CN110409802A - A kind of adjustable curvature guide rail and its assembling and application method - Google Patents

A kind of adjustable curvature guide rail and its assembling and application method Download PDF

Info

Publication number
CN110409802A
CN110409802A CN201910715510.XA CN201910715510A CN110409802A CN 110409802 A CN110409802 A CN 110409802A CN 201910715510 A CN201910715510 A CN 201910715510A CN 110409802 A CN110409802 A CN 110409802A
Authority
CN
China
Prior art keywords
guide rail
merogenesis
curvature
shaft
adjusting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910715510.XA
Other languages
Chinese (zh)
Inventor
于光
李景芳
孙喜亮
彭琳
史一剑
郭敬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China State Construction Engineering Research Institute Co Ltd
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
China State Construction Engineering Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC, China State Construction Engineering Research Institute Co Ltd filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN201910715510.XA priority Critical patent/CN110409802A/en
Publication of CN110409802A publication Critical patent/CN110409802A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/28Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bearings For Parts Moving Linearly (AREA)

Abstract

A kind of adjustable curvature guide rail and its assembling and application method, including merogenesis guide rail and curvature regulating device;Section guide rail head and the tail pass through connection hinged shaft and are attached, and head and the tail both ends are correspondingly arranged on the V-arrangement installation position of curvature regulating device;Curvature regulating device is set between adjacent two merogenesis guide rail, including adjusting screw rod, stop nut component and adjusting nut component;Stop nut component is set in the middle position of adjusting screw rod and is welded and fixed, and for the fixation after in place, adjusting nut component includes upper and lower two groups, is respectively arranged on the adjusting screw rod on stop nut component both sides, outer end is fixed with merogenesis guide rail panel.The present invention by adjusting merogenesis guide rail two adjusting nut components of link position angle, the adjusting of guide rail curvature can be realized, the hydraulic climbing mould construction scope of application is effectively widened, meet the construction demand in various Irregular Boundary Surfaces building, reduce construction cost, convenience is improved, guide rail curvature can be adjusted at any time according to the variation of structural curvature.

