CN110374628B - 一种穿越蠕滑断层隧道双层抗断层结构及施工方法 - Google Patents
一种穿越蠕滑断层隧道双层抗断层结构及施工方法 Download PDFInfo
- Publication number
- CN110374628B CN110374628B CN201910710038.0A CN201910710038A CN110374628B CN 110374628 B CN110374628 B CN 110374628B CN 201910710038 A CN201910710038 A CN 201910710038A CN 110374628 B CN110374628 B CN 110374628B
- Authority
- CN
- China
- Prior art keywords
- fault
- layer
- tunnel
- layer anti
- super
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 9
- 230000000149 penetrating effect Effects 0.000 title claims abstract description 7
- 238000009412 basement excavation Methods 0.000 claims abstract description 22
- 239000000463 material Substances 0.000 claims abstract description 10
- 230000008602 contraction Effects 0.000 abstract description 4
- 230000007547 defect Effects 0.000 abstract description 3
- 239000011435 rock Substances 0.000 description 4
- 238000006073 displacement reaction Methods 0.000 description 3
- 238000009423 ventilation Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000000779 smoke Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/105—Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
本发明公开一种穿越蠕滑断层隧道双层抗断层结构及施工方法,结构包括设置在蠕滑断层处超挖段,且总厚度与超挖尺寸相当的外层抗断层、初期支护和内层抗断层;外层抗断层为韧性材料,紧贴隧道超挖轮廓线而设;初期支护设置于外层抗断层内侧;内层抗断层为韧性材料,设置于初期支护内侧;超挖段隧道二次衬砌设置于内层抗断层内侧,其形状、尺寸与正常通过段隧道二次衬砌相同。本发明不存在断面的突然扩大或缩小,也无需单独设计二次衬砌或使用新的模板台车,克服了现有的“超挖设计”的缺点;抗断层容许断层两侧的地层产生较大的位错且对超挖段隧道二次衬砌不产生过大影响,保护其不受到破坏,且保证在超挖段隧道二次衬砌中铺设的轨道高程、平顺性。
Description
技术领域
本发明涉及隧道工程技术领域,具体为一种穿越蠕滑断层隧道双层抗断层结构及施工方法。
背景技术
实际工程中,隧道有时会不可避免地穿越活动断层。当活动断层发生错动时,地层中将会产生任何支护结构都难以抵抗的永久位移,从而严重损害隧道结构,出现如开裂、错台等破坏。隧道工程是永久性结构工程,一旦破坏便无法重建且难以修复,因此这样的破坏对于隧道乃至全线运营安全的影响都是难以估量的。
蠕滑错动是断层活动的两种主要方式之一,是断层破碎带随着时间推移产生的断层区域的缓慢滑动过程,因此是一种缓慢且有时间积累效应的运动形式。目前工程上应用的穿越蠕滑断层带隧道抗震措施主要是“超挖设计”和“铰接设计”。“超挖设计”是根据蠕滑断层可能产生的最大错位量,在隧道修建时扩大隧道断面尺寸;“铰接设计”则是尽量减小隧道节段长度,使断层带及其两侧一定范围内的节段保持相对独立,各刚性隧道节段间采用刚度相对较小的柔性连接。
采用了“超挖设计”的隧道由于提前预留了蠕滑断层的错动量,因而避免了断层错动对隧道结构造成的影响。然而超挖会导致隧道衬砌在抗震设防段出现断面突然扩大和突然减小的情况,这样的突变会会增大空气流动时的沿程阻尼,从而增大隧道内的临界风速,使得烟气排出较为困难或增加运营成本,同时,由于“超挖设计”要求隧道二次衬砌紧贴超挖后的洞壁,因此需要单独设计超挖段二衬型式并使用新的模板台车,从而增大设计、施工难度及成本。采用了“铰接设计”虽然通过柔性连接使得隧道能在一定程度上适应蠕滑断层的位移,但适应了断层位移的隧道,将难以保证轨道的平顺性,从而影响乘客舒适性甚至运营安全。
发明内容
针对上述问题,本发明的目的在于提供一种通风上不存在断面的突然扩大或缩小,也无需单独设计二次衬砌或使用新的模板台车并且能够保证在超挖段隧道二次衬砌中铺设的轨道高程、平顺性的穿越蠕滑断层隧道双层抗断层结构及施工方法。技术方案如下:
一种穿越蠕滑断层隧道双层抗断层结构,包括设置在蠕滑断层处超挖段,且总厚度与超挖尺寸相当的外层抗断层、初期支护和内层抗断层;外层抗断层为韧性材料,紧贴隧道超挖轮廓线而设;初期支护为柔性的铰接支护,设置于外层抗断层内侧;内层抗断层也为韧性材料,设置于初期支护内侧;超挖段隧道二次衬砌设置于内层抗断层内侧,其形状、尺寸与超挖段两端的正常通过段隧道二次衬砌相同。
进一步的,所述外层抗断层的厚度小于内层抗断层。
更进一步的,所述外层抗断层和内层抗断层的弹性模量为 0.5~5Mpa。
一种穿越蠕滑断层隧道双层抗断层施工方法,包括以下步骤:
步骤1:对穿过蠕滑断层、抗震设防段长度内的隧道进行超挖;
步骤2:在超挖段的隧道净空内紧贴隧道超挖轮廓线施作外层抗断层;
步骤3:在外层抗断层上施作初期支护;
步骤4:在初期支护上施作内层抗断层,且外层抗断层、初期支护和内层抗断层的总厚度与超挖尺寸相当;
步骤5:使用与正常通过段隧道二次衬砌相同的模板台车,在内层抗断层内修筑超挖段隧道二次衬砌。
本发明的有益效果是:本发明超挖段隧道二次衬砌的形状、尺寸与正常通过段隧道二次衬砌相同,因此在通风上不存在断面的突然扩大或缩小,也无需单独设计二次衬砌或使用新的模板台车,很好地克服了现有的“超挖设计”的缺点;抗断层能容许断层两侧地层产生较大的位错且对超挖段隧道二次衬砌不产生过大影响,从而保护超挖段隧道二次衬砌不受到破坏且保证在超挖段隧道二次衬砌中铺设的轨道高程、平顺性等。
附图说明
图1为本发明穿越蠕滑断层隧道双层抗断层结构示意图。
图中:1-断层上盘围岩;2-断层下盘围岩;3-蠕滑断层面;4-超挖后的隧道轮廓线;5-外层抗断层;6-初期支护;7-内层抗断层;8-超挖段隧道二次衬砌;9-正常通过段隧道二次衬砌。
具体实施方式
下面结合附图和具体实施例对本发明做进一步详细说明。如图1所示,一种穿越蠕滑断层隧道双层抗断层结构,其特征在于,包括设置在蠕滑断层处超挖段,且总厚度与超挖尺寸相当的外层抗断层5、初期支护6和内层抗断层7;外层抗断层5为韧性材料,紧贴隧道超挖轮廓线4而设;初期支护6为柔性的铰接支护,设置于外层抗断层5内侧;内层抗断层7也为韧性材料,设置于初期支护6内侧;超挖段隧道二次衬砌8设置于内层抗断层7内侧,其形状、尺寸与超挖段两端的正常通过段隧道二次衬砌9相同,纵向上相连。
由于超挖段隧道二次衬砌8的形状、尺寸与正常通过段隧道二次衬砌9相同,因此在通风上不存在断面的突然扩大或缩小,也无需单独设计二次衬砌或使用新的模板台车。很好地克服了现有的“超挖设计”的缺点。
外层抗断层5的厚度应小于内层抗断层7,同时应选用弹性模量较小且韧性较好的材料。本实施例选取的材料弹性模量为 0.5~5Mpa。外层抗断层5的厚度小于内层抗断层7,由于外层抗断层5厚度较小,故方便初期支护6迅速发挥维持围岩稳定的作用。当蠕滑断层发生错动时,外层抗断层5首先受压。由于外层抗断层5弹性模量较小,因此能承担一定压力、发生压缩变形从而成为围岩与初支6间的缓冲层。若断层错动继续发展,使得外层抗断层5变形较大时,将会使得初支6也承受较大的压力,此时地层蠕滑错动的压力将传递至初支6与超挖段隧道二次衬砌8之间的内层抗断层7上。内层抗断层7的性质与外层抗断层5相似,而弹模更小且韧性更好,因此能容许产生较大的变形且对超挖段隧道二次衬砌8不产生过大影响。从而保护超挖段隧道二次衬砌8不受到破坏且保证在超挖段隧道二次衬砌8中铺设的轨道高程、平顺性等。
本发明穿越蠕滑断层隧道双层抗断层施工方法,包括以下步骤:
步骤1:对穿过蠕滑断层、抗震设防段长度内的隧道进行超挖;
步骤2:在超挖段的隧道净空内紧贴隧道超挖轮廓线4施作外层抗断层5;
步骤3:在外层抗断层5上施作初期支护6;
步骤4:在初期支护6上施作内层抗断层7,且外层抗断层5、初期支护6和内层抗断层7的总厚度与超挖尺寸相当;
步骤5:使用与正常通过段隧道二次衬砌9相同的模板台车,在内层抗断层7内修筑超挖段隧道二次衬砌8。
Claims (2)
1.一种穿越蠕滑断层隧道双层抗断层结构,其特征在于,包括设置在蠕滑断层处超挖段,且总厚度与超挖尺寸相当的外层抗断层(5)、初期支护(6)和内层抗断层(7);外层抗断层(5)的厚度小于内层抗断层(7);外层抗断层(5)为韧性材料,紧贴隧道超挖轮廓线(4)而设;初期支护(6)为柔性的铰接支护,设置于外层抗断层(5)内侧;内层抗断层(7)也为韧性材料,设置于初期支护(6)内侧;超挖段隧道二次衬砌(8)设置于内层抗断层(7)内侧,其形状、尺寸与超挖段两端的正常通过段隧道二次衬砌(9)相同;
所述外层抗断层(5)和内层抗断层(7)的弹性模量为 0.5~5Mpa。
2.如权利要求1所述的穿越蠕滑断层隧道双层抗断层结构的施工方法,其特征在于,包括以下步骤:
步骤1:对穿过蠕滑断层、抗震设防段长度内的隧道进行超挖;
步骤2:在超挖段的隧道净空内紧贴隧道超挖轮廓线(4)施作外层抗断层(5);
步骤3:在外层抗断层(5)上施作初期支护(6);
步骤4:在初期支护(6)上施作内层抗断层(7),且外层抗断层(5)、初期支护(6)和内层抗断层(7)的总厚度与超挖尺寸相当;
步骤5:使用与正常通过段隧道二次衬砌(9)相同的模板台车,在内层抗断层(7)内修筑超挖段隧道二次衬砌(8)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910710038.0A CN110374628B (zh) | 2019-08-02 | 2019-08-02 | 一种穿越蠕滑断层隧道双层抗断层结构及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910710038.0A CN110374628B (zh) | 2019-08-02 | 2019-08-02 | 一种穿越蠕滑断层隧道双层抗断层结构及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110374628A CN110374628A (zh) | 2019-10-25 |
CN110374628B true CN110374628B (zh) | 2024-05-31 |
Family
ID=68257656
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910710038.0A Active CN110374628B (zh) | 2019-08-02 | 2019-08-02 | 一种穿越蠕滑断层隧道双层抗断层结构及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110374628B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112065432B (zh) * | 2020-09-14 | 2023-05-02 | 浙江华东工程咨询有限公司 | 一种穿过活动断层破碎带的隧道结构及其施工方法 |
CN116006213A (zh) * | 2023-01-10 | 2023-04-25 | 广州大学 | 一种盾构隧道隔震结构及施工方法 |
Citations (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003003796A (ja) * | 2001-06-25 | 2003-01-08 | Kajima Corp | トンネル覆工構造 |
JP2003239691A (ja) * | 2002-02-20 | 2003-08-27 | Kajima Corp | トンネル構造およびトンネルの構築方法 |
JP2006233626A (ja) * | 2005-02-25 | 2006-09-07 | National Institute Of Advanced Industrial & Technology | トンネル構造 |
JP2007205163A (ja) * | 2007-05-18 | 2007-08-16 | Kajima Corp | トンネル構造およびトンネルの構築方法 |
CN101550831A (zh) * | 2009-04-09 | 2009-10-07 | 西南交通大学 | 跨活动断层隧道抗减震构造 |
CN103016026A (zh) * | 2012-11-22 | 2013-04-03 | 湖北省宜昌至巴东高速公路建设指挥部 | 一种挤压膨胀岩公路隧道支护方法 |
CN103195447A (zh) * | 2013-04-08 | 2013-07-10 | 西南交通大学 | 一种穿越活动断裂带的抗震隧道结构的建造方法 |
CN103485796A (zh) * | 2013-10-18 | 2014-01-01 | 四川省交通运输厅公路规划勘察设计研究院 | 跨越活动断层的隧道支护结构 |
JP2016183516A (ja) * | 2015-03-26 | 2016-10-20 | 大成建設株式会社 | トンネル構造およびトンネル施工方法 |
CN106089235A (zh) * | 2016-07-21 | 2016-11-09 | 中国科学院武汉岩土力学研究所 | 一种穿越大型活动断裂带的输水隧洞抗错断结构 |
CN106761810A (zh) * | 2016-11-23 | 2017-05-31 | 长安大学 | 一种软岩大变形隧道支护结构体系及其施工方法 |
CN106869943A (zh) * | 2017-02-10 | 2017-06-20 | 西南交通大学 | 穿越活动断层的地铁隧道抗错动二次衬砌结构的修建方法 |
CN107100631A (zh) * | 2017-05-12 | 2017-08-29 | 西南交通大学 | 穿越活断层隧道二次衬砌的修建方法 |
CN107514268A (zh) * | 2017-06-29 | 2017-12-26 | 昆明理工大学 | 一种跨活动断裂的高延性隧道支护结构 |
CN108252721A (zh) * | 2018-01-11 | 2018-07-06 | 北京工业大学 | 一种用于穿越活动断层区的抗断型铰接隧道及其应用 |
CN108547633A (zh) * | 2018-06-22 | 2018-09-18 | 西南交通大学 | 一种跨越活动断层抗震结构及其修建方法 |
CN108798698A (zh) * | 2018-07-27 | 2018-11-13 | 中铁第四勘察设计院集团有限公司 | 一种穿越水平位错活动断层的盾构隧道结构 |
CN108798716A (zh) * | 2018-06-07 | 2018-11-13 | 中国科学院武汉岩土力学研究所 | 一种深埋输水隧洞的抗震抗错断适应性明管结构 |
CN109026016A (zh) * | 2018-07-10 | 2018-12-18 | 西南交通大学 | 一种穿越走滑断层的隧道的修建方法 |
CN109989768A (zh) * | 2019-04-26 | 2019-07-09 | 山东大学 | 一种适用于隧道穿越活断层的衬砌结构及其施工方法 |
CN210422632U (zh) * | 2019-08-02 | 2020-04-28 | 西南交通大学 | 一种穿越蠕滑断层隧道双层抗断层结构 |
-
2019
- 2019-08-02 CN CN201910710038.0A patent/CN110374628B/zh active Active
Patent Citations (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003003796A (ja) * | 2001-06-25 | 2003-01-08 | Kajima Corp | トンネル覆工構造 |
JP2003239691A (ja) * | 2002-02-20 | 2003-08-27 | Kajima Corp | トンネル構造およびトンネルの構築方法 |
JP2006233626A (ja) * | 2005-02-25 | 2006-09-07 | National Institute Of Advanced Industrial & Technology | トンネル構造 |
JP2007205163A (ja) * | 2007-05-18 | 2007-08-16 | Kajima Corp | トンネル構造およびトンネルの構築方法 |
CN101550831A (zh) * | 2009-04-09 | 2009-10-07 | 西南交通大学 | 跨活动断层隧道抗减震构造 |
CN103016026A (zh) * | 2012-11-22 | 2013-04-03 | 湖北省宜昌至巴东高速公路建设指挥部 | 一种挤压膨胀岩公路隧道支护方法 |
CN103195447A (zh) * | 2013-04-08 | 2013-07-10 | 西南交通大学 | 一种穿越活动断裂带的抗震隧道结构的建造方法 |
CN103485796A (zh) * | 2013-10-18 | 2014-01-01 | 四川省交通运输厅公路规划勘察设计研究院 | 跨越活动断层的隧道支护结构 |
JP2016183516A (ja) * | 2015-03-26 | 2016-10-20 | 大成建設株式会社 | トンネル構造およびトンネル施工方法 |
CN106089235A (zh) * | 2016-07-21 | 2016-11-09 | 中国科学院武汉岩土力学研究所 | 一种穿越大型活动断裂带的输水隧洞抗错断结构 |
CN106761810A (zh) * | 2016-11-23 | 2017-05-31 | 长安大学 | 一种软岩大变形隧道支护结构体系及其施工方法 |
CN106869943A (zh) * | 2017-02-10 | 2017-06-20 | 西南交通大学 | 穿越活动断层的地铁隧道抗错动二次衬砌结构的修建方法 |
CN107100631A (zh) * | 2017-05-12 | 2017-08-29 | 西南交通大学 | 穿越活断层隧道二次衬砌的修建方法 |
CN107514268A (zh) * | 2017-06-29 | 2017-12-26 | 昆明理工大学 | 一种跨活动断裂的高延性隧道支护结构 |
CN108252721A (zh) * | 2018-01-11 | 2018-07-06 | 北京工业大学 | 一种用于穿越活动断层区的抗断型铰接隧道及其应用 |
CN108798716A (zh) * | 2018-06-07 | 2018-11-13 | 中国科学院武汉岩土力学研究所 | 一种深埋输水隧洞的抗震抗错断适应性明管结构 |
CN108547633A (zh) * | 2018-06-22 | 2018-09-18 | 西南交通大学 | 一种跨越活动断层抗震结构及其修建方法 |
CN109026016A (zh) * | 2018-07-10 | 2018-12-18 | 西南交通大学 | 一种穿越走滑断层的隧道的修建方法 |
CN108798698A (zh) * | 2018-07-27 | 2018-11-13 | 中铁第四勘察设计院集团有限公司 | 一种穿越水平位错活动断层的盾构隧道结构 |
CN109989768A (zh) * | 2019-04-26 | 2019-07-09 | 山东大学 | 一种适用于隧道穿越活断层的衬砌结构及其施工方法 |
CN210422632U (zh) * | 2019-08-02 | 2020-04-28 | 西南交通大学 | 一种穿越蠕滑断层隧道双层抗断层结构 |
Non-Patent Citations (5)
Title |
---|
某公路隧道穿越活动断裂带抗错断研究;潘庆等;土工基础;20160630;第30卷(第3期);316-319+344 * |
柔性连接隧道在正断层黏滑错动下的变形特征;刘学增等;岩石力学与工程学报;第32卷(第S2期);3545-3551 * |
橡胶缓冲垫层保护下棚洞结构落石冲击力学响应研究;王琦等;铁道建筑(2);64-67 * |
穿越断层破碎带隧道合理抗震设防长度研究;耿萍等;岩石力学与工程学报;第33卷(第2期);358-365 * |
穿越黏滑断层分段接头隧道模型试验研究;闫高明等;岩土力学;20190531;第40卷(第11期);4450-4458 * |
Also Published As
Publication number | Publication date |
---|---|
CN110374628A (zh) | 2019-10-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110374628B (zh) | 一种穿越蠕滑断层隧道双层抗断层结构及施工方法 | |
WO2020239098A1 (zh) | 铁路桥梁弹塑性金属限位减震耗能装置设计方法 | |
JP4281010B2 (ja) | トンネル構造 | |
CN104612050B (zh) | 一种简支梁桥桥面连续新构造及施工方法 | |
CN210422632U (zh) | 一种穿越蠕滑断层隧道双层抗断层结构 | |
CN109356597B (zh) | 一种设置于有底部廊道的盾构隧道内的轨道变形控制结构 | |
Zheng et al. | Mechanism and countermeasures of progressive failure in shield tunnels | |
CN109338873A (zh) | 刚柔叠层桥墩滚石冲击防护结构及其制作方法 | |
CN110359954B (zh) | 一种穿越蠕滑断层隧道颗粒填充层抗错结构及其施工方法 | |
Saberi et al. | Welded haunches for seismic retrofitting of bolted T-stub connections and flexural strengthening of simple connections | |
Lu et al. | Centrifugal model tests on the structural response of the shield tunnel when constructing cross passages by mechanical methods | |
Valsamis et al. | Alternative design of buried pipelines at active fault crossings using flexible joints | |
CN113356880A (zh) | 一种跨活断层隧道的抗断错结构 | |
Junwei et al. | Deformation behavior of shield segment joint controlled by bolt and positioning tenon | |
CN115142871B (zh) | 穿越活断层隧道结构、装配式减错缝结构及铰接接头结构 | |
CN215408664U (zh) | 一种用于穿越活动断层的钻爆法隧道抗错断结构 | |
CN210422685U (zh) | 一种穿越蠕滑断层隧道颗粒填充层抗错结构 | |
Croll | Buckling of cylindrical tunnel liners | |
Ryjáček et al. | The rail-bridge interaction–recent advances with ERS fastening system for steel bridges | |
CN108643028A (zh) | 一种具有桥墩保护功能的桥梁梁体防偏移装置 | |
CN209277879U (zh) | 一种设置于有底部廊道的盾构隧道内的轨道变形控制结构 | |
CN112554910A (zh) | 受动载荷冲击巷道注浆加固方法 | |
Zeinali et al. | Effects of Hinged dowel system on the performance of concrete pavement joints | |
CN108798716A (zh) | 一种深埋输水隧洞的抗震抗错断适应性明管结构 | |
De Backer et al. | 05.34: Influence of temporary bridge decks on continuously welded rails |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |