CN110397202A - A kind of pitched roof mounting structure and installation method - Google Patents
A kind of pitched roof mounting structure and installation method Download PDFInfo
- Publication number
- CN110397202A CN110397202A CN201910724394.8A CN201910724394A CN110397202A CN 110397202 A CN110397202 A CN 110397202A CN 201910724394 A CN201910724394 A CN 201910724394A CN 110397202 A CN110397202 A CN 110397202A
- Authority
- CN
- China
- Prior art keywords
- hook
- roof
- mounting structure
- rib
- pitched roof
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 title claims abstract description 29
- 238000000034 method Methods 0.000 title claims abstract description 12
- 238000007688 edging Methods 0.000 claims description 22
- 229910000831 Steel Inorganic materials 0.000 claims description 12
- 239000010959 steel Substances 0.000 claims description 12
- 239000011248 coating agent Substances 0.000 claims description 7
- 238000000576 coating method Methods 0.000 claims description 7
- 238000009413 insulation Methods 0.000 claims description 7
- 239000004814 polyurethane Substances 0.000 claims description 7
- 229920002635 polyurethane Polymers 0.000 claims description 7
- 229910000838 Al alloy Inorganic materials 0.000 claims description 5
- 239000000956 alloy Substances 0.000 claims description 4
- 239000000463 material Substances 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 7
- 230000000694 effects Effects 0.000 description 6
- 238000010586 diagram Methods 0.000 description 4
- 238000011900 installation process Methods 0.000 description 3
- 230000005484 gravity Effects 0.000 description 2
- 238000003032 molecular docking Methods 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 210000000988 bone and bone Anatomy 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
- E04B7/02—Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
- E04B7/02—Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs
- E04B7/04—Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs supported by horizontal beams or the equivalent resting on the walls
- E04B7/045—Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs supported by horizontal beams or the equivalent resting on the walls with connectors made of sheet metal for connecting the roof structure to the supporting wall
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D3/00—Roof covering by making use of flat or curved slabs or stiff sheets
- E04D3/35—Roofing slabs or stiff sheets comprising two or more layers, e.g. for insulation
- E04D3/351—Roofing slabs or stiff sheets comprising two or more layers, e.g. for insulation at least one of the layers being composed of insulating material, e.g. fibre or foam material
- E04D3/352—Roofing slabs or stiff sheets comprising two or more layers, e.g. for insulation at least one of the layers being composed of insulating material, e.g. fibre or foam material at least one insulating layer being located between non-insulating layers, e.g. double skin slabs or sheets
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D3/00—Roof covering by making use of flat or curved slabs or stiff sheets
- E04D3/35—Roofing slabs or stiff sheets comprising two or more layers, e.g. for insulation
- E04D3/351—Roofing slabs or stiff sheets comprising two or more layers, e.g. for insulation at least one of the layers being composed of insulating material, e.g. fibre or foam material
- E04D3/354—Roofing slabs or stiff sheets comprising two or more layers, e.g. for insulation at least one of the layers being composed of insulating material, e.g. fibre or foam material more than one of the layers being composed of insulating material
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D3/00—Roof covering by making use of flat or curved slabs or stiff sheets
- E04D3/36—Connecting; Fastening
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The invention discloses a kind of pitched roof mounting structures and installation method in modularized house field, the pitched roof mounting structure includes roof beam, cornice beam and it is connected to roof beam, cant beam between cornice beam, purlin is connected between cant beam, roof beam upper surface is equipped with the first hook, cornice beam upper surface is equipped with the second hook, roof boarding is articulated in the first hook and the second hook, the position of corresponding first hook of roof boarding and the second hook is equipped with notch, notch top is equipped with the mounting part extended downwardly, the hook body of first hook and the second hook and mounting part mount, the hook body length for hooking body length and being greater than the second hook of first hook, the hook body inserting surface of first hook and the second hook is in up-narrow and down-wide wedge shape, the width of notch is slightly larger than the width for hooking body top and is slightly less than the width for hooking body lower part.Pitched roof mounting structure of the invention and installation method have many advantages, such as that simple installation, connection reliability are high, structural stability is strong, construction safety.
Description
Technical field
The present invention relates to a kind of modularized house, in particular to the pitched roof mounting structure of a kind of modularized house and installation
Method.
Background technique
Modularized house by its can it is prefabricated it is customized, reusable, removable expand, sturdy and durable, efficiency of construction is high
Many advantages, such as by public favor.Currently, movable more and more, field work, field exercise, field of the people in field
Scientific investigation etc. is required in field encampment Working Life, and field modularization house becomes the critical facility of field operation.
Existing field modularization house mostly uses steel construction list pitched roof or double-slope roof, and roof boarding is tight by bolt etc.
Firmware is fixed on roofing skeleton, is needed in roof boarding and the prefabricated bolt hole of roofing skeleton link position, to construction precision requirement
It is higher, and installation difficulty is larger, in roofing installation process, usually there is the case where to not upper eye in bolt hole, seriously affects slope
The installation progress and installation effect of roofing.In addition, the pitched roof mounting means of the prior art needs installation personnel in roof operation,
It is inconvenient and there are some potential safety problemss.
Summary of the invention
The object of the present invention is to provide a kind of easy to operate, safe pitched roof mounting structures and installation method, to improve
The installation effectiveness and installation effect of pitched roof.
The object of the present invention is achieved like this: a kind of pitched roof mounting structure, including roof beam, cornice beam and connection
Cant beam between roof beam, cornice beam, purlin is connected between cant beam, and roof beam upper surface is equipped with the first hook, cornice beam
Upper surface is equipped with the second hook, and roof boarding is articulated in the first hook and the second hook, corresponding first hook and second of roof boarding
The position of hook is equipped with notch, and notch top is equipped with the mounting part extended downwardly, the hook body and extension of the first hook and the second hook
The hook body of socket part mounting, the hook body length for hooking body length and being greater than the second hook of the first hook, the first hook and the second hook is inserted
Enter face in up-narrow and down-wide wedge shape, the width of notch is slightly larger than the width for hooking body top and is slightly less than the width for hooking body lower part.
The mounting means of roof boarding and roofing skeleton is changed to hang by pitched roof mounting structure of the invention by being bolted
It connects, greatly reduces pitched roof installation operation difficulty, and personnel operate the mounting that roof boarding can be completed in doors, improve behaviour
Make safety, and by setting short structure under upper length for the hook on roofing skeleton, further reduced installation difficulty, mention
High installation effectiveness.Further, since hook body inserting surface be in up-narrow and down-wide wedge shape, after mounting roof boarding under the effect of gravity under
Sliding, the connection of Gou Tiyu notch is more and more tighter, and gapless between roof boarding and roofing skeleton improves the windproof of pitched roof
Energy.
It as a further improvement of the present invention, further include tightening device, tightening device includes center ring and four connection steel
Silk, cant beam upper and lower ends bottom are equipped with ring hook, and connection steel wire both ends are respectively equipped with the first connection ring and the second connection ring, and first
Connection ring is set on center ring, and the second connection ring is set in ring and hooks, and is equipped with flower in the middle part of two connection steel wires of downside
Basket nut.By adjusting gaily decorated basket nut, so that roofing skeleton generates stable connection relationship, it, can under the external forces such as high wind
Automatic adjusument improves sloping roof structure stability and safety in utilization to reach best stressed effect.
As a further improvement of the present invention, roof boarding two sides are respectively equipped with the first splicing profile and the second splicing profile,
First splicing profile and the equal side of the second splicing profile are equipped with the big concave for connecting roof boarding side, and the other side successively includes
Edging rib, middle rib, fin, middle rib is identical as edging rib length, and middle rib end is equipped with vertical flange, the first splicing profile
Vertical flange is towards fin direction, and the vertical flange of the second splicing profile is towards edging rib direction, when two pieces of roof boardings splice, the
The edging rib and the fin of the second splicing profile of one splicing profile are affixed, the edging rib and the first splicing profile of the second splicing profile
Fin be affixed.When installation, guarantee the vertical flange of rib in the vertical flange and the second splicing profile of rib in the first splicing profile
Towards roof panel outer side, the vertical flange of twice forms twice dewatering ditch in link position, plays dual waterproof action, can bear
Intensity of drenching with rain 6mm/min continues 1 hour, non-leakage.
As a further improvement of the present invention, fin length is slightly less than edging rib length, and fin and middle rib spacing are greater than neat
Arris and middle rib spacing reduce docking difficulty when roof boarding splicing, improve installation effectiveness.
As a further improvement of the present invention, the first splicing profile and the second splicing profile use aluminum alloy material, reduce
Roof boarding weight is installed convenient for roof boarding.
As a further improvement of the present invention, roof beam, cornice beam, cant beam, high-strength bolt company is all made of between purlin
Fixation is connect, is had many advantages, such as convenient for disassembly and assembly, reusable.
As a further improvement of the present invention, roof boarding includes interior mask, external covering board and is arranged in interior mask, external covering board
Between polyurethane insulation coating, interior mask, external covering board be all made of aluminum alloy material, polyurethane insulation coating with a thickness of 50mm, thus
Roof boarding has many advantages, such as light-weight, good heat insulating, and reduces installation operation difficulty.
As a further improvement of the present invention, the first hook and the second hook are weldingly fixed on roof beam, on cornice beam, even
High reliablity is connect, stable support is provided to roof boarding.
The invention also discloses a kind of pitched roof installation methods with above-mentioned pitched roof mounting structure, including following step
It is rapid: roof beam, cornice beam, cant beam and purlin (1) being installed, roofing skeleton is formed;(2) gaily decorated basket nut is adjusted, so that tightening device
In tensioning state;(3) roof boarding is placed into roofing skeleton top, personnel station adjusts roof boarding in roofing skeleton lower part
Roof boarding is articulated on roof beam and cornice beam by position.Pitched roof installation method of the invention has simple installation, connection can
, structural stability strong, construction safety the advantages that high by property.
Detailed description of the invention
Fig. 1 is the schematic diagram of pitched roof mounting structure of the invention.
Fig. 2 is the roof boarding top view of pitched roof mounting structure of the invention.
Fig. 3 is K-K cross-sectional view in Fig. 2.
Fig. 4 is that the second hook of pitched roof mounting structure of the invention hooks body inserting surface schematic diagram.
Fig. 5 is the installation process schematic diagram of pitched roof mounting structure of the invention.
Fig. 6 is the transverse sectional view in the modular combination room with pitched roof mounting structure of the invention.
Fig. 7 is the longitudinal sectional view in the modular combination room with pitched roof mounting structure of the invention.
Fig. 8 is pitched roof link position enlarged view.
Wherein, 1 roof beam, 2 cornice beams, 3 cant beams, 4 first hooks, 5 second hooks, the second hook of 5A hook body inserting surface,
6 roof boardings, mask in 6A, 6B external covering board, 6C polyurethane insulation coating, 7 notches, the mounting part 7A, 8 center rings, 9 connection steel wires, 10
Ring hooks, 11 gaily decorated basket nuts, 12 first splicing profiles, 12A edging rib;Rib, 12C fin in 12B, the big concave of 12D, 13 second splicings
Profile, 13A edging rib;Rib, 13C fin in 13B, the big concave of 13D.
Specific embodiment
Fig. 1-8 gives a specific embodiment of pitched roof mounting structure of the present invention.Before it is specifically described, need
It will be clear that term " on ", "lower", "front", "rear", " transverse direction ", " longitudinal direction ", "vertical", "horizontal", "top", "bottom",
The orientation or positional relationship of the instructions such as "inner", "outside", " side ", " one end ", " one side " is orientation based on the figure or position
Relationship is set, is merely for convenience of description of the present invention and simplification of the description, rather than the structure of indication or suggestion meaning there must be spy
Fixed orientation is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.
As shown in Figs. 1-5, the pitched roof mounting structure of the present embodiment includes roof beam 1, cornice beam 2 and is connected to roof
Cant beam this figure of 3(omission between beam 1, cornice beam 2 is not shown), several purlins, roof beam 1, cornice beam are connected between cant beam 3
2, be all made of high strength exploitation between cant beam 3, purlin to fix, form the roofing skeleton of pitched roof, have it is convenient for disassembly and assembly, can
The advantages that reuse.In the present embodiment, roof beam 1 includes ridge board and the rectangle girder immediately below ridge board, is somebody's turn to do
Roof girder construction is suitable for the case where roof uses double-slope roof, it should be understood that, pitched roof of the invention installs knot
Structure is equally applicable to the installation of single pitched roof.Cornice beam 2 uses steel plate bending component in the present embodiment, and section includes a support
Bevel edge is turned over from the short lower flange that edge extends straight down on support bevel edge, under the length that support bevel edge lower edge extends straight down
Side, under long lower flange horizontally in the horizontal flange that extends and be connected to the short upper overturning of horizontal flange end, the eaves
The installation site of wallboard is constituted between the mouth short lower flange of girder construction and short upper overturning, is installed convenient for the wallboard in modular combination room
It is fixed.
1 upper surface of roof beam is welded with the first hook 4, and 2 upper surface of cornice beam is welded with the second hook 5, room
Panel 6 is articulated in the first hook 4 and the second hook 5, and the position of corresponding first hook 4 of roof boarding 6 and the second hook 5, which is equipped with, to be lacked
Mouth 7.7 top of notch is equipped with the mounting part 7A extended downwardly, and the hook body and mounting part 7A of the first hook 4 and the second hook 5 mount,
The hook body length L2 for hooking body length L1 and being greater than the second hook 5 of first hook 4.By setting the hook on roofing skeleton to
Short structure under length facilitates 6 down gap of roof boarding and the second contraposition in advance of hook 5, then adjust 6 position of roof boarding to make roof boarding 6
Upper notch and the first hook 4 align, and complete mounting, which can obviously reduce hook and notch in 6 installation process of roof boarding
Difficulty is aligned, and then reduces roof boarding installation difficulty, improves installation effectiveness.The hook body inserting surface of first hook 4 and the second hook 5
In up-narrow and down-wide wedge shape (specifically can hook body inserting surface 5A schematic diagram referring to the second hook of Fig. 4).The width W1 of notch 7 is slightly larger than
It hooks the width on body top and is slightly less than the width for hooking body lower part.Therefore, roof boarding 6 glides under the effect of gravity after the completion of mounting,
The connection for hooking body and notch 7 is more and more tighter, and gapless between roof boarding 6 and roofing skeleton reduces roof boarding and thrown by strong wind
A possibility that, improve the wind-proof performance of pitched roof.
As shown in fig. 6-7, to further increase sloping roof structure stability, in the present embodiment, also further in roofing bone
Frame bottom is provided with tightening device.Tightening device includes that center ring 8 and four connection steel wires 9,3 upper and lower ends bottom of cant beam are all provided with
There is ring to hook 10, connection 9 both ends of steel wire are respectively equipped with the first connection ring and the second connection ring, and the first connection ring is set in center ring 8
On, the second connection ring is set in ring and hooks on 10, and gaily decorated basket nut 11 is equipped in the middle part of two connection steel wires 9 of downside.Pass through tune
Save gaily decorated basket nut 11 so that roofing skeleton generates stable connection relationship, under the external forces such as high wind, can automatic adjusument with
Reach best stressed effect, improves sloping roof structure stability and safety in utilization.
As shown in figure 3,6 two sides of roof boarding are respectively equipped with the first splicing profile 12 and the second splicing profile 13, the first splicing
Profile 12 and 13 side of the second splicing profile are equipped with the big concave 12D/13D for connecting 6 side of roof boarding, and the other side is successively wrapped
Edging rib 12A/13A, middle rib 12B/13B, fin 12C/13C are included, middle rib 12B/13B is identical as edging rib 12A/13A length, and
The end middle rib 12B/13B is equipped with vertical flange, and the vertical flange of the first splicing profile 12 is spelled towards the direction fin 12C, second
The vertical flange of direct type material 13 is towards the direction edging rib 13A.
As shown in figure 8, when two pieces of roof boardings 6 splice, the edging rib 12A of the first splicing profile 12 and the second splicing profile 13
Fin 13C be affixed, the edging rib 13A of the second splicing profile 13 and the fin 12C of the first splicing profile 12 are affixed, first splicing
The vertical flange of the middle rib 12B of profile 12 offsets towards exterior direction and with big concave 13D, the middle rib of the second splicing profile 13
The vertical flange of 13B offsets towards exterior direction and big concave 12D, to form twice dewatering ditch in stitching position, plays double
Weight waterproof action, can bear the intensity 6mm/min that drenches with rain, continue 1 hour, non-leakage.For the ease of the assembly of roof boarding, fin
12C/13C length is slightly less than edging rib 12A/13A length, and fin 12C/13C and middle rib 12B/13B space D 1 are greater than edging rib
12A/13A and middle rib spacing 12B/13B space D 2 reduce docking difficulty, improve roof boarding and splice efficiency.
As shown in figure 3, roof boarding 6 includes interior mask 6A, external covering board 6B and is arranged between interior mask 6A, external covering board 6B
Polyurethane insulation coating 6C, interior mask 6A, external covering board 6B, the first splicing profile 12 and the preferred aluminium alloy of the second splicing profile 13
Material, polyurethane insulation coating 6C is with a thickness of 50mm.To which roof boarding 6 has many advantages, such as light-weight, good heat insulating, and reduce peace
Fill operation difficulty.
The installation method of the pitched roof of pitched roof mounting structure with the present embodiment is as follows:
(1) roof beam 1, cornice beam 2, cant beam 3 and purlin are fixed using high strength exploitation, forms roofing skeleton;
(2) above-mentioned tightening device is installed in roofing skeleton bottom, adjusts gaily decorated basket nut 11, so that tightening device is in tensioning shape
State;
(3) roof boarding 6 is placed into roofing skeleton top, personnel station adjusts 6 position of roof boarding in roofing skeleton lower part, makes its extension
It is connected on roof beam 1 and cornice beam 2.
Technical solution of the present invention is illustrated in conjunction with specific embodiments above.The present invention is by roof boarding 6 and roofing
The mounting means of skeleton is changed to mount by being bolted, and greatly reduces roof boarding installation operation difficulty, and personnel grasp in doors
The mounting that roof boarding 6 can be completed, improves operational safety.Roofing skeleton is improved by setting tightening device to stablize
Property, wedge structure is used by the hook body inserting surface of hook, roof boarding can be realized using 6 Gravitative Loads of roof boarding and roofing is solid
The close connection of part improves roofing wind-proof performance.Further, since each component of roofing is all made of detachable connection method, therefore also
Have many advantages, such as convenient for disassembly and assembly, reusable.
The present invention is not limited to the above embodiments, on the basis of technical solution disclosed by the invention, the skill of this field
For art personnel according to disclosed technology contents, one can be made to some of which technical characteristic by not needing creative labor
A little replacements and deformation, these replacements and deformation are within the scope of the invention.
Claims (9)
1. a kind of pitched roof mounting structure including roof beam, cornice beam and is connected to oblique between the roof beam, cornice beam
Beam is connected with purlin between the cant beam, it is characterised in that: the roof beam upper surface is equipped with the first hook, the cornice beam
Upper surface is equipped with the second hook, and roof boarding is articulated in first hook and the second hook, and the roof boarding corresponding first is hung
It hooks and the position of the second hook is equipped with notch, the notch top is equipped with the mounting part that extends downwardly, first hook and the
The hook body of two hooks and the mounting part mount, and the hook body that the hook body length of first hook is greater than second hook is long
The hook body inserting surface of degree, first hook and the second hook is in up-narrow and down-wide wedge shape, and the width of the notch is slightly larger than institute
It states the width for hooking body top and is slightly less than the width for hooking body lower part.
2. pitched roof mounting structure according to claim 1, it is characterised in that: it further include tightening device, the tightening dress
It sets including center ring and four connection steel wires, cant beam upper and lower ends bottom is equipped with ring hook, the connection steel wire both ends point
Not She You the first connection ring and the second connection ring, first connection ring is set on the center ring, second connection ring
It is set in the ring to hook, is equipped with gaily decorated basket nut in the middle part of two connection steel wires of downside.
3. pitched roof mounting structure according to claim 1, it is characterised in that: the roof boarding two sides are respectively equipped with first
Splicing profile and the second splicing profile, first splicing profile and the second splicing profile side are equipped with for connecting roof boarding side
The big concave in portion, the other side successively include edging rib, middle rib, fin, and the middle rib and the edging rib length are identical and described
Middle rib end is equipped with vertical flange, and the vertical flange of first splicing profile is towards fin direction, second splice type
The vertical flange of material is towards edging rib direction, and when two pieces of roof boardings splice, the edging rib of first splicing profile and second is spelled
The fin of direct type material is affixed, and the edging rib and the fin of the first splicing profile of second splicing profile are affixed.
4. pitched roof mounting structure according to claim 3, it is characterised in that: the fin length is slightly less than the edging
Rib length, the fin and middle rib spacing are greater than edging rib and middle rib spacing.
5. pitched roof mounting structure according to claim 3, it is characterised in that: first splicing profile and the second splicing
Profile uses aluminum alloy material.
6. pitched roof mounting structure according to claim 1-5, it is characterised in that: the roof beam, cornice beam,
High strength exploitation is all made of between cant beam, purlin to fix.
7. pitched roof mounting structure according to claim 1-5, it is characterised in that: the roof boarding includes Inner Mongol
Plate, external covering board and the polyurethane insulation coating being arranged between the interior mask, external covering board, the interior mask, external covering board are adopted
With aluminum alloy material, the polyurethane insulation coating is with a thickness of 50mm.
8. pitched roof mounting structure according to claim 1-5, it is characterised in that: first hook and second
Hook is weldingly fixed on the roof beam, on cornice beam.
9. a kind of pitched roof installation method with pitched roof mounting structure as claimed in claim 2, which is characterized in that including
Following steps:
(1) roof beam, cornice beam, cant beam and purlin are installed, roofing skeleton is formed;
(2) tightening device is installed in roofing skeleton bottom, gaily decorated basket nut is adjusted, so that tightening device is in tensioning state;
(3) roof boarding being placed into roofing skeleton top, personnel station adjusts roofing Board position in roofing skeleton lower part,
The roof boarding is articulated on the roof beam and cornice beam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910724394.8A CN110397202A (en) | 2019-08-07 | 2019-08-07 | A kind of pitched roof mounting structure and installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910724394.8A CN110397202A (en) | 2019-08-07 | 2019-08-07 | A kind of pitched roof mounting structure and installation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110397202A true CN110397202A (en) | 2019-11-01 |
Family
ID=68327656
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910724394.8A Pending CN110397202A (en) | 2019-08-07 | 2019-08-07 | A kind of pitched roof mounting structure and installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110397202A (en) |
Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05331982A (en) * | 1992-06-03 | 1993-12-14 | Misawa Homes Co Ltd | Roof beam suspension device |
JPH07102785A (en) * | 1993-10-05 | 1995-04-18 | Sekisui Chem Co Ltd | Mounting structure for safety net on roof |
JPH07269008A (en) * | 1994-04-01 | 1995-10-17 | Ogawa Kenbi:Kk | Roof panel mounting construction method and roof panel used in the method |
US6161339A (en) * | 1998-08-26 | 2000-12-19 | Hurri-Bolt Inc. | Structural tie-down apparatus |
JP2004239038A (en) * | 2003-02-05 | 2004-08-26 | Kawanaka Ryotaro | Earthquake resistant reinforcing construction method of wooden house |
US7516577B1 (en) * | 2006-12-08 | 2009-04-14 | Hendee Enterprises, Inc. | Fabric structures with tensioner and tensioner device |
CN203808372U (en) * | 2014-04-17 | 2014-09-03 | 深圳市鑫明光实业有限公司 | Roof board and vertical side hidden-buckling buckle cover hook type roof board structure |
KR101547845B1 (en) * | 2014-05-13 | 2015-08-31 | (주) 에센스 | The precast concrete Korean-style house structure |
CN205276712U (en) * | 2015-12-11 | 2016-06-01 | 卓达新材料科技集团有限公司 | Fine tile roofing of glass drainage in an organized way seals eaves mouth mounting structure |
CN205603986U (en) * | 2016-04-25 | 2016-09-28 | 山东大莱龙铁路有限责任公司 | Railway hangs pillow ware fast |
CN106193475A (en) * | 2016-08-23 | 2016-12-07 | 广东正华钢构股份有限公司 | Combined heat-insulated formed steel construction ceiling |
CN206034773U (en) * | 2016-08-15 | 2017-03-22 | 林娟 | Internal stability fixed pattern can be adorned, torn open, moved, metal of reload and plastics roofing system |
CN109441025A (en) * | 2018-12-17 | 2019-03-08 | 北京凯盛建材工程有限公司 | A kind of fabricated roofing cornice support rod component, support unit and installation method |
CN110005087A (en) * | 2019-05-14 | 2019-07-12 | 中铁建工集团有限公司 | Spelling pulling type movable plank house roofing global anti-wind system |
CN210597805U (en) * | 2019-08-07 | 2020-05-22 | 中国人民解放军陆军研究院特种勤务研究所 | Slope roof installation structure |
-
2019
- 2019-08-07 CN CN201910724394.8A patent/CN110397202A/en active Pending
Patent Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05331982A (en) * | 1992-06-03 | 1993-12-14 | Misawa Homes Co Ltd | Roof beam suspension device |
JPH07102785A (en) * | 1993-10-05 | 1995-04-18 | Sekisui Chem Co Ltd | Mounting structure for safety net on roof |
JPH07269008A (en) * | 1994-04-01 | 1995-10-17 | Ogawa Kenbi:Kk | Roof panel mounting construction method and roof panel used in the method |
US6161339A (en) * | 1998-08-26 | 2000-12-19 | Hurri-Bolt Inc. | Structural tie-down apparatus |
JP2004239038A (en) * | 2003-02-05 | 2004-08-26 | Kawanaka Ryotaro | Earthquake resistant reinforcing construction method of wooden house |
US7516577B1 (en) * | 2006-12-08 | 2009-04-14 | Hendee Enterprises, Inc. | Fabric structures with tensioner and tensioner device |
CN203808372U (en) * | 2014-04-17 | 2014-09-03 | 深圳市鑫明光实业有限公司 | Roof board and vertical side hidden-buckling buckle cover hook type roof board structure |
KR101547845B1 (en) * | 2014-05-13 | 2015-08-31 | (주) 에센스 | The precast concrete Korean-style house structure |
CN205276712U (en) * | 2015-12-11 | 2016-06-01 | 卓达新材料科技集团有限公司 | Fine tile roofing of glass drainage in an organized way seals eaves mouth mounting structure |
CN205603986U (en) * | 2016-04-25 | 2016-09-28 | 山东大莱龙铁路有限责任公司 | Railway hangs pillow ware fast |
CN206034773U (en) * | 2016-08-15 | 2017-03-22 | 林娟 | Internal stability fixed pattern can be adorned, torn open, moved, metal of reload and plastics roofing system |
CN106193475A (en) * | 2016-08-23 | 2016-12-07 | 广东正华钢构股份有限公司 | Combined heat-insulated formed steel construction ceiling |
CN109441025A (en) * | 2018-12-17 | 2019-03-08 | 北京凯盛建材工程有限公司 | A kind of fabricated roofing cornice support rod component, support unit and installation method |
CN110005087A (en) * | 2019-05-14 | 2019-07-12 | 中铁建工集团有限公司 | Spelling pulling type movable plank house roofing global anti-wind system |
CN210597805U (en) * | 2019-08-07 | 2020-05-22 | 中国人民解放军陆军研究院特种勤务研究所 | Slope roof installation structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203271199U (en) | Totally-closed assembly type steel membrane plant | |
CN115807481A (en) | Method for installing steel-structure branch-supported and bent long-span aluminum alloy latticed shell awning | |
CN110397202A (en) | A kind of pitched roof mounting structure and installation method | |
CN210597805U (en) | Slope roof installation structure | |
JP5152768B2 (en) | Roof structure for temporary scaffold and method for assembling structure using the same | |
US20220145614A1 (en) | Building system and method thereof | |
CN113756503B (en) | Construction method of Z-shaped streamer hall | |
CN210597623U (en) | Modular combined house | |
JP3072214B2 (en) | Temporary shed | |
RU2809840C1 (en) | Fastening system for rafters of hip and broach roofs | |
JP2764356B2 (en) | Temporary roof and its construction method | |
CN217269047U (en) | Anchoring connecting piece for protecting frame and eaves gutter for flat roof to be changed into slope roof | |
KR100950460B1 (en) | Dome style lightweight iron frame infrastructure | |
JP3782802B2 (en) | Renovation structure of building | |
JP2573545B2 (en) | Construction method of temporary tent for construction | |
CN108193835A (en) | One kind is used for roofing slidingtype accessory structure | |
RU2564292C1 (en) | Frame of quick-erect structure and method of its installation | |
CN210597803U (en) | Double-slope roof structure | |
CN2646266Y (en) | Sheet steel arch form heat preservation composite roof structure with draglines | |
CN218292269U (en) | Assembly type building structure | |
CN209779992U (en) | Connecting structure of lower flange angle brace of purlin-free roof rigid frame beam | |
CN215802590U (en) | Big space truss structure conversion structure for furred ceiling down | |
CN212453355U (en) | Roof structure for green building | |
CN214786298U (en) | Light-duty assembled aluminum alloy steel bar shed and steel bar shed group | |
CN217998870U (en) | High-rise building roof reinforced concrete beam slab of encorbelmenting greatly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |