifting trolley for shed tunnel lining arch construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201212150Y (en) * 2008-06-06 2009-03-25 中铁十四局集团有限公司 Big template lining trolley for subway stationg constructed by open-cut method
CN204126655U (en) * 2014-08-28 2015-01-28 中铁十二局集团第三工程有限公司 The anti-electric lining trolley of double track tunnel newly-built hangar tunnel lining construction
CN204163740U (en) * 2014-08-28 2015-02-18 中铁十二局集团第三工程有限公司 The anti-electric bow member chassis of single-track tunnel spreading hangar tunnel lining construction
CN104533456A (en) * 2014-12-15 2015-04-22 中铁上海工程局集团有限公司 Super-large section chamber reinforced concrete modelling construction method
CN210370698U (en) * 2019-08-21 2020-04-21 广西路建工程集团有限公司 Mould shifting trolley for shed tunnel lining arch construction

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
周晓陵;于天;杨明;: "老山隧道棚洞段施工工艺", 公路隧道, no. 03, 15 May 2007 (2007-05-15), pages 37 - 41 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115450656A (en) * 2020-05-25 2022-12-09 保利长大海外工程有限公司 Lining trolley turnover method for underground space engineering
CN111719436A (en) * 2020-07-17 2020-09-29 温州市铁路与轨道交通投资集团有限公司 Construction system and construction method for urban railway cast-in-place box girder support in soft foundation area
WO2022142193A1 (en) * 2020-12-30 2022-07-07 中铁六局集团北京铁路建设有限公司 Construction method for large-span thin-wall concrete sound barrier pouring trolley
CN112943301A (en) * 2021-02-05 2021-06-11 广西名嘉钢结构工程有限公司 Shed tunnel construction bearing structure
CN113914897A (en) * 2021-09-27 2022-01-11 中铁十四局集团建筑工程有限公司 Movable vault secondary lining template rack and connection cavern rack moving structure

Similar Documents

Publication Publication Date Title
CN110410109A (en) A kind of construction of hangar tunnel lining cutting arch shifting formwork trolley and construction method
CN109505630B (en) Full-hydraulic crawler-type self-propelled trestle and construction method
CN104612061B (en) A kind of suspension open type hanging basket device and construction method thereof
CN102146796B (en) Construction technology for inverted arch of two-track tunnel of high-speed railway
CN101781878B (en) Integral lifting template of main pylon of single-pylon cable-stayed bridge without dorsal cables and lifting construction method thereof
CN203066990U (en) Fully-hydraulic and self-walking inverted arch formworking trolley for tunnel
CN104294767B (en) A kind of semi girder cast-in-place construction spreading Hanging Basket and construction method thereof
CN102704949A (en) No-pull rod side wall construction method for underground tunnel and formwork trolley for construction
CN104109999A (en) Construction method for bridge tower transverse beams
CN105887685A (en) Railway high pier body template and scaffold integrated turnover formwork segmental construction method
CN105673048B (en) A kind of self-propelled hydraulic box culvert chassis
CN109267490B (en) Long guide beam type movable formwork and construction method thereof
CN202596743U (en) Formwork trolley for underground tunnel pull-rod-free side wall construction
CN113235472A (en) Concrete placement platform truck is contained to apron
CN106120562A (en) Overpass rod iron bracket bent cap support for shuttering integral hoisting construction method
CN109252445A (en) Cast-in-situ Beam assembled Large Diameter Pipeline steel pipe support structure and its construction method
CN107988921B (en) A kind of cross-line bridge single-point successively incremeantal launching method construction method of overcrossing railway, highway
CN102251481B (en) Railway pier layered construction method and construction device
CN206512605U (en) A kind of overall demolition, installation anticollision wall form and its walking track crane move system
CN107100361B (en) Inner support aluminum dipping form device and its installation method are climbed outside a kind of
CN106088608A (en) A kind of slding form operation method of metro depot beam slab xoncrete structure
CN203248170U (en) Lining trolley for secondary lining construction of pedestrian crosswalk
CN210370698U (en) Mould shifting trolley for shed tunnel lining arch construction
CN108533283A (en) A kind of two lining trolley of self-control and its application in repairing impaired tunnel
CN109505309A (en) A kind of shift system of piping lane segment and the piping lane installation method of application shift system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210817

Address after: 530029 9th and 10th floors, Xinfa building, No. 39, Yunjing Road, Qingxiu District, Nanning City, Guangxi Zhuang Autonomous Region

Applicant after: Guangxi Navigation Construction Engineering Co.,Ltd.

Address before: No.530001, xingyong Road, Nanning, Guangxi Zhuang Autonomous Region

Applicant before: GUANGXI ROAD CONSTRUCTION ENGINEERING GROUP Co.,Ltd.