CN110374070A CN201910695224.1A CN201910695224A CN110374070A CN 110374070 A CN110374070 A CN 110374070A CN 201910695224 A CN201910695224 A CN 201910695224A CN 110374070 A CN110374070 A CN 110374070A
Authority
CN
China
Prior art keywords
wall
water
air hose
shaft
channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910695224.1A
Other languages
Chinese (zh)
Inventor
赖勇
戴邦国
张宇弛
区丽雯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Design Institute of Water Conservancy and Hydroelectric Power
Original Assignee
Zhejiang Design Institute of Water Conservancy and Hydroelectric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Design Institute of Water Conservancy and Hydroelectric Power filed Critical Zhejiang Design Institute of Water Conservancy and Hydroelectric Power
Priority to CN201910695224.1A priority Critical patent/CN110374070A/en
Publication of CN110374070A publication Critical patent/CN110374070A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B9/00Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Mechanical Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses one kind to set shaft structure of marking time, and vertical shaft is located at water-conveyance tunnel top, by inner wall, outer wall, mark time, bottom channel, ventilating system and maintenance valve chamber form.Inner wall is located at the inside in sectional shaft face, directly contacts with water body;Outer wall is located at the outside in sectional shaft face, directly contacts with rock mass or first liner timbering;It marks time between vertical shaft inner wall and outer wall, is both tie and the channel of traffic of inner and outer wall transmitting load;Bottom channel is the steel pipe with steel bulkhead, is after water-conveyance tunnel is vented from maintenance valve chamber into the channel of people on the inner wall of silo bottom;Ventilating system is made of air hose and blower, and air hose is made of vertical air hose, horizontal air hose and air outlet.In silo bottom, the outer wall of circle " returning " font lining cutting for bottommost needs successively to cancel from top to bottom, directly utilizes the inner wall earth-retaining of water blocking.Operating maintenance transportation condition of the present invention is good, borehole wall stress condition is good, can improve construction transportation condition, and overall investment increases less.

Description

One kind setting shaft structure of marking time
Technical field
The present invention relates to the shaft structures in hydraulic and hydroelectric engineering, and in particular to draw in water supply project, one kind set mark time, can The shaft structure of Quick overhaul is carried out to homostrobe vertical shaft gate slot.
Background technique
Draw in water supply project, vertical shaft is the structure being widely used in water-conveyance tunnel crossing, shaft intake, It is widely applied in check gate, emergency repair lock, cross section is generally rectangular cross-section.
Conventional vertical shaft is generally single-wall structure, by rectangle excavate and preliminary bracing after, using certain thickness concrete into Row lining cutting, vertical shaft concrete lining are extension of the tunnel lining structure to earth's surface, are both container, the gate recess rail of internal water body Road, and be the support construction of the outer country rock of vertical shaft.
In vertical shaft with gate slot, gate can be promoted to earth's surface inspection platform by headstock gear and be overhauled, maintenance condition compared with It is good, but lock hole position embedded parts are fixed in concrete lining, are maintenance weak links, and existing shaft structure does not have Standby maintenance communication function after can only being often vented by tunnel, overhauls from upstream or downstream tunnel into people, overhauls path length, difficulty Degree is big.
Easy steel ladder, which is arranged, in shaft wall can solve the traffic problems that silo bottom is arrived after water-conveyance tunnel is vented, but steel Ladder considers that safety must be provided with shield cage, and personnel is required to go into the well maintenance with safety belt, and shaft height is larger or needs Portable device When maintenance, service personnel's traffic safety condition is still very poor.
Vertical shaft communication function can be realized by adding traditional parallel double race stair in vertical shaft unilateral side, but parallel double race stair consider Both ends landing width requirement, along with current clear height requirement, the length needed for Parallel to the flow direction is larger, sets in vertical shaft There are 2~3 gates, this body length of Parallel to the flow direction is suitable when larger, but for homostrobe vertical shaft, will cause biggish open It digs, and shaft excavation planar dimension is irregular, stress condition is poor.
Summary of the invention
It is an object of the invention to overcome the shortcomings of conventional homostrobe shaft structure maintenance transportation condition, one kind is provided sets and step on Shaft structure is walked, the lining cutting of vertical shaft top is the double-walled structure of " returning " font, on the one hand, rotation can be directly set and marked time straight-through erect Bottom, it is easier to meet current clear height requirement of marking time;On the other hand, using double-walled construction as the edge of a wing of dies, Using channel of marking time as the web of dies, it is also beneficial to improve vertical shaft lining cutting stress condition.
The technical scheme adopted by the invention is that: one kind setting shaft structure of marking time, and vertical shaft is located at water-conveyance tunnel top, including Inner wall, outer wall, mark time, bottom channel, ventilating system and maintenance valve chamber.Inner wall is located at the inside in sectional shaft face, direct with water body Contact is armored concrete water-retaining structure, venthole is equipped in the downstream side inner wall of water-conveyance tunnel Parallel to the flow direction.Outer wall position It in the outside in sectional shaft face, is directly contacted with rock mass or first liner timbering, is armored concrete soil-baffling structure.It marks time and is located at vertical shaft Between inner wall and outer wall, on vertical shaft top using " returning " font arrangement, sufficiently to increase between upper and lower two layers adjacent gangboard of marking time Distance meets requirement for height when personnel pass through, and marking time is both the tie of inner and outer wall transmitting load and leading to for traffic Road is reinforced concrete structure.Bottom channel is that the steel pipe with steel bulkhead is that water-conveyance tunnel is put on the inner wall of silo bottom After sky, from valve chamber is overhauled into the channel of people.Ventilating system is made of air hose and blower, air hose by vertical air hose, horizontal air hose and Air outlet composition;Vertical air hose is arranged in inner wall lined internal;Totally two sections of horizontal air hose, it is located at the service valve of silo bottom On indoor and earth's surface inspection platform;Air outlet is located on the indoor horizontal air hose of service valve;Wind turbine layout is in earth's surface inspection platform Horizontal air hose on, using forced ventilation.Maintenance valve chamber is the amplification underground space that silo bottom is isolated with water-conveyance tunnel, is used In cloth bottom set channel, ventilating system air outlet and Leakage water system etc..In silo bottom, to reduce excavation and concrete It pours project amount, while being also to avoid water-conveyance tunnel space and mark time space crossed, the one of bottommost encloses " returning " font lining cutting Outer wall needs successively to cancel from top to bottom, directly utilizes the inner wall earth-retaining of water blocking, i.e., the one of bottommost enclose lining cutting outer wall be from lower and On successively occur.
The shaft structure can also examined as needed in addition to ventilating system, venthole necessary to arrangement meets safety The valve chamber bottom arrangement Leakage water systems such as sump and water pump are repaired, pars intramuralis arranges drainpipe in vertical shaft lining cutting, thus real The function of percolating water is now arranged automatically.
The shaft structure can also be as needed in the floor lower disposed cable channel and lighting system marked time.
The beneficial effects of the present invention are:
1) operating maintenance transportation condition is good.When runtime overhauls, can directly it mark time servant from " returning " font at vertical shaft position Maintenance, maintenance path is short, opposite ladder comfort level and highly-safe.
2) borehole wall stress condition is good.This shaft structure top excavation size is big, and lower part excavation size is small, is conducive to vertical shaft and applies The stabilization of the duration borehole wall;After the completion of lining cutting, vertical shaft lining cutting double-walled section is substantially " work " word structure, and the either runtime still drains Turn(a)round, bears interior external pressure stress condition and is not less than single wall formula vertical shaft.
3) improve construction transportation condition.For conventional vertical shaft generally using buy securities with all one's capital scaffold or slding form operation, shaft height is larger When, formwork erection and demoulding condition are poor, and after setting the shaft structure marked time, completed mark time of lower shaft can be used as top The construction channel of vertical shaft formwork erection and demoulding, construction transportation condition are also greatly improved.
4) overall investment increases little.Although it is big to add vertical shaft part double-walled section excavation hole diameter after marking time, due to vertical shaft It excavates and is generally rock excavation, cubic meter of stone comprehensive utilization benefit is high, and overall investment increases little.
Detailed description of the invention
Fig. 1 is profilograph of the embodiment of the present invention;
Fig. 2 is I-I cross-sectional view of the embodiment of the present invention;
Fig. 3 is II-II cross-sectional view of the embodiment of the present invention;
Fig. 4 is A-A cross-sectional view of the embodiment of the present invention;
Fig. 5 is B-B cross-sectional view of the embodiment of the present invention;
Fig. 6 is C-C cross-sectional view of the embodiment of the present invention;
Fig. 7 is D-D cross-sectional view of the embodiment of the present invention;
Fig. 8 is E-E cross-sectional view of the embodiment of the present invention;
Fig. 9 is F-F cross-sectional view of the embodiment of the present invention.
In figure: 1- inner wall;2- outer wall;3- marks time;The bottom 4- channel;5- ventilating system;51- air hose;52- blower;51a- is perpendicular Straight air hose;The horizontal air hose of 51b-;51c- air outlet;6- overhauls valve chamber;7- inspection platform;8- water-conveyance tunnel;9- venthole.
Specific embodiment
With reference to the accompanying drawing, invention is further described in detail.
As shown in FIG. 1 to FIG. 9, one kind of the present invention sets shaft structure of marking time, and vertical shaft is located at 8 top of water-conveyance tunnel, by inner wall 1, outer wall 2,3, bottom channel 4 of marking time, ventilating system 5 and maintenance valve chamber 6 form.Inner wall 1 is located at the inside in sectional shaft face, with water Body directly contacts, and is armored concrete water-retaining structure, ventilation is equipped in the downstream side inner wall 1 of 8 Parallel to the flow direction of water-conveyance tunnel Hole 9.Outer wall 2 is located at the outside in sectional shaft face, directly contacts with rock mass or first liner timbering, is armored concrete soil-baffling structure. 3 are marked time between vertical shaft inner wall 1 and outer wall 2, " returns " font arrangement on vertical shaft top, upper layer and lower layer are adjacent to step on sufficiently to increase Walk the distance between 3 gangboards, meet personnel it is current when requirement for height, marking time 3 is both tie that inner wall 1 and outer wall 2 transmit load, It is the channel of traffic again, is reinforced concrete structure.Bottom channel 4 is the steel pipe with steel bulkhead, positioned at the inner wall 1 of silo bottom On, it is after water-conveyance tunnel 8 is vented, from valve chamber 6 is overhauled into the channel of people.Ventilating system 5 is made of air hose 51 and blower 52, air hose 51 are made of vertical air hose 51a, horizontal air hose 51b and air outlet 51c;Vertical air hose 51a is arranged in 1 lined internal of inner wall;Water It totally two sections of flat air hose 51b, is located in the maintenance valve chamber 6 of silo bottom and on earth's surface inspection platform 7;Air outlet 51c is located at It overhauls on the horizontal air hose 51b in valve chamber 6;Blower 52 is arranged on the horizontal air hose 51b of earth's surface inspection platform 7, using indentation Formula ventilation.Maintenance valve chamber 6 is the amplification underground space that silo bottom is isolated with water-conveyance tunnel 8, for cloth bottom set channel 4, ventilation 5 air outlet 51c of system and Leakage water system etc..In silo bottom, to reduce excavation and concreting project amount, together When be also to avoid 8 space of water-conveyance tunnel and mark time 3 space crossed, the outer wall 2 of circle " returning " font lining cutting for bottommost need to be from upper And lower layer-by-layer cancellation, 1 earth-retaining of inner wall of water blocking is directly utilized, i.e. a circle lining cutting outer wall 2 of bottommost is successively to go out from bottom to top Existing.
The shaft structure can also exist as needed in addition to ventilating system 5, venthole 9 necessary to arrangement meets safety It overhauls 6 bottom of valve chamber and arranges the Leakage water systems such as sump and water pump, arrange drainpipe inside vertical shaft lining cutting inner wall 1, from And realize the function of automatic row's percolating water.
The shaft structure can also as needed mark time 3 floor lower disposed cable channel and lighting system.
Invention has been described for above-described embodiment combination attached drawing, and but it cannot be understood as to the invention patent The limitation of range, it is noted that for those of ordinary skill in the art, in the premise for not departing from present inventive concept Under, with equivalent replacement or equivalent transformation mode technical solution obtained, these are all belonged to the scope of protection of the present invention.

Claims (6)

1. one kind sets shaft structure of marking time, it is located at water-conveyance tunnel top, it is characterised in that: it includes inner wall, outer wall, marks time, bottom Channel, ventilating system and maintenance valve chamber;The inner wall is located at the inside in sectional shaft face, directly contacts with water body, mixed for reinforcing bar Solidifying soil water-retaining structure;The outer wall is located at the outside in sectional shaft face, directly contacts with rock mass or first liner timbering, is reinforced concrete Native soil-baffling structure;It is described to mark time between vertical shaft inner wall and outer wall, it is arranged on vertical shaft top using " returning " font, it is mixed for reinforcing bar Xtah Crude Clay structure;The bottom channel is the steel pipe with steel bulkhead, is after water-conveyance tunnel is vented, certainly on the inner wall of silo bottom Valve chamber is overhauled into the channel of people;The ventilating system is made of air hose and blower, and air hose is by vertical air hose, horizontal air hose and outlet air Mouth composition;The maintenance valve chamber is the amplification underground space that silo bottom is isolated with water-conveyance tunnel, for cloth bottom set channel, ventilation System air outlet and Leakage water system.
2. according to claim 1 set shaft structure of marking time, it is characterised in that: in the silo bottom, the one of bottommost The outer wall for enclosing " returning " font lining cutting needs successively to cancel from top to bottom, directly utilizes the inner wall earth-retaining of water blocking.
3. according to claim 1 set shaft structure of marking time, it is characterised in that: the vertical air hose is arranged in inner wall lining cutting It is internal;Totally two sections of the horizontal air hose, be located in the service valve room of silo bottom and earth's surface inspection platform on;The outlet air Mouth is located on the indoor horizontal air hose of service valve;The wind turbine layout is on the horizontal air hose of earth's surface inspection platform, using indentation Formula ventilation.
4. according to claim 1 set shaft structure of marking time, it is characterised in that: the vertical shaft is in the water-conveyance tunnel side of stream downstream To downstream side inner wall in be equipped with venthole.
5. according to claim 1 set shaft structure of marking time, it is characterised in that: the maintenance valve chamber bottom, which is disposed with, catchments Well and water pump, the interior pars intramuralis are disposed with drainpipe.
6. according to claim 1 set shaft structure of marking time, it is characterised in that: the floor lower part marked time is disposed with electricity Cable pipeline and lighting system.
CN201910695224.1A 2019-07-30 2019-07-30 One kind setting shaft structure of marking time Pending CN110374070A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910695224.1A CN110374070A (en) 2019-07-30 2019-07-30 One kind setting shaft structure of marking time

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910695224.1A CN110374070A (en) 2019-07-30 2019-07-30 One kind setting shaft structure of marking time

Publications (1)

Publication Number Publication Date
CN110374070A true CN110374070A (en) 2019-10-25

Family

ID=68257157

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910695224.1A Pending CN110374070A (en) 2019-07-30 2019-07-30 One kind setting shaft structure of marking time

Country Status (1)

Country Link
CN (1) CN110374070A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113090269A (en) * 2021-04-14 2021-07-09 国网重庆市电力公司经济技术研究院 Comprehensive hidden excavation cable channel shaft

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201762695U (en) * 2010-08-17 2011-03-16 中国水电顾问集团华东勘测设计研究院 Structure applicable to large and medium-sized mechanical device to enter long tunnel for overhaul
CN105604166A (en) * 2016-02-29 2016-05-25 上海市城市建设设计研究总院 Stair type water dropping well
CN210507348U (en) * 2019-07-30 2020-05-12 浙江省水利水电勘测设计院 Vertical shaft structure with step

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201762695U (en) * 2010-08-17 2011-03-16 中国水电顾问集团华东勘测设计研究院 Structure applicable to large and medium-sized mechanical device to enter long tunnel for overhaul
CN105604166A (en) * 2016-02-29 2016-05-25 上海市城市建设设计研究总院 Stair type water dropping well
CN210507348U (en) * 2019-07-30 2020-05-12 浙江省水利水电勘测设计院 Vertical shaft structure with step

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113090269A (en) * 2021-04-14 2021-07-09 国网重庆市电力公司经济技术研究院 Comprehensive hidden excavation cable channel shaft

Similar Documents

Publication Publication Date Title
CN100501124C (en) Construction method for tunnel contact passage in shield section of underground railway
CN101280568A (en) Station pit construction method forming protection for neighboring operated subway interval tunnel
CN206386150U (en) A kind of Underground Subway Station draining and examination and repair system
CN115182737A (en) Vertical orthogonal ejection type air duct structure of deep-buried subway station and construction method
CN107131001A (en) A kind of and water delivery and the Railway Tunnel of communication function
CN112727466A (en) Construction method for support-free prefabricated assembled type shield tunnel air shaft structure
CN112323823A (en) Filling device and method for waste air-raid shelter of pile foundation construction site
CN113202173B (en) Construction method for temporarily replacing cross-foundation-pit concrete pipe with steel pipe in deep foundation pit construction
CN106812542A (en) A kind of use prefabricated components and preceding slotting shield build the construction method of subway station
CN103939109A (en) Permanent blocking inclined shaft structure isolated from tunnel
CN110374070A (en) One kind setting shaft structure of marking time
CN204040021U (en) Large diameter pile construction equipment system in city underground engineering tunneling pilot tunnel
CN210507348U (en) Vertical shaft structure with step
CN112012763A (en) Construction method of double-layer primary support multi-arch tunnel structure
CN107514265B (en) Prevent the tunnel structure of air cross pollution of opening and shaft
CN208039192U (en) Plugging structure for diversion tunnel based on karst landform
Liu et al. Design considerations for construction of the Qinling Tunnel using TBM
CN208718721U (en) A kind of railway large diameter shield tunnel rail flowering structure of rapid construction
CN209722910U (en) Device for temporarily plugging gate shaft of tunnel body of diversion tunnel
CN101644040A (en) Flow guide and navigation pier structure and construction method thereof
CN112458932A (en) Non-cutoff connection method for single-hole water diversion box culvert
CN111593707A (en) Construction channel structure and construction method for large arch dam bottom gallery
CN220748266U (en) Underpass structure of unreserved interface existing operation station
CN209112981U (en) The two-way rail travel structure of section inclined shaft
CN104060586A (en) Grouting anti-seepage method for lining steel pipe in reservoir water-supply tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination