CN110378802A - A kind of water power fortune inspection management system and method - Google Patents

A kind of water power fortune inspection management system and method Download PDF

Info

Publication number
CN110378802A
CN110378802A CN201910511077.8A CN201910511077A CN110378802A CN 110378802 A CN110378802 A CN 110378802A CN 201910511077 A CN201910511077 A CN 201910511077A CN 110378802 A CN110378802 A CN 110378802A
Authority
CN
China
Prior art keywords
data
module
analysis
equipment
management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910511077.8A
Other languages
Chinese (zh)
Inventor
高丽
温国强
刘念浩
黄正博
郭帅
刘向东
牛晓波
秦飞
殷强
张博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUILONG BRANCH OF STATE GRID XINYUAN CO Ltd
State Grid Corp of China SGCC
Henan University
Beijing Xuji Electric Co Ltd
Original Assignee
HUILONG BRANCH OF STATE GRID XINYUAN CO Ltd
State Grid Corp of China SGCC
Henan University
Beijing Xuji Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUILONG BRANCH OF STATE GRID XINYUAN CO Ltd, State Grid Corp of China SGCC, Henan University, Beijing Xuji Electric Co Ltd filed Critical HUILONG BRANCH OF STATE GRID XINYUAN CO Ltd
Priority to CN201910511077.8A priority Critical patent/CN110378802A/en
Publication of CN110378802A publication Critical patent/CN110378802A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Theoretical Computer Science (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of water power fortune inspection management system and method, comprising: data acquisition module, data processing module, real time analysis module, application service module;Data acquisition module, for the operation data of receiving device, and by the storage of the operation data of the equipment received into database server;Data processing module is analyzed for the operation data to equipment, to generate the analysis data of preset format;Wherein the analysis data include at least one below: alarm data, evaluation data, history evaluation data, predictive information data, statistical information data, field programs data;Real time analysis module, for summarizing to the preset analysis data generated in data processing module, to obtain the data set of preset themes, and it is for statistical analysis to the data set of the preset themes and summarize;Wherein the data set of the preset themes includes at least one below: device data collection, operation data collection, defective data collection.

Description

A kind of water power fortune inspection management system and method
Technical field
The invention belongs to technical field of data processing, especially with electricity power enterprises such as Pumped Storage Plant, conventional hydropowers Based on equipment history run, account, and served as theme with the Whole Course Management of equipment operation, maintenance, maintenance and test, two tickets three It is made as supporting, according to Analysis of Potential, defect processing, water conservancy project management, scheduled overhaul, point inspection, preventative maintenance, predictive dimension The fortune of the formula that repairs a die fortune inspection management domain examines management system.
Background technique
With flourishing for the sustainable development of going deep into of electricity market, especially hydropower industry, electricity power group both domestic and external Business development mode also developing to integrated, intensive, lean trend direction, the cost to realize scale is excellent Gesture improves enterprise competitiveness.With gradually mature, the production real time information that integration is run independently of each other of technological progress and application System and Production MIS form (control) integrated fortune inspection management system and have become development trend.It is American-European large-scale There are many control integration system successful story, such as the E-ON Power&Gas of France EDF, Germany, the U.S. for electricity power group Numerous electricity power groups such as Pacific Gas and Electrics (PG&E) be successively integrally formed on the basis of original or The fortune inspection management system of control integration has been created, to improve profitability, enterprise competitiveness has been promoted and provides one effectively Means.It, can be intensive by informationization support in order to promote the enabling capabilities to enterprise intensification, standardization and lean management Change management, then group's core competitiveness is promoted by intensive management, it is final to realize information-based service and branch to group strategy It holds therefore, the construction of hydropower industry management system, it is necessary to carry out integrated planning, form integrative solution, while also meeting As group company a variety of and multiple power plant are carried out with the business demand of production groupification management.To reinforce hydroelectric power plant's fortune inspection management Work, General Promotion company fortune inspection management level, supports company's scientific and technological progress and power network development, in conjunction with construction of hydropower facilities, operation pipe Reason needs, and development water power fortune inspection management system building-up work has gradually formed hydropower industry integration, big concentration water power fortune inspection pipe Manage information system.To ensure that power grid security, stabilization, economical operation and enterprise's health, steady, sustainable development provide technology base Plinth guarantee.
The construction of this hydropower industry production management system has adapted to the development trend of international control integration, will break through The frame structure that domestic traditional mode of production MIS and real time information system are mutually indepedent, establish one's own system, from service application, data source and Integrated management is carried out to management information and real time data in data flow, under the support of the unified platform, is realized to real time information, pipe Reason information, facility information collection, summarize, analyze, and on this basis, run and decision be provided for power plant and company's optimization fortune inspection It supports information, forms the integration information platform of water power fortune inspection and the support platform of Optimal Decision-making.
Summary of the invention
Exist in the prior art water power fortune inspection management data rely primarily on labor management aiming at the problem that, propose a kind of water Electricity fortune inspection management system and method, the fortune that can be widely used in hydroelectric system pick up equal fields, improve data processing when Effect property and reliability.
To solve the above-mentioned problems, it includes: data acquisition that the embodiment of the present invention, which proposes a kind of water power fortune inspection management system, Module, data processing module, real time analysis module, application service module;
Data acquisition module is arrived for the operation data of receiving device, and by the operation data storage of the equipment received In database server;
Data processing module is analyzed for the operation data to equipment, to generate the analysis data of preset format;Its Described in analysis data include at least one below: alarm data, evaluation data, history evaluation data, predictive information data, Statistical information data, field programs data;
Real time analysis module, for summarizing to the preset analysis data generated in data processing module, to obtain The data set of preset themes, and it is for statistical analysis and summarize to the data set of the preset themes;The wherein preset themes Data set include at least one below: device data collection, operation data collection, defective data collection;
Application service module, for providing user's interface of access, and according to the input of user to data acquisition module Analysis data, the data packet of the preset themes of real time analysis module of original equipment operating data, data processing module carry out Processing.
Wherein, the application service module includes: on-line monitoring module, visualization display module, aid decision module, figure Conformal analysis module, data inquiry module, knowledge base configuration module, plant maintenance module, system management module;
The on-line monitoring module is used to read data collecting module collected and the interface data stored into database is former Original device operation data in beginning table, and whether the original device operation data in real-time detection interface data original table is complete It is whole;
The visualization display module is used to read the original device operation data in interface data original table, and utilizes figure Shape interface is shown;
The aid decision module is used to read the original device operation data in interface data original table, and passes through history The Fault Model that the data set of the preset themes of equipment running equipment and history obtains after being analyzed is to interface data original Original device operation data in beginning table is analyzed to obtain aid decision;
The image analysis module is used to obtain the analysis data of the preset format of data processing module, and with graphical interfaces It is shown;
The data inquiry module is used for the querying condition inputted according to user, the original in the interface data original table Analysis data in beginning equipment operating data, data processing module, the preset themes in real time analysis module data set in into Row inquiry;
The knowledge base configuration module includes at least following at least one in the Knowledge Set for storing preset Knowledge Set Kind: quantity of state classification, quantity of state rule, code of points, state rule, fault diagnosis, overhauling project, flow setting;
The plant maintenance module is used to store the maintenance log of equipment, and the analysis number obtained according to data processing module According to generating device maintenance plan;
The system management module is for configuring system according to the input of user.
Wherein, the plant maintenance module is used for according to the analysis data of data processing module, generating device maintenance plan, The plant maintenance plan includes at least one kind below: equipment daily maintenance, equipment health analysis, is set equipment defect management Standby Analysis of Potential, regular visit plan, setting management, unit exception action management.
Wherein, the camera that the visualization display module is used to install by equipment periphery provides visual scene and sets Standby status screen, in-situ production environment picture, answers overhauling project picture at field device alarm picture.
Meanwhile the embodiment of the present invention also proposed a kind of water power fortune inspection management method, comprising:
The operation data of receiving device, and by the storage of the operation data of the equipment received into database server;
The operation data of equipment is analyzed, to generate the analysis data of preset format;The wherein analysis data packet Include at least one below: alarm data, history evaluation data, predictive information data, statistical information data, shows evaluation data Field planning data;
The preset analysis data generated in data processing module are summarized, to obtain the data set of preset themes, And it is for statistical analysis and summarize to the data set of the preset themes;Wherein the data set of the preset themes includes below It is at least one: device data collection, operation data collection, defective data collection;
User's interface of access is provided, and number is run according to original equipment of the input of user to data acquisition module According to, the analysis data of data processing module, the data packet of the preset themes of real time analysis module handled.
Wherein, the method also includes at least one steps below:
Read the original device operation of data collecting module collected and storage in the interface data original table into database Data, and whether the original device operation data in real-time detection interface data original table is complete;
The original device operation data in interface data original table is read, and is shown using graphic interface;
The original device operation data in interface data original table is read, and passes through historical Device running equipment and history The Fault Model that the data set of preset themes obtains after being analyzed runs the original device in interface data original table Data are analyzed to obtain aid decision;
The analysis data of the preset format of data processing module are obtained, and are shown with graphical interfaces;
According to the querying condition that user inputs, original device operation data, data in the interface data original table Analysis data in processing module, the preset themes in real time analysis module data set in inquired;
Preset Knowledge Set is stored, following at least one: quantity of state classification, state gauge is included at least in the Knowledge Set Then, code of points, state rule, fault diagnosis, overhauling project, flow setting;
Store the maintenance log of equipment, and the analysis data generating apparatus maintenance plan obtained according to data processing module;
System is configured according to the input of user.
Wherein, the plant maintenance plan includes at least one kind below: equipment daily maintenance, is set equipment defect management Standby health analysis, hidden trouble of equipment analysis, regular visit plan, setting management, unit exception action management.
Wherein, the method also includes: the camera installed by equipment periphery provides visual field equipment state Picture, in-situ production environment picture, answers overhauling project picture at field device alarm picture.
The advantageous effects of the above technical solutions of the present invention are as follows: the embodiment of the present invention proposes a kind of water power fortune inspection management System and method is related to hydroelectric facility operation, maintenance, maintenance and trial application field.Above scheme can be realized fortune inspection The standardization of key business process is managed, realizes the fine-grained management of fortune inspection operation.The present invention is due to utilizing computer to electric power Production process is managed and controls, so that the acquisition of entire electric power system data, summarize and analyze can be effective at the right time And it is accurate, so that the lean for improving the fortune inspection management of group company's water power is horizontal.The system that the embodiment of the present invention proposes uses The set of system of centralized deployment reduces staff development cost and hardware device repeats to throw using same set of hardware device Money;For Hydropower Enterprise ' fortune inspection management work provide it is strong manage and control tool, greatly reduce the new fortune inspection pipe of company The time of popularization and the implementation of reason system;It realizes long-range fortune inspection process, equipment state supervision, is mentioned for the fortune inspection control of company For necessary means;The system administrations contents such as standardized work ticket management, job instruction management and operational management, specification Fortune inspection management business, effectively controls Safety Risk in Production;Integrated fortune inspection management system can understand subordinate's list in real time Position production and management, Real-time Monitor Management production process, reduce scene go on business, report merge etc. marginal cost;By report Merging is changed into data merging, reduces a large amount of report merging work and report makes a report on work.
Detailed description of the invention
Fig. 1 is the general frame figure of the water power fortune inspection management method of the embodiment of the present invention;
Fig. 2 is the process synoptic diagram of the water power fortune inspection management method of the embodiment of the present invention;
Fig. 3 is the data shelf composition of the water power fortune inspection management method of the embodiment of the present invention;
Fig. 4 is the integrated support composition of the water power fortune inspection management method of the embodiment of the present invention;
Fig. 5 is the hardware deployment diagram of the water power fortune inspection management method of the embodiment of the present invention;
Fig. 6 is the water power fortune inspection schematic diagram of management system structure of the embodiment of the present invention;
Fig. 7 is the schematic diagram of the business relations of business longitudinal direction in the embodiment of the present invention.
Specific embodiment
To keep the technical problem to be solved in the present invention, technical solution and advantage clearer, below in conjunction with attached drawing and tool Body embodiment is described in detail.
As shown in FIG. 6, the water power fortune inspection management system that the embodiment of the present invention proposes includes: data acquisition module, data Processing module, real time analysis module, application service module;Wherein data acquisition module is used to acquire the data of equipment generation, and protects It is stored in database server;Data processing module for handling field data, by processing result generate alarm data, It evaluates data, remind the data such as data, field programs;Real time analysis module is used for the data to themes such as equipment, defect, operations It statisticallys analyze and summarizes;Application service mould alerts number described in user's access initial data and interactive operation for providing According to, evaluation data, remind data, the data such as field programs.
If Fig. 1-is shown in Fig. 7, the present invention also provides a kind of water power to transport inspection management method, examines management for realizing fortune and closes The fine-grained management of fortune inspection operation is realized in the standardization of key operation flow.The present invention is due to utilizing computer to power generation mistake Journey is managed and controls so that the acquisition of entire electric power system data, summarize and analyze can at the right time efficiently and accurately, To which the lean for improving the fortune inspection management of group company's water power is horizontal.
The water power fortune inspection management system module with the following functions of the embodiment of the present invention: planning management module, project management Module, plant maintenance module, operational management module, technical supervision module, water conservancy project management module, inspection management module.
Wherein, planning management module by administrative standard, overhauling project, technological transformation project, face enough item design, comprising deposit item The functions such as mesh establishment, the deposit project application, annual plan, Xiang Mingda, project monthly magazine, annual summary.Wherein, the project pipe Module is managed by management system, overhauling project, technological transformation project, autonomous item design, includes work plan, the project implementation, project knot The functions such as item, rear assessment report.Wherein, the plant maintenance module is by daily maintenance, defect management, equipment health analysis, hidden Suffer from analysis, regular working, setting management, unusual fluctuation management composition, includes position classification, company, project of standard development library, side, factory's side standard Project library, Professional Year plan, annual plan, daily maintenance work order, regular working, work setting, job, definite value pipe The functions such as reason, definite value inventory, equipment alteration, interim measure.Wherein, the operational management module is by running on duty, OMCALL value Class, operation order, work ticket, regular working, stops multiple labour plan, temporary source management, operation account inquiry, operation at collection control value class Training composition, comprising typical operation ticket, a kind of electrical work ticket, electrical two kinds of work tickets, hydraulic ticket, bill of assignment, Typical isolation library, typical hazard point pre-control, regular working, standard operation card, period setting, annual Planning of construction periods, the end of month stop using as a servant Plan, stop the functions such as answering labour request slip, setting a question, answer questions and comment on.Wherein, the technical supervision module is by organization, basis Information, plan are summarized, look into level ground rectification, document information composition, and major setting, report item setting, project of standard development, technology prison are included Superintend and direct setting, plan template, annual plan, data analysis, report, annual summary, the summary of technical supervision unit, self-appraisal, alarm, whole The functions such as change.Wherein, the water conservancy project management module by control flood pass the flood period, operation and maintenance, dam register regular inspection, regulatory, reservoir Operation, speciality of hydroelectric power engineering construction annual meeting composition, comprising organization, flood control is on duty, spend big vast measure, operation manuals, flood before check oneself report, flood Feelings weekly, flood control summary, flood control daily paper, flood control tour sheet, building operation monthly magazine, monitoring instrument run monthly magazine, building The project implementation, building overview, dam registration, dam safety examination, moon scheduling is suggested, reservoir operation monthly magazine, reservoir run annual report, water Library runs the functions such as ten days report, Hydropower Operation Automation summary, flood bulletin.Wherein, the inspection management module is by inspection point, inspection Region, inspection route, patrol task, patrol record, patrol plan composition.Wherein, the Operational preparation module by transfer production, Rectify and improve item design.Wherein, it is described it is counter arrange management module to be issued by anti-accident measures management system, anti-accident measures, anti-accident Measure work plan, work plan execute composition.Wherein, the information management module is sent out by application feedback, announcement board, information Cloth is formed using comment.
The water power fortune inspection management system of the embodiment of the present invention, fully considers hydroelectric power plant in the design of General Technology System structure It is mainly engaged in the peak-frequency regulation task of power grid and develops the actual demand of new energy, need to comprehensively consider various technical factors and hand Section, the unified design for carrying out technical architecture keep production MIS integrated with production real time information system, believe enterprise Breath and application can be carried out integrated design and integrated, realization the whole company information opened by " longitudinally through, horizontal integrating " And data sharing, reach through integration information platform and comprehensive Command Decision-making Support System, reaches safety in production and economical operation Purpose.Therefore, the construction of this fortune inspection management system will use big hubbed mode, and unified data are only established in corporate HQ Storage center, and establish the Enterprise Information Portal of concentration, unified identity authentication center and business application system.
The embodiment of the present invention proposes a kind of water power fortune inspection management system.As shown in Figure 1, illustrating a kind of water power fortune inspection pipe Reason system overall soft framework.The fortune inspection management system of the embodiment of the present invention uses advanced EAM management thought, with advanced letter Breath technology is means, using B/S structure system, and production real time information system integrated design, realize towards corporate HQ and Subordinate's plant stand two levels of traffic management application.Group is based on operation index, comprehensive supervision and decision commanding, and power plant is with equipment management Equipment, maintenance, operation, raw skill, goods and materials, technical supervision, safety supervision etc. are realized using trouble ticket dispatch processing as tie for core Functional requirement, covering company, power plant, department, teams and groups' multiple management system production Whole Course Management, build an integration, The production service process platform of networking guarantees safe production, reduces production maintenance expense, improves working efficiency and economic effect Benefit.Realization company production and operation standardization, fining, scientific management.Fortune inspection management system is built using big hubbed mode, General headquarters concentrate deployment hardware server systems and application system.
Fortune inspection management information system and production real time information system use integrated design, establish integration firm grade information Integrated platform, perfect information network dispose data exchange, and unimpeded information channel builds data center, realize data sharing, push away Into application integration, promote process optimization, builds enterprise portal, it is unified to show content.
The fortune inspection management information system of the embodiment of the present invention can cover the inspection operation of Pumped Storage Plant fortune and management process Business, the functional module for mainly including have equipment management, operational management, workform management, two ticket management, maintenance/technological transformation project pipe The modules such as reason, planning management, defect management, inspection management, water conservancy project management, technical supervision management, information management.Fortune inspection management letter Breath system covers 12 big business, more than 90 subservices;
The hydropower industry fortune inspection management system key data of interest with processing has: business indicator data, Real Time Hydrologic number According to, equipment deficiency data, start/stop machine record, KPI achievement data etc., it is specific as follows:
(1) business indicator data, comprising: unit efficiency, generate electricity water consume, and draw water power consumption, station-service electricity, station service power consumption rate, Upper library water percolating capacity, unit cost of electricity-generating, generate electricity electricity, and draw water electricity, unit reliability, starts success rate, unit availability etc.;
(2) real-time hydrologic data, comprising: upper and lower reservoir level, reservoir inflow, generating flow, storage outflow, flood discharge flow Deng;
(3) equipment deficiency data, comprising: defect device coding, defect situation and reason, disposition etc.;
(4) start and stop record, comprising: the operating condition of each unit, including operation, maintenance, capital construction, starting, capital construction test run, The states such as shutdown, various operating conditions booting number and runing times, generating electricity and drawing water starts success rate etc.;
(5) KPI achievement data, comprising: pumped storage index, unit scheduled overhaul and unplanned outage situation statistical indicator, hair Power consumption, the electricity that draws water, important operation and main protection automatic device action frequency, Power Plant and major pant item equipment start-stop Between number, tripping times, accumulated running time, repair time, standby time, non-stopping time, the important switch motion of each power plant electrical Number and runing time etc..
Grade data center, group and the supervision center that inspection management system construction is transported as this company, need from data system Reach:
Establish the information support platform of grouping of the world economy:, management data real-time by the production collected with summarize each power plant are realized Information to it is lower and on perforation, accomplish information sharing.
It is data integrated: real time data, the data integrated design of management, and can effectively carry out data correlation;
It technically needs to reach, should be able to easily adapt to the needs of hydropower industry general headquarters management, dynamic expansion increase pair The data item of power plant's data acquisition, index item are the reality that the production real time information system corporate HQ of the following building is concerned about below When data target collection example, these certain index sets can carry out dynamic expansion and amendment according to modeling tool.
The following table of corporate HQ's index set:
As shown in Fig. 2, illustrating a kind of water power fortune inspection management system process summary.
Realize a kind of centralized water power fortune inspection management system management it may first have to clear each information system of intra-company Between and with the correlation between external system.Electricity power group is divided into horizontal and vertical two classes business according to its own feature Management process, lateral service management flow are responsible for interrelated, interaction between unified level (power plant or corporate HQ) each business And its rule followed;Vertical services management process describes the mutual pass between corporate HQ and power plant inside each business module Connection, interaction and its rule followed.Due to the difference of each Group Management Mode, cause between each institute, group definition business Incidence relation between the upper and lower level of same business can be very different with the rule followed.Such as financial type power generation collection Group is served as theme with profit, pays close attention to power plant's realized profit as group, and is then let go substantially to power plant to production run process Independent management, therefore, he is not concerned with the operation of power plant's production and operation substantially.And the electricity power group of control type, such as Zhong electricity Tou group Company, is typical intensive management type genco, he will not only pay close attention to power plant's realized profit, also to pay close attention to resource planning, The monitoring of allotment and standardized management, inspection.
Fig. 2 gives the integrated information management system process principle signal of general headquarters, an intensive electricity power group transverse direction Figure, it is mutual by production real time information system, fortune inspection management information system (asset management system) and the office automation system Management, forms operation commander and the decision support system of enterprise, realizes the economical operation and safety in production of enterprise.
Incidence relation between the business module defined according to upper workflow graph, fortune inspection management information system and production real time information System has close lateral incidence relation.
Management is related to generated energy, electricity volume, startup-shutdown situation, generates electricity adjustable hour, and generation comprehensive efficiency is taken out Water power amount and station service situation etc.;
Defect management is related to the real-time condition of unit health status, equipment operation, and judges equipment according to these information Defect whether automatically into defect management arbitration etc.;
Production management is related to summarizing various real-time management data statistics, analysis decision, formation statistics and report etc..;
These require that each business module of fortune inspection management information system can carry out effectively with production real time information system Data and information sharing are realized in interaction.It to be formed certainly in addition to automatically collecting the Various types of data in two systems automatically according to definition Plan information and automatically generate outside report, can also a system automatic or manual call another system related pages, Data and status information etc., by Unit account of plant, equipment tree navigation etc., are called such as in fortune inspection management information system and open life Produce the related pages in real time information system.It, can also be straight by clicking relevant device meanwhile in production real time information system The administration page called in the relevant Production MIS of equipment is connect, such as account attribute information, defect history, work order list Etc. information, for system or operator on duty operation or decision references.
In addition to lateral business association relationship, longitudinal association of same module is also an important link, these associations Relationship is then by using the department's task, function and the authority of office exercised of these modules to be determined.
The production management work in O&M maintenance portion is carried out according to stick mode, wherein " item " have water dispenser, water conservancy project, it is electrical, The profession such as operation, maintenance, environmental protection, water guarantor, civil engineering or working face;And " block " has overhaul, technological transformation, science and technology, information, safety, technology Supervision etc..As the business department of company, to be also responsible for the work such as production statistics and reliability management.
The Yun Jian administrative department of each power plant, although the sectorial structure and title of each power plant are not quite similar, from responsibility It is substantially all O&M maintenance portion, production and operation department, equipment operation department, plant maintenance department and production technology from the point of view of in the division of labor The department of this few class difference call such as department, collaboration carry out generator operation, equipment management, plant maintenance, technical management, project pipe The many aspects such as reason, safety management, wherein Finance Department also has different degrees of participation to work such as handling of goods and materials, project managements Or data requirements.
According to the definition of respective responsibility and the division of labor between the department longitudinal direction, business longitudinal direction can be more clearly combed out Business relations, as shown in Figure 7.
Therefore, it is responsible in corporate level:
It lays down technological specification and safety standard;
Carry out technical supervision, management and guidance;
Examine the fortune inspection plan of each power plant;
Summarize the overall fortune inspection plan of generation company;
Production maintenance expense is examined per year;
Budget and technology audit are carried out to various projects (big light maintenance, science and technology, technological transformation, information etc.);
Organize Project Coordination and progress control etc.;
Power plant carries out tissue and the implementation of fortune inspection work according to the requirement of company:
Equipment life period management: formulating, report and submit and execute maintenance plan, and the supervision and management of maintenance, equipment Daily maintenance etc., including the maintenance of A, B, C, D grade, accident maintenance and the technological transformation etc. overhauled to hydroelectric facility;
Safety management: the crucial peace such as the safety in production overall target of power plant summarizes, the situation analysis of accident obstacle, safe flash report Full information report and safety management situation and horizontal monitoring and assessment etc.;
The work in every such as equipment operation management and technical supervision.
According to respective business demand between the department longitudinal direction, the industry between company and power plant can be more clearly completed Process torsion as defined in business definition and realization.
As shown in figure 3, illustrating a kind of water power fortune inspection Management System Data framework.
The management data of the centrally stored safety in production in hydroelectric power plant.In view of integrality, the consistency to full company data are wanted The effective use summed to wide area network bandwidth resource, the business need that should meet parent company meet subordinate unit's business again and want Ask, in the data of the entire company of centralized database storage and management, parent company, including device data, operation data, overhaul data, Safety management data etc. provide the overall picture of a company data structure on the whole, it is ensured that the integrality and consistency of data, together When, complete data backup mechanism is provided.
As shown in figure 4, illustrating a kind of water power fortune inspection management system integrated architecture.
Integrated architecture platform advanced, healthy and strong, safe must assist the quick exploitation and operation of service application, can accelerate to answer Development rate reduces development cost, improves using total quality and management level.
Mainly by application development framework, BPM (Business Process Management platform), BSP, (business service is flat for Technical Architecture platform Platform), Integrated Development Environment and five part of system monitoring tool constitute.
Application development framework, basic framework needed for providing applied software development help developer's fast construction industry Business system;
Business Process Management platform provides the kit and running environment of the operation system exploitation based on process, side Developer is helped to fast implement operation flow;
Business service platform provides the basic suit component of application system development needs, developer is made directly to utilize this A little general purpose modules build operation system, avoid overlapping development;
Integrated Development Environment provides visual developing instrument, realizes the management to software development Life cycle;
System monitoring tool provides the function being monitored to the various parameters of operation system operation, makes system administration Member can understand system operation situation in time.
As shown in figure 5, illustrating a kind of water power fortune inspection management system hardware deployment.
Inspection management system is transported according to hydropower industry and builds overall planning thinking, will be realized to the real-time of subordinate power plant and management The concentration of data builds unified data center in company home office, under the support at uniform data center, produced according to general headquarters, The needs of the management such as operation, the application systems such as construction fortune inspection management system.
Fortune inspection management data server: having two " database servers ", for saving the management number of all fortune inspection processes According to, select two IBM, 570 minicomputer server constitute, be configured to group system.Data storage is stored using IBM DS4800 Disc array system.
Fortune inspection Management Application Server: four 580 servers of HP are selected to constitute.Application server middleware software is installed, Hardware and basic software platform are provided for the operation of application system, is configured to group system, plans first to buy two in the first stage Platform.
Report server: it selects 580 server of HP to constitute, report operation service is provided.
Storage equipment: it in the data storage of this crucial application system, by the way of centrally stored, manages and real-time Data use same an array, establish uniform data center.An IBM DS4800 array is selected to constitute, by the database number of system It stores according to by SAN (storage area network) composed by 4Gb optical-fibre channel into the enterprise-level disk array of a core.
SAN switch: it is used for SAN fabric, configures 2 IBM B16.
Hand-held inspection device PDA: patrolling and checking management system.
Cabinet: the original-pack cabinet of configuration IBM and KVM, 1U liquid crystal display etc..
The invention discloses a kind of water power to transport inspection management system and method, is related to hydroelectric facility operation, maintenance, maintenance and examination Test (hereinafter referred to as fortune inspection) management application field, including data acquisition module, data processing module, real time analysis module, application Service module.The system is managed and controls to fortune inspection process using computer, comprising: data acquisition module, for adopting Collect the data that equipment generates, and is saved in database server;Data processing module, for handling field data, Processing result is generated into alarm data, evaluation data, reminds the data such as data, field programs;Real time analysis module, for setting The data statistic analysis of the themes such as standby, defect, operation and summarize;Application service module, it is described original for providing user's access Alarm data described in data and interactive operation, reminds the data such as data, field programs at evaluation data.In addition, the present invention is also A kind of water power fortune inspection management method is provided, the standardization of management key business process is examined for realizing fortune, realizes fortune inspection operation Fine-grained management.The present invention is due to being managed and controlling to power production process using computer, so that entire power train The acquisition for data of uniting, summarize and analyze can be at the right time effectively and accurate, manages to improve the fortune inspection of group company's water power Lean it is horizontal.
Referring to Fig. 6, the water power fortune inspection management system and method for the embodiment of the present invention, comprising: at data acquisition module, data Manage module, real time analysis module, application service module;Wherein,
Data acquisition module for acquiring the data of equipment generation, and is saved in database server;
Data processing module, for handling field data, by processing result generate alarm data, evaluation data, Remind the data such as data, field programs;
Real time analysis module for the data statistic analysis to themes such as equipment, defect, operations and summarizes;
Application service module accesses alarm data described in the initial data and interactive operation for providing user, comments Valence mumber evidence reminds the data such as data, field programs.
The data acquisition unit carries out data acquisition using task schedule mode.The data acquisition module sets system The frequency of acquisition.Collected data are saved directly to interface data original table by the data acquisition module, if acquired out Now exception or mistake, record the information in journal file;The data processing module is carried out according to collected initial data Analysis, processing, processing, statistics, prediction and evaluation operation;The data processing module generates alarm data, evaluation data, history Evaluation, predictive information, statistical information, field programs.
The real time analysis module is to the data statistic analysis of the themes such as equipment, defect, operation and summarizes;It is described to divide in real time The statistical graph of analysis module is made of parameter tracking, trend analysis, analogy analysis, Multivariate analysis, data statistics chart;It is described Application service module is by on-line monitoring module, visualization display module, aid decision module, image analysis module, data query Module, knowledge base configuration module, plant maintenance module, system management module composition;The visualization display module is set by scene Standby status visualization, produced on-site visualization, answers overhauling project visualization composition at field device alarm visualization;The figure The data of analysis module are saved in database, and extraction and analysis data at any time, form statistical graph;The knowledge base configures mould Block is made of quantity of state classification, quantity of state rule, code of points, state rule, fault diagnosis, overhauling project, flow setting.
The above is a preferred embodiment of the present invention, it is noted that for those skilled in the art For, without departing from the principles of the present invention, it can also make several improvements and retouch, these improvements and modifications It should be regarded as protection scope of the present invention.

Claims (8)

1. a kind of water power fortune inspection management system characterized by comprising data acquisition module, data processing module, in real time analysis Module, application service module;
Data acquisition module is stored for the operation data of receiving device, and by the operation data of the equipment received to data In the server of library;
Data processing module is analyzed for the operation data to equipment, to generate the analysis data of preset format;Wherein institute Stating analysis data includes at least one below: alarm data, evaluation data, history evaluation data, predictive information data, statistics Information data, field programs data;
Real time analysis module, for summarizing to the preset analysis data generated in data processing module, to be preset The data set of theme, and it is for statistical analysis and summarize to the data set of the preset themes;The wherein number of the preset themes It include at least one below: device data collection, operation data collection, defective data collection according to collection;
Application service module, for providing user's interface of access, and according to the input of user to the original of data acquisition module Equipment operating data, the analysis data of data processing module, the data packet of the preset themes of real time analysis module handled.
2. water power according to claim 1 fortune inspection management system, which is characterized in that the application service module include: Line monitoring modular, visualization display module, aid decision module, image analysis module, data inquiry module, knowledge base configure mould Block, plant maintenance module, system management module;
The on-line monitoring module is used to read data collecting module collected and stores the interface data original table into database In original device operation data, and whether the original device operation data in real-time detection interface data original table complete;
The visualization display module is used to read the original device operation data in interface data original table, and using graphically Interface is shown;
The aid decision module is used to read the original device operation data in interface data original table, and passes through historical Device The Fault Model that the data set of the preset themes of running equipment and history obtains after being analyzed is to interface data original table In original device operation data analyzed to obtain aid decision;
The image analysis module is used to obtain the analysis data of the preset format of data processing module, and is carried out with graphical interfaces Display;
The data inquiry module is used for the querying condition that inputs according to user, and original in the interface data original table sets Standby operation data, the analysis data in data processing module, the preset themes in real time analysis module data set in looked into It askes;
The knowledge base configuration module is used to store preset Knowledge Set, includes at least following at least one in the Knowledge Set: Quantity of state classification, quantity of state rule, code of points, state rule, fault diagnosis, overhauling project, flow setting;
The plant maintenance module is used to store the maintenance log of equipment, and raw according to the analysis data that data processing module obtains Forming apparatus maintenance plan;
The system management module is for configuring system according to the input of user.
3. water power fortune inspection management system according to claim 2, which is characterized in that the plant maintenance module is used for basis The analysis data of data processing module, generating device maintenance plan, the plant maintenance plan include at least one kind below: setting Standby daily maintenance, equipment defect management, equipment health analysis, hidden trouble of equipment analysis, regular visit plan, setting management, equipment Abnormal operation management.
4. water power fortune inspection management system according to claim 2, which is characterized in that the visualization display module is for leading to The camera for crossing the installation of equipment periphery provides visual field equipment state picture, field device alarm picture, produced on-site Environment picture answers overhauling project picture.
5. a kind of water power fortune inspection management method characterized by comprising
The operation data of receiving device, and by the storage of the operation data of the equipment received into database server;
The operation data of equipment is analyzed, to generate the analysis data of preset format;Wherein the analysis data include with Under at least one: alarm data, evaluation data, history evaluation data, predictive information data, statistical information data, scene meter Draw data;
The preset analysis data generated in data processing module are summarized, to obtain the data set of preset themes, and it is right The data set of the preset themes is for statistical analysis and summarizes;Wherein the data set of the preset themes include it is below at least It is a kind of: device data collection, operation data collection, defective data collection;
User's interface of access is provided, and according to the input of user to original equipment operating data, the number of data acquisition module It is handled according to the analysis data of processing module, the data packet of the preset themes of real time analysis module.
6. water power according to claim 5 fortune inspection management method, which is characterized in that the method also includes it is below at least One step:
The original device operation data of data collecting module collected and storage in the interface data original table into database is read, And whether the original device operation data in real-time detection interface data original table is complete;
The original device operation data in interface data original table is read, and is shown using graphic interface;
The original device operation data in interface data original table is read, and passes through the default of historical Device running equipment and history The Fault Model that the data set of theme obtains after being analyzed is to the original device operation data in interface data original table It is analyzed to obtain aid decision;
The analysis data of the preset format of data processing module are obtained, and are shown with graphical interfaces;
According to the querying condition that user inputs, original device operation data, data processing in the interface data original table Analysis data in module, the preset themes in real time analysis module data set in inquired;
Preset Knowledge Set is stored, following at least one is included at least in the Knowledge Set: quantity of state is classified, quantity of state is regular, Code of points, state rule, fault diagnosis, overhauling project, flow setting;
Store the maintenance log of equipment, and the analysis data generating apparatus maintenance plan obtained according to data processing module;
System is configured according to the input of user.
7. water power fortune inspection management system according to claim 6, which is characterized in that the plant maintenance plan includes at least One kind below: equipment daily maintenance, equipment defect management, equipment health analysis, hidden trouble of equipment analysis, regular visit plan, Setting management, unit exception action management.
8. water power fortune inspection management system according to claim 6, which is characterized in that the method also includes: pass through equipment The camera of periphery installation provides visual field equipment state picture, field device alarm picture, in-situ production environment and draws Overhauling project picture is answered in face.
CN201910511077.8A 2019-06-13 2019-06-13 A kind of water power fortune inspection management system and method Pending CN110378802A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910511077.8A CN110378802A (en) 2019-06-13 2019-06-13 A kind of water power fortune inspection management system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910511077.8A CN110378802A (en) 2019-06-13 2019-06-13 A kind of water power fortune inspection management system and method

Publications (1)

Publication Number Publication Date
CN110378802A true CN110378802A (en) 2019-10-25

Family

ID=68250264

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910511077.8A Pending CN110378802A (en) 2019-06-13 2019-06-13 A kind of water power fortune inspection management system and method

Country Status (1)

Country Link
CN (1) CN110378802A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111478945A (en) * 2020-03-13 2020-07-31 国家电网有限公司 Pumped storage operation and inspection data processing system and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102663537A (en) * 2012-03-13 2012-09-12 凯里供电局 Maintenance system of power equipment based on risk assessment
WO2013067745A1 (en) * 2011-11-09 2013-05-16 南方电网科学研究院有限公司 Substation control center technology
CN104638764A (en) * 2015-01-22 2015-05-20 国家电网公司 Intelligent state diagnosis and overhauling system for power distribution network equipment
US20170352010A1 (en) * 2016-06-02 2017-12-07 Doosan Heavy Industries & Construction Co., Ltd. Wind farm supervision monitoring system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013067745A1 (en) * 2011-11-09 2013-05-16 南方电网科学研究院有限公司 Substation control center technology
CN102663537A (en) * 2012-03-13 2012-09-12 凯里供电局 Maintenance system of power equipment based on risk assessment
CN104638764A (en) * 2015-01-22 2015-05-20 国家电网公司 Intelligent state diagnosis and overhauling system for power distribution network equipment
US20170352010A1 (en) * 2016-06-02 2017-12-07 Doosan Heavy Industries & Construction Co., Ltd. Wind farm supervision monitoring system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111478945A (en) * 2020-03-13 2020-07-31 国家电网有限公司 Pumped storage operation and inspection data processing system and method
CN111478945B (en) * 2020-03-13 2022-10-14 国家电网有限公司 Pumped storage operation and inspection data processing system and method

Similar Documents

Publication Publication Date Title
CN110428135A (en) A kind of pipe gallery equipment condition monitoring management system
CN107766457A (en) A kind of thermal power plant's operation management system and its task executing method
US7269569B2 (en) Method of providing maintenance services
CN111210108B (en) Performance management and control model of electric power material supply chain
CN103268531B (en) A kind of energy diode platform for energy centre
CN110428112A (en) A kind of dual prevention mechanism management system of enterprise based under internet+mode
Liu et al. Automatically updating maintenance information from a BIM database
CN104951905A (en) Equipment dynamic ledger management system
WO2015181338A1 (en) System and method for providing optimization or improvement measures for one or more buildings
CN103761629A (en) Management system and method used for concrete batching plant
CN105096047A (en) Overall process task control and assessment system and realization method thereof
CN115423289B (en) Intelligent plate processing workshop data processing method and terminal
CN107657389A (en) A kind of demand Side Management platform
Neumann et al. Continuous process management
CN110378802A (en) A kind of water power fortune inspection management system and method
KR100584903B1 (en) System for real time controlling driving data of power plant
CN116991678A (en) Intelligent operation and maintenance system of data center
Energy Edge driven Digital Twins in distributed energy systems
CN202795451U (en) Asset entire life-cycle management process control application system based on topic base
CN108549947A (en) Lean overhauls mobile application system and lean inspection base
CN112801809A (en) Salt and salt chemical industry intelligent manufacturing integrated management system
CN106169118A (en) Power marketing industry expands negative inventory management application process
Takatsu et al. Key Points for Utilizing Digital Technologies at Manufacturing and Maintenance Sites
Annepanavar et al. Digital Twins for Sustainable Production: Modelling and Simulation of a Production System Towards a Digital Twin
Redlein et al. Environmental and Social monitoring in existing building structures–results of a case study within several historical buildings

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191025