Description

A kind of adjustable curvature guide rail and its assembling and application method
Technical field
The present invention relates to the climbing shuttering construction technology of engineering construction field, in particular to a kind of adjustable curvature guide rail and its assembling And application method.
Background technique
The advantages of hydraulic climbing shuttering is a kind of technologically advanced construction technology, combines large form and climbing form, Be mainly characterized by: absorbing formwork support process, casting concrete, constructing operation simplicity, concrete surface quality are easy to according to a conventional method The advantages that guarantee, using oil cylinder or jack as power, is the rail that climbs with guide rail or support rod after the concrete demoulding newly poured Road voluntarily climbs template one layer upwards;Jumping formwork can be assembled and used since sole plate or random layer;Inner-outer wall Body and pillar can use creeping formwork, without assembling and disassembling template repeatedly;Reinforcing bar can be bound in advance, can also be with rising with tying up, operation side Just safety.According to engineering characteristic, can climb one layer of wall, pour first floor plate, can also be with the continuous climbing formwork for construction of wall, and floor is stagnant After construct;Stripper can be had in template, it is ensured that template is smoothly demoulded without sticking to mould;Creeping formwork can save template and stack place, apply Work scene civilization, for having apparent superiority in the narrow engineering project in down town construction site;After the completion of one engineering, Template, frame body and hydraulic device can continue Other Engineering use, the number of turnover is more, and template amortization charge is low, be suitble to lease and Form work engineering subpackage.
But the raising with construction level with the development of the times, the building of more and more irregular shapes occur In the sight of people, arc even Irregular Boundary Surface structure can be found everywhere, and hydraulic climbing formwork straight guide can be with knot under partial picture Structure interference, influences to construct, and needs for guide rail to be processed into specific camber line to meet construction, and may need newly to process when curved surface variation The guide rail of another batch of different curvature is badly in need of the construction that a guide rail that can adjust curvature adapts to various structures by creeping formwork, Construction efficiency is improved, difficulty of construction and cost are reduced.
Summary of the invention
It is an object of that present invention to provide a kind of adjustable curvature guide rail and its assembling and application methods, solve existing hydraulic climbing formwork In construction, when encountering arc or even Irregular Boundary Surface structure, the meeting of hydraulic climbing formwork straight guide and constructive interference influence to construct, need Guide rail is processed into specific camber line to meet construction, and needs newly to process the guide rail of another batch of different curvature when curved surface variation, is applied The technical issues of guide rail difficulty is larger, and security risk is high, construction cost is high, low efficiency is replaced in work, it is therefore intended that widen hydraulic The climbing formwork for construction scope of application reduces construction cost, improves convenience.
To realize the above-mentioned technical purpose, the present invention adopts the following technical scheme:
A kind of adjustable curvature guide rail, it is characterised in that: including merogenesis guide rail and curvature regulating device;
The merogenesis guide rail has several segments, and adjacent two merogenesis guide rail head and the tail pass through connection hinged shaft and are attached, head and the tail both ends pair The mounting groove and installation pin hole of curvature regulating device should be provided with;
The curvature regulating device is set between adjacent two merogenesis guide rail, including adjusting screw rod, stop nut component and adjusting spiral shell Female component;
The both ends of the adjusting screw rod are respectively arranged in the corresponding mounting groove of adjacent two merogenesis rail end, and upper and lower two parts are set Set reverse thread;
The stop nut component includes that stop nut, limit otic placode and the first spacer pin, the stop nut are set in adjusting It the middle position of screw rod and is welded and fixed, there are two the limit otic placodes, is symmetrically welded at two opposite lateral surfaces of stop nut On, plate face is vertical with the axis of adjusting screw rod, and dowel hole is offered among plate face;Second spacer pin is plugged in positioning pin In hole;
The adjusting nut component includes upper and lower two groups, is respectively arranged on the adjusting screw rod on stop nut component both sides, including is adjusted Save nut, connecting plate, pin shaft and the second spacer pin;The adjusting nut is socketed on adjusting screw rod;There are two the connecting plates, It is symmetrically welded on two opposite lateral surfaces of adjusting nut, plate face is parallel with the axis of adjusting screw rod;Two connecting plates are close to limit One end of position nut assembly is welded and fixed with adjusting nut, and one end far from stop nut component is respectively arranged on the abdomen of merogenesis guide rail Plate two sides, end correspondence open connecting pin bores;The pin shaft passes through the peace in the connecting pin bores and intermediate merogenesis guide rail panel of two sides After filling pin hole, end sets the limit of the second spacer pin and fixes.
Wherein, the merogenesis guide rail is H profile steel guide rail, and upper and lower side is symmetrically cut into inclined-plane, and curvature tune is formed after docking The V-arrangement installation position of regulating device, the mounting groove are opened on the web of V-arrangement installation position opening position two sides;The installation pin hole Set on the surface of mounting groove.
Further, protrusion and groove is respectively set in the side flange plate upper and lower ends that the merogenesis guide rail is not cut, Form connected structure.
Further, the connection hinged shaft includes shaft, central rotating shaft casing, lateral shaft sleeve, rotating shaft pad and turns Axis spacer pin;The central rotating shaft casing has one, and one end of merogenesis guide rail is weldingly fixed on by the first connection rib;The side To there are two shaft sleeves, the two sides of central rotating shaft casing are respectively correspondingly arranged in, merogenesis is weldingly fixed on by the second connection rib The other end of guide rail;The shaft passes through central rotating shaft casing, lateral shaft sleeve rear end is arranged rotating shaft pad, and by turning The limit of axis spacer pin is fixed.
Further, the central rotating shaft casing is fixed in the protrusion of merogenesis guide rail one end, two lateral shaft sleeves It is separately fixed at the two sides of other end groove, protrusion and groove grafting rear center's shaft sleeve and lateral shaft sleeve axis weight It closes.
Further, the end face outside of the limit otic placode is arc surface, and the connecting plate is far from stop nut component One end face is arc surface.
Further, the stop nut and adjusting nut are M24 national standard high-strength nut, and the adjusting screw rod is 130mm long φ 24mm high-strength bolt.
Further, the quantity of the merogenesis guide rail is 10~15 sections, and every section length is 500mm~800mm;Topmost divide The bottom end on the top and bottom merogenesis guide rail of saving guide rail keeps common rail structure, does not cut.
In addition, the present invention also provides the assemble methods of above-mentioned adjustable curvature guide rail, which comprises the steps of:
Step 1: preparation: including material preparation and size design, confirming the number of segment and length of merogenesis guide rail;
Step 2: production merogenesis guide rail: according to design length cutting production merogenesis guide rail, lower end is symmetrically cut into tiltedly on it Face, docking form the V-arrangement installation position of curvature regulating device, open up mounting groove on the aperture position web of V-arrangement installation position, pacifying Installation pin hole is beaten in the surface of tankage;Protrusion and groove is respectively set in the side flange plate upper and lower ends that do not cut;
Step 3: installation connection hinged shaft: central rotating shaft casing is welded in the protrusion of merogenesis guide rail one end, in other end groove Lateral shaft sleeve is respectively welded in two sides, and by protrusion and the groove grafting of adjacent two merogenesis guide rail, shaft passes through central rotating shaft set Pipe and lateral shaft sleeve, realize the connection of two sections of merogenesis guide rails;
Step 4: installation curvature regulating device: production assembling curvature regulating device first, after the completion by the connecting plate tail end at both ends It is located in the web two sides of merogenesis guide rail, the both ends of adjusting screw rod are respectively arranged on the corresponding mounting groove of adjacent two merogenesis rail end It is interior, the connecting plate and intermediate merogenesis rail web of two sides are passed through with pin shaft, end sets the limit of the second spacer pin and fixes;
Step 5: repeating step 2 to step 4, the assembling of merogenesis guide rail is successively carried out, until it is assembled into adjustable curvature guide rail, So far, construction is completed.
Finally, the application method of above-mentioned adjustable curvature guide rail includes the following steps:
Step 1: determine the node for needing to adjust curvature: according to actual requirement of engineering, preliminary judgement needs to adjust the section of curvature Point;
Step 2: carrying out node curvature just successive step one by one: taking the first spacer pin of corresponding node, rotation two adjustings up and down Nut assembly adjusts guide rail local curvature, and node adjusts one by one;
Step 3: it redefines the node for needing to adjust curvature: after the completion of first successive step, examining node curvature again, determine The node for needing further to finely tune, node adjusts one by one, until entire guide rail curvature meets engine request
Step 4: it constructs according to common climbing formwork for construction technique;
Step 5: when guide rail curvature need to be adjusted by encountering structural curvature variation again, step 1 is repeated to step 4 to guide rail part Or whole progress curvature adjusting;
Step 6: repeating step 4 and step 5 to construction terminates.
Compared with prior art, the invention has the following beneficial effects:
1, structure is simple, assembles and easy to use, constructs by adjusting two adjusting nut components of merogenesis guide rail link position The adjusting of guide rail curvature can be realized in angle,
2, flexible adjustment can adjust at any time guide rail curvature according to the variation of structural curvature, and convenience is strong, and use scope is wide, effectively The hydraulic climbing mould construction scope of application has been widened, the construction demand in various Irregular Boundary Surfaces building is met;
3, it can be recycled, repeatedly have enough to meet the need, reduce construction cost.
Detailed description of the invention
By made detailed description in conjunction with the following drawings, above-mentioned and/or other aspects of the invention and advantage will become It becomes apparent from and is easier to understand, these attached drawings are only schematical, are not intended to limit the present invention, in which:
Fig. 1 is the overall structure diagram of adjustable curvature guide rail of the present invention;
Fig. 2 is the partial enlargement structural representation of A in Fig. 1;
Fig. 3 is the structural schematic diagram of merogenesis guide rail of the present invention;
Fig. 4 is the front view of Fig. 3;
Fig. 5 is the side view of Fig. 3;
Fig. 6 is the top view of Fig. 3;
Fig. 7 is the structural schematic diagram of curvature regulating device of the present invention;
Fig. 8 is the structural schematic diagram of adjusting screw rod and fixture nut component in Fig. 3;
Fig. 9 is the structural schematic diagram of adjusting nut component in Fig. 3;
Figure 10 is the structural schematic diagram of adjusting nut and connecting plate in Fig. 5;
Figure 11 is the structural schematic diagram of shaft of the present invention;
Figure 12 is the structural schematic diagram of central rotating shaft casing of the present invention;
Figure 13 is the structural schematic diagram of lateral shaft sleeve of the present invention.
Appended drawing reference: 1- merogenesis guide rail, 1.1- mounting groove, 1.2- installation pin hole, 1.3-V shape installation position, 1.4- protrusion, 1.5- groove, 2- curvature regulating device, 2.1- adjusting screw rod, 2.2- stop nut component, 2.21- stop nut, 2.22- limit Otic placode, the first spacer pin of 2.23-, 2.24- dowel hole, 2.3- adjusting nut component, 2.31- adjusting nut, 2.32- connection Plate, 2.33- pin shaft, the second spacer pin of 2.34-, 2.35- connecting pin bores, 3- connection hinged shaft, 3.1- shaft, 3.2- central rotating shaft set Pipe, the side 3.3- are to shaft sleeve, 3.4- rotating shaft pad, 3.5- shaft spacer pin, the connection of 3.6- first rib, the connection of 3.7- second Rib.
Specific embodiment
Hereinafter, the reality of a kind of adjustable curvature guide rail of the invention and its assembling and application method is described with reference to the accompanying drawings Apply example.
The embodiment recorded herein is specific specific embodiment of the invention, for illustrating design of the invention, Be it is explanatory and illustrative, should not be construed as the limitation to embodiment of the present invention and the scope of the invention.Except what is recorded herein Outside embodiment, those skilled in the art can also based on the claim of this application book and specification disclosure of that using aobvious and The other technical solutions being clear to, these technical solutions include using any obvious to making for the embodiment recorded herein The technical solution of substitutions and modifications.The attached drawing of this specification is schematic diagram, aids in illustrating design of the invention, it is schematically indicated The shape and its correlation of each section.It note that for the ease of clearly showing the knot of each component of the embodiment of the present invention Structure is not drawn according to identical ratio between each attached drawing.Identical reference marker is for indicating identical part.
The principle and features of the present invention will be described below with reference to the accompanying drawings, and the given examples are served only to explain the present invention, and It is non-to be used to limit the scope of the invention.
Such as Fig. 1 and Fig. 2, a kind of adjustable curvature guide rail, including merogenesis guide rail 1 and curvature regulating device 2;Merogenesis guide rail 1 has Several segments, adjacent two merogenesis guide rail, 1 head and the tail are attached by connecting hinged shaft 3, and head and the tail both ends are correspondingly arranged on curvature adjusting The V-arrangement installation position 1.3 of device 3.
Such as Fig. 3~6, former H profile steel guide rail is being divided into 12 sections by merogenesis guide rail 1, and every section length is 660mm, upper and lower side pair Incisal bevel is claimed to form V-arrangement installation position 1.3, short limb listrium length 594mm, long flange plate length 650mm;Compared with short limb listrium side Web upper and lower side opens the mounting groove 1.1 of 50mm × 50mm curvature regulating device and the installation pin hole 1.2 of φ 25mm, limiting slot welt In web end face and flange plate inner surface, mounting hole distance of center circle edge of a wing plate end face 82mm, away from flange plate inner surface 25mm;Longer The protrusion 1.4 of 20mm × 20mm is stayed in flange plate side upper end between two parties, and the groove 1.5 of 20mm × 22mm is opened in lower end between two parties.Uppermost The upper end of merogenesis guide rail 1 and the lower end of most bottom section merogenesis guide rail 1 keep common rail structure, do not cut.
Such as Fig. 7~10, curvature regulating device 2 is set between adjacent two merogenesis guide rail 1, including adjusting screw rod 2.1, limit spiral shell Female component 2.2 and adjusting nut component 2.3.
Adjusting screw rod 2.1 is set with stop nut component 2.2 based on 130mm long φ 24mm high-strength bolt among it, M24 national standard high-strength nut is stop nut 2.21, and is weldingly fixed on screw rod, and adjusting screw rod is with M24 national standard high-strength nut Reverse thread is arranged in midpoint, both ends;The national standard high-strength nut side M24 is symmetrical arranged two limit otic placodes 2.22, limits otic placode 2.22 be 20mm × 20mm × 6mm steel plate, and one end is cut into the semicircle of radius 10mm, and the center point opens φ 8mm through-hole, uncut It is welded in M24 national standard high-strength nut side on one side.Adjusting nut component 2.3 by M24 national standard high-strength nut adjusting nut 2.31, Connecting plate 2.32, pin shaft 2.33 and the second spacer pin 2.34 composition: connecting plate 2.32 is 110mm × 40mm × 6mm steel plate, one end It is cut into the semicircle of radius 20mm, the center point opens φ 24mm through-hole, and two pieces of connecting plates for 90mm × 60mm rectangle plane not cut Side is cut to be symmetrically welded in M24 national standard high-strength nut two sides;Pin shaft 2.33 is 70mm long φ 24mm round steel bar, and one end is φ 30mm The anti-flake of × 6mm, the other end open φ 7mm through-hole in rod iron side away from end face 10mm between two parties;Second spacer pin 2.34 is with 3mm half The semicircle of diameter be section nest at pin.Pin shaft 2.33 is 60mm long φ 7mm round steel bar, and one end is welded in 25mm × 8mm × 5mm In the middle part of steel plate, the other end does 3mm chamfering.
Such as Figure 11~13, hinged shaft 3 is connected by shaft 3.1, shaft sleeve, rotating shaft pad 3.4 and 3.5 groups of shaft spacer pin At.Shaft is 54mm long φ 22mm round steel bar, and one end is the anti-flake of φ 30mm × 6mm, and the other end is away from end face 3.5mm in rod iron side φ 4mm through-hole is opened between two parties in face;Shaft sleeve is divided to two kinds of specifications, and one kind is lateral shaft sleeve 3.3, be 11mm long φ 30mm × Throat thickness 5mm placed in the middle on the outside of 3mm round tube, 15mm+45mm × 30mm that φ 30mm semicircle gap is opened along right-angle side it is trapezoidal the Two connect ribs 3.7, and each welding one of coxostermum bilateral symmetry under upper section guide rail, it is 20mm that another kind, which is center shaft sleeve 3.2, Two pieces of thickness 5mm are welded between two parties on the outside of long φ 30mm × 3mm round tube, the 15mm+45mm of φ 30mm semicircle gap is opened along right-angle side The first × 30mm trapezoidal connection formation of rib 3.6, the clear distance 8mm of two piece of first connection rib 3.6 are welded between two parties on lower section guide rail Side;Rotating shaft pad 3.4 is to open 22.5 circular hole of φ in the middle part of φ 30mm × 3mm steel plate;Shaft spacer pin 3.5 by φ 3mm round steel nest at. Central rotating shaft casing 3.2 is fixed in the protrusion 1.4 of 1 one end of merogenesis guide rail, and two lateral shaft sleeves 3.3 are separately fixed at separately The two sides of one end groove 1.5, protrusion 1.4 and 1.5 grafting rear center shaft sleeve 3.2 of groove and 3.3 axis of lateral shaft sleeve It is overlapped.
Whole adjustable curvature guide rail is completed in the following manner: between merogenesis guide rail difference section using protrusion 1.4 with 1.5 grafting of groove, is inserted into shaft sleeve for shaft 3.1, and rotating shaft pad 3.4 is inserted in side of the shaft with pin hole, and by shaft Spacer pin 3.5 is inserted into the limit of φ 4mm through-hole;By an adjusting screw rod 2.1 with stop nut component 2.2 and two adjusting nuts Component 2.3 is threadedly attached to together, and adjusting nut is attached to connecting pin bores 2.35 and installation pin hole 1.2 using pin shaft 2.33 It is interior, it is inserted into the second spacer pin 2.34, adjusting screw rod 2.1 is rotated to appropriate length, makes the limit otic placode of stop nut component 2.2 2.22 are located at 2.32 outside of connecting plate of adjusting nut component 2.3, and the first spacer pin 2.23 of insertion is fixed.
The assemble method of above-mentioned adjustable curvature guide rail, which comprises the steps of:
Step 1: preparation: including material preparation and size design, confirming the number of segment and length of merogenesis guide rail 1;
Step 2: production merogenesis guide rail 1: according to design length cutting production merogenesis guide rail 1, lower end is symmetrically cut into tiltedly on it Face, docking form the V-arrangement installation position 1.3 of curvature regulating device 2, open up installation on the aperture position web of V-arrangement installation position 1.3 Slot 1.1 beats installation pin hole 1.2 in the surface of mounting groove 1.1;It is respectively set in the side flange plate upper and lower ends that do not cut Protrusion 1.4 and groove 1.5;
Step 3: installation connection hinged shaft 3: central rotating shaft casing 3.2 is welded in the protrusion 1.4 of 1 one end of merogenesis guide rail, another Lateral shaft sleeve 3.3 is respectively welded in the two sides of end groove 1.5, and the protrusion 1.4 of adjacent two merogenesis guide rail 1 is inserted with groove 1.5 It connects, shaft 3.1 passes through central rotating shaft casing 3.2 and lateral shaft sleeve 3.3, realizes the connection of two sections of merogenesis guide rails 1;
Step 4: installation curvature regulating device 2: production assembling curvature regulating device 2 first, after the completion by the connecting plate at both ends 2.32 tail ends are located in the web two sides of merogenesis guide rail 1, and the both ends of adjusting screw rod 2.1 are respectively arranged on adjacent two merogenesis guide rail, 1 end In the corresponding mounting groove 1.1 in portion, the connecting plate 2.32 and intermediate 1 web of merogenesis guide rail of two sides are passed through with pin shaft 2.33, end is set The limit of second spacer pin 2.34 is fixed;
Step 5: repeating step 2 to step 4, the assembling of merogenesis guide rail 1 is successively carried out, until it is assembled into adjustable curvature guide rail, So far, construction is completed.
The application method of above-mentioned adjustable curvature guide rail, which comprises the steps of:
Step 1: determine the node for needing to adjust curvature: according to actual requirement of engineering, preliminary judgement needs to adjust the section of curvature Point;
Step 2: carrying out node curvature just successive step one by one: taking the first spacer pin 2.23 of corresponding node, rotate two up and down Adjusting nut component 2.3 adjusts guide rail local curvature, and node adjusts one by one;
Step 3: it redefines the node for needing to adjust curvature: after the completion of first successive step, examining node curvature again, determine The node for needing further to finely tune, node adjusts one by one, until entire guide rail curvature meets engine request
Step 4: it constructs according to common climbing formwork for construction technique;
Step 5: when guide rail curvature need to be adjusted by encountering structural curvature variation again, step 1 is repeated to step 4 to guide rail part Or whole progress curvature adjusting;
Step 6: repeating step 4 and step 5 to construction terminates.
Above embodiment be only preferred embodiments of the present invention will be described, not to the scope of the present invention into Row limits, and without departing from the spirit of the design of the present invention, those of ordinary skill in the art make technical solution of the present invention Various changes and improvements out should all be fallen into the protection scope that claims of the present invention determines.

Claims (10)

1. a kind of adjustable curvature guide rail, it is characterised in that: including merogenesis guide rail (1) and curvature regulating device (2);
The merogenesis guide rail (1) has several segments, and adjacent two merogenesis guide rail (1) is attached by connecting hinged shaft (3) from beginning to end, first Tail both ends are correspondingly arranged on mounting groove (1.1) and installation pin hole (1.2) of curvature regulating device (3);
The curvature regulating device (2) is set between adjacent two merogenesis guide rail (1), including adjusting screw rod (2.1), stop nut group Part (2.2) and adjusting nut component (2.3);
The both ends of the adjusting screw rod (2.1) are respectively arranged in the corresponding mounting groove (1.1) in adjacent two merogenesis guide rail (1) end, Reverse thread is arranged in its upper and lower two parts;
The stop nut component (2.2) includes stop nut (2.21), limits otic placode (2.22) and the first spacer pin (2.23), The stop nut (2.21) is set in the middle position of adjusting screw rod (2.1) and is welded and fixed, the limit otic placode (2.22) There are two, it is symmetrically welded on two opposite lateral surfaces of stop nut (2.21), the axis of plate face and adjusting screw rod (2.1) hangs down Directly, dowel hole (2.24) are offered among plate face;Second spacer pin (2.23) is plugged in dowel hole (2.24);
The adjusting nut component (2.3) includes upper and lower two groups, is respectively arranged on the adjusting screw rod on stop nut component (2.2) both sides (2.1) on, including adjusting nut (2.31), connecting plate (2.32), pin shaft (2.33) and the second spacer pin (2.34);The adjusting Nut (2.31) is socketed on adjusting screw rod (2.1);There are two the connecting plates (2.32), is symmetrically welded at adjusting nut (2.31) on two opposite lateral surfaces, plate face is parallel with the axis of adjusting screw rod (2.1);Two connecting plates (2.32) are close to limit One end of nut assembly (2.2) is welded and fixed with adjusting nut (2.31), and one end far from stop nut component (2.2) is set respectively In the web two sides of merogenesis guide rail (1), end correspondence opens connecting pin bores (2.35);The pin shaft (2.33) passes through the connection of two sides After installation pin hole (1.2) on pin hole (2.35) and intermediate merogenesis guide rail (1) panel, end sets the second spacer pin (2.34) limit It is fixed.
2. a kind of adjustable curvature guide rail according to claim 1, it is characterised in that: the merogenesis guide rail (1) is led for H profile steel Rail, upper and lower side are symmetrically cut into inclined-plane, and the V-arrangement installation position (1.3) of curvature regulating device (2), the installation are formed after docking Slot (1.1) is opened on the web of V-arrangement installation position (1.3) opening position two sides;The installation pin hole (1.2) is set to mounting groove (1.1) surface.
3. a kind of adjustable curvature guide rail according to claim 2, it is characterised in that: the merogenesis guide rail (1) is not cut Side flange plate upper and lower ends raised (1.4) and groove (1.5) are respectively set, form connected structure.
4. a kind of adjustable curvature guide rail according to claim 1, it is characterised in that: the connection hinged shaft (3) includes shaft (3.1), central rotating shaft casing (3.2), lateral shaft sleeve (3.3), rotating shaft pad (3.4) and shaft spacer pin (3.5);It is described Central rotating shaft casing (3.2) has one, and one end of merogenesis guide rail (1) is weldingly fixed on by the first connection rib (3.6);The side To there are two shaft sleeve (3.3), the two sides of central rotating shaft casing (3.2) are respectively correspondingly arranged in, pass through the second connection rib (3.7) It is weldingly fixed on the other end of merogenesis guide rail (1);The shaft (3.1) passes through central rotating shaft casing (3.2), lateral shaft sleeve (3.3) rear end is arranged rotating shaft pad (3.4), and is fixed by shaft spacer pin (3.5) limit.
5. a kind of adjustable curvature guide rail according to claim 4, it is characterised in that: the central rotating shaft casing (3.2) is solid It is scheduled in the protrusion (1.4) of merogenesis guide rail (1) one end, two lateral shaft sleeves (3.3) are separately fixed at other end groove (1.5) two sides, raised (1.4) and groove (1.5) grafting rear center shaft sleeve (3.2) and lateral shaft sleeve (3.3) axis Line is overlapped.
6. a kind of adjustable curvature guide rail according to claim 1, it is characterised in that: the outside of limit otic placode (2.22) End face is arc surface, and an end face of the connecting plate (2.32) far from stop nut component (2.2) is arc surface.
7. a kind of adjustable curvature guide rail according to claim 1, it is characterised in that: the stop nut (2.21) and adjusting Nut (2.31) is M24 national standard high-strength nut, and the adjusting screw rod (2.1) is 130mm long φ 24mm high-strength bolt.
8. a kind of adjustable curvature guide rail according to claim 1, it is characterised in that: the quantity of the merogenesis guide rail (1) is 10~15 sections, every section length are 500mm~800mm;The top of the top merogenesis guide rail (1) and bottom merogenesis guide rail (1) Bottom end keeps common rail structure, does not cut.
9. the assemble method of adjustable curvature guide rail described in any one according to claim 1~8, which is characterized in that including such as Lower step:
Step 1: preparation: including material preparation and size design, confirming the number of segment and length of merogenesis guide rail (1);
Step 2: production merogenesis guide rail (1): according to design length cutting production merogenesis guide rail (1), lower end is symmetrically cut on it At inclined-plane, docking forms the V-arrangement installation position (1.3) of curvature regulating device (2), the aperture position web in V-arrangement installation position (1.3) On open up mounting groove (1.1), the surface of mounting groove (1.1) beat installation pin hole (1.2);In the side flange plate not cut Raised (1.4) and groove (1.5) are respectively set in upper and lower ends;
Step 3: installation connection hinged shaft (3): welding central rotating shaft casing in the protrusion (1.4) of merogenesis guide rail (1) one end (3.2), lateral shaft sleeve (3.3) are respectively welded in the two sides of other end groove (1.5), by adjacent two merogenesis guide rail (1) Raised (1.4) and groove (1.5) grafting, shaft (3.1) passes through central rotating shaft casing (3.2) and lateral shaft sleeve (3.3), real The connection of existing two sections of merogenesis guide rails (1);
Step 4: installation curvature regulating device (2): production assembling curvature regulating device (2) first, after the completion by the connection at both ends Plate (2.32) tail end is located in the web two sides of merogenesis guide rail (1), and the both ends of adjusting screw rod (2.1) are respectively arranged on adjacent two merogenesis In the corresponding mounting groove (1.1) in guide rail (1) end, the connecting plate (2.32) of two sides is passed through with pin shaft (2.33) and intermediate merogenesis is led Rail (1) web, end set the second spacer pin (2.34) limit and fix;
Step 5: repeating step 2 to step 4, the assembling of merogenesis guide rail (1) is successively carried out, is led until being assembled into adjustable curvature Rail, so far, construction are completed.
10. a kind of application method of adjustable curvature guide rail described in any one of claim 1 to 9, which is characterized in that including such as Lower step:
Step 1: determine the node for needing to adjust curvature: according to actual requirement of engineering, preliminary judgement needs to adjust the section of curvature Point;
Step 2: successive step at the beginning of carrying out node curvature one by one: taking the first spacer pin (2.23) of corresponding node, rotation upper and lower two A adjusting nut component (2.3) adjusts guide rail local curvature, and node adjusts one by one;
Step 3: it redefines the node for needing to adjust curvature: after the completion of first successive step, examining node curvature again, determine The node for needing further to finely tune, node adjusts one by one, until entire guide rail curvature meets engine request;
Step 4: it constructs according to common climbing formwork for construction technique;
Step 5: when guide rail curvature need to be adjusted by encountering structural curvature variation again, step 1 is repeated to step 4 to guide rail part Or whole progress curvature adjusting;
Step 6: repeating step 4 and step 5 to construction terminates.
CN201910715510.XA 2019-08-05 2019-08-05 A kind of adjustable curvature guide rail and its assembling and application method Pending CN110409802A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910715510.XA CN110409802A (en) 2019-08-05 2019-08-05 A kind of adjustable curvature guide rail and its assembling and application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910715510.XA CN110409802A (en) 2019-08-05 2019-08-05 A kind of adjustable curvature guide rail and its assembling and application method

Publications (1)

Publication Number Publication Date
CN110409802A true CN110409802A (en) 2019-11-05

Family

ID=68365983

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910715510.XA Pending CN110409802A (en) 2019-08-05 2019-08-05 A kind of adjustable curvature guide rail and its assembling and application method

Country Status (1)

Country Link
CN (1) CN110409802A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111319433A (en) * 2020-03-19 2020-06-23 北京汽车股份有限公司 Glass guide rail and vehicle door
WO2023208662A1 (en) * 2022-04-27 2023-11-02 Renault S.A.S. Frame for guiding a window of a vehicle

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050172850A1 (en) * 2004-01-22 2005-08-11 Masami Sakita Turnout of guideway beam-based transit system
US20050236069A1 (en) * 2004-04-23 2005-10-27 O'brien Vincent E Adjustable router guide template assembly
CN203256551U (en) * 2013-05-14 2013-10-30 河北中房钢结构有限公司 Double-block type ballastless track framed bent device
CN108842794A (en) * 2018-06-19 2018-11-20 华北水利水电大学 Assemble the absorption standard channel steel cofferdam of adjustable-angle
CN211007635U (en) * 2019-08-05 2020-07-14 中国建筑股份有限公司 Adjustable curvature guide rail

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050172850A1 (en) * 2004-01-22 2005-08-11 Masami Sakita Turnout of guideway beam-based transit system
US20050236069A1 (en) * 2004-04-23 2005-10-27 O'brien Vincent E Adjustable router guide template assembly
CN203256551U (en) * 2013-05-14 2013-10-30 河北中房钢结构有限公司 Double-block type ballastless track framed bent device
CN108842794A (en) * 2018-06-19 2018-11-20 华北水利水电大学 Assemble the absorption standard channel steel cofferdam of adjustable-angle
CN211007635U (en) * 2019-08-05 2020-07-14 中国建筑股份有限公司 Adjustable curvature guide rail

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111319433A (en) * 2020-03-19 2020-06-23 北京汽车股份有限公司 Glass guide rail and vehicle door
WO2023208662A1 (en) * 2022-04-27 2023-11-02 Renault S.A.S. Frame for guiding a window of a vehicle
FR3135058A1 (en) * 2022-04-27 2023-11-03 Renault S.A.S. Frame for guiding a vehicle window.

Similar Documents

Publication Publication Date Title
CN110409802A (en) A kind of adjustable curvature guide rail and its assembling and application method
CN207526120U (en) Wall is poured with aluminum alloy pattern plate levelling device
CN205653782U (en) Mould is repaired to bored concrete pile pile head
CN107327140A (en) A kind of masonry constructional column pours mouth template
CN216427858U (en) Linear adjusting template device for post-cast section of curved track beam
CN105648899B (en) A kind of concrete hollow slab bridge hinge seam bar construction
CN211007635U (en) Adjustable curvature guide rail
CN106640545A (en) Transition connecting piece, concrete tower and concrete tower construction method
CN217777272U (en) Prefabricated box beam flange template with stable structure
CN107419897A (en) A kind of reinforcing mould of windowsill coping formwork
CN216641515U (en) Bar planting reinforcing bar anticreep device at bottom of beam slab
CN207526113U (en) A kind of reinforcing mold of windowsill coping formwork
CN108798024A (en) A kind of anti-backflow concrete filled steel tube jacking interface arrangement and its construction method
CN208363140U (en) A kind of mounting structure of subway station side wall steel side waterstop
CN207778360U (en) A kind of streetlamp foundation built-in fitting
CN220266452U (en) Gate slot forming device
CN209552089U (en) A kind of fixed device of built-in fitting
CN201065763Y (en) Arc construction template
CN202866274U (en) Flat surface and curved surface dual-use combined steel formwork for pouring of concrete
CN206721690U (en) A kind of vertical prestressing monoblock type reserves notch typified form
CN208518334U (en) Detachable Three-section water stop screw rod
CN206376545U (en) A kind of dual bracing means of external angle formwork
CN105525929A (en) Universal formwork of steel mould trolley for tunnel lining construction and use method of universal formwork
CN216194076U (en) Vertical reservation device for mounting hole of rear suspender of hanging basket
CN206454992U (en) A kind of leader pass pass structure for rolling finish rolling deformed bar

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination