CN110376944A - A kind of sequential control abnormal interrupt processing method - Google Patents

A kind of sequential control abnormal interrupt processing method Download PDF

Info

Publication number
CN110376944A
CN110376944A CN201910620951.1A CN201910620951A CN110376944A CN 110376944 A CN110376944 A CN 110376944A CN 201910620951 A CN201910620951 A CN 201910620951A CN 110376944 A CN110376944 A CN 110376944A
Authority
CN
China
Prior art keywords
sequential control
abnormal interrupt
executes
enables
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910620951.1A
Other languages
Chinese (zh)
Other versions
CN110376944B (en
Inventor
范海威
林静怀
陈郑平
陈建洪
祁海龙
郝旭亮
王昊
夏慧
平金亮
陈威
黄海腾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Kedong Electric Power Control System Co Ltd
State Grid Fujian Electric Power Co Ltd
Original Assignee
Beijing Kedong Electric Power Control System Co Ltd
State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Kedong Electric Power Control System Co Ltd, State Grid Fujian Electric Power Co Ltd filed Critical Beijing Kedong Electric Power Control System Co Ltd
Priority to CN201910620951.1A priority Critical patent/CN110376944B/en
Publication of CN110376944A publication Critical patent/CN110376944A/en
Application granted granted Critical
Publication of CN110376944B publication Critical patent/CN110376944B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • G05B19/0423Input/output
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/25Pc structure of the system
    • G05B2219/25257Microcontroller

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Safety Devices In Control Systems (AREA)
  • Debugging And Monitoring (AREA)

Abstract

The present invention relates to a kind of sequential control abnormal interrupt processing methods, by carrying out going deep into plane analysis to sequential control operation order service logic, safely, quickly for starting point, on the basis of guaranteeing safety, a kind of method continued to use former sequential control operation order after abnormal interrupt processing and continue to execute sequential control operation is proposed, to improve sequential control execution efficiency and sequential control completion rate.

Description

A kind of sequential control abnormal interrupt processing method
Technical field
The present invention relates to Automation of Electric Systems control fields, more specifically to a kind of sequential control abnormal interrupt Processing method.
Background technique
Sequential control function is also referred to as programming operations, according to prespecified operation logic and five-defence block rule, automatically The operation of a series of breakers, disconnecting switch, the final process for changing system running state are completed by rule, to realize electrical Automatic conversion of the equipment from the various states such as operation, stand-by heat, cold standby.
Currently, monitor reports when there is abnormal interrupt for multi-compartment sequential control operation (such as main transformer and bus) After dispatcher, ordered to turn remote control or local operation again again according to equipment state by dispatcher, operator need to intend ticket again, examine Ticket, operation, seriously affect operating efficiency.To solve the problems, such as present on, the invention proposes in a kind of sequential control exception Disconnected processing method is further continued for carrying out sequential control on former sequential control operation order.
Summary of the invention
(1) technical problems to be solved
In order to solve the above problem of the prior art, the invention proposes a kind of sequential control abnormal interrupt processing methods.
(2) technical solution
In order to achieve the above object, the main technical schemes that the present invention uses include:
A kind of sequential control abnormal interrupt processing method is designed, in sequential control implementation procedure, what each operation enabled is held After row, whether the execution for judging that the operation enables there is abnormal interrupt, if not occurring abnormal interrupt, it is next then to execute its A operation enables;If there is abnormal interrupt, execute interruption and control again, it is next to continue to execute its if the operation enables and executes completion again A operation enables, and enables if the operation and determining if execution also fails to complete again by operation unit exception, first terminates sequential control operation It executes and is interrupted after control after maintenance of equipment and confirmation equipment are without exception again.Break during control in commission, first judges whether to skip The operation of abnormal interrupt enables, and carries out sequential control preview if then first enabling from next operation that abnormal interrupt operation enables, then from Next operation order that abnormal interrupt operation enables continues to execute sequential control, if otherwise first enabling progress sequence from abnormal interrupt operation Control preview, then enabled from abnormal interrupt operation and continue to execute sequential control.During sequential control preview, using executing exception The former sequential control operation order of termination executes unfinished operation in defence section Imitating and enables, and whether verification executes section full Full border executes requirement, continues to execute sequential control if sequential control preview is completed, if sequential control is previewed there are exception item, Then first exclude and determine that exception item re-executes sequential control preview again.
This method specifically includes the following steps:
Step 1): sequential control executes, and whether the execution for judging that i-th of operation enables abnormal interrupt occurs, if occurring abnormal It interrupts, then executes interruption and control again, go to step 2);If not occurring abnormal interrupt, then executes i+1 operation and enable;
Step 2): it if sequential control executes again and completes i-th of operation order, then executes i+1 operation and enables;If Sequential control executes again but does not complete i-th of operation and enables, then determines by operation unit exception, first terminates sequential control operation, It gos to step 3) after maintenance of equipment and confirmation equipment are without exception again;
Step 3): executing and interrupt whether i-th of operation order for first judging abnormal interrupt after control has been completed, if completing, I-th of operation order is skipped, sequential control preview is first executed since enabling i+1 operation, i+1 operation is then executed and enables; If not completing, sequential control preview is first executed since enabling i-th of operation, continues to execute i-th of operation order;
Step 4): the sequential control that all operations enable is completed by step 1) to step 3).
The invention has the characteristics that:
(1) it interrupts and controls again
In sequential control implementation procedure, if some operation enables and abnormal interrupt occurs, a subfunction is controlled in system offer again, with Guarantee after an abnormal interrupt, after confirmation relevant device state and signal condition, primary, raising sequence control can be controlled again The success rate of system.
(2) it interrupts after control
In sequential control implementation procedure, if some operation enables and abnormal interrupt occurs, a subfunction is controlled again by interrupting Can not normally execute down, after sequential control abnormal end, using interrupt after control function, on former sequential control operation order followed by The continuous function of carrying out sequential control.
Initial state judgement is the critical function for ensureing the safe and smooth execution of sequential control at sequential control initial stage, only controlled device Initial equilibrium state it is consistent with the initial equilibrium state that operation order requires when, sequential control can be executed.And interrupting after control is in sequential control Operation order executes sequential control operation on the basis of having been carried out a part again, carries out initial state judgement again at this time and can not Row.In order to guarantee that sequence control procedure is safe and reliable, before execution " interruption control again " operation, need under five anti-sections to not holding Capable operation, which enables, carries out sequential control preview, it is ensured that each controlled device can be transferred through defence check logic.It interrupts after control function It can solve the above problem.
In interruption during control, the operation order operated is no longer operated, is directly skipped.
(3) beneficial effect
The beneficial effects of the present invention are: the present invention gos deep into plane analysis by carrying out to sequential control operation order service logic, with It is safely, quickly starting point, on the basis of guaranteeing safety, proposes one kind and continue to use former sequential control after abnormal interrupt processing The method that operation order continues to execute sequential control operation, to improve sequential control execution efficiency and sequential control completion rate.
Detailed description of the invention
Fig. 1 is a kind of flow diagram of sequential control abnormal interrupt processing method;
Fig. 2 is that operation executes the schematic diagram for interrupting and controlling again after enabling abnormal interrupt in the embodiment of the present invention;
Fig. 3 is to judge abnormal interrupt operation enables the schematic diagram whether completed in the embodiment of the present invention;
Fig. 4 is that abnormal interrupt operation executes the schematic diagram interrupted after control after the completion of enabling in the embodiment of the present invention;
Fig. 5 is that abnormal interrupt operation enables the schematic diagram for executing and being interrupted after control when not completing in the embodiment of the present invention.
Specific embodiment
In order to preferably explain the present invention, in order to understand, with reference to the accompanying drawing, by specific embodiment, to this hair It is bright to be described in detail.
The present invention provides a kind of sequential control abnormal interrupt processing methods, in sequential control implementation procedure, Mei Gecao After making the execution enabled, whether the execution for judging that the operation enables there is abnormal interrupt, if not occurring abnormal interrupt, then holds Its next operation of row enables;If there is abnormal interrupt, execute interruption and control again, continues to hold if the operation enables and executes completion again Its next operation of row enables, and enables and determining if execution also fails to complete again by operation unit exception, first termination sequence if the operation Maintenance of equipment and confirmation equipment rear execute without exception are interrupted after control again for control operation.Break during control in commission, first judges Whether the operation order of abnormal interrupt is skipped, if then first enabling progress sequential control pre- from next operation that abnormal interrupt operation enables It drills, then the next operation order enabled from abnormal interrupt operation continues to execute sequential control, enables if otherwise first operating from abnormal interrupt Sequential control preview is carried out, then is enabled from abnormal interrupt operation and continues to execute sequential control.During sequential control preview, use Abortive former sequential control operation order is executed, unfinished operation is executed in defence section Imitating and enables, verification executes disconnected Face whether meet it is practical execute requirement, if sequential control preview complete if continue to execute sequential control, if sequential control preview deposit In exception item, then first exclude and determine that exception item re-executes sequential control preview again.Sequential control previews the realization of function, makes With D5000 platform integration defence function, section using integrated defence section, needed before preview be in real time with SCADA It unites and synchronizes section.
As shown in Figure 1, this method specifically includes the following steps:
Step 1): sequential control executes, and whether the execution for judging that i-th of operation enables abnormal interrupt occurs, if occurring abnormal It interrupts, then executes interruption and control again, go to step 2);If not occurring abnormal interrupt, then executes i+1 operation and enable;
Step 2): it if sequential control executes again and completes i-th of operation order, then executes i+1 operation and enables;If Sequential control executes again but does not complete i-th of operation and enables, then determines by operation unit exception, first terminates sequential control operation, It gos to step 3) after maintenance of equipment and confirmation equipment are without exception again;
Step 3): executing and interrupt whether i-th of operation order for first judging abnormal interrupt after control has been completed, if completing, I-th of operation order is skipped, sequential control preview is first executed since enabling i+1 operation, i+1 operation is then executed and enables; If not completing, sequential control preview is first executed since enabling i-th of operation, continues to execute i-th of operation order;
Step 4): the sequential control that all operations enable is completed by step 1) to step 3).
Same sequential control is operated, interruption can be performed a plurality of times after control, that is to say, that step 3) can be performed a plurality of times.
The operation that sequential control executes enables, be generated by SCADA advanced application function intelligence at ticket function, that is, Say, the operation order of sequential control is above-mentioned steps 1) basis is executed to step 4).
Interrupt control again, the realization interrupted after control relies on smart grid Dispatching Control System basic platform.Operational order warp The acquisition of main website data and swap server, transformer substation communication gateway machine are handed between regulation main website and monitoring system of electric substation Mutually.Function obtains operation equipment remote signalling value and telemetry value according to main website data acquisition function, the announcement provided in conjunction with SCADA service The information such as alert obtain operation and enable implementing result as judgment basis.Function is controlled in interruption again enables implementing result, Yi Jicao according to operation Enable type information come decision systems whether need to start interruption control function again.After function starting is controlled in interruption again, to executing exception Operation is enabled and being executed again, is specifically executed content according to operation and is enabled type.
After sequential control, no matter run succeeded, or execute abnormal end of a period, sequential control function can all grasp every The implementing result for making to enable carries out backfill preservation.Interrupt after control function according to backfill information come analyze identification which operation enable operated It completes, sequential control is from which abnormal interrupt.Backfill information is enabled according to operation, interrupts to enable operation after control carrying out classification knowledge Not, to different implementing results, different operations is executed.Completed operation order no longer executes, and enables to abnormal operation is executed User's selection is obtained by man-machine interaction mode, is decided whether to skip abnormal operation order according to user's selection.
The present invention is implemented to execute " 500kV water Pu's line route is made as cold standby by operation is suitable " sequential control operation order and be Example, the operation order correspond to concrete operations and enable as follows:
1, to turn cold standby sequence block signal without exception by running for 5001/5002 route of inspection 500kV water Pu line
2, three lines of 500kV water/water Pu line 5002 is disconnected to switch
3, it looks into three lines of 500kV water/switch of water Pu line 5002 indeed to disconnect, telemetering of current value is zero
4, to turn cold standby sequence block signal without exception by running for 5001/5002 route of inspection 500kV water Pu line
5,500kV water Pu line 5001 is disconnected to switch
.......
(1) it interrupts and controls again
When execution second step " disconnecting three lines of 500kV water/water Pu wiretap " operation enables, it is abnormal, clicks and " interrupt again Control " option executes operation order again, as shown in Figure 2.
It is enabled if still can not normally be executed by " interruption is controlled again " option and complete the operation, it may be considered that being set by operation It is standby to need to terminate sequential control operation there are abnormal conditions, after confirming status of equipment, continued by click " interruption is controlled again " option Execute sequential control operation.
(2) it interrupts after control
After sequential control implementation procedure abnormal interrupt, when can continue sequential control by treatment in situ completion or confirmation, make " interrupting after control " is executed with former sequential control operation order.As shown in figure 3, if Section 2 is by way of non-sequential control Reason is completed, and after clicking "Yes" button, " interrupting after control " function will skip the exception item, is executed since the next item down of exception item, As shown in Figure 4.If the untreated completion of Section 2, after clicking "No" button, " interrupting after control " function will be since the exception item To execution, as shown in Figure 5.
The embodiment of the present invention is described in attached drawing, but the invention is not limited to above-mentioned specific embodiment parties Formula, the above mentioned embodiment is only schematical, rather than restrictive, and those skilled in the art are in this hair Under bright enlightenment, without breaking away from the scope protected by the purposes and claims of the present invention, many forms can be also made, this It is belonged within protection of the invention a bit.

Claims (7)

1. a kind of sequential control abnormal interrupt processing method, it is characterised in that: in sequential control implementation procedure, each operation is enabled Execution after, judge the operation enable execution whether there is abnormal interrupt, if not occurring abnormal interrupt, then execute it Next operation enables;If there is abnormal interrupt, execute interruption and control again, continues to execute it if the operation enables and executes completion again Next operation enables, and enables if the operation and determines first to terminate sequential control by operation unit exception if execution also fails to complete again Maintenance of equipment and confirmation equipment rear execute without exception are interrupted after control again for operation.
2. a kind of sequential control abnormal interrupt processing method as described in claim 1, it is characterised in that: execute and interrupt after controlling Cheng Zhong first judges whether that the operation for skipping abnormal interrupt enables, continues if then enabling from next operation that abnormal interrupt operation enables Sequential control is executed, continues to execute sequential control if otherwise enabling from abnormal interrupt operation.
3. a kind of sequential control abnormal interrupt processing method as claimed in claim 2, it is characterised in that: first grasped from abnormal interrupt Make next operation for enabling and enable to carry out sequential control preview, then the next operation order enabled from abnormal interrupt operation continue to execute it is suitable Sequence control.
4. a kind of sequential control abnormal interrupt processing method as claimed in claim 2, it is characterised in that: first grasped from abnormal interrupt Make to enable and carry out sequential control preview, then is enabled from abnormal interrupt operation and continue to execute sequential control.
5. a kind of sequential control abnormal interrupt processing method as described in claim 3 or 4, it is characterised in that: in sequential control During preview, using abortive former sequential control operation order is executed, unfinished behaviour is executed in defence section Imitating Enable, verification execute section whether meet it is practical executes requirement, if sequential control preview completion if continue to execute sequential control, if There are exception items for sequential control preview, then first exclude and determine that exception item re-executes sequential control preview again.
6. a kind of sequential control abnormal interrupt processing method as described in claim 1, it is characterised in that: this method specifically includes Following steps:
Step 1): sequential control executes, and whether the execution for judging that i-th of operation enables abnormal interrupt occurs, if there is abnormal interrupt, It then executes interruption to control again, go to step 2);If not occurring abnormal interrupt, then executes i+1 operation and enable;
Step 2): it if sequential control executes again and completes i-th of operation order, then executes i+1 operation and enables;If sequence Control executes again but does not complete i-th of operation and enables, then determines by operation unit exception, first terminates sequential control operation, then tie up It repairs equipment and confirms and go to step 3) after equipment is without exception;
Step 3): it executes and interrupts whether i-th of operation order for first judging abnormal interrupt after control has been completed, if completing, skip I-th of operation enables, and then executes i+1 operation and enables;If not completing, i-th of operation order is continued to execute;
Step 4): the sequential control that all operations enable is completed by step 1) to step 3).
7. a kind of sequential control abnormal interrupt processing method as described in claim 1, it is characterised in that: in the step 3) In, sequential control preview is first carried out before executing i+1 operation order or i-th of operation order: abortive using executing Former sequential control operation order, executes unfinished operation in defence section Imitating and enables, and verification executes whether section meets reality Requirement is executed, if sequential control preview is completed, i+1 operation order is executed or i-th of operation enables;If sequential control preview is deposited In exception item, then first exclude and determine that exception item re-executes sequential control preview again.
CN201910620951.1A 2019-07-10 2019-07-10 Sequence control abnormal interrupt processing method Expired - Fee Related CN110376944B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910620951.1A CN110376944B (en) 2019-07-10 2019-07-10 Sequence control abnormal interrupt processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910620951.1A CN110376944B (en) 2019-07-10 2019-07-10 Sequence control abnormal interrupt processing method

Publications (2)

Publication Number Publication Date
CN110376944A true CN110376944A (en) 2019-10-25
CN110376944B CN110376944B (en) 2022-07-01

Family

ID=68252626

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910620951.1A Expired - Fee Related CN110376944B (en) 2019-07-10 2019-07-10 Sequence control abnormal interrupt processing method

Country Status (1)

Country Link
CN (1) CN110376944B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110727263A (en) * 2019-10-31 2020-01-24 南方电网调峰调频发电有限公司 Method for overhauling abnormal equipment action sequence and monitoring signal jitter state

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10187211A (en) * 1996-12-24 1998-07-14 Hitachi Ltd Control method for power plant sequence
CN102169343A (en) * 2011-05-16 2011-08-31 国电南瑞科技股份有限公司 Programmed remote operation system and method of grid centralized monitoring center
CN103441570A (en) * 2013-06-18 2013-12-11 国家电网公司 One-button type sequential control operation control method based on integrated information platform
CN103970571A (en) * 2014-05-20 2014-08-06 中国航空动力机械研究所 Running error recovery method and system for control software of aircraft engine
CN105634129A (en) * 2016-01-27 2016-06-01 云南电网有限责任公司电力科学研究院 Sequence control method for intelligent substation
CN106059073A (en) * 2016-06-17 2016-10-26 国网浙江省电力公司绍兴供电公司 Programmed control method based on cooperative misoperation prevention of master station and substation
CN106100118A (en) * 2016-06-17 2016-11-09 国网浙江省电力公司绍兴供电公司 Boss based on the shutdown of substation data communication network stands distant place Programmed control method
CN106297073A (en) * 2016-07-29 2017-01-04 深圳怡化电脑股份有限公司 A kind of self-aided terminal method for processing business and system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10187211A (en) * 1996-12-24 1998-07-14 Hitachi Ltd Control method for power plant sequence
CN102169343A (en) * 2011-05-16 2011-08-31 国电南瑞科技股份有限公司 Programmed remote operation system and method of grid centralized monitoring center
CN103441570A (en) * 2013-06-18 2013-12-11 国家电网公司 One-button type sequential control operation control method based on integrated information platform
CN103970571A (en) * 2014-05-20 2014-08-06 中国航空动力机械研究所 Running error recovery method and system for control software of aircraft engine
CN105634129A (en) * 2016-01-27 2016-06-01 云南电网有限责任公司电力科学研究院 Sequence control method for intelligent substation
CN106059073A (en) * 2016-06-17 2016-10-26 国网浙江省电力公司绍兴供电公司 Programmed control method based on cooperative misoperation prevention of master station and substation
CN106100118A (en) * 2016-06-17 2016-11-09 国网浙江省电力公司绍兴供电公司 Boss based on the shutdown of substation data communication network stands distant place Programmed control method
CN106297073A (en) * 2016-07-29 2017-01-04 深圳怡化电脑股份有限公司 A kind of self-aided terminal method for processing business and system

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
姚宏昕等: "基于ARM9内核的IRQ异常中断编程机制的研究", 《计算机工程与设计》 *
庞亚云等: "顺序控制功能在河滨220kV智能变电站的应用", 《宁夏电力》 *
李毅: "智能变电站顺控操作的一些细节讨论", 《科技创新导报》 *
毛志强等: "智能变电站顺序控制技术应用研究", 《山东电力技术》 *
陈磊: "顺序控制技术在220 kV公园智能变电站的应用", 《科技与创新》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110727263A (en) * 2019-10-31 2020-01-24 南方电网调峰调频发电有限公司 Method for overhauling abnormal equipment action sequence and monitoring signal jitter state

Also Published As

Publication number Publication date
CN110376944B (en) 2022-07-01

Similar Documents

Publication Publication Date Title
CN109634243A (en) A kind of scheduler program operating system based on intelligent robot
EP2377222B1 (en) Hybrid distribution network power restoration control
CN111614157B (en) Sequence control system and method for switching operation of transformer substation
CN106651198B (en) Power grid accident auxiliary processing method and system
CN110210632A (en) Failure emergency processing method, device and terminal based on ubiquitous electric power Internet of Things
CN103490514B (en) Rural power distribution grid electricity leakage protection device monitoring, controlling and fault detecting method
CN105406603A (en) Power grid adjustment and control end anti-misoperation locking method
CN109847200A (en) A kind of vacuum monitoring system for medical heavy ion avcceleration
CN109802355B (en) Method and device for preventing misoperation of relay protection soft pressing plate
CN108494089A (en) A kind of fast and safely reliably ration the power supply draws road mass-produced remote control method
CN107482772B (en) Measurement and control device and anti-misoperation lockout logic display method thereof
CN110376944A (en) A kind of sequential control abnormal interrupt processing method
CN103208089B (en) Electric network intelligent scheduling system and method based on mode identification technology
CN101741145A (en) Traditional switch intelligent interface device for digitized transformer substation
CN103701207A (en) Method for preventing misoperation of SV soft strap with current gap
CN106655520A (en) Method for ensuring safe and reliable execution of relay protection remote operation
CN115986936B (en) Intelligent power dispatching control system and method thereof
CN110473747A (en) A kind of breaker and breaker operator recognition methods
CN106451788A (en) Method for remotely controlling and operating dispatching automation systems by aid of remote-control safety strategy module
CN107944570B (en) Automatic processing method and device for intelligent substation sequential control atypical state
CN106526498A (en) Uninterrupted Power Supply (UPS) self-inspection method and UPS self-inspection circuit
CN113113971B (en) Automatic remote control execution method and related device for distribution network feeder operation task
CN114254774A (en) One-key sequential control-based automatic issuing system for maintenance order associated operation order
CN108082214A (en) Key operation emergency response system based on track traffic SCADA
CN109861393B (en) Processing method for preventing error locking and execution terminal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220701